Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEET”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Recent Improvements and Verification of A Full Body Model in Opensim

BACKGROUND: The dynamic feasibility [1,2] criterion, that the subject’s Center of Pressure (COP) be located within the Base of Support (BOS) which outlines the feet, has aided in assessing the stability of human motion recorded on earth while performing the recorded tasks in lunar gravity or as countermeasures exercises on a vibration isolation and stabilization system in microgravity. The convex hull of the BOS on the platform under the subject’s feet was estimated using virtual markers on the feet of the scaled subject model. The COP was calculated using the ground reaction forces and moments determined from motion capture data with biomechanical modeling tools [3]. Occasionally, large-amplitude oscillatory spikes or “artifacts” were observed in the subject’s linear and angular momentum derivatives, affecting some COP data derived from motion capture. The purpose of this investigation was to assess and improve the accuracy of model scaling and BOS estimation as well as to determine the efficacy of model adjustments in mitigating artifacts influencing motion capture-derived ground reaction force and COP results. METHODS: To aid evaluation of proposed process and model updates, motion capture data were collected for two subjects during unit test and range of motion trials, lunar tasks, and countermeasures exercise motions. Markers were added to the full body Plug-in Gait marker set [4] during data collection. New markers were placed on the front, back, sides, and top of the head to improve scaling using distances between marker pairs. Medial elbow markers were added to stabilize the upper arm during OpenSim Inverse Kinematics (IK) [5]. Finally, markers were added on the outer edge of the heels and on the outside edges of the first and last toes on each foot. These additional foot markers were made available to test new automated foot scaling techniques and to calculate the error between the subject’s estimated and recorded BOS. The modified unscaled OpenSim Full Body Rajagopal Model [6,7] was adjusted using some previously investigated techniques [8] to mitigate rapid shifts in joint angles occurring during IK, as these were found to cause the spike artifacts observed in subsequent stages of analysis. Since OpenSim models use Euler angles and rotation sequences, the arm axes of rotation were adjusted, and the pelvis order of rotation was changed to minimize the likelihood of encountering “gimbal lock” during common human motion. The model clavicle, arm, elbow, wrist, pelvis, and ankle angle limits were adjusted to better accommodate the full human range of motion seen in exercise and lunar data. The shoulder joint center was calculated using a “pivoting” algorithm [9], and both shoulder joint center and upper arm markers were included during IK to provide additional shoulder stability on a case-by-case basis. The quality of IK results was assessed by three criteria: minimizing error between recorded motion capture markers and model markers, checking for reasonable rates of change in joint angles between fames (i.e., no IK artifacts), and ensuring the absence of spikes in the inertial forces and angular momentum derivatives calculated using a custom OpenSim plugin [10]. RESULTS: The additional markers placed on the subject during data collection allowed the head and feet to be scaled more accurately using distances between new marker pairs. Scaling with BOS markers placed on the subject and removing the limit on subtalar angle resulted in more accurate BOS determination. Unrealistically large changes in joint angles between frames could be reduced by including clavicle, sternum, and medial elbow markers during IK. In cases with large arm ranges of motion, results could be further improved by running IK using medial elbow and virtual shoulder joint center markers. Model adjustments significantly improved the IK results affecting COP calculation and increased the accuracy of BOS estimation.

C A Bell↗

Interim Measures Work Plan: South Repeater Building: Solid Waste Management Unit 121: Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances: Kennedy Space Center, Florida

This document presents the design details of a granular activated carbon (GAC) hydraulic containment and groundwater treatment system Interim Measures Work Plan for the South Repeater Building site (South Repeater, Solid Waste Management Unit 121), located at John F. Kennedy Space Center (KSC), Florida. The interim measures (IM) treatment area includes the source area and downgradient property boundary, which have been impacted by per- and polyfluoroalkyl substances (PFAS). The objectives of the IM are to treat the source area and mitigate PFAS migration to areas outside of KSC boundaries. This document was prepared by AECOM Technical Services, Inc., for the National Aeronautics and Space Administration under Contract 80KSC019D0010, Task Order 80KSC021F0096. The IM consists of the installation and operation of 19 extraction wells and an associated groundwater treatment system. A total of 13 wells will be installed to a depth of 34 feet below land surface (bls) to target the upper medium-grained sand with shell layer. A total of six wells will be installed to a depth of 56 feet bls to target the lower layer of poorly graded sand with shell fragments. The system will be designed to operate each extraction well simultaneously using submersible pumps at flow rates of 5 or 10 gallons per minute (gpm), excluding one extraction well with a flow rate of 30 gpm. The extracted groundwater will be conveyed to a groundwater treatment system, where it will be treated via GAC prior to disposal via infiltration. To evaluate treatment system performance, baseline groundwater sampling will be conducted prior to treatment system startup. Performance monitoring will be completed quarterly for the first year. A total of eight performance monitoring wells will be installed to a depth of 12 feet bls, and eight performance monitoring wells will be installed to a depth of 30 feet bls. In addition to the installation of 16 performance monitoring wells, 12 existing monitoring wells will be incorporated into the performance monitoring program.

