Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch Campaign”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Inversion of multiangular polarimetric measurements from the ACEPOL campaign: an application of improving aerosol property and hyperspectral ocean color retrievals

NASA's Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission, scheduled for launch in the time frame of late 2022 to early 2023, will carry the Ocean Color Instrument (OCI), a hyperspectral scanning radiometer, and two multiangle polarimeters (MAPs), the UMBC Hyper-Angular Rainbow Polarimeter 2 (HARP2) and the SRON Spectro-Polarimeter for Planetary EXploration one (SPEXone). One purpose of the PACE MAPs is to better characterize aerosol properties, which can then be used to improve atmospheric correction for the retrieval of ocean color in coastal waters. Though this is theoretically promising, the use of MAP data in the atmospheric correction of colocated hyperspectral ocean color measurements have not yet been well demonstrated. In this work, we performed aerosol retrievals using the MAP measurements from the Research Scanning Polarimeter (RSP) and demonstrate its application to the atmospheric correction of hyperspectral radiometric measurements from SPEX airborne. Both measurements were collected on the same aircraft from the Aerosol Characterization from Polarimeter and Lidar (ACEPOL) field campaign in 2017. Two cases over ocean with small aerosol loading (aerosol optical depth ∼0.04) are identified including colocated RSP and SPEX airborne measurements and Aerosol Robotic Network (AERONET) ground-based observations. The aerosol retrievals are performed and compared with two options: one uses reflectance measurement only and the other uses both reflectance and polarization. It is demonstrated that polarization information helps reduce the uncertainties of aerosol microphysical and optical properties. The retrieved aerosol properties are then used to compute the contribution of atmosphere and ocean surface for atmospheric correction over the discrete bands from RSP measurements and the hyperspectral SPEX airborne measurements. The water-leaving signals determined this way are compared with both AERONET and Moderate Resolution Imaging Spectroradiometer (MODIS) ocean color products for performance analysis. The results and lessons learned from this work will provide a basis to fully exploit the information from the unique combination of sensors on PACE for aerosol characterization and ocean ecosystem research.

Meng Gao↗

Project Centaur

The National Aeronautics and Space Administration (NASA) and the Canada Centre for Space Science, National Research Council of Canada (NRCC), conducted a cooperative sounding rocket campaign in the Canadian Arctic during November/December 1981. The objective of the campaign was to investigate the earth's dayside magnetic cleft region. The project was named CENTAUR for Cleft Energetics Transport and Ultraviolet Radiation. Remote launch support facilities were established at Cape Parry, NWT, Canada (70 deg 10 min N latitude, 124 deg 40 min W longitude). The cleft region is accessible from this location when launched poleward during reasonably quiet magnetic activity. Five large sounding rockets were launched (3 NASA, 2 NRCC). About 30 scientific experiments were launched, and an extensive array of ground based experiments was established at Cape Parry and at Sachs Harbour, Banks Island, 130 miles poleward. This paper discusses the unique organization, planning, facilities, instrumentation, and operation required to support the campaign, and looks briefly at the results.

Brence, W. A.↗

A diurnal study of the electrical structure of the equatorial middle atmosphere

Electrical parameters measured from 115 km down to below 20 km during the Project Condor campaign at the Punta Lobos Rocket Range near Lima, Peru, are presented. Ten rocket-launched payloads measured electrical conductivity. A strong diurnal influence due to solar ultraviolet radiation is shown. Nine of the payloads also measured electric fields. No large mesospheric vertical electric fields are found in the data. A calculation of the dc global conduction current density at 18 km is smaller than previously measured at low latitudes and does not show the conventional diurnal variation.

Croskey, C. L.↗

The Mars Exploration Rover Project

The twin rovers of the Mars Exploration Rover Project successfully landed on the surface of Mars in January 2004, and initiated a highly successful science and exploration campaign. This marked the culmination of an unprecedented four-year effort to design, build, launch, and operate two of the most complex planetary spacecraft ever built. The project was started in the aftermath of the 1999 Mars mission failures, and was commissioned to take advantage of the highly advantageous 2003 opportunity. The development schedule from project start to launch was only 35 months, so schedule management was the most significant challenge facing the project. This problem was compounded when early assumptions about the extent of design heritage from Mars Pathfinder proved to be flawed. The project derived a number of useful lessons learned in solving these challenges that can be applied to future missions.

