Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MW”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

HTurbine Generator, 1.5-6 MW, Manufacturing

This unit process tracks materials and energy needed to manufacture high-speed and medium-speed permanent-magnet generators for horizontal 1.5 to 6 MW wind turbines, and manufacturing of direct drive with negligible amounts of other materials. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=BA87A065-6A2E-40C0-AFB5-A9CED16ED1D6

17 WIND ENERGY↗

Operation of a 250 MW solar thermal power plant

Operation of a 250 MW solar thermal power plant. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=5EE5B7E0-1B62-468A-8D6D-8337A21CF876

14 SOLAR ENERGY↗

Computational Fluid Dynamics Analysis of a 12 MW Circulating Fluidized Bed Rise

A three-dimensional (3D) two fluid model (TFM) model of the 12 MW circulating fluidized bed (CFB) riser at Chalmers University was developed using the open-source Multiphase Flow with Interphase eXchanges (MFiX) Software Suite. The hydrodynamic behavior of the riser was validated by comparing axial pressure profiles from experimental measurements with the results from the simulations. Under some of the operating conditions where there was no external circulation of solids, the pressure profiles from the simulation matched well with the experimental measurements. For the cases where there was external circulation of solids, the pressure profiles with the monodisperse solid phase modeling underpredicted the solids concentration in the freeboard region. With the inclusion of polydispersity in the model, the predicted pressure profiles agreed well with the experimental measurements. A two-dimensional (2D) model of the riser was used to perform simulations of coal combustion. The predicted flue gas outlet compositions of oxygen and carbon dioxide compared reasonably to experiments. The experiments also reported some concentration of carbon monoxide which was overpredicted in the simulations. Additional experimental data such as axial oxygen concentration profile and pressure profiles were also compared with the experiment. It was observed that the oxygen concentration in the bottom bed from the simulations was higher than in the experiments, which suggested that most of the oxidation reactions occurred in the bottom bed. The concentration of volatiles and char in the simulations was lower in the bottom bed than in the experiments, which suggest that there is not sufficient penetration of the solid phase species into the bed.

20 FOSSIL-FUELED POWER PLANTS↗

MW-Scale PEM-Based Electrolyzers for RES Applications (CRADA CRD-18-00742 Final Report)

Many nations are rapidly increasing electrical generation capacity from renewable energy sources (RES) such as wind and solar. The wide penetration of RES requires an energy storage solution which has come in the form of hydrogen generated via polymer exchange membrane (PEM) electrolysis. A study of the current state-of-the-art PEM electrolysis indicates that the largest PEM-based stacks range from 150 - 250kW and that a significant scale-up of the technology is required to accommodate multi-Megawatt (MW) energy storage solutions in large-scale RES applications.

08 HYDROGEN↗

H- Injection Simulations for a Multi-MW Upgrade

Fermilab intends to increase its Main Injector (MI) beam power to 2.4 MW in an effort to advance its flagship long-baseline neutrino program. Two scenarios are proposed for this ”PIP-III” upgrade, a 2-8 GeV RCS or an 8 GeV Linac. A Python tracking simulation was developed to model foil injection for these cases. First, the simulation was matched to the well established PIP-II case. From the matched simulation, investigations established that an on-momentum longitudinal injection increases foil traversals in PIP-II. Then the simulation was changed to model the RCS and Linac PIP-III scenarios, for both correlated and anti-correlated beam painting. The results of the PIP-III studies indicate that correlated painting is preferable for both the Linac and RCS scenarios. This research creates a baseline of foil injection performance for PIP-III.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

SiC Based Modular Transformer-less MW-Scale Power Conditioning System and Control for Flexible CHP System

This project aims at developing a SiC-based, modular, transformer-less (60-Hz-transformers-free), MW-scale, four-wire DC/AC power conditioning system (PCS) converter, and a corresponding control system for flexible-CHP (F-CHP) systems. With the help of an F-CHP controller and power electronics converters, different CHP sources, renewable sources, and batteries can be assembled to the DC grid, which is then connected to the medium voltage (MV) AC grid through the PCS converter. To meet grid support and performance requirements, the F-CHP controller design and PCS converter design follow IEEE 1547 and IEEE 2030.7 standards. Five main tasks, including PCS converter design, F-CHP controller development, PCS converter prototype building and testing, F-CHP controller testing, and PCS paralleling, have been carried out. In this project, the F-CHP controller testing has been completed in simulation, HIL and HTB, and the PCS converter prototypes have been successfully built and tested.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Main Shaft Bending Moment Analysis for a Gamesa G97 2-MW Wind Turbine

