Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering Considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Changes in the microstructure and mechanical properties of additively manufactured AlSi10Mg alloy after exposure to elevated temperatures

Highlights: • Elevated temperatures above 120 °C brought changes to the AM AlSi10Mg alloy. • A maximum hardness state obtained at 160 °C/5 h was thoroughly tested. • Hardness increased by 15% and TYS by 5%, but elongation dropped by 60%. • Pure Si precipitates were responsible for the observed changes. - Abstract: The additive manufacture (AM) of the AlSi10Mg alloy has become the subject of considerable attention, especially for production of complex parts in engines. Because such parts can be exposed to elevated temperatures during operation, material stability is very important, but as yet little is known about it in relation to AM. Here, we studied changes of the AlSi10Mg alloy produced by selective laser melting (SLM) after its exposure to temperatures between 120 and 180 °C. At each temperature, hardness evolution was measured, with hardness increasing over time. The maximum hardness state obtained at 160 °C was selected for further studies comprising microstructural analysis by scanning and transmission electron microscopy, chemical composition analysis and mechanical properties assessment. Transmission microscopy revealed nano-scale acicular precipitates that caused a slight increase in the yield strength of the alloy together with a significant drop in elongation. Electron energy loss spectroscopy (EELS) and energy dispersive spectroscopy (EDS) showed that the precipitates surprisingly consisted of pure Si. To provide a comparison, conventional regimes of heat treatment (stress-relief and T6) were applied. Despite a considerable loss in mechanical performance, thermal instability was no longer observed. Overall, our results indicate that operating temperatures are a key factor in ensuring the smooth operation of AM parts of the AlSi10Mg alloy. In respect to that, we offer recommendations for their industrial use.

36 MATERIALS SCIENCE↗

Enabling fast charging – Vehicle considerations

To achieve a successful increase in the plug-in battery electric vehicle (BEV) market it is anticipated that a significant improvement in battery performance is required to improve the range that BEVs can travel. While the range that BEVs can travel on a single recharge is improving, the rate at which these vehicles can be recharged is still much slower than conventional internal combustion engine vehicles. To achieve comparable recharge times we explore the vehicle considerations of charge rates up to 350 kW. This faster recharge is expected to significantly mitigate the perceived deficiencies for long-distance transportation, to provide alternative charging in densely populated areas where overnight charging at home may not be possible, and to reduce range anxiety for travel within a city when unplanned charging maybe required. This substantial increase in the charging rate is expected to create technical issues in the design of the battery system and the vehicle electrical architecture that must be resolved. This work will focus on the battery system thermal design and total recharge time to meet the goals of implementing higher charge rates as well as the impacts of the expected increase in system voltage on the components of the vehicle.

25 ENERGY STORAGE↗

Functional and operational requirements document : building 1012, Battery and Energy Storage Device Test Facility, Sandia National Laboratories, New Mexico.

This report provides an overview of information, prior studies, and analyses relevant to the development of functional and operational requirements for electrochemical testing of batteries and energy storage devices carried out by Sandia Organization 2546, Advanced Power Sources R&D. Electrochemical operations for this group are scheduled to transition from Sandia Building 894 to a new Building located in Sandia TA-II referred to as Building 1012. This report also provides background on select design considerations and identifies the Safety Goals, Stakeholder Objectives, and Design Objectives required by the Sandia Design Team to develop the Performance Criteria necessary to the design of Building 1012. This document recognizes the Architecture-Engineering (A-E) Team as the primary design entity. Where safety considerations are identified, suggestions are provided to provide context for the corresponding operational requirement(s).

25 ENERGY STORAGE↗

Software-Defined Networking Traffic Engineering Process for Operational Technology Networks

Network design goals are often functional with little consideration for security. Growth and maintenance of critical infrastructure mission-focused networks can be ad hoc and preclude large-scale technology replacements, reconfigurations, or even patching. These restrictions are contributing factors to increased vulnerabilities. Over 90% of all attacks begin with phishing and include lateral movement (Frinke 2019). Adopting a software-defined networking (SDN) approach is an effective mitigation strategy for many existing vulnerabilities. SDNs deny-by-default approach to networking restricts an adversary’s freedom of movement without impacting an organization’s mission. SDN implementations require a process that identifies an organization’s mission-specific network communications. A well-defined traffic engineering process ensures that only known devices communicate with each other on specific ports.