Mars↗

Suborbital Testing of the OSCAR Trash-to-Gas System

With the sustained human exploration of nearby celestial bodies on the horizon, a renewed outlook on crew waste management must be realized. Current waste management strategies aboard the International Space Station become impractical as we venture beyond low Earth orbit. Furthermore, for future exploration missions, extracting resources from various waste streams becomes increasingly advantageous. One method of combatting the long-duration waste management problem is by thermally degrading solid and liquid crew waste items into a chemically inert, ventable gas stream, a process known as Trash-to-Gas. The Orbital Syngas/Commodity Augmentation Reactor (OSCAR) is the state-of-the-art Trash-to-Gas system which has been designed to explore microgravity Trash-to-Gas concepts for improved mass/volume reduction and resource recovery from waste. OSCAR is a subscale testbed design that supports the NASA Logistics Reduction project under the Advanced Exploration Systems Program and Space Technology Mission Directorate Flight Opportunities Program to determine the feasibility of Trash-to-Gas technology for future use on long duration space missions. OSCAR has flown on two suborbital flight demonstrations aboard Blue Origin’s New Shepard launch vehicle. This paper presents a high-level comparative analysis of these microgravity test campaigns with Earth gravity laboratory experiments. Solid-to-gas conversion, gas production & composition, and reactor temperature & pressure are compared to highlight the operational factors and performance differences within the microgravity environment for future optimization.

Ray P Pitts↗

Updated Mars Mission Architectures Featuring Nuclear Thermal Propulsion

Nuclear thermal propulsion (NTP) can potentially enable routine human exploration of Mars and the solar system. By using nuclear fission instead of a chemical combustion process, and using hydrogen as the propellant, NTP systems promise rocket efficiencies roughly twice that of the best chemical rocket engines currently available. The most recent major Mars architecture study featuring NTP was the Design Reference Architecture 5.0 (DRA 5.0), performed in 2009. Currently, the predominant transportation options being considered are solar electric propulsion (SEP) and chemical propulsion; however, given NTP's capabilities, an updated architectural analysis is needed. This paper provides a top-level overview of several different architectures featuring updated NTP performance data. New architectures presented include a proposed update to the DRA 5.0 as well as an investigation of architectures based on the current Evolvable Mars Campaign, which is the focus of NASA's current analyses for the Journey to Mars. Architectures investigated leverage the latest information relating to NTP performance and design considerations and address new support elements not available at the time of DRA 5.0, most notably the Orion crew module and the Space Launch System (SLS). The paper provides a top level quantitative comparison of key performance metrics as well as a qualitative discussion of improvements and key challenges still to be addressed. Preliminary results indicate that the updated NTP architectures can significantly reduce the campaign mass and subsequently the costs for assembly and number of launches.

Rodriguez, Mitchell A.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Australian Soil Moisture Field Experiments in Support of Soil Moisture Satellite Observations

Large-scale field campaigns provide the critical fink between our understanding retrieval algorithms developed at the point scale, and algorithms suitable for satellite applications at vastly larger pixel scales. Retrievals of land parameters must deal with the substantial sub-pixel heterogeneity that is present in most regions. This is particularly the case for soil moisture remote sensing, because of the long microwave wavelengths (L-band) that are optimal. Yet, airborne L-band imagers have generally been large, heavy, and required heavy-lift aircraft resources that are expensive and difficult to schedule. Indeed, US soil moisture campaigns, have been constrained by these factors, and European campaigns have used non-imagers due to instrument and aircraft size constraints. Despite these factors, these campaigns established that large-scale soil moisture remote sensing was possible, laying the groundwork for satellite missions. Starting in 2005, a series of airborne field campaigns have been conducted in Australia: to improve our understanding of soil moisture remote sensing at large scales over heterogeneous areas. These field data have been used to test and refine retrieval algorithms for soil moisture satellite missions, and most recently with the launch of the European Space Agency's Soil Moisture Ocean Salinity (SMOS) mission, to provide validation measurements over a multi-pixel area. The campaigns to date have included a preparatory campaign in 2005, two National Airborne Field Experiments (NAFE), (2005 and 2006), two campaigns to the Simpson Desert (2008 and 2009), and one Australian Airborne Cal/val Experiment for SMOS (AACES), just concluded in the austral spring of 2010. The primary airborne sensor for each campaign has been the Polarimetric L-band Microwave Radiometer (PLMR), a 6-beam pushbroom imager that is small enough to be compatible with light aircraft, greatly facilitating the execution of the series of campaigns, and a key to their success. An L-band imaging radar is being added to the complement to provide simultaneous active-passive L-band observations, for algorithm development activities in support of NASA's upcoming Soil Moisture Active Passive (.S"M) mission. This paper will describe the campaigns, their objectives, their datasets, and some of the unique advantages of working with small/light sensors and aircraft. We will also review the main scientific findings, including improvements to the SMOS retrieval algorithm enabled by NAFE observations and the evaluation of the Simpson Desert as a calibration target for L-band satellite missions. Plans for upcoming campaigns will also be discussed.