groundwater treatment↗

Fukushima Nuclear Crisis Recovery: A Modular Water Treatment System Deployed in Seven Weeks - 12489

On March 11, 2011, the magnitude 9.0 Great East Japan earthquake, Tohoku, hit off the Fukushima coast of Japan. This was one of the most powerful earthquakes in recorded history and the most powerful one known to have hit Japan. The ensuing tsunami devastated a huge area resulting in some 25,000 persons confirmed dead or missing. The perfect storm was complete when the tsunami then found the four reactor, Fukushima-Daiichi Nuclear Station directly in its destructive path. While recovery systems admirably survived the powerful earthquake, the seawater from the tsunami knocked the emergency cooling systems out and did extensive damage to the plant and site. Subsequent hydrogen generation caused explosions which extended this damage to a new level and further flooded the buildings with highly contaminated water. Some 2 million people were evacuated from a fifty mile radius of the area and evaluation and cleanup began. Teams were assembled in Tokyo the first week of April to lay out potential plans for the immediate treatment of some 63 million gallons (a number which later exceeded 110 million gallons) of highly contaminated water to avoid overflow from the buildings as well as supply the desperately needed clean cooling water for the reactors. A system had to be deployed with a very brief cold shake down and hot startup before the rainy season started in early June. Joined by team members Toshiba (oil removal system), AREVA (chemical precipitation system) and Hitachi-GE (RO system), Kurion (cesium removal system following the oil separator) proposed, designed, fabricated, delivered and started up a one of a kind treatment skid and over 100 metric tons of specially engineered and modified Ion Specific Media (ISM) customized for this very challenging seawater/oil application, all in seven weeks. After a very short cold shake down, the system went into operation on June 17, 2011 on actual waste waters far exceeding 1 million Bq/mL in cesium and many other isotopes. One must remember that, in addition to attempting to do isotope removal in the competition of seawater (as high as 18,000 ppm sodium due to concentration), some 350,000 gallons of turbine oil was dispersed into the flooded buildings as well. The proposed system consisted of a 4 guard vessel skid for the oil and debris, 4 skids containing 16 cesium towers in a lead-lag layout with removable vessels (sent to an interim storage facility), and a 4 polishing vessel skid for iodine removal and trace cesium levels. At a flow rate of at least 220 gallons per minute, the system has routinely removed over 99% of the cesium, the main component of the activity, since going on line. To date, some 50% of the original activity has been removed and stabilized and cold shutdown of the plant was announced on December 10, 2011. In March and April alone, 10 cubic feet of Engineered Herschelite was shipped to Seabrook Nuclear Power Plant, NPP, to support the April 1, 2011 outage cleanup; 400 cubic feet was shipped to Oak Ridge National Laboratory (ORNL) for strontium (Sr-90) ground water remediation; and 6000 cubic feet (100 metric tons, MT, or 220,400 pounds) was readied for the Fukushima Nuclear Power Station with an additional 100 MT on standby for replacement vessels. This experience and accelerated media production in the U.S. bore direct application to what was to soon be used in Fukushima. How such a sophisticated and totally unique system and huge amount of media could be deployable in such a challenging and changing matrix, and in only seven weeks, is outlined in this paper as well as the system and operation itself. As demonstrated herein, all ten major steps leading up to the readiness and acceptance of a modular emergency technology recovery system were met and in a very short period of time, thus utilizing three decades of experience to produce and deliver such a system literally in seven weeks: - EPRI - U.S. Testing and Experience Leading to Introduction to EPRI - Japan and Subsequently TEPCO Emergency Meetings - Three Mile Island (TMI) Media and Vitrification Experience by PNNL - Commercial Nuclear Power Plant Media Experience (including long term Cs removal) - DOE Low Active Waste (LAW) and High Level Waste (HLW) in High Salt and pH Conditions Media and Vitrification Experience - National Laboratory (e.g. Oak Ridge National Laboratory, ORNL) Ground Water Media Experience - Gulf Oil Spill Media Experience in Seawater - All Media Had to be Fully Tested at High Rad Levels in Seawater and Oil Before Arriving in Japan - Final Waste Form and Disposal Experience (e.g., vitrification) - 100 Metric Tons (6000 cubic feet or 220,400 pounds) of Media had to be Immediately Available with the same amount in production as replacement media. [To date, for 2011, 400 MT of media have been prepared for Japan alone.] - Remote Operation, Modular Water Treatment Equipment Design and Fabrication in both Commercial NPP and DOE Canyon Operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Treatment Plant - 12508

