Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating Reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Hierarchical Control of Grid-Connected Hydrogen Electrolyzer Providing Grid Services

This paper presents the operational modes and control architecture of the grid-connected hydrogen electrolyzer systems for the provision of frequency and voltage supports. The analysis is focused on the primary and secondary loops in the hierarchical control scheme. At the power converter inner control loop, the voltage- and current-control modes are analyzed. At the primary level, the droop and opposite droop control strategies to provide voltage and frequency support are described. Coordination between primary control and secondary, tertiary reserves is briefly discussed. The case studies and real-time hardware-in-the-loop simulation results are provided using Typhoon HIL to back the theoretical investigation.

ancillary services↗

Resilient Operation of Power Distribution Systems Using MPC-Based Critical Service Restoration: Preprint

Power distribution systems are more prone to disruptions and cause most power system outages. We propose a service restoration technique to recover the system service (electricity delivery) following an extreme event-triggered substation outage. The proposed technique considers the problem of controlling distributed energy resources (DERs) of a distribution system with the objective of achieving maximum load pick up while satisfying network flow and voltage constraints. The problem is formulated as a model predictive control (MPC), where a linearized optimal power flow (OPF) model is employed to describe the network. The formulation is augmented with a ramping (up) reserve product for the DERs to ensure an upward monotonic load restoration as time evolves. We perform simulations considering the IEEE 13-bus test feeder integrated with wind, solar, microturbine, and energy storage devices. We demonstrate the efficacy of the devised technique in restoring the system loads monotonically, without shedding previously restored loads. We also show the benefit of co-optimization of power and reserve products for DERs on service restoration. In addition, the capability of the technique in regulating nodal voltages and reducing renewable power curtailment is demonstrated.

61 RADIATION PROTECTION AND DOSIMETRY↗

Superiority of compensatory reserve measurement compared with the Shock index for early and accurate detection of reduced central blood volume status

Shock index (SI) equals the ratio of heart rate (HR) to systolic blood pressure (SBP) with clinical evidence that it is more sensitive for trauma patient status assessment and prediction of outcome compared with either HR or SBP alone. We used lower body negative pressure (LBNP) as a human model of central hypovolemia and compensatory reserve measurement (CRM) validated for accurate tracking of reduced central blood volume to test the hypotheses that SI: (1) presents a late signal of central blood volume status; (2) displays poor sensitivity and specificity for predicting the onset of hemodynamic decompensation; and (3) cannot identify individuals at greatest risk for the onset of circulatory shock. We measured HR, SBP, and CRM in 172 human subjects (19–55 years) during progressive LBNP designed to determine tolerance to central hypovolemia as a model of hemorrhage. Subjects were subsequently divided into those with high tolerance (HT) (n = 118) and low tolerance (LT) (n = 54) based on completion of 60 mm Hg LBNP. The time course relationship between SI and CRM was determined and receiver operating characteristic (ROC) area under the curve (AUC) was calculated for sensitivity and specificity of CRM and SI to predict hemodynamic decompensation using clinically defined thresholds of 40% for CRM and 0.9 for SI. The time and level of LBNP required to reach a SI = 0.9 (~60 mm Hg LBNP) was significantly greater (p < 0.001) compared with CRM that reached 40% at ~40 mm Hg LBNP. Shock index did not differ between HT and LT subjects at 45 mm Hg LBNP levels. ROC AUC for CRM was 0.95 (95% CI = 0.94–0.97) compared with 0.91 (0.89–0.94) for SI (p = 0.0002). Despite high sensitivity and specificity, SI delays time to detect reductions in central blood volume with failure to distinguish individuals with varying tolerances to central hypovolemia.