Kim, Edward↗

Mars Ascent Vehicle Hybrid Propulsion Development

Hybrid propulsion is being investigated as a propulsion method for a possible Mars Ascent Vehicle (MAV) application. MAV is part of a proposed larger Mars Sample Return (MSR) campaign plan to bring samples from Mars to earth for examination. The Mars Ascent Vehicle would launch Mars surface samples found and packaged by the Mars 2020 mission to orbit around Mars. This version of hybrid propulsion is based on a wax based solid fuel, called SP7A, and a Mixed Oxides of Nitrogen oxidizer, MON-25. SP7 is a new fuel formulation developed by Space Propulsion Group and was modified for this application to be resistant to Mars temperature extremes and modified again to lower the regression rate to become SP7A. MON-25 was chosen for its low freezing temperature. Due to cost constraints, MON-3 was the oxidizer used during testing through 2018. In 2019, full scale hybrid testing with MON-25 commenced in Mojave, CA by Whittinghill Aerospace. One flight motor will be subjected to thermal cycling in a vacuum and later fired in a vacuum to demonstrate the proposed Liquid Injection Thrust Vector Control system performance at White Sands Test Facility (WSTF). In addition, there will be MON-25 characterization work done at Purdue University and WSTF. Additional testing of subscale and full scale motors will be conducted with MON-3 with fuel grain stress, fuel grain support and case design test objectives by Space Propulsion Group Inc. of Butte, MT. This paper documents some of the testing, issues and accomplishments with the MAV hybrid propulsion option that is being considered (along with a two-stage solid propulsion option).

Story, G. T.↗

Mars Sample Return Mission Concept Status

This paper will provide an overview of current concepts and options for the architecture and design of a Mars Sample Return Mission, including the Sample Retrieval Lander (SRL) (developed by NASA) and the Earth Return Orbiter (ERO) (developed by ESA) . Key mission objectives and the overall campaign will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit and return to Earth. The overall SRL lander vehicle concept will be described, including current options being evaluated. Key lander element options that have been studied will be discussed, including the Mars Ascent Vehicle (MAV), Sample Fetch Rover (provided by ESA), Orbiting Sample container (OS), and sample tube transfer robotics systems. For the ERO the vehicle concept will be described including key interfaces with the Capture/Containment and Return System (CCRS). Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and backward planetary protection. The information provided about possible Mars sample return architectures is for planning and discussion purposes only. NASA has made no official decision to implement Mars sample return.

Muirhead, Brian K↗

Fan Noise Predictions of the NASA Source Diagnostic Test using Unsteady Simulations with LAVA Part II - Tonal and Broadband Noise Assessment

