Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental Radioactivity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Model Package Report: Plateau to River Groundwater Model Version 8.3

This model package report documents the groundwater flow component of the Plateau to River Groundwater Model (P2R Model), which is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by CH2M HILL Plateau Remediation Company at the Hanford Site in Washington State. The objective of this report is to describe the modeling objectives, conceptualization, model implementation, calibration, sensitivity, uncertainty, configuration control, limitations, and future model enhancements of the groundwater flow component of the P2R Model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Functions and Features, Events and Processes for the E-Area Performance Assessment

The DOE Technical Standard, “Disposal Authorization Statement and Tank Closure Documentation,” (DOE 2017) recommends the use of safety functions and features, events and processes (FEPs) to support development of conceptual models and identification of scenarios to be considered in a performance assessment (PA). The FEP process provides a means to describe how a PA considers and addresses the factors that could influence the performance of key barriers. Understanding the roles of barriers in terms of limiting migration helps to focus on how changes in the system could lead to a situation where those roles cannot be fulfilled and there is the potential for compromised performance. The FEPs screening and review process was used to identify FEPs that are relevant for the EArea Low-Level Waste Facility (LLWF) and specifically those FEPs that could have a detrimental impact on the effectiveness of a given safety function. For this PA, a default list of FEPs developed at the International Atomic Energy Agency (IAEA 2004) and an approach implemented for PAs at the Hanford and Idaho sites (Mehta et al. 2016, DOE-ID 2019) are used to identify processes and events that could influence the effectiveness of a given safety function for the E-Area LLWF (e.g., subsidence can impact the safety function of the cover system and lead to increased infiltration). The Hanford and Idaho PAs represent two of the most recent applications of this approach. The PA evaluates the potential impacts of changes in performance of different features of the system and demonstrates that the safety functions represent multiple and redundant barriers. Barrier analyses, assuming a safety function is not present, also test the robustness of the system in the event of the loss of one or more safety functions. Such evaluations also support a qualitative illustration of the concept of defense in depth. The safety concept for closure of the E-Area LLWF (generically referred to as “E-Area”) encompasses a variety of different features (i.e., administrative controls, natural site features, and engineered barriers) that reduce the potential impacts on human health and the environment from the residual waste that will remain after closure. These features can be represented as a collection of safety functions acting independently and as a system to provide for overall safety. In some applications, there have been attempts to assign numerical expectations to specific safety functions, but that is not the intent in this case. The concept of safety functions is used more qualitatively in two ways for this PA: 1. To illustrate the robustness of the E-Area design, operational practices and closure approach by documenting features that are and are not credited in different modeling cases. 2. To identify the roles of the different features and potential processes and events that could compromise the performance of safety features and need to be considered when developing the modeling approach. This report addresses both safety functions and FEPs for the E-Area PA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comoparison of Slit Trench and Engineered Trench 3D Vadose Zone Conceptual Models

In the next revision of the E-Area Low-Level Waste Facility (ELLWF) Performance Assessment (PA), radionuclide groundwater transport from slit (ST) and engineered trenches (ET) will be simulated using 3-dimensional PORFLOW models representing the vadose zone. In total, the conceptual framework will aim to model 29 total trenches with a degree of conservatism that provides a high level of confidence in meeting performance objectives. The implementation of generic conceptual models allows for a reasonable number of simulation scenarios, thereby reducing the chances of errors and enabling a better one-to-one comparison between the results, while still capturing the most important features of each trench. The current investigation seeks to understand if a generic trench model based on the general ET footprint can justifiably be used for representing both STs and ETs while maintaining a reasonable degree of conservatism. In this process, the groundwater transport of several key radionuclides was simulated for both ET and ST geometries and the flux-to-the-water-table profiles were compared. For all radionuclides simulated, the ET geometry is shown to be conservative (i.e., produces the highest peak flux to the water table).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Waste Landfill Annual Post-Closure Care Report, Calendar Year 2019