60 APPLIED LIFE SCIENCES↗

Managing Hanford's Direct Feed Low Activity Waste Program - 20002

The Office of River Protection (ORP) is responsible for the management and completion of the River Protection Project (RPP) mission, which comprises both the Hanford Site tank farms operations and the completion and operation of the Waste Treatment and Immobilization Plant Project. The RPP mission is to safely retrieve, treat, and immobilize Hanford's high-level and low-activity tank waste and close the tank farms to protect the Columbia River. The Direct-Feed Low-Activity Waste (DFLAW) Program is a major subset of the overall RPP mission, providing disposition of low-activity waste. The scope is to retrieve, treat, and immobilize the low-activity waste at the Low-Activity Waste Facility. DFLAW will begin operations no later than December 2023. The DFLAW Program overarches a suite of individual projects, activities, and infrastructure upgrades. The major projects and activities include multiple contractors under both ORP and the Richland Operations Office, underscoring the need for effective integration, coordination, and collaboration. The objectives of the DFLAW Program leadership team are to: - Effectively coordinate and integrate the projects that comprise the DFLAW Program - Manage the interfaces between the projects so that the integrated DFLAW Program is completed successfully - Ensure the DFLAW portfolio of projects operate as required without gaps or conflicts at the interfaces. DOE is accomplishing these objectives through a newly established leadership model that integrates the DOE and contractor work streams and promotes a teamwork model to enable collaborative success. Long considered one of the most formidable cleanup challenges at Hanford, the Department of Energy and its contractors are on the verge of achieving a cleanup commitment that has been decades in the making. DOE is preparing to vitrify (turn to glass) Hanford's chemical and radioactive tank waste using the DFLAW process. The Modified Consent Decree milestone for completing hot commissioning of the Hanford Site's Low- Activity Waste Facility is Dec. 31, 2023. While this milestone may seem distant under normal project management circumstances, it is a relatively short period of time for the operational and cultural transformation necessary to successfully begin treating tank waste at Hanford. Direct feed means separating the waste at a tank farm to remove the more radioactive portion (i.e., solids and cesium) so that the resulting low-activity (less radioactive) waste can be fed directly to the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility. Starting DFLAW will require a singular, intensive leadership focus, along with a sustained, collective commitment to excellence and teamwork by the Department and its contractors. Major upgrades to Hanford's infrastructure will occur prior to startup. Supporting DFLAW operations requires significant integration between the DFLAW facilities - the Waste Treatment Plant, Hanford's tank farms, effluent treatment facilities, disposal facilities - and between all of the site contractors to achieve success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2021 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPRs ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of available drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar - to - diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the structural integrity with more detail using geomechanical models. Finite-element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent red flags for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the caverns drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns .

02 PETROLEUM↗

Available Drawdowns for Each Oil Storage Cavern in the Strategic Petroleum Reserve (2022 Annual Report)

The Department of Energy maintains an up-to-date documentation of the number of available full drawdowns of each of the caverns owned by the Strategic Petroleum Reserve (SPR). This information is important for assessing the SPR's ability to deliver oil to domestic oil companies expeditiously if national or world events dictate a rapid sale and deployment of the oil reserves. Sandia was directed to develop and implement a process to continuously assess and report the evolution of drawdown capacity, the subject of this report. A cavern has an available drawdown if after that drawdown, the long-term stability of the cavern, the cavern field, or the oil quality are not compromised. Thus, determining the number of a vailable drawdowns requires the consideration of several factors regarding cavern and wellbore integrity and stability, including stress states caused by cavern geometry and operations, salt damage caused by dilatant and tensile stresses, the effect of enhanced creep on wellbore integrity, and the sympathetic stress effect of operations on neighboring caverns. A consensus has now been built regarding the assessment of drawdown capabilities and risks for the SPR caverns (Sobolik et al., 2014; Sobolik 2016). The process involves an initial assessment of the pillar-to-diameter (P/D) ratio for each cavern with respect to neighboring caverns. A large pillar thickness between adjacent caverns should be strong enough to withstand the stresses induced by closure of the caverns due to salt creep. The first evaluation of P/D includes a calculation of the evolution of P/D after a number of full cavern drawdowns. The most common storage industry standard is to keep this value greater than 1.0, which should ensure a pillar thick enough to prevent loss of fluids to the surrounding rock mass. However, many of the SPR caverns currently have a P/D less than 1.0 or will likely have a low P/D after one or two full drawdowns. For these caverns, it is important to examine the s tructural integrity with more detail using geomechanical models. Finite - element geomechanical models have been used to determine the stress states in the pillars following successive drawdowns. By computing the tensile and dilatant stresses in the salt, areas of potential structural instability can be identified that may represent "red flags" for additional drawdowns. These analyses have found that many caverns will maintain structural integrity even when grown via drawdowns to dimensions resulting in a P/D of less than 1.0. The analyses have also confirmed that certain caverns should only be completely drawn down one time. As the SPR caverns are utilized and partial drawdowns are performed to remove oil from the caverns (e.g., for occasional oil sales , purchases, or exchanges authorized by the Congress or the President), the changes to the cavern caused by these procedures must be tracked and accounted for so that an ongoing assessment of the cavern's drawdown capacity may be continued. A proposed methodology for assessing and tracking the available drawdowns for each cavern was presented in Sobolik et al. (2018). This report is the latest in a series of annual reports, and it includes the baseline available drawdowns for each cavern, and the most recent assessment of the evolution of drawdown expenditure for several caverns.