The NASA Source Diagnostic Test (SDT) campaign experimental data is used for validation of a sliding mesh technique recently implemented within the Launch, Ascent, and Vehicle Aerodynamics computational framework for time-accurate simulation of rotating fans. The far-field acoustics are analyzed in this work, building upon the aerodynamic validation studies previously published in Part I. Two modeling approaches are explored: the unsteady Reynolds-averaged Navier Stokes (uRANS) with the negative Spalart-Allmaras (SA-neg) turbulence model closure, and a hybrid Reynolds-averaged Navier Stokes/large-eddy simulation (RANS/LES) paradigm employing a zonal detached-eddy simulation (ZDES) closure with enhanced shielding protection. Two convective flux scheme approaches with different dissipation properties are also explored with ZDES. The Ffowcs-Williams and Hawkings (FW-H) permeable surface approach is used for propagation of the near-field acoustics to the far-field microphone locations. This work analyzes the low-speed (approach) condition, characterized by a fan rotation speed of 7808 rotations-per-minute (RPM). Three different grid levels ranging between 200 million and 1.1 billion grid points are considered. Results show good prediction of the broadband noise levels at sideline angles ranging between 70° and 110°. The forward arc observers show an under-prediction of the overall sound pressure levels (OASPL) even at the fine grid level. A breakdown of the inlet and exhaust contributions reveals a steep drop-off in the broadband noise levels past a blade-passing frequency (BPF) of 1.5, potentially caused by a lack of resolved small-scale turbulent fluctuations in the interstage region. Past 110° the OASPL are over-predicted by up to 10 dB due to an over-prediction of the low-frequency broadband noise levels in the aft arc. The detuning of BPF2 caused by small deviations in the blade stagger angle around the wheel is captured, and a corresponding decrease in the sound power level for this cut-on tone is observed.

AATT↗

Developments on Low Cost Manufacturing Methods for Cylindrical Launch Vehicle Structures

Due to the increasing international competition and growing pressure to lower the cost of launch vehicles, enhanced technologies and competences for efficient, low cost manufacturing have to be developed. In this paper, an innovative manufacturing technology for launch vehicle applications is presented that was developed over the last few years at MT Aerospace AG (MTA) in collaboration with NASA Langley Research Center, the European Space Agency (ESA), Lockheed Martin Corporation (LMCO), Leifeld Metal Spinning and Scot Forge. The Integrally Stiffened Cylinder (ISC) manufacturing method was first investigated in 2010. Early results indicated a high mass saving potential for cylindrical structures for launch vehicle systems, such as cryogenic tank barrels and intertanks, produced using the ISC method. Cost-benefit studies conducted at NASA and MTA estimated up to 50% reduction in manufacturing costs is possible compared to conventional multi-piece, welded fabrication methods. Associated reductions in manufacturing lead times have shown that a 40% faster production rate is possible by the ISC process. Following proof of concept and process development efforts, a cylindrical structure manufactured using the ISC method had its maiden flight in 2015 on a Black Brant sounding rocket at NASA Wallops Flight Facility. Further collaboration between ESA, NASA, MTA, LMCO, and Scot Forge led to manufacturing test campaigns at MT Aerospace in 2017 and 2018 that successfully demonstrated ISC fabrication at a scale representative of commercial launch vehicles. This paper summarizes the status and relevant results of the development sequence of the ISC cylinder manufacturing method. Results of cost / benefit and structural performance analyses are also summarized. Moreover, an outlook will be given on further planned activities and development steps.

Martin Stachulla↗

Delving into the depths of NGC 3783 with XRISM II. Cross-calibration of X-ray instruments used in the large, multi-mission observational campaign

