Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plug Loads”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

Technology development of the Space Transportation System mission and terrestrial applications of satellite technology

The Space Transportation System (STS) is discussed, including the launch processing system, the thermal protection subsystem, meteorological research, sound supression water system, rotating service structure, improved hypergol or removal systems, fiber optics research, precision positioning, remote controlled solid rocket booster nozzle plugs, ground operations for Centaur orbital transfer vehicle, parachute drying, STS hazardous waste disposal and recycle, toxic waste technology and control concepts, fast analytical densitometry study, shuttle inventory management system, operational intercommunications system improvement, and protective garment ensemble. Terrestrial applications are also covered, including LANDSAT applications to water resources, satellite freeze forecast system, application of ground penetrating radar to soil survey, turtle tracking, evaluating computer drawn ground cover maps, sparkless load pulsar, and coupling a microcomputer and computing integrator with a gas chromatograph.

Source record↗

Development of a preprototype Sabatier CO2 reduction subsystem

A lightweight, quick starting reactor utilizes a highly active and physically durable methanation catalyst composed of ruthenium on alumina. The use of this improved catalyst permits a single straight through plug flow design with an average lean component H2/CO2 conversion efficiency of over 99% over a range of H2/CO2 molar ratios of 1.8 to 5 while operating with flows equivalent to a crew size of one person steadystate to 3 persons cyclical. The reactor requires no heater operation after start-up even during simulated 55 minute lightside/39 minute darkside orbital operation over the above range of molar ratios and crew loadings. Subsystem performance was proven by parametric testing and endurance testing over a wide range of crew sizes and metabolic loadings. The subsystem's operation and performance is controlled by a microprocessor and displayed on a nineteen inch multi-colored cathode ray tube.

Kleiner, G. N.↗

Experimental investigation of jet-induced loads on a flat plate in hover out-of-ground effect

Effects of varying jet decay rate on jet-induced loads on a flat plate located in the plane of the jet exit perpendicular to the jet axis were investigated using a small-scale laboratory facility. Jet decay rate has been varied through use of two cylindrical centerbodies having either a flat or hemispherical tip, which were submerged various distances below the flat plate jet exit plane. Increased jet decay rate, caused by the presence of a center-body or plug in the jet nozzle, led to an increased jet-induced lift loss on the flat plate. Jet-induced lift losses reached 1 percent of the jet thrust for the quickest jet decay rates for plate areas equal to 100 times the effective jet exit area. The observed lift loss versus jet decay rate trend agreed well with results of previous investigations.

Kuhlman, J. M.↗

Proteus - An experimenter's view

The scientific experiments package to be carried by the Proteus system takes the form of an Instrument Load carried into orbit by a Space Shuttle, and there mated to a Proteus spacecraft with the Shuttle's Remote Manipulator System. The Proteus system extends to ground support equipment, development tools, and communications, as well as the orbiting satellites. It is expected that Proteus will be able to triple the number of Explorer missions while staying within the current budgetary allocation for such missions. The Proteus spacecraft encompasses a system interface assembly plug, a data handling module, remote interface units, and a power distribution module.

Hibbard, W. D.↗

Some preliminary results of brush seal/rotor interference effects on leakage at zero and low RPM using a tapered-plug rotor

Some preliminary brush seal leakage results for ambient temperature air are presented. Data for four nominal brush rotor radial clearances of -0.09, -0.048, -0.008, and 0.035 mm were taken by using a tapered plug rotor at 0 and 400 rpm with rotor runout of 0.127 mm peak to peak. The brush seal nominal bore diameter was 38 mm with 0.05 mm bristles at 200 bristles/mm of circumference and a 0.61 mm fence height. Leakages were greater than predicted, but agreement was reasonable. Leakage rates were not significantly altered by hysteresis or inlet flow variations. Visualization studies showed that the bristles followed the 400 rpm excitation, and loading studies indicated that bristles slid relative to one another.