02 PETROLEUM↗

A Multi-Stage Stochastic Risk Assessment With Markovian Representation of Renewable Power

Probabilistic forecasts provide a distribution of possible outputs and so can capture the uncertainty and variability of Variable Renewable Energy (VRE). However, taking advantage of uncertainty information has practical challenges that make it difficult to integrate probabilistic forecasting into control room decision-making. This paper proposes a novel use-case for probabilistic forecasts by incorporating them into the hour-ahead operations for situational awareness via a risk-averse multi-stage stochastic program. We employ a Markovian representation of the probabilistic forecasts that enables the formulation of the multi-stage problem and avoids a scenario generation phase. We test the model on a realistically sized system to assess risk and showcase the capability of using probabilistic renewable forecast as input to produce probabilistic output forecasts of future system states. The results show that the model can capture time consistency in the reserves and Area Control Error (ACE) forecast. The solution times are adequate for risk profiling in hour-ahead timescales.

forecasting↗

Physically Realistic Estimates of Electric Water Heater Demand Response Resource

Multiple grid integration studies have examined the value of demand response, including from water heaters, to bulk power systems. Common shortcomings of these studies include physically unrealistic assumptions. For example, studies often assume that all electric water heater load can be shed for up to an hour to provide capacity or contingency service, that all electric water heater load is shiftable, and that round-trip efficiencies for shifting service are 100%. Another issue is that simply summing up estimates of individual water heaters' flexibility bounds, an attractive idea for constructing the MW-scale resources necessary for direct inclusion in grid investment and operational models, can result in significant overestimates of actual resource, because, e.g., a water heater with the ability to reduce load may not be able sustain the reduction for as long as the aggregate model suggests is possible. This presentation demonstrates the impact of estimating the flexibility of electric water heaters with physically realistic models suitable for grid service analysis. Electric water heater flexibility representations are constructed based on ResStock simulations of New England. Specifically, we examine contingency resource (related to capacity, shed, and contingency reserve services) and energy shifting resource from electric resistance and heat pump water heaters. Different estimation methods are compared; and the surrogate models' event responses are validated against events directly simulated in EnergyPlus. We also demonstrate the impact of using electric water heaters for contingency reserves and energy shifting in detailed models of possible future ISO New England power systems.

building energy modeling↗

High-resolution in-beam video rate imaging with the ClearXCam for synchrotron beamlines

The ClearXCam detector is a new video rate imaging in-beam monitor based on a diamond sensor. Imaging with 2304 effective pixels is achieved by sequentially biasing one of 48 metal stripes on one side of a diamond sensor, while reading out the current from 48 stripes on the other side of the sensor. This system was characterized for real-time X-ray beam diagnostics at synchrotron beam­line 17-BM at the National Synchrotron Light Source II. Significant results include: detection of in-beam structure via the imaging mode, beam focusing in one minute with real-time imaging feedback during a focusing event, linearity over five orders of magnitude, validation of a fast mode operating at 100 Hz, and sub-micron beam-positioning resolution. The system is now available commercially.

