Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Innovation in Contracting Strategy for a Master Services Agreement for Remediation of Low Level Radioactive Waste - 18381

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. The safety of workers, the public and the environment while delivering the PHAI on time and within budget is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.2 million cubic metres of historic waste from several locations, including the Port Hope Harbour, a closed municipal landfill and approximately 800 residential properties. This complex project requires contracting the services of qualified, skilled and experienced environmental remediation contractors to meet the diverse needs of the myriad tasks that comprise the remediation and restoration of all properties. This paper will highlight how the CNL contracting services team developed an innovative approach to a contracting strategy designed to deliver the safe execution of work and keep the project on time and within budget. The approach addresses the complexities of a scope of work that consists of multiple work packages to be executed both concurrently and in tandem, and that require highly specialized trades/skills, as well as high-level project management expertise to ensure seamless coordination among the various contractors. The author will discuss CNL's strategy to engage the market with a Request for Expression of Interest to identify potential qualified suppliers and gauge their level of interest, issue a Request for Prequalification (RFPQ) to determine eligible contractors and, ultimately, issue a Request for Proposal for a Master Services Agreement (MSA) that would competitively evaluate each contractor's direct experience, technical expertise, quality management programs, safety systems compliance and track record. Using CNL's experience as a case study, the paper will highlight how an innovative approach can positively affect project timelines by describing how CNL addressed the challenge associated with the limited time available to implement procurement processes and deliver a series of executed agreements while ensuring that work would begin on time and key project milestones would be met. The author will summarize how CNL's strategy put the project back on schedule, without compromising the process guideline/requirements, and ensured that a qualified and experienced set of contractors, committed to a strong safety culture, will be available to perform the work required when the cleanup in the Port Hope community begins in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Unique Master's Program in Combined Nuclear Technology and Nuclear Chemistry at Chalmers University of Technology, Sweden

The need for engineers and scientists who can ensure safe and secure use of nuclear energy is large in Sweden and internationally. Chalmers University of Technology is therefore launching a new 2-year master's program in Nuclear Engineering, with start from the autumn of 2009. The program is open to Swedish and foreign students. The program starts with compulsory courses dealing with the basics of nuclear chemistry and physics, radiation protection, nuclear power and reactors, nuclear fuel supply, nuclear waste management and nuclear safety and security. There are also compulsory courses in nuclear industry applications and sustainable energy futures. The subsequent elective courses can be chosen freely but there is also a possibility to choose informal tracks that concentrate on nuclear chemistry or reactor technology and physics. The nuclear chemistry track comprises courses in e.g. chemistry of lanthanides, actinides and transactinides, solvent extraction, radioecology and radioanalytical chemistry and radiopharmaceuticals. The program is finished with a one semester thesis project. This is probably a unique master program in the sense of its combination of deep courses in both nuclear technology and nuclear chemistry.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Improving Operational Efficiency, Compliance and Community Perception with Real-time Data - 19260

