BioNutrients-1 (BN-1) Payload Overview POIWG #43
This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of BioNutrients-1 operations.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of BioNutrients-1 operations.
The Proton Improvement Plan-II (PIP-II) is a crucial upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) with 23 cryomodules operating at 2K. The LINAC thermohydraulic conditions are satisfied by the cryogenic subsystems: Cryogenic Distribution System (CDS), a helium refrigerator cold box (CB), a warm compression station (WCS) and a helium recovery system (RSYS). The accelerator has a strict requirement of non-thermal cycling of the LINAC cryomodules during planned and unplanned subsystem outages. This paper presents an integrated operating modes analysis of the of the LINAC/CDS thermohydraulic loads satisfied by the CB/WCS cooling system supported by the RSYS inventory management system. The study is based on latest cryoplant and CDS engineering deliverables, as well as the recent performance data from single cryomodule qualification tests performed at the Fermilab PIP-II Injector Test test s tand. The study evaluates both normal and abnormal operating modes, with a focus on identifying integrated scenarios that put subsystems components under stress. The conclusions of this study will help build redundancy to reduce the risk of thermal cycles during planned and unplanned subsystem outages.
This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of Cell Science-03 operations.
This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on April 26, 2018. It provides a high-level overview of Cell Science-02 operations.
This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on October 25th, 2018. It provides a high-level overview of Cell Science-03 operations.
In January 2013, a human-in-the-loop evaluation of the Operational Airspace Sectorization Integrated System (OASIS) was conducted in the Airspace Operations Laboratory of the Human Systems Integration Division (Code TH) in conjunction with the Aviation Systems Division (Code AF). The development of OASIS is a major activity of the Dynamic Airspace Configuration (DAC) research focus area within the Aeronautics Research Mission Directorate (ARMD) Airspace Systems Program. OASIS is an advisory tool to assist Federal Aviation Administration (FAA) En Route Area Supervisors in their planning of sector combinedecombine operations as well as opening closing of Data-side (D-side) control positions. These advisory solutions are tailored to the predicted traffic demand over the next few hours. During the experiment, eight retired FAA personnel served as participants for a part-task evaluation of OASIS functionality, covering the user interface as well as the underlying algorithm. Participants gave positive feedback on both the user interface and the algorithm solutions for airspace configuration, including an excellent average rating of 94 on the tool usability scales. They also suggested various enhancements to the OASIS tool, which will be incorporated into the next tool development cycle for the full-scale human-in-the-loop evaluation to be conducted later this year.
This payload overview presentation will be presented at the Payload Operations Integration Working Group (POIWG) on October 23-25th, 2018. It provides a high-level overview of BioNutrients-1 operations.
Abstract The helium cryogenic system at Spallation Neutron Source (SNS) provides cooling to 81 superconducting radio frequency cavities. To support the operation of the cryogenic facility, a highly reliable control system consisting of software, hardware, and Human Machine Interface (HMI) has been developed and improved during the first fifteen years of operation. Integrating the cryogenic control system with other subsystems of the SNS complex is an important aspect to the success of the operation. The operating experience, lessons learned and recommendations to consider for future facilities will be detailed in this paper.
The concept of Boolean integration is developed, and different Boolean integral operators are introduced. Given the changes in a desired function in terms of the changes in its arguments, the ways of 'integrating' (i.e. realizing) such a function, if it exists, are presented. The necessary and sufficient conditions for integrating, in different senses, the expression specifying the changes are obtained. Boolean calculus has applications in the design of logic circuits and in fault analysis.
Integrate the mission operations assurance function into the flight team providing: (1) value added support in identifying, mitigating, and communicating the project's risks and, (2) being an essential member of the team during the test activities, training exercises and critical flight operations.
With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.
With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.
A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.