In a collaborative project between Siemens Gamesa Renewable Energy and the National Renewable Energy Laboratory (NREL), a cost-effective method to measure dynamic main shaft torque and the influence of non-torque loads was applied to the gearbox of the Gamesa G97 2-megawatt (MW) wind turbine at the NREL Flatirons Campus and verified through a field test campaign that took place in 2023. The method involved the installation of fiber-optic sensors on the ring gear of the gearbox. Additionally, traditional strain gauges and a rotary encoder were installed on the main shaft to measure mechanical torque and orthogonal bending moments. We compare the measured total main shaft bending moments from the field test campaign to those predicted by an updated OpenFAST model of the G97 wind turbine for similar environmental conditions. We also assessed the sensitivity of the predicted bending moment to varying levels of turbulence intensity, shear exponent, and yaw error.

17 WIND ENERGY↗

Development of a 50 MW Multiple Beam Klystron

The goal of this program was to develop a 50 MW, multiple beam klystron at 11.424 GHz. The device uses eight electron guns and beam lines to achieve the required power level at a beam voltage of 190 kV, consistent with solid state power supplies. The electron gun operates with confined flow focusing, which is unique among current multiple beam sources, and allows operation at power levels consistent with producing 10s of MWs of pulsed RF power. The circuit consists of a ring resonator input cavity, eight sets of buncher cavities, and a ring resonator output cavity. The RF output power is coupled into four rectangular waveguides equally spaced around the klystron. Eight individual collectors absorb the spent beam power in each beam. The klystron operates in a solenoid. The principle challenges in the design included development of the beam optics using confined flow focusing, shaping of the magnetic field in the gun region to avoid beam spiraling, coupling input power equally to all eight beam lines from a single input, and obtaining the required frequency and Q in the output cavity. The mechanical design was particularly complex due to the large parts count, number of braze and weld joints, and close proximity of the beam lines that limited access. Addressing vacuum leaks and cold testing the complex structures was particularly troublesome. At the conclusion of the program, the klystron is experiencing several vacuum leaks that are under repair. Efforts will continue to seal and test the klystron.

43 PARTICLE ACCELERATORS↗

A 30 MW, 200 MHz Inductive Output Tube for RF Accelerators

This program investigated development of a multiple beam inductive output tube (IOT) to produce 30 MW pulses at 200 MHz. The program was successful in demonstrating feasibility of developing the source to achieve the desired power in microsecond pulses with 70% efficiency. The predicted gain of the device is 24 dB. Consequently, a 200 kW driver would be required for the RF input. Estimated cost of this driver is approximately $1.25 M. Given the estimated development cost of the IOT of approximately $750K and the requirements for a test set that would significantly increase the cost, it was determined that development could not be achieved within the funding constraints of a Phase II program.

43 PARTICLE ACCELERATORS↗

Toxecon Retrofit for Mercury and Mulit-Pollutant Control on Three 90-MW Coal-Fired Boilers