36 MATERIALS SCIENCE↗

Section 3 Reporting: Preserve America

Brookhaven National Laboratory (BNL) is a multidisciplinary laboratory with seven Nobel Prize-winning discoveries, 37 R&D 100 Awards, and countless advances in science and technology. For over 75 years, the Laboratory has played a leading role in the Department of Energy (DOE) Science and Technology mission and continues to contribute to the DOE’s missions in energy resources, environmental quality, and national security. The Laboratory is operated and managed by Brookhaven Science Associates (BSA), which was founded by the Research Foundation for the State University of New York on behalf of Stony Brook University, and Battelle, a non-profit applied science and technology organization. BNL is committed to longstanding partnerships with researchers, academic institutions, industry, students, teachers, and the surrounding community. BNL is located near the center of Suffolk County on Long Island, New York within Brookhaven Township, about 60 miles east of New York City. Most of BNL’s principal facilities are located near the center of the 5,265-acre (8.23 square mile) site (Figure 1). The developed area encompasses approximately 1,820 acres, consisting of: ▪ 500 acres originally developed by the Army (as part of WW II Camp Upton) and still used for offices and other operational buildings. ▪ 200 acres occupied by large, specialized research facilities. ▪ 520 acres occupied by outlying facilities, such as the Sewage Treatment Plant, research agricultural fields, housing facilities, and fire breaks. ▪ 400 acres of roads, parking lots, and connecting areas. ▪ 200 acres developed for the Long Island Solar Farm. The balance of the site, approximately 3,400 acres, is largely wooded and represents a native pine barrens ecosystem. In November 2000, DOE set aside 530 acres of undeveloped land at BNL as the Upton Ecological and Research Reserve. The Upton Reserve preserves this portion of the pine barrens ecosystem and provides an area for ecological research and education activities.

99 GENERAL AND MISCELLANEOUS↗

Improving the performance of first- and last-mile mobility services through transit coordination, real-time demand prediction, advanced reservations, and trip prioritization

Socio-demographic trends and recent economic development patterns have resulted in travel behavior changes that call for more flexible and accessible public transit options. Because flexible transit services vary in scope, size, and service type, new data-informed methods are useful to optimize services based on the specific needs of local communities and riders. In this study, real-world demand and vehicle trajectory data were used to evaluate and optimize system performance for an existing first-mile–last-mile (FMLM) service in Robinson Township, PA. A general FMLM model for arbitrary demand and service supply was then developed to quantify system performance—both travel time costs and day-to-day reliability—for various operational polices considering spatio-temporal demand variation and transportation network dynamics. Heuristics were used for optimal real-time vehicle routing in sizable real-world networks accommodating various service types and scopes. In this case study, total user costs were reduced by 18.6% when rides were coordinated with mainline fixed-route transit. Predictive routing strategies were shown to marginally improve system performance under sparse and variable spatio-temporal demand. The case study also highlights potentially large travel time and user reliability improvements—reductions of 51% and 53.8%, respectively—when trip requests were made in advance of their desired pickup time. Finally, we show that travel time reliability can be improved for time-inflexible trips with trip prioritization without increasing total user costs. These results were stable to changes in demand density.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Insights Into On-Demand Transit: A Case Study of Houston METRO's curb2curb Transit Services: Preprint

