DOE OSTI2024
The Advanced Test Reactor (ATR) creates a unique, high neutron flux materials testing environment that subsequently causes neutron embrittlement damage to its beryllium reflector. The reflector is eventually required to be replaced during a reactor Outage. Concurrently, a piece-for-piece core replacement is conducted to maintain reactor functionality called a core internals changeout (CIC). Once changeout is complete, ATR Reactor Engineering utilizes previous CIC data, notably 1977-1994 CIC data, to conduct predictive criticality analysis on the new, unirradiated core. However, CIC data has been inconsistently reported over the years making it difficult, and in some cases impossible, to utilize. These inconsistencies arise in various forms of not using correct units, inconsistent diagram usage, and not portraying the same kind of data similarly across the reports. To work around this inconsistency issue, Reactor Engineering is implementing the use of several new neutronic modeling codes that utilize modern computation speeds and methods to model the new core in different criticality environments. Further validation is then conducted by nuclear testing and bringing the reactor critical and conducting various irradiation tests. Upon completion and certification that the reactor passed all testing requirements, ATR can once again re-start normal operations.
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