This U.S. Department of Energy (DOE) Clean Coal Power Initiative (CCPI) project was based on a cooperative agreement between We Energies and the DOE Office of Fossil Energy's National Energy Technology Laboratory (NETL) to design, install, evaluate, and demonstrate the EPRI-patented TOXECON{trademark} air pollution control process. Project partners included Cummins & Barnard, ADA-ES, and the Electric Power Research Institute (EPRI). The primary goal of this project was to reduce mercury emissions from three 90-MW units that burn Powder River Basin coal at the We Energies Presque Isle Power Plant in Marquette, Michigan. Additional goals were to reduce nitrogen oxide (NO{sub x}), sulfur dioxide (SO{sub 2}), and particulate matter emissions; allow reuse and sale of fly ash; advance commercialization of the technology; demonstrate a reliable mercury continuous emission monitor (CEM) suitable for use at power plants; and demonstrate recovery of mercury from the sorbent. Mercury was controlled by injection of activated carbon upstream of the TOXECON{trademark} baghouse, which achieved more than 90% removal on average over a 44-month period. During a two-week test involving trona injection, SO{sub 2} emissions were reduced by 70%, although no coincident removal of NOx was achieved. The TOXECON{trademark} baghouse also provided enhanced particulate control, particularly during startup of the boilers. On this project, mercury CEMs were developed and tested in collaboration with Thermo Fisher Scientific, resulting in a reliable CEM that could be used in the power plant environment and that could measure mercury as low as 0.1 {micro}g/m{sup 3}. Sorbents were injected downstream of the primary particulate collection device, allowing for continued sale and beneficial use of captured fly ash. Two methods for recovering mercury using thermal desorption on the TOXECON{trademark} PAC/ash mixture were successfully tested during this program. Two methods for using the TOXECON{trademark} PAC/ash mixture in structural concrete were also successfully developed and tested. This project demonstrated a significant reduction in the rate of emissions from Presque Isle Units 7, 8, and 9, and substantial progress toward establishing the design criteria for one of the most promising mercury control retrofit technologies currently available. The Levelized Cost for 90% mercury removal at this site was calculated at $77,031 per pound of mercury removed with a capital cost of $63,189 per pound of mercury removed. Mercury removal at the Presque Isle Power Plant averages approximately 97 pounds per year.

01 COAL, LIGNITE, AND PEAT↗

Expansion of Michigan EOR Operations Using Advanced Amine Technology at a 600 MW Project Wolverine Carbon Capture and Storage Project

Wolverine Power Supply Cooperative Inc, a member owned cooperative utility based in Cadillac Michigan, proposes to demonstrate the capture, beneficial utilization and storage of CO{sub 2} in the expansion of existing Enhanced Oil Recovery operations. This project is being proposed in response to the US Department of Energy Solicitation DE-FOA-0000015 Section III D, 'Large Scale Industrial CCS projects from Industrial Sources' Technology Area 1. The project will remove 1,000 metric tons per day of CO{sub 2} from the Wolverine Clean Energy Venture 600 MW CFB power plant owned and operated by WPC. CO{sub 2} from the flue gas will be captured using Hitachi's CO{sub 2} capture system and advanced amine technology. The capture system with the advanced amine-based solvent supplied by Hitachi is expected to significantly reduce the cost and energy requirements of CO{sub 2} capture compared to current technologies. The captured CO{sub 2} will be compressed and transported for Enhanced Oil Recovery and CO{sub 2} storage purposes. Enhanced Oil Recovery is a proven concept, widely used to recover otherwise inaccessible petroleum reserves. While post-combustion CO{sub 2} capture technologies have been tested at the pilot scale on coal power plant flue gas, they have not yet been demonstrated at a commercial scale and integrated with EOR and storage operations. Amine-based CO{sub 2} capture is the leading technology expected to be available commercially within this decade to enable CCS for utility and industrial facilities firing coal and waste fuels such as petroleum coke. However, traditional CO{sub 2} capture process utilizing commercial amine solvents is very energy intensive for regeneration and is also susceptible to solvent degradation by oxygen as well as SOx and NO{sub 2} in the flue gas, resulting in large operating costs. The large volume of combustion flue gas with its low CO{sub 2} concentration requires large equipment sizes, which together with the highly corrosive nature of the typical amine-based separation process leads to high plant capital investment. According to recent DOE-NETL studies, MEA-based CCS will increase the cost of electricity of a new pulverized coal plant by 80-85% and reduce the net plant efficiency by about 30%. Non-power industrial facilities will incur similar production output and efficiency penalties when implementing conventional carbon capture systems. The proposed large scale demonstration project combining advanced amine CO{sub 2} capture integrated with commercial EOR operations significantly advances post-combustion technology development toward the DOE objectives of reducing the cost of energy production and improving the efficiency of CO{sub 2} Capture technologies. WPC has assembled a strong multidisciplinary team to meet the objectives of this project. WPC will provide the host site and Hitachi will provide the carbon capture technology and advanced solvent. Burns and Roe bring expertise in overall engineering integration and plant design to the team. Core Energy, an active EOR producer/operator in the State of Michigan, is committed to support the detailed design, construction and operation of the CO{sub 2} pipeline and storage component of the project. This team has developed a Front End Engineering Design and Cost Estimate as part of Phase 1 of DOE Award DE-FE0002477.