The nuclear and medical radiation industry has always faced a significant burden in effectively balancing exposure and productivity. Maintenance operations and development of new techniques require significant staffing resources to monitor and review personnel exposures and changes in operational radiation levels. Currently utilised monitoring technology and review techniques remain unchanged since the 1950's, relying upon mostly analogue instrumentation and paper reporting. After utilising isolated-area monitoring during a reactor decommissioning project it became apparent that current systems created false assurance as the units continually failed without warning due to 'dirty' power. These instrument failures could have easily led to an unnecessary exposure while operators continued to assume they were being safely monitored. This paper is a philosophical discussion on how current shortcomings could be addressed, security increased, and exposure risks minimised, by utilising real-time monitoring and automated reporting. The community and media expectations of reported data and nuclear monitoring systems continue to be coloured by sensational technology seen in movies and emerging technology available through smart homes and smart cities initiatives. For the general public to be more engaged with real radiation levels and effects, the nuclear industry needs to more effectively communicate safe levels. Organisations can have regain control of exposure levels discussions through the controlled release of background and expected exposure level data. An increase in real world monitoring data communicated in a controlled and more effective way will aid in the general public accepting, and being educated about, the minimal increase above natural background levels of the nuclear industry and other radiation facilities. This is particularly as Australia is in the process of implementing its Nuclear Waste Facility, with community acceptance the number one inhibitor of being able to move forward. Storage, mobile assets, and processing all present unique management, security, exposure, and telemetry challenges for a facility operations manager. Active monitoring and automated review of the monitoring data can alert operators to any unexpected events before any resultant increases in radiation levels cause an unplanned exposure to operators or the environment. Integration of radiation monitoring data with global positioning telemetry enables better organisational awareness of mobile asset location and early detection of any potential shifting and reduction in shielding integrity of sources and encapsulated waste during transport. Additionally, the real-time monitoring can be set-up to enhance an organisations' or nation's security capabilities. For instance, the real time monitor will send an automated alert in the case of an unexpected movement of a source through a monitored facility or for an unscheduled movement of a monitored vehicle. There are further benefits to be gained in control, ALARA principles and effluent management by increasing real-time monitoring capabilities through the stages of the waste cycle. Increasing operational effectiveness while delivering operational cost savings sounds like an attractive proposition. With increased access to operational area radiation data comes drastically improved real-time management of exposures for new, and experimental practices. Increased live data can be utilised to identify optimum practices for reducing operational and environmental exposures or releases. This increased operational data effectively comes with the added benefit of a reduction in the required health physics personnel resources for general operations. By reducing exposure and the detachment of required health physics resources from routine operations, there is greater availability for these resources to support maintenance operations and project-based work. The review of this increased data will create internal capability to identify low-- and high-risk activities, resulting in the ability to reduce the number of highly skilled workers in an industry where the availability of this talent is declining. During my time as the Radiation Safety and Nuclear Security Manager at a research facility, I implemented a real-time monitoring system. The system identified a secondary risk that had previously been unidentified and posed a higher exposure and security risk than the radiation practice being monitored. What stops industry from implementing technology that encourages agile work practices, while minimising security risks and personnel exposure? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Materials capability review Los Alamos National Laboratory, May 3-6, 2010

The 2010 'Capability Review' process at LANL significantly differs from the Division reviews of prior years. The Capabilities being reviewed (some 4-8 per year) are deliberately chosen to be crosscutting over the Laboratory, and therefore will include not only several experimental, theoretical and simulation disciplines, but also contributions from multiple line organizations. This approach is consistent with the new Laboratory organizational structure, focusing on agile and integrated capabilities applied to present national security missions, and also nurtured to be available for rapid application to future missions. The overall intent is that the Committee assess the quality of the science, engineering, and technology identified in the agenda, and advise the LANS Board of Governors and Laboratory management. Specifically, the Committees will: (1) Assess the quality of science, technology and engineering within the Capability in the areas defined in the agenda. Identify issues to develop or enhance the core competencies within this capability. (2) Evaluate the integration of this capability across the Laboratory organizations that are listed in the agenda in terms of joint programs, projects, proposals, and/or publications. Describe the integration of this capability in the wider scientific community using the recognition as a leader within the community, ability to set research agendas, and attraction and retention of staff. (3) Assess the quality and relevance of this capability's science, technology and engineering contributions to current and emerging Laboratory programs, including Nuclear Weapons, Threat Reduction/Homeland Security, and Energy Security. (4) Advise the Laboratory Director/Principal Associate Director for Science, Technology and Engineering on the health of the Capability including the current and future (5 year) science, technology and engineering staff needs, mix of research and development activities, program opportunities, environment for conducting science, technology and engineering. The specific charge for the Materials Capability Review is to assess the Los Alamos Laboratory Directed Research and Development project titled, 'First Principles Predictive Capabilities for Transuranic Materials: Mott Insulators to Correlated Metals' using the criteria performance, quality, and relevance for the current status of the project. The committee is requested to provide advice on future direction of the project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel reports session

