Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROTOTYPING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Contingency Contractor Optimization Phase 3 Extension Quick Start Guide: Contingency Contractor Optimization Tool - Engineering Prototype (Release 2.3)

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

42 ENGINEERING↗

Contingency Contractor Optimization Phase 3 Quick Start Guide Contingency Contractor Optimization Tool Prototype - Release 2.2

This Quick Start Guide is an abbreviated version of the Contingency Contractor Optimization Phase 3, User Manual for the Contingency Contractor Optimization Tool engineering prototype. It focuses on providing quick access instructions to the core activities of the two main user roles: Planning Manager and Analyst. Based on an electronic storyboard prototype developed in Phase 2, the Contingency Contractor Optimization Tool engineering prototype was refined in Phase 3 of the OSD ATL Contingency Contractor Optimization to support strategic planning for contingency contractors. The tool uses a model to optimize the total workforce mix by minimizing the combined total costs for the selected mission scenarios. The model will optimize the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet the mission requirements as effectively as possible, based on risk, cost, and other requirements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Improvements to the Prototype Design of the AGU

The existing design for the Magnet Structure of the prototype multi-segment AGU (Adaptive- Gap Undulator) has undergone analysis (see TN #298). To optimize performance, after review of said analysis, certain design modifications are proposed herein. A primary constraint of this proposed design is to use the existing fabricated parts from initial assembly SR-ID-SAGU-4300 with three pairs of feed-throughs spaced along the platen length of a single segment, but with foresight for the eventual multi-segment prototype. Measurements of the center segment are to be conducted on the frame and gap-drive system of the NSLS X9 MGU with its single driven axis. The eventual multi-segment prototype will also use the sister devices (X13, X27) for simultaneous measurement of both central and outboard segments at various segment gaps. Criteria effecting IVU performance like Gap Tolerance, Taper Error, and the critical Planarity of pole plane as in Figure 1 are used to evaluate the design. The error in planarity to be minimized is the deviation of vertical displacement (Y direction) with Platen length (beam Z direction).

36 MATERIALS SCIENCE↗

Contingency Contractor Optimization Tool Prototype (Phase 3 Extension- Analyst Tutorial)

This tutorial walks the user through analysis examples using the Contingency Contractor Optimization Tool Prototype. The examples are designed to showcase key capabilities of the tool. The main goal of this tutorial is to provide examples of how to use the tool to perform analyses to those users acting in the analyst role. All examples and locations used in the prototype are fictional, but are intended to be realistic. Users reading this manual are expected to have a basic understanding and familiarity with the Contingency Contractor Optimization Tool Prototype. This tutorial includes scenarios for the occurrence of two wars, Prussia and New Granada.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

An Integrated Energy Systems Prototype Human-System Interface for a Steam Extraction Loop System to Support Joint Electricity-Hydrogen Flexible Operations

Due to increasing economic competition from renewables and combined-cycle natural gas plants, nuclear power plants are looking toward flexible operations to enhance their cost competitiveness. The Integrated Energy Systems project under the Light Water Reactor Sustainability program of the U.S. Department of Energy focuses on joint electricity-hydrogen flexible operations. Joint electricity-hydrogen flexible operations entail the nuclear power plant diverting thermal energy via main steam to a hydrogen production plant located nearby. The steam serves to enhance the efficiency of the hydrogen production. Furthermore, high temperature electrolysis requires a large amount of electricity, which the plant can also provide. The plant provides steam and electricity to the hydrogen plant throughout the day, but during peak demand hours the nuclear power plant returns to solely providing electricity to meet the high demand. Through this flexible concept of operations, the plant can optimize the thermal energy it produces without having to maneuver the power of the plant. This report documents the human factors process to design and develop a prototype human-system interface for the steam extraction loop that serves as the conduit between the nuclear power plant and the adjacent hydrogen plant. The design process followed the human factors guidelines set by NUREG-0711, Human Factors Engineering Program Review Model (O’Hara, Higgins, & Fleger, 2012), and expanded upon by the Guideline for Operational Nuclear Usability and Knowledge Elicitation (GONUKE; Boring, Ulrich, Joe, & Lew, 2015; Boring, Lew, & Ulrich, 2016). The design process entailed operator interviews to determine the concept of operations for the steam extraction loop, a review and adaptation of digital interface design concepts developed by the team in prior projects, an iterative design process, and reviews conducted by both operators and human factors experts. Several versions of the prototype human-system interface were developed. Operators were interviewed to determine what design features they found useful and would like to see in the interface. The design underwent a review by human factors experts against NUREG-0700, Human Interface Design Review Guidelines (U.S. Nuclear Regulatory Commission, 2019), to ensure compliance with the latest human factors standards for digital interfaces in nuclear applications. The design was then prototyped as a functional windows-based application integrated with the Generic Pressurized Water Reactor simulator modified to include the steam extraction loop. The simulation is supported by the Human Systems Simulation Laboratory at Idaho National Laboratory, which supports operator-in-the-loop testing. This is an ongoing project and the next phase of the project entails performing an operator-in-the-loop usability study to evaluate the interface and examine the proposed concept of operations to extraction steam from the nuclear power plant for delivery to the coupled hydrogen production plant.