Software Defined Networking, Situational Awareness↗

Synthesis and property of EPEG ‐based polycarboxylate ether superplasticizers via RAFT polymerization

Abstract Polycarboxylate ether superplasticizers (PCEs) with comb‐shaped molecular structures have attracted considerable attention in the area of admixtures for construction engineering. However, there are some contradictions in studying the relationship between the molecular structure and property of PCE due to its random structure based on traditional free radical polymerization, which is confused for designing and developing novel PCEs. In this article, a series of reversible addition fragmentation chain transfer (RAFT) polymerization‐based polycarboxylate ether superplasticizers (RPCs) were prepared by the copolymerization of acrylic acid (AA) and ethylene‐glycol monovinyl polyethylene glycol (EPEG). The chemical structure and composition of RPCs were characterized and their adsorption behavior and dispersion properties were conducted. The results demonstrate that the molecular weights of RPCs do not vary significantly with prolonging reaction time, and the actual monomer ratio in RPCs displays a significant change to the feed one due to the monomer reactivity and conversion at higher reaction temperature, which is different from conventional free radical polymerization. The dispersion and adsorption properties of RPCs to cement were evaluated by slurry fluidity tests and total organic carbon (TOC) experiments. The effect of polymerization temperature and time on the dispersion ability has been systematically studied. The results indicate that the dispersion ability and adsorption capacity of RPCs are closely related to their molecular structures. The dispersion ability of RPCs were enhanced with increasing carboxyl group density in a certain range of monomer molar ratios (≤6:1). This study will provide a new platform for designing and developing high‐performance and rational cost‐effective superplasticizers with well‐defined structure and controlled molecular weight.

Chen, Xiaodong↗

Binary and Ternary Colloidal Cu–Sn–Te Nanocrystals for Thermoelectric Thin Films

Recent advances in copper chalcogenide-based nanocrystals (NCs), copper sulfide, and copper selenide derived nanostructures, have drawn considerable attention. However, reports of crystal phase and shape engineering of binary or ternary copper telluride NCs remain rare. Here, a colloidal hot-injection approach for producing binary copper/tin telluride, and ternary copper tin telluride NCs with controllable compositions, crystal structures, and morphologies is reported. Here, the crystal phase and growth behavior of these tellurides are systematically studied from both experimental and theoretical perspectives.

30 DIRECT ENERGY CONVERSION↗

Topological Assembly of a Deployable Hoberman Flight Ring from DNA

Deployable geometries are finite auxetic structures that preserve their overall shapes during expansion and contraction. The topological behaviors emerge from intricately arranged elements and their connections. Despite the considerable utility of such configurations in nature and in engineering, deployable nanostructures have never been demonstrated. In this paper, a deployable flight ring, a simplified planar structure of Hoberman sphere is shown, using DNA origami. The DNA flight ring consists of topologically assembled six triangles in two layers that can slide against each other, thereby switching between two distinct (open and closed) states. The origami topology is a trefoil knot, and its auxetic reconfiguration results in negative Poisson’s ratios. This work shows the feasibility of deployable nanostructures, providing a versatile platform for topological studies and opening new opportunities for bioengineering.