This section brings together the reports of the 31 panel sessions listed below: - Avoiding the Human Capital Cliff in the DOE (PS22); - Implementing Technically-Based Cleanup; US DOE Balancing Regulatory and Fiscal Complexity (PS24); - United Kingdom - Remediation of Sellafield Legacy Ponds and Silos (PS25); - Aligning Decision-Making to Deliver Timely Results in Large Clean-up Programs (PS38); - Transition to Government Owned-Contractor Operated Site at Canadian Nuclear Laboratories (PS39); - Emerging Middle East Nuclear States' Status and Plans (PS40); - NPP Panel on Waste Management (PS41); - Robotics - International Innovations in Robotic Decommissioning Technology (PS43); - Fukushima Panel (1/2): Japan Fukushima Daiichi Decommissioning Update (PS54); - Fukushima Panel (2/2): Update on the Revitalization of Fukushima and the Surrounding Area (PS55); - US DOE LLW On-Site Disposal: LLW Disposal Facility Federal Review Group Review Process (PS56); - Challenges in DOE HLW Tank Management: Facility Start-up and Waste Disposition (PS57); - Waste Management Planning for Utility Small Modular Reactors (PS58); - US Nuclear Power Plant Waste Management - LLW Disposal Issues (PS59); - DOE-EM Robotics and Emerging Technologies Road-map (4/8) (PS60); - Graduating Students and New Scientists and Engineers - Wants and Needs - Are Companies Even Listening? (PS63); - U.S. Nuclear Robotics: Yesterday, Today, Tomorrow (5/8) (PS74); - US DOE Mixed Waste: Proposals for Dealing with Problematic Waste Streams and Policy Changes (PS76); - Current and Emerging US NRC LLW Regulatory Topics (PS77); - Agency Perspectives (US and International) on the Use of Risk and Dose Assessment Tools (PS80); - Progress on Deep Repository Programs Around the World (PS81); - US DOE Procurement and Contracting Opportunities (PS82); - Collaboration across Borders to Deliver Cleanup and Decommissioning Challenges (PS93a); - DOE Mission Success through Application of Practices and Solutions (PS94); - Challenges in Cask Certification - International Perspectives (PS96); - Robotics: Leveraging Innovations in Science and Technology to Benefit Safety Performance (PS98); - DOE Panel: DOE EM Featured Office - Portsmouth/Paducah Project Office (PS109); - Robotics: Lessons Learned from Industrial Robotics Deployment that can be Applied to the Nuclear Field (PS110a); - Roundtable: DOE Radioactive Management - Energy Facility Contractors Group - Waste Management Working Group (EFCOG WMWG) (PS118); - Thursday Topical Session 'Management of Used Nuclear Fuel: Will the United States Reengage and Align with International Efforts' (PS124); - Remotely Operated Vehicles for Emergency, Disaster, and Operational Upset Response (PS125)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating regulatory, programmatic and technical needs for modeling tools to support decision-making - 15219

The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater Remediation, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM provides a modeling work-flow to support decision-making for site restoration, tank closure and waste management activities. Potential users involved in regulatory applications (e.g., performance and risk assessments and other activities supporting regulatory decisions) are a key target group for the tool-set. Decision-making in these applications often requires consideration of multiple perspectives, including: regulators and the public, oversight and project management personnel, as well as practitioners involved in conducting the calculations, each with different interests. From its inception, a key objective of the ASCEM project has been to actively seek input from these different user perspectives to help guide development. ASCEM formed a User Steering Committee (USC) with membership representing interests from management/staff at DOE Site Contractors, DOE-HQ and Field offices and Regulators (State and Federal). The project also provides opportunities for input from the broader user community through participation in meetings of the Performance and Risk Assessment (P and RA) Community of Practice (CoP), routine briefings and participation in meetings of the Low-Level Waste Disposal Facility Federal Review Group, and direct interactions with users involved in regulatory applications. Interactions with users involved in regulatory applications have influenced the requirements for the tool-sets and are reflected in capabilities that have been and are being implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Geological Disposal Project: From Siting to Permitting - 19018

The future 'Cigeo' geological repository will be located in eastern France, at the border between the Meuse and Haute-Marne. Research has been carried out in this area since the 1990's, leading to the identification of a zone within the Paris basin whose geological characteristics make it suitable for the deep geological disposal of high- and intermediate-level long-lived radioactive waste, as well as a smaller zone of approximately 250 km{sup 2} (proposed in 2005) within which the characteristics of the host layer are very similar to those observed in the Underground Research Laboratory (URL). In 2010, based on additional surveys, a zone of approximately 30 km{sup 2} called ZIRA, in which the industrial underground facility would be constructed was defined. The repository structures within the ZIRA will be located at a depth of 525 metres. Half the surface area of the ZIRA is located in a wooded area, the other half being situated in grassland or farmland. All the subsequent design studies (preliminary and detailed) of Cigeo as well as the preparation of the licensing files (to be submitted in 2020) were conducted on the basis on this precise siting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on Management Controls over the Use of Service Contracts at the Office of River Protection