99 GENERAL AND MISCELLANEOUS↗

Prototype for Unclassified Algorithm

Continuing previous efforts to investigate and develop the Unclassified Radioisotope Algorithm, the goal of the FY19-FY20 effort was to develop a prototype detector system which uses the algorithm to confirm warhead attributes related to the presence of either weapons grade plutonium (WGPu) or highly enriched uranium (HEU). The final deliverable is a prototype attribute measurement system built with common, commercially available gamma radiation detector components, capable of confirming the presence of specific, complex radioactive sources of interest, without the collection and storage of gamma energy spectra. This is accomplished by processing each gamma pulse as it is received, applying weight values based on the energy and incrementing or decrementing scalar counters which can be compared with expected values to determine if the measured source is consistent with WGPu or HEU. This report documents the design of the prototype system as well as the development of the algorithm and performance testing results. While the previously conceptualized, simple algorithm resulted in a prohibitive amount of false positives, the goal for a simple attribute measurement system capable of verifying Ba-133 and Ra-226 (weapons grade plutonium and highly enriched uranium surrogate testing sources) at over 95% accuracy with sub 5% false positive rate was demonstrated.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Enhancements to ASHRAE Standard 90.1 Prototype Building Models

Since the last publication of the commercial prototype building models, PNNL has made numerous enhancements to the original prototype models compliant with the 2004, 2007, and 2010 editions of Standard 90.1. Those enhancements are described here and were made for several reasons: (1) to change or improve prototype design assumptions; (2) to improve simulation accuracy; (3) to improve simulation infrastructure; and (4) to add additional detail to the models needed to capture certain energy impacts from Standard 90.1 improvements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SOFC Prototype System Test

The goal of this U.S. Department of Energy (DOE) sponsored project is to test a 200 kWe thermally self-sustaining atmospheric-pressure solid oxide fuel cell (SOFC) prototype system at a prominent site. Fuel Cell Energy Inc. (FCE) utilized the state-of-the-art SOFC technology of its wholly-owned subsidiary Versa Power Systems (VPS) to design, fabricate and test the 200 kW prototype system. The specific objectives of this project were to achieve an SOFC stack power degradation rate of ≤1.5% per 1000 hours for the 400 kW stand-alone prototype power system undergoing ≥ 5000 hours of steady state tests at thermally self-sustained normal operating conditions (NOC), and to verify the prospects for a high volume SOFC stack production cost below the DOE target of 225 dollars per kilowatt. Achieving these goals enables commercial natural gas fueled SOFC system deployment in the 2020 timeframe, which will eventually lead to SOFC technology that is viable for large scale central power generation applications.

