At least 217 records · Page 12

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Generating Sequential PV Deployment Scenarios for High Renewable Distribution Grid Planning

This paper introduces a novel approach for generating solar photovoltaic (PV) plant deployment scenarios for grid integration planning. The approach guarantees consistency among scenarios of the same deployment by ensuring that higher penetration scenarios contain PV units deployed in lower penetration scenarios. It also constrains the size and spatial distribution of the PV plants and considers three placement types. A case study on a real-world distribution system proves that the precepts of scenario consistency, deployment diversity, and placement are met. The study further investigates the impact of the resulting scenarios via a stochastic hosting capacity analysis. Results indicate that the ratio between PV and load sizes, referred to as the nodal PV penetration factor (NPPF), is a key driver of the grid integration impact. By reducing the NPPF from 5 to 2, the maximum hosting capacity increased by at least 112%. The study also reveals that scenarios under random placement can lead to higher hosting capacity values.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

The Distribution System Operator with Transactive (DSO+T) Study

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Distribution System Operator with Transactive (DSO+T) Study: Volume 1 (Main Report)

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Generating Sequential PV Deployment Scenarios for High Renewable Distribution Grid Planning: Preprint

This paper introduces a novel approach for generating solar photovoltaic (PV) plant deployment scenarios for grid integration planning. The approach guarantees consistency among scenarios of the same deployment by ensuring that higher penetration scenarios contain PV units deployed in lower penetration scenarios. It also constrains the size and spatial distribution of the PV plants and considers three placement types. A case study on a real-world distribution system proves that the precepts of scenario consistency, deployment diversity, and placement are met. The study further investigates the impact of the resulting scenarios via a stochastic hosting capacity analysis. Results indicate that the ratio between PV and load sizes, referred to as the nodal PV penetration factor (NPPF), is a key driver of the grid integration impact. By reducing the NPPF from 5 to 2, the maximum hosting capacity increased by at least 112%. The study also reveals that scenarios under random placement can lead to higher hosting capacity values.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

A Sensitivity-driven Wide Area Protection (SWAP) Coordination Tool for High Penetration of Inverter-based Resources (IBR)

Traditionally, power system generation sources have been composed of synchronous generators, of which the fault current behavior is understood with minimal differences between generation size and types due to the physics of their construction. Present protection schemes and modeling methods are based upon these understood characteristics. Most renewable generation is composed of inverter-based resources (IBR), in which fault current is determined by switching control software and hardware limitations, each of which can vary between manufacturers and even between models of the same manufacturer. The resulting fault current is low in magnitude, low in negative-sequence current, unpredictable phase angles, and is a challenge to model. These characteristics also result in a challenge to traditional protection schemes and fault simulation software. To address several of these concerns, the project has the following goals: 1. Improve IBR models: Improve IBR models used in short circuit (SC) programs to accurately capture the response of IBRs at the bulk power system (BPS) level for fault and protection studies. 2. Develop automation tool: Develop an automation tool that allows engineers to identify protection coordination and sensitivity issues by performing SC and protection coordination studies in a high IBR-penetrated grid by applying variations to the IBR models, faults, contingencies, etc. 3. Develop schemes: Develop new protection mitigation solution schemes that complement the existing protection systems to ensure safe operation of the BPS with higher IBR penetration levels. The project team did not achieve this final goal, as the Department of Energy (DOE) stopped the project early due to changes in DOE funding priorities. The termination notice came at the beginning of the final project phase, while the team was identifying and beginning to investigate protection issues. It should be noted that the team discussed a 100% penetration scenario. However, this scenario would require the use of grid-forming IBR models that are not presently available. Since developing these models requires additional effort, the 100% penetration scenario was not pursued during this project. In the future, developing the methodology and models for the 100% scenario could benefit the industry.

14 SOLAR ENERGY↗

A Technical and Economic Assessment of LWR Flexible Operation for Generation and Demand Balancing to Optimize Plant Revenue