01 COAL, LIGNITE, AND PEAT↗

Rotational Augmentation on a 2.3 MW Rotor Blade with Thick Flatback Airfoil Cross-Sections: Preprint

Rotational augmentation was analyzed for a 2.3 MW wind turbine, which was equipped with thick flatback airfoils at inboard radial locations and extensively instrumented for acquisition of time varying surface pressures. Mean aerodynamic force and surface pressure data were extracted from an extensive field test database, subject to stringent criteria for wind inflow and turbine operating conditions. Analyses of these data showed pronounced amplification of aerodynamic forces and significant enhancements to surface pressures in response to rotational influences, relative to two-dimensional, stationary conditions. Rotational augmentation occurrence and intensity in the current effort was found to be consistent with that observed in previous research. Notably, elevated airfoil thickness and flatback design did not impede rotational augmentation.

17 WIND ENERGY↗

Optimized Floating Offshore Wind Turbine Substructure Design Trends for 10–30 MW Turbines in Low-, Medium-, and High-Severity Wave Environments

Floating offshore wind is a promising renewable energy source, as 60% of the wind resources globally are found at depths requiring floating technologies, it minimizes construction at sea, and provides opportunities for industrialization given a lower site dependency. While floating offshore wind has numerous advantages, a current obstacle is its cost in comparison to more established energy sources. One cost-reduction approach for floating wind is increasing turbine capacities, which minimizes the amount of foundations, moorings, cables, and O&M equipment. This work presents trends in mass-optimized VolturnUS hull designs as turbine capacity increases for various wave environments. To do this, a novel rapid hull optimization framework is presented that employs frequency domain modeling, estimations of statistical extreme responses, industry constructability requirements, and genetic algorithm optimization to generate preliminary mass-optimal VolturnUS hull designs for a given turbine design and set of site conditions. Using this framework, mass-optimized VolturnUS hull designs were generated for 10–30 MW turbines for wave environments of varying severities. These design studies show that scaling up turbine capacities increases the mass efficiency of substructure designs, with decreasing returns, throughout the examined turbine capacity range. Additionally, increased wave environment severity is shown to increase the required mass of a given substructure design.

VolturnUS↗

Wind/Wave Testing of a 1:70-Scale Performance-Matched Model of the IEA Wind 15 MW Reference Wind Turbine with Real-Time ROSCO Control and Floating Feedback

Experimental results from the Floating Offshore-wind and Controls Advanced Laboratory (FOCAL) experimental program, which tested a performance-matched model of the IEA Wind 15 MW Reference Turbine on a 1:70 scale floating semisubmersible platform, are compared with OpenFAST simulations. Four experimental campaigns were performed, and data from the fourth campaign, which focused on wind and wave testing of the scaled floating wind turbine system, are considered. Simulations of wave-only, wind-only, and wind/wave environments are performed in OpenFAST, and results for key metrics are compared with the experiment. Performance of the real-time Reference OpenSource COntroller (ROSCO) in above-rated wind conditions, including the effects of the floating feedback loop, are investigated. Results show good agreement in mean values for key metrics, and hydrodynamic effects are matched well. Differences in the surge resonant behavior of the platform are identified and discussed. The effect of the controller and floating feedback loop is evident in both the experiment and OpenFAST, showing significant reduction in platform pitch response and tower base bending load near the platform pitch natural frequency.