01 COAL, LIGNITE, AND PEAT↗

Autonomous System Subversion Tactics: Prototypes and Recommended Countermeasures

One of the fielding requirements for Advanced and Small Modular Reactors (AR/SMR) is the ability to support remote and autonomous operations. Autonomous Control Systems (ACS) are found on platforms such as Autonomous Space Vehicles, Cruise Missiles, and advanced driver-assistance systems. Each of these ACS implementations depends upon a set of decision support subsystems responsible for supporting Autonomous Mission Managers (names vary based upon field and author preferences). These Autonomous Mission Managers receive inputs from system sensors (e.g., LIDAR collection from an automobile travelling down a street; transients from a nuclear reactor), and perform a set of classifications (e.g., Red Traffic Light; Small Pedestrian at 10m; Load Rejection; Single Coolant Pump Trip), and then use these classifications in combination with recommendation algorithms to achieve platform goals (e.g., Stop the Vehicle at the Traffic Light, Avoid the Small Pedestrian; Trip the Reactor to prevent a Safety Event). The design, implementation, and fielding of an ACS capability will alter the cyber-attack surface such that existing risk management plans will need to be updated to include how to protect and defend against data-science and decision-support-system attack classes. These attack classes would include protection of the design and training environments where algorithm selection and testing and training data would be obvious attack vectors. These attack classes would also require an informed set of detection and response procedures to identify anomalous behaviors and document best practices for anomaly assessment and vulnerability mitigation and remediation. Last year we published a Cyber Threat Assessment Methodology for Autonomous and Remote Operations for AR/SMRs along with a companion publication on Cyber Attack and Defense Use Cases. The focus of the methodology was on describing and enumerating ACS processes, components, and functions such that security engineers could: evaluate subversion options against the target; identify threat actor attributes and capabilities derived from each subversion option; and identify security controls and response countermeasures. The Use Cases document offered detailed methodology examples including an assessment of a Military Base SMR, an Autonomous System Decision Loop, and implementation of AR/SMR Machine Learning algorithms. Our proposal at the end of last year was to focus on implementation of subversion prototypes related to the last Use Case area: AR/SMR Machine Learning (ML) Algorithms. We included six attack scenarios in our Use Cases paper: a Poisoning Attack against ML functions implemented using an FPGA; a Trojaning Attack against ML classifiers exploiting the excitability of Nuclear Engineers; a Backdooring Attack against ML Training environments to ensure persistence of an attack vector; a False Positive Evasion Attack against multi-factor Access Control Systems using clever inputs; an Inference Attack against ML models by an Insider with access to the Operational environment; and an Adversarial Reprogramming Attack against a Material Access Control Video Surveillance System. At the beginning of this year these six attack scenarios were provided to our research teams at Georgia Tech and Idaho State University and each team successfully implemented a subversion attack against a ML implementation to include transient misclassifications. While this is a notable outcome from this type of research, this paper offers the reader insight into not only how to structure and execute these types of attacks, but into the thought process behind how the researcher investigated the problem space, performed initial algorithm implementation, and the trial-and-error behind arriving at the successful subversion prototypes. We include in this paper a set of associated Scenarios on how these subversion prototypes could be implemented and an initial set of guidance for AR/SMR architects, Nuclear Regulators, and Cyber Defenders to implement awareness and defense capabilities into their current operational portfolios.

42 ENGINEERING↗

A Prototype Software to Demonstrate a Data Catalog for Hanford Environmental Datasets

Ensuring that data on long-term environmental remediation at the Hanford Site is high-quality, traceable, and easily accessible is an ongoing challenge, complicated by decades of data collection, multiple contractors maintaining data sources, and the wide range of data types. A centralized data catalog, known as the Hanford Environmental Information and Data Index (HEIDI), has been under development as part of the Hanford Environmental Data Management (HEDM) program to address these challenges. HEIDI fulfills a critical need to bring together a wide range of data types and sizes from multiple authoritative data sources, while documenting the data pedigree and quality information (i.e., traceable to the data source/originator). This document describes additional development and maturation of the HEIDI prototype. Key accomplishments included deploying the catalog software, Esri Geoportal Server, on a server accessible to Hanford Local Area Network users, conducting cybersecurity evaluations, investigating integrated authentication solutions, and conducting functional testing of the catalog prototype. The server-based deployment enabled targeted feedback, leading to enhancements including improved accessibility features and an expanded metadata schema. Specifications for the server-based deployment of the prototype catalog and the HEIDI metadata schema are provided in this document to support subsequent HEIDI deployment by the U.S. Department of Energy Richland Operations Office.

54 ENVIRONMENTAL SCIENCES↗

Development of National New Construction Weighting Factors for the Commercial Building Prototype Analyses (2008-2022)

The U.S. Department of Energy (DOE) tasked Pacific Northwest National Laboratory (PNNL) with updating commercial building construction weights for the purpose of estimating national and state-by-state energy savings impacts of changes made to various commercial energy codes and standards. A similar activity was last completed by PNNL in 2020 using disaggregate construction volume data acquired from the Dodge Data & Analytics database (formerly McGraw Hill) for the years 2003-2018 (Lei et al, 2020). As time passes, changes in economic and social demand reshape construction volume trends. For the current update, PNNL reviewed the same data source with the latest construction data for the years 2008-2022. For commercial building analyses, PNNL typically uses a suite of 16 prototype buildings simulated in the 19 ASHRAE climate zones with 16 of them present in the United States. The 2008-2022 commercial building weighting factors were derived using the same approach employed to develop the 2003-2018 set (Lei et al, 2020). Applying the construction volume data from the database to the prototypes and climate zones resulted in the following new construction area-based weighting factors. Table ES.1 shows the weighting factors including all building categories found in the database, and Table ES.2 shows the weighting factors normalized to include only buildings represented by the 16 prototypes. Section 3.0 also includes national- and state-level weighting factors by area and building count.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advance prototype silver ion water bactericide system