With increased penetration of subsidized variable renewable energy (VRE) resources and competition from low natural gas prices, existing light water reactor (LWR) nuclear power plants (NPPs) are struggling to remain economically competitive. This work examines the potential economic competitiveness of various thermal energy storage (TES) technologies when coupled directly or indirectly with a NPP. To highlight their relative economic competitiveness, we contrast several energy storage solutions in stochastic dispatch optimization. We leverage data from recent work analyzing a range of TES technologies with varying capital costs, performance, and technology readiness level (TRL) to establish our case. We explore inserting these technologies into an electricity market with existing nuclear generation and large projected variable renewable energy (VRE) penetration. Although these technologies' projected capital costs may make them unlikely candidates in their current state, this analysis demonstrates a high-fidelity techno-economic analysis of energy storage. Furthermore, as the projected cost of energy storage technologies evolves, this analysis sets a precedent for similar future investigations. One region with projected trends that may be unfavorable for existing nuclear capacity is the New York Independent System Operator (NYISO) market. New York state’s baseload generation has been historically provided by fossil-fired and nuclear assets. However, amid economic pressures from subsidized VREs and low natural gas prices, the state has recently deactivated Indian Point nuclear power plant units 2 and 3. Furthermore, the state plans to meet its zero-emission generation target by 2040 by replacing fossil-fired capacity with significant investments in VRE resources like wind and solar photovoltaic (PV) and battery storage. Increased intermittent resource penetration lowers the baseload power requirement, adding further economic pressure to the state’s three remaining NPPs still in operation. With three NPPs still in operation in New York, this work analyzes potential economic benefits to NPPs on the New York grid when directly or indirectly coupled with various TES technologies. This work requires two modeling steps to analyze the potential economic benefits of various system configurations of the TES directly or indirectly coupled with nuclear. First, this analysis leverages capacity expansion modeling by experts at the Electric Power Research Institute (EPRI). Using their deterministic capacity expansion model, U.S. Regional Economy, Greenhouse Gas, and Energy (US-REGEN), EPRI analysts evaluated the capacity and generation evolution of the New York state energy market under four projection scenarios. These four projection scenarios were developed to represent the potential evolution of the capacity and generation in NYISO from 2015 to 2050 under various economic, technology, and policy constraints. The results from these capacity expansion models are then used as boundary conditions in the second modeling step. The second modeling step uses the Holistic Energy Resource Optimization Network (HERON) for a set of stochastic techno-economic analyses (STEAs) to investigate the potential increase in the economic viability of various configurations of the TES. With no current capacity expansion capabilities, HERON takes the data generated from US-REGEN for 2050 to generate synthetic load, solar, and wind data. Then HERON economically optimizes the capacity and dispatch of the various TES configurations. The potential economic benefit is the differential net present value (NPV) of the TES configurations from the no-TES baseline. As a stochastic techno-economic analysis package, HERON introduces uncertainty into the economic metrics, while US-REGEN trades resolution for reduced computational complexity. Using HERON also allows the modeling of direct thermal coupling, a feature not common in capacity and dispatch models. As expected, with high capital costs, the costs of introducing energy storage for all the technologies considered outweighed the potential economic benefit of this strategy for flexible plant operation. The benefit of this analysis is primarily in demonstrating a workflow that examines innovative solutions to increase NPP revenue via TES coupling. HERON’s stochastic capacity and dispatch optimization process used in this work has proven an effective tool in observing and evaluating the impact of introducing storage technologies in a grid energy system.

25 ENERGY STORAGE↗

DEEP Solar: Data DrivEn Modeling and Analytics for Enhanced System Layer ImPlementation

Realizing the SETO 2030 mission of reducing solar energy costs to 3-5 c/kWh will require innovative enabling research on effective, cost-efficient integration of local PV within distribution systems. However, the intermittent and variable nature of PVs compels operators to impose conservative hosting capacity constraints. Given the extremely high variability of (intermittent and unpredictable) solar energy generation, relaxing the capacity constraints (which are currently around 15%) and achieving 100% or greater integration of renewables will require a fundamental transformation of the power grid via the utilization of exponentially larger amounts of AMI enabled fine-grained data. To address the challenges in increasing the penetration of renewable energy based DERs, this project envisions an Enhanced System Layer (ESL) at the distribution network level that is reliable, cost-effective and scalable to millions of Distributed Energy Resources (DERs)/devices. This includes developing: 1) Transformative and highly scalable machine learning based predictive analytics tools that plug into distribution system planning and provide real-time situational awareness at the distribution level for short and long-term operational planning. The tools will be built using novel data-driven energy models of millions of active nodes with AMI, 2) Adaptive stochastic analysis and optimization algorithms for real-time grid operations, 3) Dynamic Scenario Analysis using parallel Cloudenabled implementations with < 1 minute computational cycle times.