The Waste Treatment Plant (WTP) will immobilize millions of gallons of Hanford's tank waste into solid glass using a proven technology called vitrification. The vitrification process will turn the waste into a stable glass form that is safe for long-term storage. Our discussion of the WTP will include a description of the ongoing design and construction of this large, complex, first-of-a-kind project. The concept for the operation of the WTP is to separate high-level and low-activity waste fractions, and immobilize those fractions in glass using vitrification. The WTP includes four major nuclear facilities and various support facilities. Waste from the Tank Farms is first pumped to the Pretreatment Facility at the WTP through an underground pipe-in-pipe system. When construction is complete, the Pretreatment Facility will be 12 stories high, 540 feet long and 215 feet wide, making it the largest of the four major nuclear facilities that compose the WTP. The total size of this facility will be more than 490,000 square feet. More than 8.2 million craft hours are required to construct this facility. Currently, the Pretreatment Facility is 51 percent complete. At the Pretreatment Facility the waste is pumped to the interior waste feed receipt vessels. Each of these four vessels is 55-feet tall and has a 375,000 gallon capacity, which makes them the largest vessels inside the Pretreatment Facility. These vessels contain a series of internal pulse-jet mixers to keep incoming waste properly mixed. The vessels are inside the black-cell areas, completely enclosed behind thick steel-laced, high strength concrete walls. The black cells are designed to be maintenance free with no moving parts. Once hot operations commence the black-cell area will be inaccessible. Surrounded by black cells, is the 'hot cell canyon'. The hot cell contains all the moving and replaceable components to remove solids and extract liquids. In this area, there is ultrafiltration equipment, cesium-ion exchange columns, evaporator boilers and recirculation pumps, and various mechanical process pumps for transferring process fluids. During the first phase of pretreatment, the waste will be concentrated using an evaporation process. Solids will be filtered out, and the remaining soluble, highly radioactive isotopes will be removed using an ion-exchange process. The high-level solids will be sent to the High-Level Waste (HLW) Vitrification Facility, and the low activity liquids will be sent to the Low-Activity Waste (LAW) Vitrification Facility for further processing. The high-level waste will be transferred via underground pipes to the HLW Facility from the Pretreatment Facility. The waste first arrives at the wet cell, which rests inside a black-cell area. The pretreated waste is transferred through shielded pipes into a series of melter preparation and feed vessels before reaching the melters. Liquids from various facility processes also return to the wet cell for interim storage before recycling back to the Pretreatment Facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Installing Deep Groundwater Monitoring Wells in a Volcanic Dominated Rift Basin: Los Alamos National Laboratory, New Mexico - 17594

Los Alamos National Laboratory (LANL, or the Laboratory) is located in northern New Mexico near the west margin of the Espanola Basin. LANL is underlain by a complex basin-fill sequence of alluvial fan deposits, volcanic tuff, basaltic and dacitic lavas, and riverine deposits. On-going environmental remediation and characterization activities have evolved to improve the performance of groundwater monitoring wells, ensuring they yield representative groundwater and core samples. Groundwater occurs as canyon-fill alluvial water, perched intermediate-depth water associated with the basalts and other local-scale perching horizons, and as a regional-scale aquifer that is the main water supply for the area. Anthropogenic contaminants are found in all three groundwater zones. The regional aquifer below LANL is nominally 1000-1400 feet below ground surface (bgs). Monitoring wells at the Laboratory, are therefore, among the deepest routinely installed in the US. Logistical challenges at LANL include steep terrain, widespread cultural sites, and threatened and endangered species habitat restrictions. Additionally, the cost of installing monitoring wells is high because of groundwater depths and the variable drilling techniques that are required to characterize and install wells in a complex geologic environment. A major challenge to the characterization approach at LANL has been to meet sample quality requirements while minimizing drilling costs. In the late 1990's threaded drill-casing was advanced by rotary drilling methods using compressed air as the only circulation fluid. This resulted in relatively low impacts to the geochemical integrity of rock and groundwater samples, but led to frequent episodes of stuck casing. Additional fluids were introduced to the air-rotary program, improving penetration rates, but also resulting in non-representative groundwater samples due to long-term impacts to the aquifer in the vicinity of the well screen. Mud-rotary drilling was incorporated into the program, but it also had significant long-term impacts on groundwater quality, and often inhibited identification of perched groundwater zones and accurate identification of the water table in the regional aquifer. Current drilling practice makes limited use of fluid additives (e.g. foam) to supplement air circulation methods in order to advance drill casing through the vadose zone. Starting about 100 feet above the water table, drill casing is advanced to the target horizon in the regional aquifer using only air and municipal water (when needed) for circulation. Additionally, the threaded drill casing couplings have been replaced with welded connections, significantly reducing the occurrence of stuck casing. Careful observations of water production and water levels during drilling, coupled with the ability to retract casing for video and geophysical logs, now allows for robust characterization of perched groundwater systems and accurate definition of the top of regional saturation. Recent advances in the drilling program include combined dual-rotary/sonic drilling to depths up to 1150 feet and dual-rotary casing advance at angles up to 25 deg. from vertical. The former allows for core collection with minimal fluid addition, thereby preserving pore water chemistry. The latter method allows for well installation into portions of the aquifer otherwise inaccessible due to constraints at the surface (e.g., cultural sites or topography). Similar to the development of drilling techniques, both well design and groundwater sampling system design have evolved throughout the program. Current well design emphasizes a minimal annulus of filter pack, maximum screen slot size based on formation sieve analyses, and thorough well development to mitigate formation damage due to drilling. To sample groundwater at multiple levels in the same well, earlier sampling systems included Westbay{sup R} multi-zone systems and dual-screen single-pump and dual-screen dual-pump systems designed in collaboration with Baski, Inc. These multi-zone sampling systems proved difficult to develop and maintain given the depth to groundwater, and most current well installations are configured with a single screen and a submersible pump. The ability to purge from a well-developed single-screen well has substantially improved the collection of representative groundwater samples. A carefully crafted groundwater characterization program in target aquifers at depths ranging from 1,000 to 1,400 feet bgs within a complex geologic setting, while also retaining the ability to collect representative core and groundwater samples, may have application at a number of sites throughout the environmental industry. Optimizing each well to meet program objectives while reducing total project costs benefits all environmental investigations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mega salt-stone Disposal Units at the Savannah River site - 15322