59 BASIC BIOLOGICAL SCIENCES↗

ECRH System For ITER

A 26 MW Electron Cyclotron Heating and Current Drive (EC H and CD) system is to be installed for ITER. The main objectives are to provide, start-up assist, central H and CD and control of MHD activity. These are achieved by a combination of two types of launchers, one located in an equatorial port and the second type in four upper ports. The physics applications are partitioned between the two launchers, based on the deposition location and driven current profiles. The equatorial launcher (EL) will access from the plasma axis to mid radius with a relatively broad profile useful for central heating and current drive applications, while the upper launchers (ULs) will access roughly the outer half of the plasma radius with a very narrow peaked profile for the control of the Neoclassical Tearing Modes (NTM) and sawtooth oscillations. The EC power can be switched between launchers on a time scale as needed by the immediate physics requirements. A revision of all injection angles of all launchers is under consideration for increased EC physics capabilities while relaxing the engineering constraints of both the EL and ULs. A series of design reviews are being planned with the five parties (EU, IN, JA, RF, US) procuring the EC system, the EC community and ITER Organization (IO). The review meetings qualify the design and provide an environment for enhancing performances while reducing costs, simplifying interfaces, predicting technology upgrades and commercial availability. In parallel, the test programs for critical components are being supported by IO and performed by the Domestic Agencies (DAs) for minimizing risks. The wide participation of the DAs provides a broad representation from the EC community, with the aim of collecting all expertise in guiding the EC system optimization. Still a strong relationship between IO and the DA is essential for optimizing the design of the EC system and for the installation and commissioning of all ex-vessel components when several teams from several DAs will be involved together in the tests on the ITER site.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Lower-Energy Energy Storage System (LEESS) Component Evaluation

Alternate hybrid electric vehicle (HEV) energy storage systems (ESS) such as lithium-ion capacitors (LICs) and electrochemical double-layer capacitor (EDLC) modules have the potential for improved life, superior cold temperature performance, and lower long-term cost projections relative to traditional battery storage systems. If such lower-energy ESS (LEESS) devices can also be shown to maintain high HEV fuel savings, future HEVs designed with these devices could have an increased value proposition relative to conventional vehicles. NREL's vehicle test platform is helping validate the in-vehicle performance capability of alternative LEESS devices and identify unforeseen issues. NREL created the Ford Fusion Hybrid test platform for in-vehicle evaluation of such alternative LEESS devices, bench testing of the initial LIC pack, integration and testing of the LIC pack in the test vehicle, and bench testing and installation of an EDLC module pack. EDLC pack testing will continue in FY15. The in-vehicle LIC testing results suggest technical viability of LEESS devices to support HEV operation. Several LIC configurations tested demonstrated equivalent fuel economy and acceleration performance as the production nickel-metal-hydride ESS configuration across all tests conducted. The lowest energy LIC scenario demonstrated equivalent performance over several tests, although slightly higher fuel consumption on the US06 cycle and slightly slower acceleration performance. More extensive vehicle-level calibration may be able to reduce or eliminate these performance differences. The overall results indicate that as long as critical attributes such as engine start under worst case conditions can be retained, considerable ESS downsizing may minimally impact HEV fuel savings.

25 ENERGY STORAGE↗

Parametric Study to Assess Technical Prospect Feasibility for Offshore CO 2 Storage

This report is a white paper on the parametric study to assess technical prospect feasibility for CO 2 storage with and without CO 2 -EOR. The SECARB Offshore GOM team reviewed key parameters that previous modeling experience suggests have the largest impact on CO 2 plume size and CO 2 -EOR performance (SSEB, 2019) These parameters include tectonic impacts (reservoir dip and fault block size), reservoir properties (permeability) and development strategies (well field payout, waterflood, and CO 2 flooding strategies). These parameters are further evaluated in this study in order to identify upper and lower boundary conditions for the parametric values. The boundary conditions are needed to set constraints for key parameters when performing modeling assessments. Understanding the key parametric values for the GOM will facilitate locating successful offshore carbon capture utilization and storage (CCUS) projects in terms of plume size, CO 2 stored and, in the case of EOR, oil recovery. Importantly, this white paper focuses on both technical factors (geologic and engineering), but does not address economic, commercial, or stakeholder considerations. The report is organized into four sections and includes a review of the datasets used to define the parameter ranges, the results of a full-physics reservoir simulation, a summary of a reduced order modeling approach to evaluate the impact of the study parameters, and, finally, a discussion of the work that will occur during the next phase of the project.

02 PETROLEUM↗

Key Pandemic Response R&D Contributions by Los Alamos National Laboratory

New research goals, mitigation successes, and beneficial collaborations burgeoned from the early critical days of 2020 when LANL (Los Alamos National Laboratory) pivoted to help respond to the pandemic. By applying its considerable capabilities in the fields of science, technology, and engineering (STE), LANL responded to the coronavirus infectious disease (COVID-19) pandemic. This report documents representative examples of that response. Through significant investments in COVID-19 mitigations and ongoing research and development (R&D), important advancements were made to address the pandemic that not only benefited the global population affected by the pandemic, but also protected our staff and collaborators as we executed our Lab’s mission.