The Department of Energy's (Department) Office of River Protection (ORP) is responsible for the storage, treatment, and disposal of over 53 million gallons of highly radioactive waste from over 40 years of plutonium production at the Hanford Site. Because of the diversity, complexity, and large scope of its mission, coupled with its small staff, ORP told us that it has found it necessary to engage in service contracts to obtain consulting services, technical expertise, and support staff. Federal policy generally permits contractors to perform a wide range of support service activities, including, in most situations, the drafting of Government documents subject to the review and approval of Federal employees. Federal policy issued by the Office of Management and Budget, however, prohibits contractors from drafting agency responses to Congressional inquiries and reports issued by the Office of Inspector General and Government Accountability Office (GAO) because they are so closely related to the public interest and provide the appearance of private influence. To provide a majority of its needed services, ORP issued a Blanket Purchase Agreement to Project Assistance Corporation (PAC) in 2003. Through the Blanket Purchase Agreement, ORP acquired services in the areas of project management, risk assessment, program assessment, quality assurance, safety, cost and schedule estimating, budgeting and finance, and engineering. PAC has, in turn, subcontracted with various other firms to obtain some of the services needed by ORP. From 2005 to 2008, the total annual cost for the contract with PAC had grown from $4.7 million to $9.2 million. Because of the extent of the services provided and growing costs of the contract, we conducted this review to determine whether ORP appropriately administered its contract with the Project Assistance Corporation. Our review disclosed that, in some instances, ORP had not appropriately administered all work performed under the PAC contract. Specifically, ORP allowed PAC employees to perform work that was inherently governmental and created situations where a potential conflict of interest occurred. Specifically: (1) ORP assigned PAC employees responsibility for providing information and responses to Congressional inquiries and reports issued by the GAO and the Department of Energy's Office of Inspector General (OIG); and (2) PAC employees were also allowed to perform functions that created potential conflicts of interest. ORP permitted PAC employees, for example, to develop statements of work and approve funding of work to be performed under PAC's own contract. We concluded that these problems occurred, at least in part, because ORP had not established controls necessary to effectively administer the PAC contract. Federal procurement regulations recommended that agencies provide additional management controls over contractors whose work has the potential to influence the action of government officials. ORP, however, had not implemented the controls specifically recommended in Federal policy guidance for administering contracts, including: (1) Performing conflict of interest reviews; and (2) Separating contractor and Department employees either physically or organizationally. By not effectively administering its contract with PAC, ORP increased the risk that decisions based on work performed by the contractor may not have been made in the best interests of the Department. For example, ORP increased the risk that approved work would be unnecessary or too costly. As we also recently noted in our report on 'Management Challenges at the Department of Energy' (DOE/IG-0808, December 2008), contract administration issues such as those discussed in this report remain a significant vulnerability. Continued efforts to improve this area are vitally important since the risk that contractors receive payments for unallowable costs could also increase as the Department expands its contracting activities under the American Recovery and Reinvestment Act. To its credit, however, ORP has recognized that there are weaknesses in its oversight of the PAC contract and is in the process of taking certain corrective actions. ORP indicated that it had reassigned responsibility to a Federal employee for responding to Congressional requests, GAO reviews, and OIG reports, and, planned to physically separate PAC employees from their government counterparts. While positive, those actions do not sufficiently address the issues identified in our report. Accordingly, we have made several recommendations designed to strengthen internal controls over this area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Treatment of Irradiated Graphite to meet Acceptance Criteria for Waste Disposal: A New IAEA Collaborative Research Program - 12443

World-wide, more than 250,000 tonnes of irradiated graphite have arisen through commercial nuclear-power operations and from military production reactors. Whilst most nations responsible for the generation of this material have in mind repository disposal alongside other radwaste, the lack of progress in this regard has led in some cases to difficulties where, for example, the site of an existing graphite-moderated reactor is required for re-utilisation. In any case, graphite as a radwaste stream has unique chemical and physical properties which may lend itself to more radical and innovative treatment and disposal options, including the recovery of useful isotopes and also recycling within the nuclear industry. Such aspects are important in making the case for future graphite-moderated reactor options (for example, High-Temperature Reactors planned for simultaneous power production and high-grade heat sources for such applications as hydrogen production for road fuel). A number of initiatives have taken place since the mid 1990s aimed at exploring such alternative strategies and, more recently, improving technology offers new options at all stages of the dismantling and disposal process. A new IAEA Collaborative Research Program aims to build upon the work already done and the knowledge achieved, in order to identify the risks and uncertainties associated with alternative options for graphite disposal, along with cost comparisons, thus enabling individual Member States to have the best-available information at their disposal to configure their own programs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination and Decommissioning Program of a Radiopharmaceuticals Production Facility - 17103