The Liquid Waste (LW) System at Savannah River Site (SRS) is a highly integrated operation involving safely storing radioactive liquid waste in underground storage tanks; vitrifying the higher activity waste; and storing the vitrified waste in stainless steel canisters until permanent disposition is provided; and removing, treating, and dispositioning the low-level waste (LLW) fraction in concrete with final disposition being the salt-stone Disposal Units (SDUs) at the SRS salt-stone Disposal Facility (SDF). Treatment and disposition of salt waste is the critical path to completion of the SRS Liquid Waste (LW) Disposition Program. Successful and timely salt waste removal and disposal is integral to efforts by SRS to proceed with all aspects of tank cleanup and removal from service. The construction and implementation of the first-of-a-kind Mega SDU (MSDU) is underway to provide the most environmentally safe and cost-effective solution for salt processing and long term storage of the LLW at SRS. The MSDU design is a duplicate of the Water Treatment Tanks located in Syracuse, New York. This commercial design, developed by an affiliate of Savannah River Remediation LLC (SRR), was slightly modified to meet the requirements of the nuclear industry. The MSDU is a critical link in salt disposition. In comparison to the current SDU design, approximately 46 meters (150 feet) in diameter and 7 meters (22 feet) tall with a capacity of approximately 11,000 m{sup 3} (3.0 million gallons), the MSDU is 114 meters (375 feet) in diameter and 13 meters (43 feet) tall which will provide a capacity of approximately 121,000 m{sup 3} (32.0 million gallons) to receive the LLW fraction embedded in a grout-like form. The MSDU will provide the taxpayers an estimated $300 M in life cycle savings at SRS by reducing the number of SDUs from the estimated 72 smaller vessels to 7 of the new larger vessels. Additionally, based on the reduced number of SDUs, the environmental footprint is significantly reduced as well. Due to the similarities between the existing SDU design and the MSDU design, efforts to integrate the MSDU into the LW system are minimal. Required infrastructure modifications will consist of tying into the existing grout and drain lines, as well as the installation of new electrical and instrumentation services for the MSDU. Grout flow testing has been successfully completed, with results showing the MSDU will be a safe and cost-effective replacement for the existing SDUs. The MSDU design is complete, Critical Decision (CD)-3 was approved on June 17, 2014, and the first MSDU, salt-stone Disposal Unit n.6 (SDU 6), is being constructed in the existing LW SDF operated by SRR as a Capital Line Item project. As an added benefit, once constructed, lessons learned will be available for future MSDUs at SRS and throughout the complex as necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and Remediation of the Hanford 618-10 Burial Ground Steel-pipe Vertical Pipe Units - 18238