14 SOLAR ENERGY↗

Impact of High PV Penetration on Voltage Stability

Photovoltaics (PV) are becoming increasingly relevant in modern power systems. With this increase also comes reliability concerns as photovoltaics behave differently than conventional generators. One reliability concern is voltage stability. In this paper, voltage stability of the Austin area in the Electric Reliability Council of Texas (ERCOT) system is studied using dynamic models with varying levels of photovoltaic penetration. The base case is set at 0% renewable penetration. Additional cases include 15% wind penetration and up to 65% photovoltaic penetration. The study results show that voltage/var control capacity is critical to voltage stability, which PV lacks. Voltage regulation of photovoltaics may cause over-voltage and voltage collapse may be more abrupt under high regional photovoltaic penetration.

Till, Jeremy↗

On-Sun Testing of a High-Temperature Solar Receiver's Flux Distribution

Concentrated solar power (CSP) is a promising technology in transitioning to renewable energy because of its abundance in nature and thermal energy storage (TES) capability. Among the four types of available CSP technology, including parabolic trough, linear Fresnel, power tower, and parabolic dishes, a power tower using a central receiver has more potential to generate high-temperature heat in a scale supporting power cycles efficiency and achieve low levelized cost of energy (LCOE). Other than the conventional type of receiver design, the high-absorptive receiver concept developed and presented in this paper is novel in its design approach. The novel receiver design originated from National Renewable Energy Laboratory (NREL) consists of an array of solar flux absorb tubes. The solar absorb tubes require uniform flux distribution and in-depth flux penetration through the three different reflective sections of tubes in a hexagonal shape. To evaluate this unique receiver design and thermal performance, the flux distribution, flux uniformity, and intensity were numerically simulated using ansys fluent and SolTrace modeling program. On-sun testing has been done at NREL high flux solar testing facility, based on the computational analysis.

clean energy↗

Leveraging concentrating solar power plant dispatchability: A review of the impacts of global market structures and policy

Concentrating solar power (CSP) integrated with thermal energy storage delivers flexible and dispatchable power, which is an increasingly valuable quality as electricity systems integrate growing penetrations of variable renewable energy. Valuing and compensating CSP's dispatchability and flexibility requires electricity market structures and policies that appropriately remunerate generation during high-value portions of the day. In this paper, we review previous analyses of CSP economics and deployment, and we find that continued CSP growth will require valuation mechanisms that appropriately compensate for CSP's flexibility during both plant design and plant operation. We then review market structures that drive CSP operations and dispatch in jurisdictions where CSP is being developed, with perspectives from Spain, Chile, Australia, Morocco, South Africa, the United States, China, and the United Arab Emirates (Dubai). Despite broad agreement that CSP's dispatchability provides value to electricity grids, countries' policies for remunerating and leveraging such dispatchability varies widely. As deployment of CSP and variable renewable energy grows, it will be increasingly important to redesign current integration policies to signal the delivery of CSP's grid services more appropriately.

14 SOLAR ENERGY↗

Exploration planning in the context of human exploration and development of the Moon

It is widely believed that the next step beyond low Earth orbit in attaining the United States' stated goal of 'Expanding human presence beyond the Earth' should be to reestablish a lunar capability, building on the Apollo program, and preparing the way for eventual human missions to Mars. The Moon offers important questions in planetary and Earth science, can provide a unique platform for making astronomical observations of high resolution and sensitivity, and can be in the development path for unlocking resources of the inner solar system to support space activities and return benefits to Earth. NASA's Office of Exploration has undertaken the planning of future lunar exploration missions with the assistance of the Solar System Exploration Division in matters dealing with the quality of scientific data and the manner in which it will be made available to the scientific community. The initial elements of the proposed program include the Lunar Scout missions, which consist of two small identical spacecraft in polar orbit around the Moon, which can accomplish most of the objectives associated with previous proposals for Lunar Polar Orbiters. These missions would be followed by 'Artemis' landers, capable of emplacing up to 200 kg payloads anywhere on the Moon. In addition, the exploration program must incorporate data obtained from other missions, including the Galileo lunar flybys, the Clementine high orbital observations, and Japanese penetrator missions. In the past year, a rather detailed plan for a 'First Lunar Outpost (FLO)' which would place 4 astronauts on the lunar surface for 45 days has been developed as a possible initial step of a renewed human exploration program. In the coming year, the FLO concept will be reviewed and evolved to become more highly integrated with planning for the initial human exploration of Mars, which could come perhaps 5 years after the reestablishment of lunar capability. Both programs could benefit from the common development of systems and subsystems, where that is sensible from a performance perspective.

