Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

QuEST: Qualifying Environmentally Sustainable Technologies

In 2004, in one of their first collaborative efforts, Centro Para Prevencao da Poluicao (Portuguese Center for Pollution Prevention or C3P). teamed with Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) and two Portuguese entities, TAP Portugal (Portuguese National Airline) and OGMA Indtistria Aeron utica de Portugal (Portuguese Aeronautics Industry), to target the reduction of hexavalent chromium, cadmium, and volatile organic compounds (VOCs) in aircraft maintenance operations. This project focused on two coating systems that utilize non-chrome pretreatments and low-VOC primers and topcoats.

Lewis, Pattie L.↗

Mars 2024/2026 Pathfinder Mission: Mars Architectures, Systems, and Technologies for Exploration and Resources Project

Integrate In Situ Resource Utilization (ISRU) sub-systems and examine advanced capabilities and technologies to verify Mars 2024 Forward architecture precursor pathfinder options: Integrated spacecraft/surface infrastructure fluid architecture: propulsion, power, life support center dot Power system feed and propellant scavenging from propulsion system center dot High quality oxygen for life support and EVA Fluid/cryogenic zero-loss transfer and long-term storage center dot Rapid depot-to-rover/spacecraft center dot Slow ISRU plant-to-ascent vehicle Integration of ISRU consumable production center dot Oxygen only from Mars atmosphere carbon dioxide center dot Oxygen, fuel, water, from extraterrestrial soil/regolith Test bed to evaluate long duration life, operations, maintenance on hardware, sensors, and autonomy

Technology Portfolio System↗

Building M7-0505 Treatment Tank (SWMU 039) Annual Performance Monitoring Report

This Annual Performance Monitoring Report presents a summary of Interim Measure (IM) activities and an evaluation of data collected during the third year (June 2014 to September 2015) of operation, maintenance, and monitoring (OM&M) conducted at the Building M7-505 (M505) Treatment Tank area, Kennedy Space Center (KSC), Florida ("the Site"). Under KSC's Resource Conservation and Recovery Act Corrective Action Program, the M505 Treatment Tank area was designated Solid Waste Management Unit 039. Arcadis U.S., Inc. (Arcadis) began IM activities on January 10, 2012, after completion of construction of an in situ air sparge (IAS) system to remediate volatile organic compounds (VOCs) in groundwater at concentrations exceeding applicable Florida Department of Environmental Protection (FDEP) Chapter 62-777, Florida Administrative Code, Natural Attenuation Default Concentrations (NADCs). This report presents a summary of the third year of OM&M activities conducted between June 2014 and September 2015.

Source record↗

Developing Reliable Life Support for Mars

A human mission to Mars will require highly reliable life support systems. Mars life support systems may recycle water and oxygen using systems similar to those on the International Space Station (ISS). However, achieving sufficient reliability is less difficult for ISS than it will be for Mars. If an ISS system has a serious failure, it is possible to provide spare parts, or directly supply water or oxygen, or if necessary bring the crew back to Earth. Life support for Mars must be designed, tested, and improved as needed to achieve high demonstrated reliability. A quantitative reliability goal should be established and used to guide development t. The designers should select reliable components and minimize interface and integration problems. In theory a system can achieve the component-limited reliability, but testing often reveal unexpected failures due to design mistakes or flawed components. Testing should extend long enough to detect any unexpected failure modes and to verify the expected reliability. Iterated redesign and retest may be required to achieve the reliability goal. If the reliability is less than required, it may be improved by providing spare components or redundant systems. The number of spares required to achieve a given reliability goal depends on the component failure rate. If the failure rate is under estimated, the number of spares will be insufficient and the system may fail. If the design is likely to have undiscovered design or component problems, it is advisable to use dissimilar redundancy, even though this multiplies the design and development cost. In the ideal case, a human tended closed system operational test should be conducted to gain confidence in operations, maintenance, and repair. The difficulty in achieving high reliability in unproven complex systems may require the use of simpler, more mature, intrinsically higher reliability systems. The limitations of budget, schedule, and technology may suggest accepting lower and less certain expected reliability. A plan to develop reliable life support is needed to achieve the best possible reliability.

life support↗

CAIDA CUI Confirmation for OMRS & LCC SOCRRATES Emulator and iSEE Upgrade, Operations, & Analysis