The 618-10 Burial Ground is approximately 485 feet by 470 feet and consisted of 12 trenches and 94 VPUs. It is located approximately 5 miles north of Richland, Washington in the 600 Area of the Hanford Site. The 618-10 Burial Ground received low- to high-activity waste (e.g., fission products and some plutonium-contaminated waste). Most of the waste originated at the 300 Area laboratory facilities. Lower activity radioactive material and shielded drums were disposed in trenches, while laboratory wastes with higher levels of radiation were disposed in Vertical Pipe Units (VPUs). The 618-10 Burial Ground contained approximately 94 VPUs (uncertain mix of first and second generation). There are different variants of VPUs. The first generation of VPUs was simply corrugated culverts or standard pipes, 14-in diameter and 10- to 15-ft long, buried vertically. The second generation of VPUs was 22-in diameter, 15-ft long waste receptacles constructed by welding five 55-gallon bottomless drums together end-to-end and burying them vertically, separated by approximately 10 feet on center in rows approximately 25 feet apart. A subset of the first generation VPUs consisted of the steel pipe VPUs represented by carbon-steel pipes, 10 to 24 in. in diameter with various wall thicknesses. This paper will present the remediation of the steel-pipe VPUs, which were the last of the VPUs remediated in this project. The remediation process developed for steel pipe VPUs included exposing a section of the VPU within an excavated trench, placing a mix box around the VPU, filling the mix box with grout, shearing the VPU and contents, and then removing the grout waste mixture into a waste box for disposal at the Hanford Environmental Restoration Disposal Facility (ERDF). Prior the start of remedial activities extensive mock-ups were performed on surrogate steel-pipe VPUs to ensure the effectiveness of the process before introducing the hazards of radioactive VPU waste. The critical steps in the process of size reducing steel-pipe VPUs and mixing the contents with grout was successfully demonstrated. This process was completed for each steel-pipe VPU in successive lifts until the entire set of steel-pipe VPUs were mixed in grout and removed from the excavation. The remediation of the steel-pipe VPUs proved be successful in that all the VPUs were removed and transported to ERDF without a release to the local environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative Prospective Study of Load Distribution Projection Among Patients with Vertebral Fractures Treated with Percutaneous Vertebroplasty and a Control Group of Healthy Volunteers

Purpose: Through a prospective comparison of patients with vertebral fractures and normal population, we illustrate effect of percutaneous vertebroplasty (PV) upon projection of load distribution changes. Methods: Vertebroplasty group (36 symptomatic patients with osteoporotic vertebral fractures) was evaluated on an electronic baropodometer registering projection of weight bearing areas on feet. Load distribution between right and left foot (including rear-front of the same foot) during standing and walking was recorded and compared before (group V1) and the day after (group V2) PV. Control group (30 healthy asymptomatic volunteers-no surgery record) were evaluated on the same baropodometer. Results: Mean value of load distribution difference between rear-front of the same foot was 9.45 ± 6.79 % (54.72–45.28 %) upon standing and 14.76 ± 7.09 % (57.38–42.62 %) upon walking in the control group. Respective load distribution values before PV were 16.52 ± 11.23 and 30.91 ± 19.26 % and after PV were 10.08 ± 6.26 and 14.25 ± 7.68 % upon standing and walking respectively. Mean value of load distribution variation between the two feet was 6.36 and 14.6 % before and 4.62 and 10.4 % after PV upon standing and walking respectively. Comparison of load distribution variation (group V1–V2, group V1-control group) is statistically significant. Comparison of load distribution variation (group V2-control group) is not statistically significant. Comparison of load distribution variation among the two feet is statistically significant during walking but not statistically significant during standing. Conclusions: There is a statistically significant difference when comparing load distribution variation prior vertebroplasty and that of normal population. After vertebroplasty, this difference normalizes in a statistically significant way. PV is efficient on equilibrium-load distribution improvement as well.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The development of poly(vinyl chloride) [PVC] extrusions for a 14,000-ton self-supporting structure for the detection of neutrinos

The NOvA Neutrino Experiment has built a one of a kind self-supporting plastic structure, potentially the largest ever built. The PVC structure serves as a neutrino detector and is composed of 28 individual blocks that measure 15.5 m (51 feet) high by 15.5 m (51 feet) wide by 2.1 m (7 feet) deep. The primary parts in the detector construction are 15.5m (51 foot), 15-cell PVC extrusions. These extrusions from the basis of the detector modules which are laminated together in a crossed pattern to form the individual blocks and then filled with mineral oil based liquid scintillator. The self-supporting nature of the detector places important structural requirements on both the PVC formulation and the extrusions. Block assembly requirements impose narrow geometric tolerances. Due to the method of detecting neutrinos, the extrusions must possess exceptionally high reflectivity over a particular wavelength range. The requirement places additional restrictions on the components of the PVC formulation. Altogether, the PVC extrusions have to maintain important reflectivity characteristics, provide structural support to the detector, and meet relatively tight geometric requirements for assembly. In order to meet these constraints, a custom PVC formulation had to be created and extruded. Here, we describe the purpose and requirements of the NOvA detector leading to the production of our unique PVC extrusion, summarize the R&D process, and discuss the lessons learned.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Satellite-based monitoring of groundwater depletion in California’s Central Valley