As modern on-demand transit (ODT) deployments increase, the insights gained from studying real-world systems prove more useful. In this study, a shared ODT system called "METRO curb2curb" in the suburbs of Houston, Texas was studied, with a particular focus on the Missouri City zone, which has the highest ridership out of the four total zones in which the system operates. The Missouri City zone spans 18 square miles with an average daily ridership of nearly 400 as of November 2024. In order to gain a passenger perspective, data collection was performed through using the ODT system first-hand, completing 50 rides in March and April of 2023. These rides included a mix of three different types of on-demand travel accommodations - 1.) advance bookings (30 min - 2 hours ahead), 2.) as-soon-as-possible / real-time dispatch bookings, and 3.) no-reservation trips at two designated "anchor points." Wait and travel time were collected for each ride. Anecdotal findings related to ease of locating the driver/vehicle, the process of booking a ride, and popular trip purposes were also documented. This study provides an overview of the METRO curb2curb system, including its history, service provider, service area, ridership, booking options, wait time, and travel time. Intricacies related to different definitions of wait time are included. Finally, relevant considerations for automating the on-demand transit system and discussed.

33 ADVANCED PROPULSION SYSTEMS↗

2022 Summer Resource Adequacy in the ERCOT Region

This report is a 2022 update to the National Energy Technology Laboratory (NETL) report that examined the potential system performance of the Electric Reliability Council of Texas (ERCOT) system during the summer of 2021. Anticipated summer reserve margins in ERCOT have risen year-over-year from the 15.7 percent reported in ERCOT’s Final Seasonal Assessment of Resource Adequacy (SARA) for Summer 2021 to 22.8 percent in the Final SARA for Summer 2022, driven mostly by increases in wind and solar generation. Using data from ERCOT’s 2022 Summer SARA, Capacity, Demand and Reserves (CDR) reports, and historical performance data obtained from ERCOT and Hitachi Energy Velocity Suite, six economic dispatch scenarios using PROMOD were developed to assess the risk to ERCOT of a load shedding event for Summer 2022. The results suggests that ERCOT may be facing a very tight resource adequacy situation, with the potential for a serious shortfall during the summer peak, usually the end of July through mid-August, if demand and generator outage rates significantly exceed peak levels. Under these conditions, ERCOT will need to call on its operating tools, including Energy Emergency Alerts (EEA) and calls to conserve electricity, to maintain reliability and continue serving load. Those measures alone may not be sufficient to avert a shedding of load.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cosmological moduli and non-perturbative production of axions

Cosmological moduli generically come to dominate the energy density of the early universe, and thereby trigger an early matter dominated era. Such non-standard cosmological histories are expected to have profound effects on the evolution and production of axion cold dark matter and dark radiation, as well as their prospects for detection. We consider moduli-axion couplings and investigate the early history of the coupled system, considering closely the evolution of the homogeneous modulus field, the back-reaction from the axion, and the energy densities of the two fields. A particular point of interest is the enhancement of axion production from modulus decay, due to tachyonic and parametric resonant instabilities, and the implications of such production on the cosmological moduli problem, axion dark radiation, and the available parameter space for axion dark matter. Using an effective field theory approach, WKB-based semi-analytical analysis, and detailed numerical estimates of the co-evolution of the system, we evaluate the expected decay efficiency of the modulus to axions. The effects of higher-order operators are studied and implications for UV-complete frameworks such as the Large Volume Scenarios in Type IIB string theory are considered in detail.

Axions and ALPs↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

2021 Summer Resource Adequacy in the ERCOT Region

This report is an update to the NETL report on the same topic that examined the potential system performance of the Electric Reliability Council of Texas (ERCOT) system during the summer of 2020. Anticipated reserve margins in ERCOT have risen year-over-year from the 10.7 percent reported in ERCOT’s Final Seasonal Assessment of Resource Adequacy (SARA) for Summer 2020 to 15.7 percent for Summer 2021 in ERCOT’s Capacity, Demand and Reserves [CDR] report published in December 2020 and 2021 Summer Preliminary SARA published in March 2021. Using data from ERCOT’s 2021 Summer SARA, CDR, and historical performance data, six economic dispatch scenarios using PROMOD were developed to assess the risk to ERCOT of a load shedding event for Summer 2021. The results suggest that ERCOT could make it through the summer season without a loss of load event, as long as the weather remains normal. However, through a combination of scenarios, including increased demand, increased forced outages, and low wind output, ERCOT is likely to find itself operating in emergency conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