This internship has focused on providing solutions for the Customer Avionics Interface Development and Analysis (CAIDA) subsystem. The main emulator that has been used during this internship is the Software-Only CEV (Crew Exploration Vehicle) Risk Reduction Analysis and Test Engineering Simulator (SOCRRATES). This emulator uses advanced math and physics methods to simulate specific points in a mission, such as ascent, entry, and orbit. Exploration Ground Systems (EGS) must ensure that all KSC based ground systems can be properly integrated with the flight vehicle software, therefore, the Modeling and Simulation Branch (NE-XM) of the KSC (Kennedy Space Center) Engineering Directorate supports a virtual environment that simulates the interface between ground systems and the flight vehicle. A primary component in assuring that is knowing whether the emulators have incorporated the correct CUIs (Compact Unique Identifiers) into their system, as well as understanding both the static and dynamic responses of the individual CUIs. Also, an effort for verification of Operational Maintenance Requirements Specifications (OMRS) and Launch Commit Criteria (LCC) that are supported by SOCRRATES for the Orion Crew Module were part of the project tasks this semester. This internship also focused on comparing two different simulation Commercial-off-the-shelf (COTS) products and to determine whether or not a COTS package was a viable replacement for the current software that the iSEE (Immersive Simulations and Engineering Environment) lab uses. Upon research and testing, I found that this software was not feasible for the lab. It could not easily load CAD (Computer-Aided Design) or CREO models, give live feedback while the user is in the environment, and was not compatible with a virtual reality headset, all of which are necessary for the lab.

Bundy, Caleb↗

Surface Systems and Interface Standardization

Space exploration on planetary surfaces will require the use of various surface systems which will likely need to interface with one another. These systems must communicate and share data, as well as distribute power and transfer fluids for sustainable surface operations. Such systems can range from landers, surface habitats, mobility systems, cargo, and In-Situ Resource Utilizations (ISRUs). Previous and current programs have developed space interoperability standards that help aid in reducing potential risks of interface integration. One example of this is the International Deep Space Interoperability Standards (IDSIS) which focuses on deep space exploration. A goal of the Artemis program is to develop a sustained human presence on the lunar surface that would be a training ground for future Mars exploration. Therefore, it will be beneficial to identify interface standards between the surface assets which will help mitigate risk and reduce complexity in the harsh environments of space exploration. A key contribution to sustainability is commonality between hardware and software interfaces. Generic interfaces for data, power, and fluids will reduce risk, promote interoperability, and define standard interfaces across surface exploration projects and programs. Standardized interfaces would be advantageous for improving efficiency and reducing overall complexity, which are critical considerations for future space exploration. Furthermore, it will provide cost reductions to the Artemis programs over their life cycle (in Operations & Maintenance (O&M) and Logistics). Unique proprietary interfaces if considered or allowed would not only increase complexity but also add cost to the programs. Of course, understanding what will work and not work effectively in these unique environments such as the lunar surface is important. These unique environments require much needed intelligent design, prototyping, comprehensive testing, and field experience, utilizing consensus on common interface solutions.

Jaime Gomez↗

Surface Systems and Interface Standardization

A key contribution to surface systems sustainability on Lunar and planetary surfaces is commonality between hardware and software interfaces. Generic interfaces for data, power, and fluids will reduce risk, promote interoperability, and define standard interfaces across surface exploration projects and programs. Standardized interfaces would be advantageous for improving efficiency and reducing overall complexity, which are critical considerations for future space exploration. Furthermore, it will provide cost reductions to NASA’s Artemis program over its life cycle (in Operations & Maintenance (O&M) and Logistics). Unique proprietary interfaces if considered or allowed would not only increase complexity but also add cost to the programs. Of course, understanding what will work and not work effectively in these unique environments such as the lunar surface is important. These unique environments require much needed intelligent design, prototyping, comprehensive testing, and field experience, utilizing consensus on common interface solutions.

Lunar↗

Integration of CFD and Wind-Tunnel Testing at NASA

The debate over when wind-tunnel testing will be replaced by Computational Fluid Dynamics (CFD) comes and goes. More recently, however, the debate has subsided with a more collaborative spirit between practitioners of these two disciplines. Combining these complementary disciplines has led to significant improvements in both as well as better understanding of aero- and fluid dynamics. Also, as CFD codes become more accurate, the need for comparisons with experimental data has increased. New measurement techniques, pressure-sensitive paint and off-body velocity measurements for example, have provided detailed, high-quality data for the comparisons. In-tunnel CFD simulations are also providing more direct comparisons between predicted and measured flows. Given this newenvironment, a concerted effort is now underway to facilitate in-tunnel CFD for the 12 major wind tunnels operated by NASA.The Aerosciences Evaluation and Test Capabilities Portfolio (AETC) manages the major aerodynamic ground-testing facilities within NASA. This group is responsible for the operation, maintenance, and improvement of the wind-tunnel facilities and their capabilities. AETC has recently added a project to integrate CFD and wind-tunnel testing to better support customers of the NASA wind tunnels and to better understand the flow in the wind tunnels themselves. Being able to perform CFD simulations of wind-tunnel models in the wind tunnel environment providesthe cleanest way to assess the accuracy of the simulations relative to test data. AETC plans to provide accurate geometry and guidance to wind-tunnel customers who request it, to facilitate in-tunnel simulations. How this effort got started will be presented along with the status and plans for the project.

