Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Lunar Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Sampling and Control Circuit Board for an Inertial Measurement Unit

Spacesuit navigation is one component of NASA s efforts to return humans to the Moon. Studies performed at the NASA Glenn Research Center (GRC) considered various navigation technologies and filtering approaches to enable navigation on the lunar surface. As part of this effort, microelectromechanical systems (MEMS) inertial measurement units (IMUs) were studied to determine if they could supplement a radiometric infrastructure. MEMS IMUs were included in the Lunar Extra-Vehicular Activity Crewmember Location Determination System (LECLDS) testbed during NASA s annual Desert Research and Technology Studies (D-RATS) event in 2009 and 2010. The testbed included one IMU in 2009 and three IMUs in 2010, along with a custom circuit board interfacing between the navigation processor and each IMU. The board was revised for the 2010 test, and this paper documents the design details of this latest revision of the interface circuit board and firmware.

Chelmins, David↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

NASA's Robotic Lunar Exploration Program (RLEP) 2 Mission

Before returning humans to the Moon for mankind's seventh lunar landing, NASA will embark upon a series of robotic missions to prepare the way for further exploration. These missions, part of the Robotic Lunar Exploration Program (RLEP), are designed to acquire decisive knowledge about the moon as well as to develop infrastructure needed to sustain human exploration in the lunar environment. Here we focus on the second mission in the RLEP program, RLEP-2, the first dedicated to landing in the south polar region of the moon. Managed by NASA's Marshall Space Flight Center in Huntsville, Alabama, along with the Applied Physics Laboratory and NASA Goddard Space Flight Center, RLEP-2 will build upon knowledge gained from the Chandraayan-1 and Lunar Robotic Orbiter orbital missions, to help further the prospects for sustainable human exploration on the moon. This mission will characterize the lighting environment in the polar region, critically important to understanding the amount of power available and to the thermal design of hardware, as well as explore the nature and distribution of volatiles that may be present in permanently shadowed regions of polar craters. We shall review the current status of the mission, articulate the results of onoging trade studies in power, surface mobility, launch vehicles, measurements and instrumentation, and navigation/communication, as well as discuss the primary mission objectives in detail.

Horack, John M.↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar Base↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Relevant Environment Additive Construction Technology (REACT)

Project Overview This project is focused on developing technologies that enable construction of a Lunar Safe Haven type structure on the moon. A full scale architectural and structural design will be completed based on lunar conditions and Artemis mission needs. A scaled structure will be 3D printed in simulated lunar environments. Technical Approach Polymer bound regolith composite materials will be developed and characterized for lunar additive construction applications. A full scale architectural and structural design will be completed based on the latest scientific data on lunar environments including radiation, meteoroids, thermal conditions, reduced gravity, and moonquakes. The project will culminate with a demonstration of additive construction in simulated lunar vacuum, thermal, regolith, and UV conditions. Results/Summary Preliminary material specifications have been developed and an initial batch has been produced. A first iteration of the architectural and structural designs have been completed. Hardware for 3D printing in simulated lunar conditions is under development. Contributing Partners AI Space Factory – Winner of the NASA 3D Printed Habitat Centennial Challenge Infusion and Transition Plan On-surface construction of infrastructure is a critical capability of the sustainable phase of the Artemis Program and eventual sustainable human presence on Mars. It provides the ability to create protective shelters on-demand using local resources. The 3D-printing technology will achieve TRL 6 in 1g/vacuum tests with thermal/UV exposure in this project. CLPS missions will be pursued for infusion to demonstrate vertical construction with lunar regolith and conditions. Modeling and simulation will be used to define the pilot-scale shelter construction mission for long-term exposure on the lunar surface to validate the system for Artemis operational deployment.

Lunar Construction↗

On The Incorporation of Both Function-Driven Requirements and Topology Optimization in The Development of Lunar Launch & Landing Pads

In the design of additively manufactured structures, there can be a constant battle between focusing on function-driven design and topology optimization in an attempt to improve a products ability to meet all requirements. Function-driven optimization is defined as the process of identifying the best design parameters that satisfy project functionality requirements. Function-driven optimization is typically implemented by a designer(s) who, instead of computational limitations, has human bias for the input or inputs determined. On the other hand, topology optimization is defined as a mathematical method that optimizes material layout within a given design space, for a given set of loads, boundary conditions, and constraints with the goal of maximizing the performance of the system. In topology optimization, the work is defined by the limited mathematical inputs and computationally available goals/restraints. If not evaluated simultaneously, these two approaches can result in fundamentally different design concepts meant to address the same requirements. NASA’s Artemis program includes the development of a base camp near the lunar South Pole. After site selection is made, one of the first infrastructure elements needed will be a launch and landing pad (LLP). The construction of such a pad will prevent damage to nearby structures from plume-surface interaction (PSI) while also providing a stable platform for the lander. These benefits reduce the required distance between the established landing zones and other settlement infrastructure. In this paper, the authors evaluate the requirements associated with lunar LLP development, application of both functional and topological optimization techniques, methodologies to combine the two techniques, and potential impacts on final design of such a pad.