The Chemical Waste Landfill (CWL) at Sandia National Laboratories/New Mexico (SNL/NM) is a remediated hazardous waste landfill that underwent closure in accordance with Title 20, Chapter 4, Part 1 of the New Mexico Administrative Code (20.4.1.600 NMAC), incorporating Title 40, Code of Federal Regulations (CFR), Part 265, (40 CFR § 265) Subpart G, and the CWL Final Closure Plan (SNL/NM December 1992 and subsequent revisions). The CWL Post- Closure Care Permit (PCCP) (NMED October 2009), which became effective June 2, 2011 (Kieling June 2011) and as modified, defines all post-closure requirements. This ninth CWL Annual Post-Closure Care Report documents all activities and results as required by the PCCP Attachment 1, Section 1.12.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds (FY2019 Annual Status Report)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730) and are compared with U.S. Department of Energy requirements (DOE O 435.1 and performance objectives defined in companion documents DOE M 435.1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations, indicating that potential impacts are well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. A new PA study has been initiated in this fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 West and East Areas (Trenches 31 and 34 in 200 West; Trench 94 in 200 East) because extended time has elapsed between the current annual status report and the original PA (WHC-SD-WM-TI-370) for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site (FY2019 Annual Status Report)

In accordance with DOE M 435.1-1 requirements and as implemented by DOE/RL-2000-29, the U.S. Department of Energy (DOE), Richland Operations Office has prepared this annual summary for fiscal year (FY) 2019. Originally reported in PNNL-11800 and PNNL-11800, Addendum 1, the Hanford Site Composite Analysis was approved through issuance of a 2002 memorandum. As required by DOE/RL-2000-29, an annual evaluation of new information and data developed by a number of onsite programs was completed. The reporting period for this annual evaluation is FY 2019 (October 1, 2018, through September 30, 2019). The information provided in this evaluation includes activities performed in FY 2019 that are considered pertinent to the Hanford Site Composite Analysis - information that could change source terms considered, and monitoring, research, and development results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low Level Waste in the 200 West Area Burial Grounds (FY2019 Annual Statius Report)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645) and are compared with performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations, indicating that potential impacts are well below performance objectives; therefore, future compliance with DOE O 435.1 is expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Flow and Transport Parameters Data Package for the Hanford Site Composite Analysis

This report provides a description of the basis for the development and implementation of a conceptual model for vadose zone flow and transport for the Hanford Site composite analysis (CA) groundwater pathway analysis. The parameterization for a numerical model is intimately linked to the conceptual model framework. This report describes the basis for the selection of hydraulic and transport parameters for the hydrostratigraphic units (HSUs) identified in the 200 East and 200 West Areas. The following three-step process was used to develop the hydraulic properties and transport parameters for the CA modeling: 1. Breakdown of existing database on hydraulic properties by HSUs 2. Constitutive model parameters for laboratory, core-scale hydraulic properties 3. Upscaling for macroscopic, field-scale flow, and transport parameters This document provides data and information on the following items: A brief description and technical basis for the conceptual model selected to represent vadose zone flow and transport for the CA modeling. Variation in sediment particle size distribution for representative sites in the 200 East and West Areas. A summary of effective (upscaled) moisture retention, and saturated and unsaturated hydraulic conductivity estimates for the HSUs in the 200 East and West Areas. A summary of effective transport parameters, including sediment bulk density and macrodispersivity estimates for various HSUs. The 200 East Area B Complex perched water aquifer hydraulic properties

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Disposition Baseline for Composite Analysis

An updated version of the Hanford Site Disposition Baseline (HSDB) was prepared to document the evolution of conditions for 637 waste sites within Central Plateau of the U.S. Department of Energy’s (DOE’s) Hanford Site. The HSDB provides information that will be used to evaluate post-closure radiological dose in the updated composite analysis (CA).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solid Waste Release Calculations for the Composite Analysis Baseline Assessment