CFD↗

Core Body Temperature Predictions Using Metabolic Energy Expenditure and Heart Rate During Simulated Extravehicular Activity

Long duration spaceflight missions will require crew to become more autonomous in conducting extravehicular activities (EVA) without direct communication with Mission Control for biomedical support. To enable such autonomy, we are developing a Crew State and Risk Model (CSRM) as a collection of key physiology domains that drive EVA crew capabilities and workloads. One model component of CSRM is human thermal regulation. In this paper, customized development of a baseline model to predict core body temperature is presented using physiology inputs of heart rate and metabolic rate. The model development dataset included a baseline study where participants (n=6, equal male and female) performed a 5-hour EVA in a two-part session while wearing a hybrid space suit simulator (HS3). The first session included an end-to-end EVA traversing 1500 meters to a geology site and traversing back to a habitat conducting geology, payload relocation, and maintenance operations every 500 meters. The second session included standalone tasks of a 2000-meter traverse followed by geology tasks. Thermal measures of core body temperature, local skin temperature, liquid cooling garment temperature, heart rate, and metabolic rate were collected through the test duration. Multiple regression was used to build a linear equation to predict core body temperature from inputs of heart rate and metabolic rate. Heat storage was calculated via predicted core body temperature plus LCG and skin temperatures. The model was tested against a dataset from a pressurized suited test (n=6, equal male and female) in the NASA Active Response Gravity Offload System (ARGOS) conducting similar end-to-end EVA and standalone tasks. Predicted error of the model against the raw test cases was 0.2±0.15 °C. The baseline prediction of core body temperature using heart rates and metabolic rates allows for simple real-time tracking from data collected in-flight to monitor crew consumables and thermal flight limits during EVA.

Bradley Hoffmann↗

Area South of K7-516, SWMU 100 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents operations, maintenance, and monitoring information and performance monitoring results for the air sparging (AS) groundwater Interim Measure at the Area South of K7-516 (516S) located at Kennedy Space Center (KSC), Florida. AS expansion activities are also included in this PMR. The 516S site has been designated Solid Waste Management Unit 100 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from January 1, 2023, through December 31, 2023.

Mark J. Jonnet↗

Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

Remediation↗

A simulation program for the analysis of on-orbit Space Station maintenance and logistics operations

This paper describes the analysis approach adopted by NASA's Space Station Maintenance Planning and Analysis (MPA) Study and focuses on the development and use of a simulation program called Simulation of Manned Space System Logistics Support (SIMSYLS) for modeling the Space Station operations environment. The basic assumptions and groundrules used in the development of SIMSYLS are presented, including its capabilities, limitations and samples of analyses performed. Finally, a proposed simulation outgrowth entitled Space Applications System Simulation (SASS) is described. SIMSYLS will constitute the foundation for SASS which will provide a full system operational RAM analysis tool for Space Station and its logistics support environment.

Furlong, Kelly L.↗

High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm Maintenance

During the performance period of this grant HRDI (High Resolution Doppler Imager) operations remained nominal. The instrument has suffered no loss of scientific capability and operates whenever sufficient power is available. Generally, there are approximately 5-7 days per month when the power level is too low to permit observations. The daily latitude coverage for HRDI measurements in the mesosphere, lower thermosphere (MLT) region are shown.It shows that during the time of this grant, HRDI operations collected data at a rate comparable to that achieved during the UARS (Upper Atmosphere Research Satellite) prime mission (1991 -1995). Data collection emphasized MLT wind to support the validation efforts of the TIDI instrument on TIMED, therefore fulfilling one of the primary objectives of this phase of the UARS mission. Skinner et al., (2003) present a summary of the instrument performance during this period.

Skinner, Wilbert↗

Preliminary maintenance experience for DSS 13 unattended operations demonstration

The maintenance data base collected for 15 weeks of recent unattended and automated operation of DSS 13 is summarized. During this period, DSS 13 was receiving spacecraft telemetry while being controlled remotely from JPL in Pasadena. Corrective and preventive maintenance manhours are reported by subsystem for DSS 13 including the equipment added for the automation demonstration. The corrective and preventive maintenance weekly manhours at DSS 13 averaged 22 and 40, respectively. The antenna hydraulic and electronic systems accounted for about half of the preventive and corrective maintenance manhours for a comparable attended DSN station, DSS 11.

Remer, D. S.↗

NIMBUS-7 ERB DELMAT operators guide and maintenance manual

Described in detail are the ERB DELMAT algorithms used to correct the wide field-of-view channels (11, 12, 13 and 14) radiometer data. The computer software and the required operational environment are also delineated. The information and procedures required to maintain the DELMAT program are also described.