In-situ↗

Low cost communication support of Lunar Missions

We present a concept and architecture for a low-cost communications infrastructure for these missions. There are two major elements: Earth stations and a small lunar relay constellation.

Deep Space Network (DSN) array↗

Microwave Structure Construction Capability Year One Accomplishments

The Microwave Structure Construction Capability (MSCC) element, part of the Moon to Mars Planetary Autonomous Construction Project (MMPACT) was initiated in 2020. MSCC is responsible for creating horizontal and vertical infrastructure on the moon using microwave energy. Microwave energy was selected since it is the only method to volumetrically heat the regolith. All other sintering/melting methods rely on thermal conduction through the very low conductivity surface, resulting in an inefficient process. Advances were achieved in materials characterization and understanding, microwave sintering in vacuum, and microwave design and analyses. Two dielectric property testing systems have been developed at Radiance Technologies and JPL. These will examine dielectric properties at cryogenic temperatures and over a broad frequency range. Permittivity and permeability testing at -60 ̊C in vacuum from 0.05 to 3 GHz has been generated at JPL. Additional modifications will be made to go to -190 ̊C (LN2). Radiance Technologies created a test system to measure dielectric properties at greater than 10 GHz and initiated work on developing a vacuum capable, portable test system to measure dielectric properties of Apollo regolith and simulants from 100 MHz to 18 GHz. These tests are to identify optimal heating frequencies and protocols. During microwave sintering at about 1100 ̊C, volatiles were creating difficulty in achieving a reasonably dense specimen. Due to processing in vacuum and the nature of the lunar regolith, some volatiles and porosity are expected. However, the Earth produced simulants have non-lunar materials in them that create volatiles that aren’t representative of lunar regolith. Therefore, a five month effort was conducted to establish a heat treat method to remove these non-lunar materials. Tests were conducted using TGA mass spectrometry, heating in vacuum and conducting mass spectrometry, dielectric and DTA, Raman, BET, particle size analysis, morphological analysis, carbon and sulfur chemical content determination and microscopy. The process has been scaled-up to 6 kg batch size and undergoing evaluation. A 36 kg batch size is the target for JSC-1A and other limited availability simulants. These calcining protocols will be standard for NASA and beyond. MSCC has also created scalable processes for fabricating synthetic lunar materials. Processes to fabricate Anorthite (plagioclase CaAl2Si2O8), Diopside (pyroxene CaMgSi₂O₆), and Enstatite (pyroxene Mg2Si2O6) have been generated. These materials will enable generation of microwave sintering models to bound various composition ranges anticipated on the Moon, therefore mitigating the need for a precise simulant with respect to location on the Moon. Successful microwave sintering in air using a horn applicator was demonstrated. All previous microwave vacuum sintering in the literature was at small scale and in a contained enclosure thus taking advantage of reflections. This is the first to use a lunar like microwave applicator to sinter ceramic in a bed as it would be done on the Moon. Small scale and inert sintering were conducted to assist in developing protocols with quicker turnaround times than larger scale testing. Testing has anchored thermal analysis predicting heat flow in vacuum during microwave sintering. Thermal conductivity testing was also initiated. Microwave coupling to the regolith has been modeled by multiple organizations and with different software packages. At least six horn designs and applicator configurations for both magnetron and solid state sources are being examined. Optimal simulant container designs for microwaves have also been generated. The power and electronics design for the solid state microwave system has been initiated. Concept designs for a lander based microwave sintering have been evaluated.

microwave↗

Robotic missions for the moon

In the course of the exploration and settlement of the moon, robotic missions will precede and accompany humans. These robotic missions are defined respectively as precursors and adjuncts. Their contribution is twofold: to generate information about the lunar environment (and system performance in that environment), and to emplace elements of infrastructure for subsequent use. This paper describes information that may be gathered by robotic missions and infrastructure elements that may be deployed by them during an early lunar program phase.

Bourke, R. D.↗

First steps to lunar manufacturing: Results of the 1988 Space Studies Institute Lunar Systems Workshop

Prior studies by NASA and the Space Studies Institute have looked at the infrastructure required for the construction of solar power satellites (SPS) and other valuable large space systems from lunar materials. This paper discusses the results of a Lunar Systems Workshop conducted in January 1988. The workshop identified components of the infrastructure that could be implemented in the near future to create a revenue stream. These revenues could then be used to 'bootstrap' the additional elements required to begin the commercial use of nonterrestrial materials.