An advance prototype unit was designed and fabricated to treat anticipated fuel cell water. The unit is a single canister that contains a membrane-type prefilter and a silver bromide contacting bed. A seven day baseline simulated mission test was performed; the performance was satisfactory and the effluent water was within all specifications for potability. After random vibrations another seven day simulated mission test was performed, and results indicate that simulated launch vibrations have no effects on the design and performance of the advanced prototype. Bench tests and accelerated breadboard tests were conducted to define the characteristics of an upgraded model of the advance prototype unit which would have 30 days of operating capability. A preliminary design of a silver ion generator for the shuttle orbiter was also prepared.

Jasionowski, W. J.↗

Construction of prototypes of a new class of infrared detectors

A class of infrared detectors is proposed and experimental results are presented for a prototype device. The material used is LaF3, an ionic conductor with a capacitance that varies exponentially with temperature. The detectivity of a prototype detector is estimated from measured signal voltages and incident power, and a Johnson noise voltage calculated from the measured resistance. For the parameters characterizing this device the estimated detectivity is consistent with a theoretical prediction. The theory further predicts an optimum detectivity for much thinner devices than the prototypes.

Sher, A.↗

Characteristics of a prototype experiment

A new proposed software system was prototyped. Since the system, the Flight Dynamics Analysis System (FDAS), was to be a source code control system, and not the more typical flight dynamics software which NASA personnel were more familiar with, the decision was made to prototype an initial implementation in order to gain insights into the actual features needed to build a full FDAS and to evaluate the idea of prototype in NASA environment. The status of that project at the end of 1983 is described.

Sukri, J.↗

The evaluation of a number of prototypes for the free-tip rotor constant-moment controller

The development of several prototypes of a constant moment controller, a critical component of the free-tip rotor (FTR) concept, is described. Also presented are the experimental results of a whirl test designed to select a final controller configuration to be included in a future wind-tunnel test of this innovative rotor system. A brief explanation of the FTR concept and its history are included. The paper documents the controller design constraints, each prototype's operating principle, the evaluation test, and the individual prototype test results. A recommended design is identified, along with the selection rationale.

Young, L. A.↗

SOT: A rapid prototype using TAE windows

The development of the window interface extension feature of the Transportable Applications Executive (TAE) is discussed. This feature is being used to prototype a space station payload interface in order to demonstrate and assess the benefits of using windows on a bit mapped display and also to convey the concept of telescience, the control and operation of space station payloads from remote sites. The prototype version of the TAE with windows operates on a DEC VAXstation 100. This workstation has a high resolution 19 inch bit mapped display, a keyboard and a three-button mouse. The VAXstation 100 is not a stand-alone workstation, but is controlled by software executing on a VAX/8600. A short scenario was developed utilizing the Solar Optical Telescope (SOT) as an example payload. In the scenario the end-user station includes the VAXstation 100 plus an image analysis terminal used to display the CCD images. The layout and use of the prototype elements, i.e., the root menu, payload status window, and target acquisition menu is described.

Stephens, Mark↗

MOORE: A prototype expert system for diagnosing spacecraft problems

MOORE is a rule-based, prototype expert system that assists in diagnosing operational Tracking and Data Relay Satellite (TDRS) problems. It is intended to assist spacecraft engineers at the TDRS ground terminal in trouble shooting problems that are not readily solved with routine procedures, and without expert counsel. An additional goal of the prototype system is to develop in-house expert system and knowledge engineering skills. The prototype system diagnoses antenna pointing and earth pointing problems that may occur within the TDRS Attitude Control System (ACS). Plans include expansion to fault isolation of problems in the most critical subsystems of the TDRS spacecraft. Long term benefits are anticipated with use of an expert system during future TDRS programs with increased mission support time, reduced problem solving time, and retained expert knowledge and experience. Phase 2 of the project is intended to provide NASA the necessary expertise and capability to define requirements, evaluate proposals, and monitor the development progress of a highly competent expert system for NASA's Tracking Data Relay Satellite. Phase 2 also envisions addressing two unexplored applications for expert systems, spacecraft integration and tests (I and T) and support to launch activities. The concept, goals, domain, tools, knowledge acquisition, developmental approach, and design of the expert system. It will explain how NASA obtained the knowledge and capability to develop the system in-house without assistance from outside consultants. Future plans will also be presented.

Howlin, Katherine↗