Penn, L. M.↗

Methanator Fueled Engines for Pollution Control

A methanator fueled Otto-cycle engine is compared with other methods proposed to control pollution due to automobile exhaust emissions. The comparison is made with respect to state of development, emission factors, capital cost, operational and maintenance costs, performance, operational limitations, and impact on the automotive industries. The methanator fueled Otto-cycle engine is projected to meet 1975 emission standards and operate at a lower relative total cost compared to the catalytic muffler system and to have low impact. Additional study is required for system development.

Cagliostro, D. E.↗

Case for Deploying Complex Systems Utilizing Commodity Components

When the International Space Station (ISS) finally reached an operational state, many of the Payload Operations and Integration Facility (POIF) hardware components were reaching end of life, COTS product costs were soaring, and the ISS budget was becoming severely constrained. However, most requirement development was complete. In addition, the ISS program is a fully functioning program with at least fifteen years of operational life remaining. Therefore it is critical that any upgrades, refurbishments, or enhancements be accomplished in realtime with minimal disruptions to service. For these and other reasons, it was necessary to ensure the viability of the POIF. Due to the to the breadth of capability of the POIF (a NASA ground station), it is believed that the lessons to be learned by other complex systems are applicable and any solutions garnered by the POIF are applicable to other complex systems as well. With that in mind, a number of new approaches have been investigated to increase the portability of the POIF and reduce the cost of refurbishment, operations, and maintenance. These new approaches were directed at the Total Cost of Ownership (TCO); not only the refurbishment but also current operational difficulties, licensing, and anticipation of the next refurbishment. Our basic premise is that technology had evolved dramatically since the concept of the POIF ground system and we should leverage our experience on this new technological landscape. Fortunately, Moore's law and market forces have changed the landscape considerably. These changes are manifest in five (5) ways that are particularly relevant to POIF: 1. Complex Instruction Set Computing (CISC) processors have advanced to unprecedented levels of compute capacity with a dramatic cost break, 2. Linux has become a major operating system supported by most vendors on a broad range of platforms, 3. Windows(TradeMark) based desktops are pervasive in the office environment, 4. Stable and affordable WindowsTM development environments and tools are available and offer a rich set of capabilities, 5. The WindowsTM 2000 provides a stable client platform, Therefore, five studies were proposed, developed, and are in the current process of deployment which dramatically reduces the cost of operations, maintenance, refurbishment, and deployment of a ground system. Restating and refining the basic premise stated earlier, it is possible to enhance operations through the replacement of hardware and software components with commodity based items wherever applicable. This will dramatically reduce the overall lifecycle cost of the project. The first study leveraged the POIF S secure, three-tier, web architecture to replace the client workstations with lower cost PC platforms. A second study initiated a review of COTS products to examine the level of added value of each product. This study included replacement of some COTS products with custom code, deletions, substitutions, and consolidation of COTS products. Studies three and four reviewed the server architectures of the data distribution systems and Enhanced HOSC System (EHS) command and telemetry system to propose migration to new platforms, both software and hardware. The final study reviewed current IP communication technologies, developed an operational model for flight operations, and demonstrated that voice over IP was practical and could be integrated into operations.

Bryant, Barry S.↗

The effects of Crew Resource Mangement (CRM) training in airline maintenance: Results following three years' experience

This report describes three years' evaluation of the effects of one airline's Crew Resources Management (CRM) training operation for maintenance. This evaluation focuses on the post-training attitudes of maintenance managers' and technical support professionals, their reported behaviors, and the safety, efficiency and dependable maintenance performance of their units. The results reveal a strong positive effect of the training. The overall program represents the use of CRM training as a long-term commitment to improving performance through effective communication at all levels in airline maintenance operations. The initial findings described in our previous progress reports are reinforced and elaborated here. The current results benefit from the entire pre-post training survey, which now represents total attendance of all managers and staff professionals. Additionally there are now full results from the two-month, six-month, and 12-month follow-up questionnaires, together with as many as 33 months of post-training performance data, using several indicators. In this present report, we examine participants' attitudes, their reported behaviors following the training, the performance of their work units, and the relationships among these variables. Attitudes include those measured immediately before and after the training as well as participants' attitudes months after their training. Performance includes measures, by work units, of on-time flight departures, on-schedule maintenance releases, occupational and aircraft safety, and efficient labor costs. We report changes in these performance measures following training, as well their relationships with the training participants' attitudes. Highlights of results from this training program include increased safety and improved costs associated with positive attitudes about the use of more assertive communication, and the improved management of stress. Improved on-time performance is also related to those improved attitudes, as well as favorable attitudes about participative management.

Taylor, J. C.↗