Maryniak, Gregg E.↗

The Application of Advanced Electric Propulsion on the NASA Power and Propulsion Element (PPE)

NASA is charged with landing the first American woman and next American man on the South Pole of the Moon by 2024. To meet this challenge, NASA's Gateway will develop and deploy critical infrastructure required for operations on the lunar surface and that enables a sustained presence on and around the moon. NASA's Power and Propulsion Element (PPE), the first planned element of NASA's cis-lunar Gateway, leverages prior and ongoing NASA and U.S. industry investments in high-power, long-life solar electric propulsion technology investments. NASA awarded a PPE contract to Maxar Technologies to demonstrate a 2,500 kg xenon capacity, 50 kW-class SEP spacecraft that meets Gateway's needs, aligns with industry's heritage spacecraft buses, and allows extensibility for NASA's Mars exploration goals. Maxar's PPE concept design, is based directly on their high heritage, modular, highly reliable 1300-series bus architecture. The electric propulsion system features two 13 kW Advanced Electric Propulsion (AEPS) strings from Aerojet Rocketdyne and a Maxar-developed system comprised of four Busek 6 kW Hall-effect thrusters mounted in pairs on large range of motion pointing arms with four 6 kW-class, SPT-140-based PPUs. NASA is continuing to develop the 13 kW AEPS system through a contract with Aerojet Rocketdyne. In addition to the flight demonstration of an advanced electric propulsion system on PPE, a government-furnished plasma diagnostics package is planned to assess on-orbit performance characteristics and vehicle interactions. The paper will present overviews of NASA's Gateway and the PPE Project, the Maxar ion propulsion subsystem, the status of the two electric propulsion system developments, and the implementation of the plasma diagnostics package on the Maxar PPE spacecraft. The project is currently heading into SRR, with the propulsion build scheduled for 2021, and launch in 2022.

Herman, Daniel A.↗

Lunar Commercialization Workshop

This slide presentation describes the goals and rules of the workshop on Lunar Commercialization. The goal of the workshop is to explore the viability of using public-private partnerships to open the new space frontier. The bulk of the workshop was a team competition to create a innovative business plan for the commercialization of the moon. The public private partnership concept is reviewed, and the open architecture as an infrastructure for potential external cooperation. Some possible lunar commercialization elements are reviewed.

Martin, Gary L.↗

Selenia: A habitability study for the development of a third generation lunar base

When Apollo astronauts landed on the Moon, the first generation of lunar bases was established. They consisted essentially of a lunar module and related hardware capable of housing two astronauts for not more than several days. Second generation lunar bases are being developed, and further infrastructure, such as space station, orbital transfer, and reusable lander vehicles will be necessary, as prolonged stay on the Moon is required for exploration, research, and construction for the establishment of a permanent human settlement there. Human life in these habitats could be sustained for months, dependent on a continual flow of life-support supplies from Earth. Third-generation lunar bases will come into being as self sufficiency of human settlements becomes feasible. Regeneration of water, oxygen production, and development of indigenous construction materials from lunar resources will be necessary. Greenhouses will grow food supplies in engineered biospheres. Assured protection from solar flares and cosmic radiation must be provided, as well as provision for survival under meteor showers, or the threat of meteorite impact. All these seem to be possible within the second decade of the next century. Thus, the builders of Selenia, the first of the third-generation lunar bases are born today. During the last two years students from the School of Architecture of the University of Puerto Rico have studied the problems that relate to habitability for prolonged stay in extraterrestrial space. An orbital personnel transport to Mars developed originally by the Aerospace Engineering Department of the University of Michigan was investigated and habitability criteria for evaluation of human space habitats were proposed. An important finding from that study was that the necessary rotational diameter of the vessel has to be on the order of two kilometers to ensure comfort for humans under the artificial gravity conditions necessary to maintain physiological well being of passengers, beyond the level of mere survival.