Hendricks, R. C.↗

Some preliminary results of brush seal/rotor interference effects on leakage at zero and low rpm using a tapered-plug rotor

Some preliminary brush seal leakage results for ambient-temperature air are presented. Data for four nominal brush-rotor radial clearances of -0.09, -0.048, -0.008, and 0.035 mm were taken by using a tapered plug rotor at 0 and 400 rpm with rotor runout of 0.127 mm peak to peak. The brush seal nominal bore diameter was 38 mm with 0.05-mm bristles at 200 bristles/mm of circumference and a 0.61-mm fence height. Leakages were greater than predicted, but agreement was reasonable. Leakage rates were not significantly altered by hysteresis or inlet flow variations. Visualization studies showed that the bristles followed the 400-rpm excitation, and loading studies indicated that bristles slid relative to one another.

Hendricks, R. C.↗

A Graph-Net with Node Embeddings to Detect False Data Injection Attacks in Photovoltaic Systems

Distributed energy resources (DER) contribute to the operational stability of the larger power grid both at utility-scale as well as commercial and residential scales in aggregated forms. These DER in-turn are susceptible to increasing cyber threats. An adversary can plug into the same local network that a field photovoltaic (PV) system uses to interconnect its data loggers and inverters and manipulate certain measurements collected from the network or trick existing irradiance and inverter readings through false data injection attacks (FDIA). Control routines that rely on these measurements can propagate the false data, impacting critical decisions that result in a suboptimal operation or even cause intentional harm leading to inverter-tripping or unscheduled loads that need to be shed. To detect FDIA in PV systems, the paper introduces an attention-based graph neural network with node embeddings and applied it to a simple prototypical DC-coupled microgrid with PV, energy storage, and load. The algorithm shows a detection accuracy of up to 98.95%. The proposed FDIA detection technique will provide micro-grid operators with an effective method to safeguard their systems, guaranteeing the secure and reliable operation.

Parvez, Imtiaz [Utah Valley University]↗

Test report for 120-inch-diameter Solid Rocket Booster (SRB) model tests

The space shuttle solid rocket boosters (SRB's) will be jettisoned to impact in the ocean within a 200-mile radius of the launch site. Tests were conducted at Long Beach, California, using a 12-inch diameter Titan 3C model to simulate the full-scale characteristics of the prototype SRB during retrieval operations. The objectives of the towing tests were to investigate and assess the following: (1) a floating and towing characteristics of the SRB; (2) need for plugging the SRB nozzle prior to tow; (3) attach point locations on the SRB; (4) effects of varying the SRB configuration; (5) towing hardware; and (6) difficulty of attaching a tow line to the SRB in the open sea. The model was towed in various sea states using four different types and varying lengths of tow line at various speeds. Three attach point locations were tested. Test data was recorded on magnetic tape for the tow line loads and for model pitch, roll, and yaw characteristics and was reduced by computer to tabular printouts and X-Y plots. Profile and movie photography provided documentary test data.

Jones, W. C.↗

Development of a preprototype sabatier CO2 reduction subsystem

A preoprototype Sabatier CO2 Reduction Subsystem was successfully designed, fabricated and tested. The lightweight, quick starting reactor utilizes a highly active and physically durable methanation catalyst composed of ruthenium on alumina. The use of this improved catalyst permits a single straight through plug flow design with an average lean component H2/CO2 conversion efficiency of over 99% over a range of H2/CO2 molar ratios of 1.8 to 5 while operating with flows equivalent to a crew size of one person steadystate to 3 persons cyclical (equivalent to 5 persons steady state). The reactor requires no heater operation after start-up even during simulated 55 minute lightside/39 minute darkside orbital operation over the above range of molar ratios and crew loadings. The subsystem's operation and performance is controlled by a microprocessor and displayed on a nineteen inch multi-colored cathode ray tube.

Kleiner, G. N.↗

Magnetohydrodynamics (MHD) Aerocapture System for Enabling Faster-Larger Planetary Science & Human Exploration Missions