Context. Accurate X-ray spectroscopic measurements are fundamental for deriving basic physical parameters of the most abundant baryon components in the Universe. The plethora of X-ray observatories currently operational enables a panchromatic view of the high-energy emission of celestial sources. However, uncertainties in the energy-dependent calibration of the instrument transfer functions (e.g. the effective area, energy redistribution, or gain) can limit - and historically, did limit - the accuracy of X-ray spectroscopic measurements. Aims. We revised the status of the cross-calibration among the scientific payload on board four operation missions: Chandra, NuSTAR, XMM-Newton, and the recently launched XRISM. XRISM carries the micro-calorimeter Resolve, which yields the best energy resolution at energies ≥2 keV. For this purpose, we used the data from a 10-day-long observational campaign targeting the nearby active galactic nucleus NGC 3783, carried out in July 2024. Methods. We present a novel model-independent method for assessing the cross-calibration status that is based on a multi-node spline of the spectra with the highest-resolving power (XRISM/Resolve in our campaign). We also estimated the impact of the intrinsic variability of NGC 3783 on the cross-calibration status due to the different time coverages of participating observatories and performed an empirical reassessment of the Resolve throughput at low energies. Results. Based on this analysis, we derived a set of energy-dependent correction factors of the observed responses, enabling a statistically robust analysis of the whole spectral dataset. They will be employed in subsequent papers describing the astrophysical results of the campaign. Aims. We revised the status of the cross-calibration among the scientific payload on board four operation missions: Chandra, NuSTAR, XMM-Newton, and the recently launched XRISM. XRISM carries the micro-calorimeter Resolve, which yields the best energy resolution at energies ≥2 keV. For this purpose, we used the data from a 10-day-long observational campaign targeting the nearby active galactic nucleus NGC 3783, carried out in July 2024. Methods. We present a novel model-independent method for assessing the cross-calibration status that is based on a multi-node spline of the spectra with the highest-resolving power (XRISM/Resolve in our campaign). We also estimated the impact of the intrinsic variability of NGC 3783 on the cross-calibration status due to the different time coverages of participating observatories and performed an empirical reassessment of the Resolve throughput at low energies. Results. Based on this analysis, we derived a set of energy-dependent correction factors of the observed responses, enabling a statistically robust analysis of the whole spectral dataset. They will be employed in subsequent papers describing the astrophysical results of the campaign.

Active Galactic Nuclei, individual: NGC 3783↗

Mars Ascent Vehicle - Payload?, Spacecraft?, Launch Vehicle? - A Systems Approach to MAV

Significant effort has been expended over the past few years in order to examine propulsion technologies for an eventual robotic Mars Ascent Vehicle (MAV). The recent emphasis on studies for an overall sample return campaign, and specifically the Sample Return Lander (SRL) includes the full slate of systems required to implement a MAV. Depending on your point of view, the MAV is a major SRL flight system payload, a Mars Surface Spacecraft, or a Launch Vehicle. We will examine the MAV from these three perspectives in order to tease out the key architectural trades required to be completed prior to the start of a project Phase A activity.

Jackman, Angie↗

Multi-Spectral Lidar Observations and Balloon Borne Validation of SO 2 -O 3 During the SOWLETS Campaign: An Examination of Local Incinerator Plume

The Langley Mobile O3 Lidar (LMOL) was stationed at NASA's Langley Research Center for the initiation of the SO 2 -O 3 Water Land Environment study (SOWLETS). The primary focus of the campaign was to examine the capabilities of a novel four-wavelength detection technique to measure the concentrations of sulfur dioxide (SO2) and ozone (O3). The exact location of the lidar, near the NASA/CAPABLE site, was optimized to intercept the plume emissions from a proximate incinerator facility using historical weather data for the month of the campaign. A novel four-wavelength lidar technique focused on the detection of sulfur dioxide (SO2) and ozone (O3) was employed, and its capabilities were thoroughly examined. The technique is built upon the standard DIAL. While 3 wavelengths would be enough to retrieve both SO2 and O3, the 4 wavelengths allow to provide data on aerosol backscattering. In parallel, SO 2 -O 3 sondes were launched and installed in the nearby NASA Landing and Impact research facility, providing validation for the lidar's atmospheric measurements. In conclusion, this campaign offers an improved understanding of SO2 emissions in the local environment and a validation of a novel technique to facilitate pollution observations. It shows the promise of this new kind of lidar to better understand and validate the observations by NASA/TEMPO ("Tropospheric Emissions: Monitoring of Pollution").