Duke, Michael B.↗

Time-frequency based cyber security defense of wide-area control system for fast frequency reserve

Global power systems are transiting from conventional fossil fuel energy to renewable energies due to their environmental benefits. The increasing penetration of renewable energies presents challenges for power system operation. The efficiency and sufficiency of responsive reserves have become increasingly important for power systems with a high proportion of renewable energies. The Fast Frequency Reserve (FFR), especially the Wide-area Monitoring System (WAMS)-based FFR, is a promising and effective solution to secure and enhance the stability of power systems. However, cyber security has become a new challenge for the WAMS-based FFR system. Cyber attacks on the FFR control system may threaten the safety of power system operation due to the rapid power controllability requirement of FFR. Therefore, to address this problem, a time-frequency based cyber security defense framework is proposed to detect the cyber spoofing of synchrophasor data in WAMS-based FFR control systems. This paper first introduces the Continuous Wavelet Transforms (CWTs) to decompose spoofing signals. Then, the Dual-frequency Scale Convolutional Neural Networks (DSCNN) is proposed to identify the time-frequency domains matrix from two frequency scales. Integrating CWTs and DSCNN, an identification framework called CWTs-DSCNN is further proposed to detect the spoofing attacks in the WAMS-based FFR system. Multiple experiments using the actual data from FNET/GridEye are performed to verify the effectiveness of the framework in securing WAMS-based FFR systems.

25 ENERGY STORAGE↗

New Industry Partnerships: Solar Energy Technologies Office Support for Early Projects in the Energy Systems Integration Facility: An Agreement Closeout Summary Report

The U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) Solar Energy Technologies Office (SETO)-funded New Industry Partnerships (NIPs) agreement established multiple new cooperative research projects with industry partners. Each project demonstrated the use of the National Renewable Energy Laboratory's Energy Systems Integration Facility (ESIF) as a national asset for research and development, testing, and validation of new technologies to support high penetrations of solar energy on the electric grid. The agreement was launched in 2013 and represented the SETO portion of the DOE EERE-wide Integrated Network Testbed for Energy Grid Research and Technology Experimentation (INTEGRATE) program. The focus of INTEGRATE was on multi-energy system testing and on testing the interactions of energy systems with information technology, communications, and telecommunications (ICT) systems. The NIPs agreement was a bit different from traditional research projects because it was specifically structured to enable partnerships for ESIF testing and as such required at least a 1:1 funds-in cost share from industry partners. In the end, the project engaged six different industry partnerships and resulted in testing a large number of innovative technologies. These included tiny inverters; power-to-gas technologies; and advanced simulation, analysis, and power-hardware-in-the-loop testing techniques. The agreement also provided significant impact for both research and industrial communities. This summary report provides a brief, high-level overview of these projects and their highlights along with lists of citations and other impacts. Readers are referred to the corresponding project reports for more in-depth information.

14 SOLAR ENERGY↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Optimal design and integration of decentralized electrochemical energy storage with renewables and fossil plants

Increasing renewable energy requires improving the electricity grid flexibility. Existing measures include power plant cycling and grid-level energy storage, but they incur high operational and investment costs. Using a systems modeling and optimization framework, we study the integration of electrochemical energy storage with individual power plants at various renewable penetration levels. Furthermore, our techno-economic analysis includes both Li-ion and NaS batteries to encompass different technology maturity levels. A California case-study indicates localized integration to be cost-effective for greater grid flexibility. Li-ion batteries can mitigate the residual demand fluctuations of small to medium-sized plants, while NaS batteries would be best-suited for larger storage with higher renewable penetration. Overall, the battery-enabled renewable integration could reduce the unmet grid demand by 75%, the renewable curtailment by 58%, and the CO 2 emission intensity by 16% while including the life cycle emissions of the battery and the renewable farm. Our scenario-based analysis also indicates that rather than replacing all fossil power plants, it is more economical to combine batteries and renewables with individual fossil plants to achieve a clean energy grid.

25 ENERGY STORAGE↗

Inertia Emulation Control using Demand Response via 5G Communications

Building energy equipment is moving rapidly towards Internet of Things (IoT)-driven devices to provide consumer connectivity and device management. These device-level interfaces along with 5G communications will be leveraged to develop control architectures to engage a large number of monitoring and control devices and provide real-time and reliable energy services. Emerging 5G networks have high potential to provide the communication technology for demand response, with fast transfer speed, high reliability, and high number of connections. Guaranteed inertial response to limit frequency fluctuations is one of the main challenges in modern power systems due to the increased penetration of renewable generation, and it is largely affected by communication delays and packet losses. This paper analyzes inertial response and rate of change of frequency in a power system model with inverter-interfaced air conditioners. The control loop considers time delays and packet losses to show the need to switch to 5G networks in future smart grids.

Morovati, Samaneh↗