Abstract Range change data, obtained from Synthetic Aperture Radar satellites, form the basis for estimates of aquifer volume change in California’s Central Valley. The estimation algorithm incorporates a function penalizing changes far from known well locations, linking the aquifer volume changes to agricultural, industrial, and municipal pumping within the Tulare basin. We show that the range changes are compatible with the hypothesis that the source of aquifer volume changes are variations in effective pressure around documented wells. Specifically, inclusion of the well distance penalty does not degrade the fit to the observations, inversions with and without it both give variance reductions of 99.6%. The patterns of aquifer volume change vary significantly from the drought year, between October 2015 and October 2016, to a wet year in 2017, and into 2018, a year with near average rainfall. The 2.3 million acre-feet of estimated volume reduction, a lower bound on the amount of water extracted from the basin between October 2015 and 2016, agrees with independent estimates of 1.8 and 2.3 million acre-feet. The aquifer volume reduction is also compatible with a loss of 3.1 km 3 (2.5 million acre-feet) in groundwater volume derived from Gravity Recovery and Climate Experiment (GRACE) satellite data.

47 OTHER INSTRUMENTATION↗

University of Illinois Campus Deep Direct-Use Feasibility Study - Preliminary Geothermal Reservoir Model

Preliminary geothermal reservoir simulations were performed using a homogeneous static model to evaluate and understand the effects of fluid and rock properties that could influence the delivery of thermal energy in a doublet system. A 5000 feet by 5100 feet by 500 feet homogeneous model having a constant porosity and permeability of 20% and 100 mD was used to perform preliminary geothermal reservoir simulations. The model was discretized in the x-, y-, and z-directions into 100, 101, and 100, gridblocks. Two wells were placed on the opposite ends of the central column of the discretized model. One of the wells was designated as a producer and the other an injector. Equal volumes of water was extracted and then injected into the reservoir via the production and injection wells. Water was extracted at a temperature of 109 deg F and re-injected at 50 deg F at the 1000 bbl/day. The files attached contains the input and output files of this simulation case. The input and some of the output files can be viewed in any text editor.

15 GEOTHERMAL ENERGY↗

Geocellular model of St. Peter Sandstone for University of Illinois at Urbana-Champaign DDU Feasibility Study

The geocellular model of the St. Peter Sandstone was constructed for the University of Illinois at Urbana-Champaign DDU feasibility study. Starting with the initial area of review (18.0 km by 18.1 km [11.2 miles by 11.3 miles]) the boundaries of the model were trimmed down to 9.7 km by 9.7 km (6 miles by 6 miles) to ensure that the model enclosed a large enough volume so that the cones of depression of both the production and injection wells would not interact with each other, while at the same time minimizing the number of cells to model to reduce computational time. The grid-cell size was set to 61.0 m by 61.0 m (200 feet by 200 feet) for 160 nodes in the X and Y directions. The top surface of the St. Peter Sandstone was provided by geologists working on the project, and the average thickness of the formation was taken from the geologic prospectus they provided. An average thickness of 68.6 m (225 feet) was used for the St. Peter Sandstone, resulting in 45 layers for the model. Petrophysical data was taken from available rotary sidewall core data (Morrow et al., 2017). As geothermal properties (thermal conductivity, specific heat capacity) are closely related to mineralogy, specifically the percentage of quartz, available mineralogical data was assembled and used with published data of geothermal values to determine these properties (Waples and Waples, 2004; Robertson, 1988). The St. Peter Sandstone was divided into facies according to similar geothermal and petrophysical properties, and distributed according to available geophysical log data and prevailing interpretations of the depositional/diagenetic history (Will et al. 2014). Petrophysical and geothermal properties were distributed through geostatistical means according to the associated distributions for each lithofacies. The formation temperature was calculated, based on data from continuous temperature geophysical log from a deep well drilled into the Precambrian basement at the nearby Illinois Basin Decatur Project (IBDP) where CO2 is currently being sequestered (Schlumberger, 2012). Salinity values used in the model were taken from regional studies of brine chemistry in the St. Peter Sandstone, including for the IBDP (e.g., Panno et al. 2018). After being reviewed by the project's geologists, the model was then passed onto the geological engineers to begin simulations of the geothermal reservoir and wellbores.