A concept of operations for the Assembly, Integration and Testing (AIT) and the Ground Systems Development Operations (GSDO) of the European Service Module (ESM) propulsion system has been developed. The AIT concept of operations covers all fabrication, integration and testing activities in both Europe and in the United States. The GSDO Program develops the facilities, equipment, and procedures for the loading of hypergolic propellants, the filling of high-pressure gases, and contingency de-servicing operations for the ESM. NASA and ESA along with the Lockheed Martin and Airbus Space and Defense are currently working together for the EM-1 and EM-2 missions in which the ESM will be flown as part of the Orion Multi-Purpose Crew Vehicle (MPCV). The NASA/ESA SM propulsion team is collaborating with the AIT personnel from ESA/Airbus and NASA/Lockheed Martin to ensure successful integration of the European designed Service Module propulsion system, the Lockheed Martin designed Crew Module Adapter and the heritage Space Shuttle Orbital Maneuvering System Engines (OMS-E) being provided as Government Furnished Equipment (GFE). This paper will provide an overview of the current AIT and GSDO concept of operations for the ESM propulsion system.
In flight control, as with any human in the loop system, operator error is an inevitable reality. On the International Space Station (ISS) where crew time and physical resources are precious and often irreplaceable, operator errors can result in significant, irreversible consequences. Flight controllers at the Payload Operations Integration Center (POIC) located at NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama know this reality well. At the POIC, operator errors can be caused by a variety of factors, from poor hardware or software design to environmental factors such as time pressure or fatigue. The most difficult errors to address, however, are those which result from ineffective teamwork. To address these teamwork errors, trainers at the POIC have drawn best practices from high reliability industries as well as from our sister ISS control center at the Johnson Space Center (JSC) in Houston, Texas, to develop and implement a new training program focused specifically on teamwork skills. This training program, called Team Skills Training, is inspired by modern and historical training programs developed by NASA and is specifically tailored to the needs of the payload operations flight control team at the POIC. The program consists of training for both certified and trainee flight controllers, and covers team skills topics such as situational awareness, leadership, and communication skills. To maximize effectiveness, the program uses novel instructional techniques which extend beyond the classroom to encourage students to apply what they have learned to their day to day work. Minimizing operator errors in flight control is an endeavor which requires constant vigilance and continuous improvement. At the POIC, Team Skills Training is an important step in this journey.
This paper describes a modeling effort used to develop an improved type of magnetic bearing controller, called a modal controller, for use on high speed flywheel systems. The controller design is based on models of the flywheel system, is designed to directly control the natural dynamics of the spinning rotor, and is generic enough to be readily adapted to future flywheel systems. Modeling and development are described for two key controller subsystems: the modal controller subsystem, which allows direct control over the rotor rigid body modes, and the bending mode compensation subsystem, which tracks, and prevents interference from, the rotor bending modes during flywheel operation. Integration of modeling results into the final controller is described and data taken on the NASA Glenn D1 flywheel module during high speed operation are presented and discussed. The improved modal controller described in this paper has been successfully developed and implemented and has been used for regular hands-free operation of the D1 flywheel module up to its maximum operating speed of 60,000 RPM.
Human exploration beyond low-Earth orbit (LEO) will require a unique collection of advanced, innovative technologies and the precise execution of complex and challenging operational concepts. One tool we in the Analog Missions Project at the National Aeronautics and Space Administration (NASA) utilize to validate exploration system architecture concepts and conduct technology demonstrations, while gaining a deeper understanding of system-wide technical and operational challenges, is our analog missions. Analog missions are multi-disciplinary activities that test multiple features of future spaceflight missions in an integrated fashion to gain a deeper understanding of system-level interactions and integrated operations. These missions frequently occur in remote and extreme environments that are representative in one or more ways to that of future spaceflight destinations. They allow us to test robotics, vehicle prototypes, habitats, communications systems, in-situ resource utilization, and human performance as it relates to these technologies. And they allow us to validate architectural concepts, conduct technology demonstrations, and gain a deeper understanding of system-wide technical and operational challenges needed to support crewed missions beyond LEO. As NASA develops a capability driven architecture for transporting crew to a variety of space environments, including the moon, near-Earth asteroids (NEA), Mars, and other destinations, it will use its analog missions to gather requirements and develop the technologies that are necessary to ensure successful human exploration beyond LEO. Currently, there are four analog mission platforms: Research and Technology Studies (RATS), NASA s Extreme Environment Mission Operations (NEEMO), In-Situ Resource Utilization (ISRU), and International Space Station (ISS) Test bed for Analog Research (ISTAR).
This overview presentation is for the externals splinter at the payloads operations integration working group (POIWG). This presentation gives a high level overview of the ISS MCS system and pertinent information in regards to payloads operations on station.