17 WIND ENERGY↗

Responses of a Modular Floating Wind TLP of MarsVAWT Supporting a 10 MW Vertical Axis Wind Turbine

Offshore floating wind foundations supporting a large wind turbine require a large yard facility or significant facility upgrades for their fabrication. To overcome the cost increase associated with facility upgrades, an innovative lightweight modular floating foundation is developed. The foundation comprises multiple modules to enable their assembly on water, offering many benefits and expanding fabrication options for a reduction in the overall cost of the platform. In this paper, the foundation modules and their assembly are briefly described, and an analysis of the platform’s dynamic responses is presented. The modular foundation includes a modular and lightweight tension leg platform (TLP) called “MarsVAWT” which supports a Darrieus 10 MW vertical axis wind turbine (VAWT). The platform is moored with highly pretensioned wire rope tendons. The responses of the platform are analyzed in the time domain in a semi-coupled manner under the turbine operating and parked conditions for an offshore site in the US Northeast. The tower base shear forces and bending moments increase considerably with the combination of wind and waves, compared to those with wind only. The tendon tensions on the weatherside in the operating condition at high wind speeds are comparable to the values of the 50-year extreme (parked). The tendon tension increases are highly correlated to the platform pitch, as well as the horizontal and vertical velocities and vertical acceleration at the tendon porch. The modular platform performances and tendon designs are confirmed to comply with industry standards and practices.

Boo, Sung Youn↗

One-to-one aeroservoelastic validation of operational loads and performance of a 2.8 MW wind turbine model in OpenFAST

Abstract. This article presents a validation study of the popular aeroservoelastic code suite OpenFAST leveraging weeks of measurements obtained during normal operation of a 2.8 MW land-based wind turbine. Measured wind conditions were used to generate one-to-one turbulent flow fields (i.e., comparing simulation to measurement in 10 min increments, or bins) through unconstrained and constrained assimilation methods using the kinematic turbulence generators TurbSim and PyConTurb. A total of 253 bins of 10 min of normal turbine operation were selected for analysis, and a statistical comparison in terms of performance and loads is presented. We show that successful validation of the model was not strongly dependent on the type of inflow assimilation method used for mean quantities of interest, which had median modeling errors per wind-speed interval generally within 5 %–10 % of the measurement. The type of inflow assimilation method did have a larger effect on the fatigue predictions for blade-root flapwise and tower-base fore–aft quantities, which surprisingly saw larger errors from the assumed higher-fidelity assimilation methods. Avenues for further work are discussed and include possible improvements to the aerodynamic, structural, and controller modeling that may offer insight on the origin of the up to ∼ 40 % median overprediction of fatigue for these quantities.

17 WIND ENERGY↗

Thermostructural testing of instrumented ATJ-S graphite nosetip models in the AFFDL 50 MW rent facility

Instrumented ATJ-S graphite shell nosetip models were tested in the AFFDL 50 MW RENT Facility. The inside surface of the models were instrumented with seven thermocouples and three clip-on extensometers. One thermocouple was located at the inside stagnation point and three thermocouples were located at 120 degree intervals on the aft portion of the skirt of the model. In addition, three thermocouples at 120 degree intervals plus three clip-on extensometers at 120 degree intervals offset 60 degrees from the thermocouples were located in the critical region. The outside surface temperature of the models was monitored in two locations by optical pyrometers. Finally, the tests were recorded by three high speed motion picture cameras. Pressure models and calorimeters were also tested in order to help define the flow field condition and heating distribution around the models.

Budde, C. L.↗

Engineering of beam direct conversion for a 120-kV, 1-MW ion beam

Practical systems for beam direct conversion are required to recover the energy from ion beams at high efficiency and at very high beam power densities in the environment of a high-power neutral-injection system. Such an experiment is now in progress using a 120-kV beam with a maximum total current of 20 A. After neutralization, the H(+) component to be recovered will have a power of approximately 1 MW. A system testing these concepts has been designed and tested at 15 kV, 2 kW in preparation for the full-power tests. The engineering problems involved in the full-power tests affect electron suppression, gas pumping, voltage holding, diagnostics, and measurement conditions. Planning for future experiments at higher power includes the use of cryopumping and electron suppression by a magnetic field rather than by an electrostatic field. Beam direct conversion for large fusion experiments and reactors will save millions of dollars in the cost of power supplies and electricity and will dispose of the charged beam under conditions that may not be possible by other techniques.

Barr, W. L.↗