15 GEOTHERMAL ENERGY↗

Geocellular Model of Mt. Simon Sandstone for University of Illinois at Urbana-Champaign DDU feasibility study

The geocellular model of the Mt. Simon Sandstone was constructed for the University of Illinois at Urbana-Champaign DDU feasibility study. Starting with the initial area of review (18.0 km by 18.1 km [11.2 miles by 11.3 miles]) the boundaries of the model were trimmed down to 9.7 km by 9.7 km (6 miles by 6 miles) to ensure that the model enclosed a large enough volume so that the cones of depression of both the production and injection wells would not interact with each other, while at the same time minimizing the number of cells to model to reduce computational time. The grid-cell size was set to 61.0 m by 61.0 m (200 feet by 200 feet) for 160 nodes in the X and Y directions. Within the model, 67 layers are represented that are parameterized with their sediment/rock properties and petrophysical data. The top surface of the Mt. Simon Sandstone was provided by geologists working on the project, and the average thickness of the formation was taken from the geologic prospectus they provided. An average thickness of 762 m (2500 feet) was used for the Mt. Simon Sandstone, resulting in 60 layers for the model. Petrophysical data was taken from available rotary sidewall core data (Morrow et al., 2017). As geothermal properties (thermal conductivity, specific heat capacity) are closely related to mineralogy, specifically the percentage of quartz, available mineralogical data was assembled and used with published data of geothermal values to determine these properties (Waples and Waples, 2004; Robertson, 1988). The Mt. Simon Sandstone was divided into three separate units (lower, middle, upper) according to similar geothermal and petrophysical properties, and distributed according to available geophysical log data and prevailing interpretations of the depositional/diagenetic history (Freiburg et al. 2016). Petrophysical and geothermal properties were distributed through geostatistical means according to the associated distributions for each lithofacies. The formation temperature was calculated, based on data from continuous temperature geophysical log from a deep well drilled into the Precambrian basement at the nearby Illinois Basin Decatur Project (IBDP) where CO2 is currently being sequestered (Schlumberger, 2012). Salinity values used in the model were taken from regional studies of brine chemistry in the Mt. Simon Sandstone, including for the IBDP (e.g., Panno et al. 2018). After being reviewed by the project's geologists, the model was then passed onto the geological engineers to begin simulations of the geothermal reservoir and wellbores.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Well 16A(78)-32 Drilling Data

This dataset includes survey data, drilling data, daily reports, summaries of daily operations, and rig photos from the drilling of Utah FORGE well 16A(78)-32, which is a highly deviated deep well. It was completed 60 days ahead of schedule. Rig move in began 10/22/2020 and drilling commenced on 10/30/2020, and total depth was reached on 12/18/2020. Drilling was followed by a diagnostic fracture injection test (DFIT), logging, and circulating casing. The rig was released on 1/12/2021. The upper part of the well was drilled vertically through approximately 4,700 feet of sediments before penetrating into high strength, crystalline granite. The well was deviated at a 65 degree angle from vertical after reaching a depth of 6,000 ft. This angle was maintained for the remainder of the well's trajectory. The well ultimately reached a true vertical depth of 8,559 feet, and a total measured depth of 10,987 feet. Preliminary measurements indicate temperatures at the "toe" of the well will exceed 442 degrees F (228 degrees C). Approximately 74 ft of core of the granitic and metamorphic rocks that will form the FORGE reservoir was also recovered.

15 GEOTHERMAL ENERGY↗

Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies

This dataset is a collection of well logs provided by Schlumberger Technologies from the Utah FORGE well 16B(78)-32 drilling project. Information here includes critical borehole information collected by an ultrasonic borehole imager (UBI) and a fullbore formation microimager (FMI). Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The total depth measured 10,947 feet and the vertical depth measured 8,357 feet.

11.5 inch intermediate casing logs↗

Utah FORGE: Neubrex Well 16B(78)-32 DAS Data - April, 2024

This dataset comprises Distributed Acoustic Sensing (DAS) data collected from the Utah FORGE monitoring well 16B(78)-32 (the producer well) during hydraulic fracture stimulation operations conducted in April 2024. The data were acquired continuously over the stimulation period at a temporal sampling rate of 10,000 Hz (10 kS/s) and a spatial resolution of approximately 3.35 feet (1.02109 meters). The measurements were captured using a Neubrex NBX-S4100 Time Gated Digital DAS interrogator unit connected to a single-mode fiber optic cable, which was permanently installed within the casing string. All recorded channels correspond to downhole segments of the fiber optic cable, from a measured depth (MD) of 5,369.35 feet to 10,352.11 feet. The DAS data reflect raw acoustic energy generated by physical processes within and surrounding the well during stimulation activities at wells 16A(78)-32 and 16B(78)-32. These data have potential applications in analyzing cross-well strain, far-field strain rates (including microseismic activity), induced seismicity, and seismic imaging. Metadata embedded in the attributes of the HDF5 files include detailed information on the measured depths of the channels, interrogation parameters, and other acquisition details. The dataset also includes a recording of a seminar held on September 19, 2024, where Neubrex's Chief Operating Officer presented insights into the data collection, analysis, and preliminary findings. The raw data files, stored in HDF5 format, are organized chronologically according to the recording intervals from April 9 to April 24, 2024, with each file corresponding to a 12-second recording interval.