G. Gronoff↗

The Goes-R Geostationary Lightning Mapper (GLM): Algorithm and Instrument Status

The Geostationary Operational Environmental Satellite (GOES-R) is the next series to follow the existing GOES system currently operating over the Western Hemisphere. Superior spacecraft and instrument technology will support expanded detection of environmental phenomena, resulting in more timely and accurate forecasts and warnings. Advancements over current GOES capabilities include a new capability for total lightning detection (cloud and cloud-to-ground flashes) from the Geostationary Lightning Mapper (GLM), and improved capability for the Advanced Baseline Imager (ABI). The Geostationary Lighting Mapper (GLM) will map total lightning activity (in-cloud and cloud-to-ground lighting flashes) continuously day and night with near-uniform spatial resolution of 8 km with a product refresh rate of less than 20 sec over the Americas and adjacent oceanic regions. This will aid in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency. In parallel with the instrument development (a prototype and 4 flight models), a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 algorithms, cal/val performance monitoring tools, and new applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. A joint field campaign with Brazilian researchers in 2010-2011 will produce concurrent observations from a VHF lightning mapping array, Meteosat multi-band imagery, Tropical Rainfall Measuring Mission (TRMM) Lightning Imaging Sensor (LIS) overpasses, and related ground and in-situ lightning and meteorological measurements in the vicinity of Sao Paulo. These data will provide a new comprehensive proxy data set for algorithm and application development.

Goodman, Steven J.↗

The GOES-R GeoStationary Lightning Mapper (GLM)

The Geostationary Operational Environmental Satellite (GOES-R) is the next series to follow the existing GOES system currently operating over the Western Hemisphere. Superior spacecraft and instrument technology will support expanded detection of environmental phenomena, resulting in more timely and accurate forecasts and warnings. Advancements over current GOES capabilities include a new capability for total lightning detection (cloud and cloud-to-ground flashes) from the Geostationary Lightning Mapper (GLM), and improved capability for the Advanced Baseline Imager (ABI). The Geostationary Lighting Mapper (GLM) will map total lightning activity (in-cloud and cloud-to-ground lighting flashes) continuously day and night with near-uniform spatial resolution of 8 km with a product refresh rate of less than 20 sec over the Americas and adjacent oceanic regions. This will aid in forecasting severe storms and tornado activity, and convective weather impacts on aviation safety and efficiency among a number of potential applications. In parallel with the instrument development (a prototype and 4 flight models), a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 algorithms (environmental data records), cal/val performance monitoring tools, and new applications using GLM alone, in combination with the ABI, merged with ground-based sensors, and decision aids augmented by numerical weather prediction model forecasts. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. An international field campaign planned for 2011-2012 will produce concurrent observations from a VHF lightning mapping array, Meteosat multi-band imagery, Tropical Rainfall Measuring Mission (TRMM) Lightning Imaging Sensor (LIS) overpasses, and related ground and in-situ lightning and meteorological measurements in the vicinity of Sao Paulo. These data will provide a new comprehensive proxy data set for algorithm and application development.

Goodman, Steven J.↗

Dawn Spacecraft Performance at Ceres: Results of Hybrid Control for Ceres Mapping

Dawn is a low-thrust interplanetary spacecraft currently orbiting the dwarf planet Ceres, to better understand the early creation of the solar system. Launched in September 2007, Dawn arrived at Vesta in July 2011. After a 16-month successful science campaign at Vesta, Dawn departed for Ceres, arriving in early 2015. The Dawn spacecraft uses both reaction wheel assemblies (RWA) and a reaction control system (RCS) to provide 3-axis attitude control for the spacecraft. Reaction wheels were designed to be the primary system for attitude control, however two wheels have shown high friction anomalies and have been removed from service. The project has implemented a hybrid control algorithm using two reaction wheels and RCS thrusters. This hybrid control capability enabled Dawn to achieve very high science return, while significantly conserving remaining hydrazine propellant. With only two remaining healthy RWA’s, hybrid control became part of the baseline plan for Ceres science operations. The Dawn team developed specific operational approaches in which sequences were developed with careful consideration of science versus resource trades. Commanding and sequence planning also incorporated contingency planning, in the event that another reaction wheel may fail. Despite the differences in operational approach between Vesta and Ceres, both campaigns achieved very rich scientific data return. This paper highlights Dawn’s recent flight experience with hybrid attitude control during Ceres orbit operations. The discussion includes the approaches utilized by the Dawn team to address unique operational challenges presented by the hybrid approach, and reviews spacecraft performance under hybrid control in low orbit at Ceres. Additionally, methods used to optimize hydrazine use and thereby extend the science campaign will be presented. Finally, a preliminary assessment of an orbit transfer with two reaction wheels, during extended mission operations, is discussed.

Smith, Brett A.↗