Since our completing the NIAC Phase I NIAC on this Advanced Aerocapture System, NASA Langley Research Center has funded or supported a number of studies and code enhancements through its Center Innovation Fund (CIF) and NASA’s NSTGRO and Internship Programs to mature the analysis capabilities and quantify the merits of the MHD Aerocapture System technology. These efforts have resulted in a plug and play analysis capability for assessing MHD aerocapture system performance for arrival at many planetary bodies of interest. Our efforts have especially focused on the potential mass savings for improving the capacity for science observations at Neptune and Triton. A re-cent Forbes article published “‘Orbital mechanics is probably going to decide for us whether we go to Uranus or Neptune because we need to flyby Jupiter,’ said Kunio Sayanagi at Hampton University, Virginia, who also worked on the Neptune Odyssey proposal…. Exactly when a mission can be sent to Uranus, or Neptune, depends on the relative position of Jupiter, which can help give a spacecraft a gravitational slingshot. That drastically shortens the cruise phase.” [1] Since shortening the cruise phase is important for these science missions, any mass savings enabled by the MHD Aerocapture System could be reallocated to increasing Thermal Protection System mass to allow faster arrival speeds and/or for onboarding additional payloads such as science instruments, batteries, or propellant for conducting more science for longer durations in the desired orbits. The analysis steps and codes for conducting trades and sizing vehicles for aerocapture are as follows: Step 1 is to conduct aeroheating analysis using LAURA of the selected entry vehicle shape to identify locations on the forebody where ionization and flow velocity are sufficient for producing Lo-rentz forces. LAURA is a multiblock structured grid finite-volume CFD solver developed at the NASA Langley Research Center. [2] LAURA has been used for aerothermal analysis support of the entry, de-scent and landing (EDL) phase of interplanetary missions over the last three decades [3-7]. Step 2 is to port the LAURA results into CFDWARP to calcu-late electrical and thermal conductivities of ionized flow for sizing MHD patch system and calculating Lorentz forces needed for controls analysis. CFDWARP is a CFD code that uses advanced nu-merical methods that enable the simulation of the full coupling between the aerodynamics, the magne-tohydrodynamics, and the non-neutral plasma sheaths. CFDWARP has the unique capability to simulate efficiently the non-neutral sheaths (near the electrodes) in coupled form with the quasi-neutral bulk MHD flow [8-11]. Step 3 is to link re-sults from LAURA and CFDWARP into POST2 for calculating entry trajectories and comparing MHD control results with other aerodynamic control strategies. The Program to Optimize Simulated Tra-jectories II (POST2) is a generalized point mass, discrete parameter targeting and optimization pro-gram. POST2 provides the capability to target and optimize point mass trajectories for multiple pow-ered or un-powered vehicles near an arbitrary rotat-ing, oblate planet [12]. Step 4: TPS sizing was per-formed using the Fully Implicit Ablation and Ther-mal-response code (FIAT) tool which computes the transient one-dimensional thermal response and surface thermochemistry of a multilayer stackup of thermal protection, bonding, and structural materi-als subject to aeroheating on one surface [13]. The sizing and margining methodology used was based on the approach documented by Mahzari and Milos [14] for the dual-layered heatshield for extreme entry environment technology (DL-HEEET) TPS concept. TPS analysis utilizes trajectory information from POST2. Using this step-wise plug and play MHD Aerocapture performance assessment process, our analysis targets a Neptune aerocapture trajectory that will place the spacecraft in an observation orbit for Triton. [15]. Magnetohydrodynamic (MHD) control of a 4.5-meter diameter MSL-style capsule resulted in TPS mass savings of nearly 2000 kg when using an MHD system mass of under 200 kg. The flight path for a vehicle using the MHD control strategy has a much lower heat rate and heat load compared to the conventional aerodynamic aerocapture strategies known as bank angle con-trolled (BAC) and direct force controlled (DFC). Both BAC and DFC have heat rates significantly greater than 1500 W/cm2 typically used as an upper limit for PICA. Thus, DL-HEEET TPS concept was required for the BAC and DFC control strategies. However, considering the more benign environ-ments for the MHD case, additional TPS concepts with improved mass efficiency were also assessed. PICA was considered for the MHD controlled strat-egy since the maximum heat rate was well within the limits (<1500 W/cm2) of PICA. TPS sizing re-sulted in a significant mass reduction. The PICA layer for this sizing case was about 7.8 cm. As a point of reference, the Mars 2020 mission, which used this same PICA concept, had a PICA thickness of 3.18 cm [16]. The trajectories used for the TPS sizing originat-ed from the POST2 simulations. The current, I, to an electromagnet configuration can be manipulated to allow for active control of the vehicle. Manipula-tion of the current, I, changes the magnetic field, B, which affects the Lorentz force and therefore the MHD drag force on the vehicle. Our analysis in-cluded both open-loop and close-loop control. Closed-loop control will enable improved overall performance when taking into account mission level uncertainties, such as interplanetary delivery errors and atmospheric modeling uncertainties. The open-loop and closed-loop MHD control cases do not dip as deep into the atmosphere as the aerodynamic cases. Three types of aerodynamic-only approach-es are investigated: bank angle modulation (BAM), director force control (DFC), and Drag Modulated. BAM and DFC make use of vehicle aerodynamic angles to steer the vehicle. Thus, changing the aer-odynamic forces acting on the vehicle for control, aerodynamic drag modulated case requires a vary-ing drag area to modulate the drag force. The MHD drag modulated case modulates MHD generated drag force that adds to the aerodynamic drag. This higher atmospheric activation of drag forces by the MHD patch results in significantly less heat flux on the vehicle. The MHD technology will enable shorter cruise times and deceleration of larger payloads for increasing the capacity for science at the Ice Giants or for returning astronauts to Earth from cislunar space or from Mars. The purpose of this presentation is to provide more details about this work and to highlight plans for further research and development including a flight demonstration.

