Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NaS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

UAS Integration in the NAS Project - ICAO Visit

This briefing will be given to ICAO Visitors to discuss project alignment with NASA, project overview, technical challenges, technology development approach and FY14 technical accomplishments.

UAS in the NAS↗

UAS Integration in the NAS Project Test Site Kick-off Meeting

This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

Unmanned↗

Flight Test Overview for UAS Integration in the NAS Project

The National Aeronautics and Space Administration is conducting a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The most recent testing supported two separate test configurations. The first investigated the timing of Detect and Avoid (DAA) alerting thresholds using a radar-equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries. The second configuration included a surrogate unmanned vehicle (flown from a ground control station, with a safety pilot on board) flying a mission in a virtual air traffic control airspace sector using research pilot displays and DAA advisories to maintain separation from live and virtual aircraft. The test was conducted over a seven-week span in the summer of 2015. The data from over 100 encounter sorties will be used to inform the RTCA Phase 1 Detect and Avoid and Command and Control Minimum Operating Performance Standards (MOPS) intended to be completed by the summer of 2016. Follow-on flight-testing is planned for the spring of 2016 to capture remaining encounters and support validation of the MOPS.

UAS↗

UAS Integration into the NAS: Detect and Avoid Display Evaluations in Support of SC-228 MOPS Development

At the May 2015 SC-228 meeting, requirements for TCAS II interoperability became elevated in priority. A TCAS interoperability work group was formed to identify and address key issuesquestions. The TCAS work group came up with an initial list of questions and a plan to address those questions. As part of that plan, NASA proposed to run a mini HITL to address display, alerting and guidance issues. A TCAS Interoperability Workshop was held to determine potential displayalertingguidance issues that could be explored in future NASA mini HITLS. Consensus on main functionality of DAA guidance when TCAS II RA occurs. Prioritized list of independent variables for experimental design. Set of use cases to stress TCAS Interoperability.

detect and avoid↗

Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries. The second configuration included a surrogate unmanned vehicle (flown from a ground control station, with a safety pilot on board) flying a mission in a virtual air traffic control airspace sector using research pilot displays and Detect and Avoid advisories to maintain separation from live and virtual aircraft. The test was conducted over an eight-week span within the R-2508 Special Use Airspace. Over 200 encounters were flown for the first configuration, and although the second configuration was cancelled after three data collection flights, Flight Test 3 proved to be invaluable for the purposes of planning, managing, and execution of this type of integrated flight test.

unmanned aircraft systems↗

Operational Overview for UAS Integration in the NAS Project Flight Test Series 3

The National Aeronautics and Space Administration Unmanned Aircraft Systems Integration in the National Airspace System Project has conducted a series of flight tests intended to support the reduction of barriers that prevent unmanned aircraft from flying without the required waivers from the Federal Aviation Administration. The 2015 Flight Test Series 3, supported two separate test configurations. The first configuration investigated the timing of Detect and Avoid alerting thresholds using a radar equipped unmanned vehicle and multiple live intruders flown at varying encounter geometries.

UAS in the NAS↗