Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

LHCb: Recent Results and Future Plans

In this overview contribution we introduce the most recent results in high-multiplicity $pp$ and heavy ion collisions obtained by the LHCb experiment, detector developments and plans for the future heavy ion program. Some of the highlights include the study of double charm production, nuclear modification of B-hadrons, quarkonia and Z-bosons in pPb and the suppression of prompt X(3872) hadrons in high multiplicity $pp$ events. On the detector side, we bring to attention the preparation for the upcoming Run III in LHC and the fixed target program.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Mission planning and analysis division development plan for STS-2 through STS-4

The baseline products, schedules, and resource requirements for the Mission Planning and Analysis Division's support of Space Transportation System flights 2, 3, and 4 are presented. Major functions addressed are: orbiter software, Mission Control Center software, flight design, flight operations support, simulation tools, and postflight analysis.

Source record↗

Planning repair sequences using the AND/OR graph representation of assembly plans

A simple modification is shown in the set of goal nodes of the AND/OR graph that allows its use in planning repairs such as the replacement of a part or a subassembly. An algorithm for the generation of all feasible sequences for disassembly and reassembly of parts that will achieve a repair is shown. This approach has been demonstrated for the example of the repair of space-based satellite equipment.

Homem De Mello, L. S.↗

Liquid rocket booster study. Volume 2, book 3, appendices 2-5: PPIP, transition plan, AMOS plan, and environmental analysis

This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.

Source record↗

Enroute flight planning: The design of cooperative planning systems

Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

Smith, Philip J.↗

Region based route planning - Multi-abstraction route planning based on intermediate level vision processing

Intermediate and high level processing operations are performed on vision data for the organization of images into more meaningful, higher-level topological representations by means of a region-based route planner (RBRP). The RBRP operates in terrain scenarios where some or most of the terrain is occluded, proceeding without a priori maps on the basis of two-dimensional representations and gradient-and-roughness information. Route planning is accomplished by three successive abstractions and yields a detailed point-by-point path by searching only within the boundaries of relatively small regions.

Doshi, Rajkumar S.↗

Nascom System Development Plan: System Description, Capabilities and Plans

The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

Source record↗

EOS Science Plan and EOS Science Plan Executive Summary

Remote sensing of aerosol properties from space is reviewed both for present and planned national and international satellite sensors. Techniques that are being used to enhance our ability to characterize the global distribution of aerosol properties include well-calibrated multispectral radiometers, multispectral polarimeters, and multi-angle spectroradiometers. Though most of these sensor systems rely primarily on visible to mid-infrared spectral channels, the availability of thermal channels to aid in cloud screening is an important additional piece of information that is not always incorporated into the sensor design. In this paper, we describe the various satellite sensor systems being developed by Europe, Japan, and the U.S., and highlight the advantages and disadvantages of each of these systems for aerosol applications. An important underlying theme is that the remote sensing of aerosol properties, especially aerosol size distribution and single scattering albedo, is exceedingly difficult. As a consequence, no one sensor system is capable of providing totally unambiguous information, and hence a careful intercomparison of derived products from different sensors, together with a comprehensive network of ground-based sunphotometer and sky radiometer systems, are required to advance our quantitative understanding of global aerosol characteristics.

King, Michael D.↗

Underground Test Area Activity Waste Management Plan; and Attachment 1 Fluid Management Plan for the Underground Test Area Activity

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office initiated the Underground Test Area Activity to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada National Security Site. The UGTA Activity is now administered by the DOE Environmental Management Nevada Program. This document is a revision to NNSA/NSO (2009). The new document and revision number reflect EM Nevada Program as the current UGTA Activity administrator.

54 ENVIRONMENTAL SCIENCES↗

Planning for sustained water-electricity resilience over the U.S.: Persistence of current water-electricity operations and long-term transformative plans

The electricity system relies upon the availability and predictability of water to support hydropower operations and cooling of thermoelectric plants, implying that water plays a fundamental role in power operations and that water-related stresses may have a critical effect on the electricity system. Designing for electricity system resilience to changing societal demands and environmental conditions is a complex and urgent endeavor, one that requires robust diagnosis and an articulation of interdependencies among key system components. Here we consider the argument that water may help to navigate that complexity, revealing thresholds for system change and the transformations that may be required for enduring resilience of the electricity sector. To assess this thesis, we apply a framework for understanding resilient systems following Folke et al., that is extended in this special issue, by which resilience comprises three capabilities: system persistence, adaptability, and transformation. We apply this resilience diagnosis approach to the bulk electricity system of the contiguous United States, with particular attention to water-driven stressors. We provide a qualitative narrative that discusses the spectrum of resilience capabilities (persistence, adaptability, and transformability) of the water-electricity system in the United States over three scales of inter-dependencies: individual power plant, urban and grid scales.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Change in Brooklyn and Queens: How New York?s Reforming the Energy Vision Program and Con Edison Are Reshaping Electric Distribution Planning

The New York City boroughs of Brooklyn and Queens are undergoing a period of gentrification, infrastructure rebuilding, new construction, and load growth not experienced in decades. Significant numbers of residents are moving in, and structures that had been abandoned or were in disrepair are being refurbished and modernized to accommodate the burgeoning population. Homes, businesses, and industries are reviving areas long in decline, and Brooklyn's growth has made it the nation's fourth most populous city, according to the U.S. Census Bureau.

24 POWER TRANSMISSION AND DISTRIBUTION↗