R. W. Moses↗

A Plug-and-Play Design Suite of Converters for the Electric Grid

Power electronic (PE) systems are increasingly being integrated into the electric grid in a distributed fashion. As the number of installations increases, the challenge of integration of these systems into the grid is also growing. Advanced control features of these systems are often overlooked or neglected due to the complex nature and novelty of these systems. This is also complicated from the vendor point of view as different converter topology integration is usually composed of single system designs with tight coupling and configurations. The presented work discusses a novel architecture for the integration of PE systems with other sources and loads to create a coordinated controllable resource for the grid. The presented work also describes a system level controller to coordinate these systems. 1 Testing results on a hardware in the loop (HIL) platform are provided to show the validity of the proposed architecture and framework.

Starke, Michael↗

Software for Building Models of 3D Objects via the Internet

The Virtual EDF Builder (where EDF signifies Electronic Development Fixture) is a computer program that facilitates the use of the Internet for building and displaying digital models of three-dimensional (3D) objects that ordinarily comprise assemblies of solid models created previously by use of computer-aided-design (CAD) programs. The Virtual EDF Builder resides on a Unix-based server computer. It is used in conjunction with a commercially available Web-based plug-in viewer program that runs on a client computer. The Virtual EDF Builder acts as a translator between the viewer program and a database stored on the server. The translation function includes the provision of uniform resource locator (URL) links to other Web-based computer systems and databases. The Virtual EDF builder can be used in two ways: (1) If the client computer is Unix-based, then it can assemble a model locally; the computational load is transferred from the server to the client computer. (2) Alternatively, the server can be made to build the model, in which case the server bears the computational load and the results are downloaded to the client computer or workstation upon completion.

Schramer, Tim↗

Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage

NASA is designing a new crewed launch vehicle called Ares I to replace the Space Shuttle after its scheduled retirement in 2010. This new launch vehicle will build on the Shuttle technology in many ways including using a first stage based upon the Space Shuttle Solid Rocket Booster, advanced aluminum alloys for the second stage tanks, and friction stir welding to assemble the second stage. Friction stir welding uses a spinning pin that is inserted in the joint between two panels that are to be welded. The pin mechanically mixes the metal together below the melting temperature to form the weld. Friction stir welding allows high strength joints in metals that would otherwise lose much of their strength as they are melted during the fusion welding process. One significant change from the Space Shuttle that impacts NDE is the implementation of self-reacting friction stir welding for non-linear welds on the primary metallic structure. The self-reacting technique differs from the conventional technique because the load of the pin tool pressing down on the metal being joined is reacted by a nut on the end of the tool rather than an anvil behind the part. No spacecraft has ever flown with a self-reacting friction stir weld, so this is a major advancement in the manufacturing process, bringing with it a whole new set of challenges for NDE to overcome. The metal microstructure and possible defects are different from other weld processes. Friction plug welds will be used to close out the hole remaining in the radial welds when friction stir welded. This plug welding also has unique challenges in inspection. The current state of development of these inspections will be presented, along with other information pertinent to NDE of the Ares I.