15 GEOTHERMAL ENERGY↗

Multi-Scale Lithofacies and Chemostratigraphic Analysis of Two Middle Devonian Marcellus Shale Wells in Northern West Virginia, USA

The Marcellus Shale Energy and Environmental Laboratory (MSEEL) consists of two project areas within the dry gas producing region of the Marcellus shale play in Monongalia County, West Virginia. MSEEL is a collaborative field project led by West Virginia University, with Northeast Natural Energy LLC, several industrial partners, and sponsored by the US Department of Energy National Energy Technology Laboratory. The study areas are drilled approximately 8.5 miles apart to better understand the vertical and lateral changes in stratigraphy over a short distance. Two vertical pilot wells, MIP-3H and Boggess 17H were drilled in the fall of 2015 and spring of 2019, respectively. Core was recovered from the MIP-3H (API: 47-061-01707-00-00) 112 feet (34m) between depths of 7445 to 7557 feet, and from the Boggess 17H (API: 47-061-01812-00-00) 139 feet (42m) between depths of 7908 and 8012 ft. A full suite of triple combo (gamma ray, neutron, density logs), image logs, and advanced logging tools were run in both wells and calibrated to core analysis. Core analysis includes medical computed tomography (CT) scans, mineralogy and chemostratigraphy determined from handheld X-Ray fluorescence (hhXRF) and X-Ray powder diffraction (XRD) measurements, and determination of total organic content (TOC). Lithofacies were determined at core-scale using traditional core description techniques and medical CT-scan images. Log-scale facies are based on mineralogy and TOC data and developed using petrophysical logging data calibrated to core data (XRD and pyrolysis data). Chemostratigraphic analysis utilized hhXRF data to determine the major and trace element trends in the cores. In the two wells six shale lithofacies were recognized at the core and log scale. Both wells show organic-rich facies (TOC > 6.5%) primarily in the middle and lower Marcellus, with a slight decrease in thickness of this interval in the Boggess 17H. This interval is interpreted as an increase in paleo-productivity (increased Ni, Zn, and V), decreased sedimentation (decreased detrital proxies), and anoxic to euxinic conditions (increased Mo and chalcophile elements). Paleo-redox conditions in both wells are dynamic throughout deposition transitioning between euxinic/anoxic to dysoxic/oxic. This trend is seen through elemental proxies and calcite/pyrite concretion distributions.

03 NATURAL GAS↗

EEB Hub Regional Sankey Diagram: Philadelphia Authority for Industrial Development Historical and Forecast Energy by Planned Use at the Philadelphia Navy Yard

The Energy Efficient Buildings Hub (EEB Hub) is a DOE-funded center, focused on improving the energy use in commercial and large-scale residential buildings. One of the Hub’s goals has been to develop the means and methods to reduce energy use in commercial buildings by 20 percent by 2020. Understanding energy use in buildings is a key component to managing energy use at multiple scales, from the building to the city, to the region. Sankey diagrams are an accessible tool to visualize energy flows, and help identify opportunities to deploy energy saving technologies. A campus-level Sankey diagram was previously generated from 2010-2011 data for ~100 metered Navy Yard buildings to quantify natural gas and electricity usage by principal building activity. As these properties are renovated, the energy consumption and building principal activities are being updated and modified. To depict the multi-year time lapse of regional electricity distribution in the Navy Yard, LLNL generated Sankey diagrams using data from 36 properties (buildings, developments, equipment) used to develop Philadelphia Authority for Industrial Development’s (PIDC) Navy Yard Master Energy Plan (NYEMP). The diagrams presented in this report depict ~10 building use types and the yearly changes in forecasted usage in GWh from 2011 to 2022. The forecast captures increases in regional energy use from planned building additions and renovations and yearly increases for existing buildings. From 2009 to 2022, there is approximately 5.6 million square feet of planned additions and renovations. The largest addition of properties are for office (~ 2.3 million square feet for dedicated office, and larger for shared office space) and residential space (~1 million square feet). Until 2014, the largest user of energy is for flex space, reaching a forecasted 11.4 GWh. In 2015-2016, the largest forecasted user is for a data center reaching ~25.7 GWh. After 2016, the largest consumers are either for office space (reaching 63.2 GWh forecast in 2022), or heavy industry (68 GWh forecast in 2022).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