Source record↗

Lunar campsite concept: Space transfer concepts and analysis for exploration missions

The lunar Campsite concept responds to a perceived need to identify early manned science and exploration missions that require minimal initial funding. The Campsite concept defers the build-up of many infrastructure components without escalating total program costs. The lunar Campsite has been sized nominally for four crew for 42 days (1 lunar night and 2 lunar days), but can be modified to span two lunar nights up to 60 days. Total mission fulfillment requires five Earth-to-LEO launches, four (100 mt class launch vehicle) for the two vehicle assemblies and one (PLS or NSTS) for the crew. The lunar Campsite mission mode is tandem direct using a booster stage and a lander stage. The booster is separated from the lander after the TLI burn and is expended into the Earth's atmosphere. In the Campsite mode, the lander lands on the surface not to be returned. In the crew delivery mode, the lander is guided to a precision landing about 500 m from the Campsite, and with enough propellant to return the crew to Earth. The Campsite consists of a habitat and airlock, body mounted radiators with a surface shield, sun tracking solar arrays, and an Earth-tracking high-gain antenna. The CV is very similar to the campsite delivery vehicle. The CV does not, however, have radiators or solar arrays. The vehicle stacks are essentially common in that they utilize the same structure system and engines, the same propellant tanks, the same 'cut-out' in which the CRV and payloads are incorporated, and the same RCS locations. The booster and lander stage propellant tank propellant capacities are identical and have margins which would allow additional fueling for propulsive capture of the boost stage into Earth orbit. This contractual study was performed to identify Campsite and vehicle interfaces and vehicle requirements, and to surface issues related to the integration of the Campsite and LTV's.

Source record↗

Selection, Production, and Properties of Regolith Polymer Composites for Lunar Construction

NASA’s Artemis Program seeks to establish a long-term presence on the moon to enable scientific discoveries and utilization of lunar resources through public-private partnerships. Over the next decades, a lunar spaceport enabling regular transportation from and to Earth will need to be established to provide the services and facilities that are necessary to achieve this goal. Robotic construction technologies using in-situ materials must be developed to build up enabling infrastructure such as launch/landing pads, blast protection, power/communications towers, improved trafficability pathways and radiation protection shelters. Kennedy Space Center’s Granular Mechanics and Regolith Operations laboratory at Swamp Works has partnered with AI SpaceFactory to develop the architectural and structural design of an unpressurized shelter. The shelter, called Lina, is designed to protect astronauts and surface assets from radiation, meteoroid impact, moon quakes and thermal gradients. Lina’s structural design criteria and the resulting structure design are detailed in separate papers. A Fused Filament Fabrication (FFF) construction process using regolith polymer composites has been developed. This paper presents the material formulations and selection rationale for each of the composite components. Formulations include 70:30, 80:20, and 85:15 wt.% mixture ratios of lunar mare simulant Black Point-1 (BP-1): Polylactic Acid (PLA), 80:20 Lunar Highlands Simulant (LHS-1): PLA and an 80:20 BP-1:PLA formulation with a processing aid/compatibilizer additive. Test samples were printed in simulated lunar dirty thermal vacuum conditions (~-180 °C, ~10 -3 torr). The test environment evolved throughout the duration of the print process. A series of tests were performed to characterize the mixture ratios achieved for each formulation, the off-gassing products during vacuum printing, the strength properties, and porosity of printed products. The LHS-1: PLA formulation yielded an advantageous combination of properties and was used in a final test that additively constructed a sub-scaled Lina on regolith simulant in dirty vacuum conditions.

lunar infrastructure↗

The Use of Solar Heating and Heat Cured Polymers for Lunar Surface Stabilization

Dust ejecta can affect visibility during a lunar landing, erode nearby coated surfaces and get into mechanical assemblies of in-place infrastructure. Regolith erosion was observed at many of the Apollo landing sites. This problem needs to be addressed at the beginning of the lunar base missions, as the amount of infrastructure susceptible to problems will increase with each landing. Protecting infrastructure from dust and debris is a crucial step in its long term functionality. A proposed way to mitigate these hazards is to build a lunar launch pad. Other areas of a lunar habitat will also need surface stabilization methods to help mitigate dust hazards. Roads would prevent dust from being lifted during movement and dust free zones might be required for certain areas critical to crew safety or to critical science missions. Work at NASA Kennedy Space Center (KSC) is investigating methods of stabilizing the lunar regolith including: sintering the regolith into a solid and using heat or UV cured polymers to stabilize the surface. Sintering, a method in which powders are heated until fusing into solids, has been proposed as one way of building a Lunar launch/landing pad. A solar concentrator has been built and used in the field to sinter JSC-1 Lunar stimulant. Polymer palliatives are used by the military to build helicopter landing pads and roads in dusty and sandy areas. Those polymers are dispersed in a solvent (water), making them unsuitable for lunar use. Commercially available, solvent free, polymer powders are being investigated to determine their viability to work in the same way as the solvent borne terrestrial analog. This presentation will describe the ongoing work at KSC in this field. Results from field testing will be presented. Physical testing results, including compression and abrasion, of field and laboratory prepared samples will be presented.

Hintze, Paul↗