Russell, Sam↗

NASA Tech Briefs, September 2013

Topics include: ISS Ammonia Leak Detection Through X-Ray Fluorescence; A System for Measuring the Sway of the Vehicle Assembly Building; Fast, High-Precision Readout Circuit for Detector Arrays; Victim Simulator for Victim Detection Radar; Hydrometeor Size Distribution Measurements by Imaging the Attenuation of a Laser Spot; Quasi-Linear Circuit; High-Speed, High-Resolution Time-to-Digital Conversion; Li-Ion Battery and Supercapacitor Hybrid Design for Long Extravehicular Activities; Ultrasonic Low-Friction Containment Plate for Thermal and Ultrasonic Stir Weld Processes; High-Powered, Ultrasonically Assisted Thermal Stir Welding; Next-Generation MKIII Lightweight HUT/Hatch Assembly; Centrifugal Sieve for Gravity-Level-Independent Size; Segregation of Granular Materials; Ion Exchange Technology Development in Support of the Urine Processor Assembly; Nickel-Graphite Composite Compliant Interface and/or Hot Shoe Material; UltraSail CubeSat Solar Sail Flight Experiment; Mechanism for Deploying a Long, Thin-Film Antenna From a Rover; Counterflow Regolith Heat Exchanger; Acquisition and Retaining Granular Samples via a Rotating Coring Bit; Very-Low-Cost, Rugged Vacuum System; Medicine Delivery Device With Integrated Sterilization and Detection; FRET-Aptamer Assays for Bone Marker Assessment, C-Telopeptide, Creatinine, and Vitamin D; Multimode Directional Coupler for Utilization of Harmonic Frequencies from TWTAs; Dual-Polarization, Multi-Frequency Antenna Array for use with Hurricane Imaging Radiometer; Complementary Barrier Infrared Detector (CBIRD) Contact Methods; Autonomous Control of Space Nuclear Reactors; High-Power, High-Speed Electro-Optic Pockels Cell Modulator; Covariance Analysis Tool (G-CAT) for Computing Ascent, Descent, and Landing Errors; Enigma Version 12; Micrometeoroid and Orbital Debris (MMOD) Shield Ballistic Limit Analysis Program; Spitzer Telemetry Processing System; Planetary Protection Bioburden Analysis Program; Wing Leading Edge RCC Rapid Response Damage Prediction Tool (IMPACT2); ISSM: Ice Sheet System Model; Automated Loads Analysis System (ATLAS); Integrated Main Propulsion System Performance Reconstruction Process/Models. Phoenix Telemetry Processor; Contact Graph Routing Enhancements Developed in ION for DTN; GFEChutes Lo-Fi; Advanced Strategic and Tactical Relay Request Management for the Mars Relay Operations Service; Software for Generating Troposphere Corrections for InSAR Using GPS and Weather Model Data; Ionospheric Specifications for SAR Interferometry (ISSI); Implementation of a Wavefront-Sensing Algorithm; Sally Ride EarthKAM - Automated Image Geo-Referencing Using Google Earth Web Plug-In; Trade Space Specification Tool (TSST) for Rapid Mission Architecture (Version 1.2); Acoustic Emission Analysis Applet (AEAA) Software; Memory-Efficient Onboard Rock Segmentation; Advanced Multimission Operations System (ATMO); Robot Sequencing and Visualization Program (RSVP); Automating Hyperspectral Data for Rapid Response in Volcanic Emergencies; Raster-Based Approach to Solar Pressure Modeling; Space Images for NASA JPL Android Version; Kinect Engineering with Learning (KEWL); Spacecraft 3D Augmented Reality Mobile App; MPST Software: grl_pef_check; Real-Time Multimission Event Notification System for Mars Relay; SIM_EXPLORE: Software for Directed Exploration of Complex Systems; Mobile Timekeeping Application Built on Reverse-Engineered JPL Infrastructure; Advanced Query and Data Mining Capabilities for MaROS; Jettison Engineering Trajectory Tool; MPST Software: grl_suppdoc; PredGuid+A: Orion Entry Guidance Modified for Aerocapture; Planning Coverage Campaigns for Mission Design and Analysis: CLASP for DESDynl; and Space Place Prime.

Source record↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