The purpose of the Hanford Site Composite Analysis (CA) is to provide an estimate of the cumulative radiological impacts from active and planned low-level radioactive waste disposals and other potentially interacting radioactive waste disposal sources that will remain following Hanford Site closure. The need for a waste form release model addressing multiple solid waste forms is documented in CP-60410, Hanford Site Composite Analysis Technical Approach Description: Waste Form Release.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater and Intruder Radionuclide Screening

Solid Waste Management (SWM) operates the E-Area Low-Level Waste Facility (ELLWF) where low level on-site and off-site solid waste streams are buried. The facility has been in operation since late 1994 and is currently projected to remain in operation until 2065. This facility can accommodate a broad range of waste forms resulting from the six different types of disposal unit options (i.e., varying degrees of engineered barriers → trenches to concrete vaults). This facility is currently operating under a Performance Assessment (PA) issued back in 2008, along with several subsequent supporting Special Analyses (SA). The Savannah River National Laboratory (SRNL) developed the prior PAs and SAs and has been tasked to update the facility’s PA. For operating the E-Area facility, a Waste Inventory Tracking System (e.g., WITS) is actively employed by waste generators where every radionuclide entering the facility (to be buried in one of its many disposal units) must be either directly or indirectly accounted for. Since there is a large number of radionuclides in existence (>3,000), the International Commission on Radiological Protection (ICRP-107) has provided guidance on the subset of radionuclides requiring further assessment in landfills such as the E-Area LLWF. The ICRP-107 publication provides critical radiological information on 1,252 radionuclides of 97 elements. This database is the critical starting point for developing a consistent inventory limit system. The explicit measurement and tracking of all radionuclides are not necessary when process knowledge, burial history, and radiological aspects are factored into conservative groundwater and intruder screening processes. Across the DOE complex these screening processes have been historically performed using the methodology suggested by the National Council on Radiation Protection and Measurements (NCRP) as presented in their original report (NCRP 1984) and then refined in a later report (NCRP 1996). In the recommended screening models employed within this report the traditional NCRP models are updated to better handle progeny and better reflect the known characteristics of E-Area. This improved screening process is referred to as the “NCRP-like” method. Various upgrades to the traditional NCRP methodology have been used by others (e.g., NRC funded effort by Kennedy and Strenge 1992). The more detailed models by Kennedy and Strenge (1992) were considered in this effort and are compared to the results from the more traditional NCRP-like models. The groundwater and inadvertent intruder screening analyses presented in this report start with this 1,252 radionuclide list and reduces it down to more manageable lists that are applicable to the various disposal unit types contained within E-Area. In order to reduce this starting list, some level of exposure risk must be considered acceptable. Historically, a dose (or concentration level) has been compared with a screening criterion set to 1% of a performance measure (e.g., a beta-gamma dose not to exceed the 4 mrem/yr beta-gamma performance measure x 0.01 = 0.04 mrem/yr). Thus, if a radionuclide produced a bounding or screening-level dose (or concentrations) less than the screening criterion, it could be safely removed from further consideration. Several tiers of screening and bounding level analyses have been considered in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Flow and Transport Parameters Data Package for the Hanford Site Composite Analysis and Cumulative Impact Evaluation

This report provides a description of the basis for the development and implementation of a conceptual model for vadose zone flow and transport for the composite analysis (CA) groundwater pathway analysis and the cumulative impact evaluation (CIE). The parameterization for a numerical model is intimately linked to the conceptual model framework. The report describes the basis for the selection of hydraulic and transport parameters for the hydrostratigraphic units (HSUs) identified in the 200 East and 200 West Areas. Whenever data are sparse or unavailable, surrogate hydraulic properties are chosen based on samples collected within the 200 Areas and nearby locations that are representative of sediments characteristic of the HSUs identified elsewhere.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-63 Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for REDOX Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for U Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for LLBG-200W B for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for M Pond Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for PFP Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