On May 2012, Best Medical Belgium (BMB) S.A., a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and the decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF/NIRAS Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel supports the definition of the clean-up and decommissioning strategies; the drafting of the Final Decommissioning Plan (FDP) and License Application for decommissioning; and the follow-up of the clean-up and upcoming D and D works on site. Four nuclear buildings are part of the clean-up and D and D activities. One of them, Building 14 (B14), represents the most challenging task with the clean-up of highly contaminated areas and their further decommissioning up to greenfield. Beside its two cyclotrons successively used for the production of radioisotopes, this building features hot cells and glove boxes used for the purification of radioisotopes and the conditioning of the final pharmaceutical product. The present paper aims at presenting the development of the D and D program in terms of modifications of existing facilities to allow carrying out the clean-up and D and D activities and the management of dismantled radioactive materials in a safe, efficient and cost-effective way as well as in terms of strategic options to be developed for the FDP. To support the clean-up and D and D activities, several workshops have been designed in order to treat radioactive materials removed from the building rooms. Those workshops feature an input buffer storage area, a common output buffer storage area and installations for the treatment of radioactive materials and waste (handling devices, cutting means, decontamination means, free release measurements means, etc.). Some modifications to the existing auxiliary systems will be required in order to dispose of appropriate systems to operate those workshops in a safe way. Activated concrete structures will constitute the most important part of radioactive materials that will arise from the decommissioning activities. To limit the total decommissioning costs, and especially the costs associated to radioactive waste management, two strategies have been developed in order to manage a part of activated concrete as candidate for free release with a certain decay period or as candidate for conventional landfill. Both strategies will have to be further detailed and discussed with the competent Authorities to ensure they can actually be implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The impact of council directive 2011/70/EURATOM and IAEA joint convention review meetings on the ongoing establishment of the Portuguese regulatory framework and on the future of national radioactive waste

Council Directive 2011/70/EURATOM of 19 July 2011, establishing a Community framework for the responsible and safe management of spent fuel and radioactive waste will enter in force August 2013 in all EU Member States. Portugal has already started preparing its legislative framework to accommodate the new legislative piece. However, the first report of Portugal to the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management of the IAEA, in Vienna, 2012, has shown that Portugal still has many steps to overcome to establish a successful and effective basic regulatory framework. The existence of many competent authorities related to the radiological protection area and a newly independent commission that is still looking on how to fulfill its regulator role in other areas such as the radioactive waste management makes quite challenging the full application of the new directive as well as compliance that Portugal will have to show in the next Joint Convention review meeting in order to meet the obligations of the Convention. In this paper, the reality of the regulatory Portuguese framework on radiological protection, nuclear safety and radioactive waste management is presented. Discussion of the future impact of the new legislation and its consequences such as the need to setup the national program on radioactive waste management is critical discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Acquisition Strategy for the Idaho National Laboratory Remote-Handled Low-Level Waste Disposition Project

This document describes the design-build acquisition strategy that will be applied to the Remote Handled LLW Disposal Project. The design-build delivery method will be tailored, as appropriate, to integrate the requirements of Department of Energy (DOE) Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets,' with the DOE budget formulation process and the safety requirements of DOE-STD-1189, 'Integration of Safety into the Design Process.'

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Hot Lab Concept for Advanced D and D Application - 19175

Hot Labs are used in the nuclear industry for various purposes: maintenance of nuclear reactor, sampling and testing of fuel, inspection activities and decommissioning. Despite their vast use, their current designs and operations do not meet entirely today's needs and requirements of the operations nor tomorrow's. This paper will give an overview of the research and investigations performed around Hot Cells design and concept in order to integrate new operability modes and functions. The overall idea is to bring modularity, flexibility and adaptability to the Hot Lab nuclear industry. Taking the key principles of Model Based System Engineering, an interoperable data model, the most advanced digital technologies (Building Information Modelling - BIM, Virtual Reality / Augmented Reality, Artificial Intelligence), and looking at all the life-cycle of such a facility, a concept design of a new type of Hot Lab has been developed. Four mains aspects are implemented during this study: Implement the principles of the Industry 4.0; use modular and flexible solutions; explore the concept of in service maintenance and predictive maintenance; optimise the decommissioning and dismantling process by taking into account the entire life-cycle of the facility. The design was developed as a case study taking several assumptions to adapt to any project. The design developed demonstrates that modularity and flexibility can be brought in without compromising the core safety functions of such a facility. This Hot Lab concept brings the current Hot Lab to the next level as the design has been adapted to meet the current operational needs, implement novel ideas and consider its entire life-cycle. This paper will demonstrate how decommissioning and dismantling operations can become more efficient and safer with such a concept. In addition, the Model Based System Engineering approach used from the beginning of the design phase allows to have an optimum architecture during its entire lifetime. It also allowed to flag new topics to be further developed for the benefit of the nuclear industry as a whole. A first example would be the development of the Control System using digital tools and artificial intelligence to run remotely controlled equipment inside the Hot Lab. Assystem is an international engineering group. As a key participant in the nuclear industry for over 50 years, the Group supports its clients in managing their capital expenditure throughout their asset life-cycles. Assystem can offer support in project management, design, digital engineering, industrial control systems, security and safety and industrial digitalisation. Assystem's Imagine program is an internal program intending to serve as an incubator for the development of innovations. The Innovative Hot Lab project integrates one of the four innovation projects Assystem choose to develop and invest in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reactor-Based Management of Used Nuclear Fuel: Assessment of Major Options

This paper discusses the current status of the ongoing Advanced Fuel Cycle Initiative (AFCI) program in the U.S. Department of Energy that is investigating the potential for using the processing and recycling of used nuclear fuel to improve radioactive waste management, including used fuel. A key element of the strategies is to use nuclear reactors for further irradiation of recovered chemical elements to transmute certain long-lived highly-radioactive isotopes into less hazardous isotopes. Both thermal and fast neutron spectrum reactors are being studied as part of integrated nuclear energy systems where separations, transmutation, and disposal are considered. Radiotoxicity is being used as one of the metrics for estimating the hazard of used fuel and the processing of wastes resulting from separations and recycle-fuel fabrication. Decay heat from the used fuel and/or wastes destined for disposal is used as a metric for use of a geologic repository. Results to date indicate that the most promising options appear to be those using fast reactors in a repeated recycle mode to limit buildup of higher actinides, since the transuranic elements are a key contributor to the radiotoxicity and decay heat. Using such an approach, there could be much lower environmental impact from the high-level waste as compared to direct disposal of the used fuel, but there would likely be greater generation of low-level wastes that will also require disposal. An additional potential waste management benefit is having the ability to tailor waste forms and contents to one or more targeted disposal environments (i.e., to be able to put waste in environments best-suited for the waste contents and forms).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SLFP: A stochastic linear fractional programming approach for sustainable waste management

Highlights: > A new fractional programming (SLFP) method is developed for waste management. > SLFP can solve ratio optimization problems associated with random inputs. > A case study of waste flow allocation demonstrates its applicability. > SLFP helps compare objectives of two aspects and reflect system efficiency. > This study supports in-depth analysis of tradeoffs among multiple system criteria. - Abstract: A stochastic linear fractional programming (SLFP) approach is developed for supporting sustainable municipal solid waste management under uncertainty. The SLFP method can solve ratio optimization problems associated with random information, where chance-constrained programming is integrated into a linear fractional programming framework. It has advantages in: (1) comparing objectives of two aspects, (2) reflecting system efficiency, (3) dealing with uncertainty expressed as probability distributions, and (4) providing optimal-ratio solutions under different system-reliability conditions. The method is applied to a case study of waste flow allocation within a municipal solid waste (MSW) management system. The obtained solutions are useful for identifying sustainable MSW management schemes with maximized system efficiency under various constraint-violation risks. The results indicate that SLFP can support in-depth analysis of the interrelationships among system efficiency, system cost and system-failure risk.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