59 BASIC BIOLOGICAL SCIENCES↗

The Hydropower Game: An Interactive Learning Tool for the Future Hydropower Workforce

This report documents a Seedling project supported by the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO), conducted by Argonne National Laboratory (ANL) and the National Laboratory of the Rockies (NLR). The Seedling and Sapling Program provides small grants over short duration to enable early-stage research at national laboratories. This funding mechanism is intended to cultivate innovative ideas and expand research road maps in hydropower and marine energy technologies. Under this Seedling award, the project team developed an educational outreach tool, or “serious game”, built in Python and powered by the Pygame library, aimed at teaching fundamental hydropower concepts through an engaging, interactive learning experience. The game features multiple lessons covering several hydropower topics while allowing for expansion and customization in the instance of future funding availability: • Hydropower Plant Types: Players explore and compare the mechanics and applications of run-of-river, dam hydropower, and pumped-storage hydropower. • Flow Dynamics and Power Generation: Interactive tasks demonstrate how release rate and hydraulic head combine to determine power output. • Grid Operations and Load Following: Simulations illustrate how hydropower facilities respond to fluctuating electricity demand to balance the grid. • Market Integration: Levels scaffold understanding of how hydropower interfaces with the broader energy market, including operational and economic considerations. The tool was showcased at several science, technology, engineering, and mathematics (STEM) outreach events, where it was demoed to students, educators, and the general public. These events provided valuable opportunities to collect feedback on the gameplay, storyline, and educational objectives from a wide audience. The game was presented at STEMapalooza, Introduce a Girl to Engineering Day, STEMCON, and Clean Currents 2025. Insights gathered during these demonstrations informed refinements to the game’s user experience and strengthened its effectiveness as an educational tool for teaching hydropower concepts. This report outlines the game’s design philosophy, educational objectives, technical implementation, user experience insights, and potential for broader deployment within educational and workforce development contexts. It emphasizes how gamified learning can demystify complex hydropower science and inspire interest in water-power technologies. The project’s success demonstrates the value of Seedling funding in fostering creative, lowcost educational tools that support DOE’s mission to advance energy literacy and innovation. The report concludes with recommendations for expanding the tool by adding new levels, integrating assessment metrics, and exploring commercialization or deployment pathways through future Sapling funding. The official webpage of the Hydropower Game, which includes a link to the educational tool, can be accessed at www.anl.gov/hydropower/hydropower-game.

13 HYDRO ENERGY↗

Vectorization of Random Number Generation and Reproducibility of Concurrent Particle Transport Simulation

Efficient random number generation with high quality statistical properties and exact reproducibility of Monte Carlo simulations are important requirements in many areas of computational science. VecRNG is a package providing pseudo-random number generation (pRNG) in the context of a new library VecMath. This library bundles up several general-purpose mathematical utilities, data structures, and algorithms having both SIMD and SIMT (GPUs) support based on VecCore.~Several state-of-the-art RNG algorithms are implemented as kernels supporting parallel generation of random numbers in scalar, vector, and Cuda workflows. In this report, we will present design considerations, implementation details, and computing performance of parallel pRNG engines on both CPU and GPU. Reproducibility of propagating multiple particles in parallel for HEP event simulation is demonstrated, using GeantV-based examples, for both sequential and fine-grain track-level concurrent simulation wor kflows. Strategies for efficient uses of vectorized pRNG and non-overlapping streams of random number sequences in concurrent computing environments is discussed as well.

Jun, S. Y.↗

DEVELOPMENT OF OPERATIONAL CONCEPTS FOR ADVANCED SMRs: THE ROLE OF COGNITIVE SYSTEMS ENGINEERING

Advanced small modular reactors (AdvSMRs) will use advanced digital instrumentation and control systems, and make greater use of automation. These advances not only pose technical and operational challenges, but will inevitably have an effect on the operating and maintenance (O&M) cost of new plants. However, there is much uncertainty about the impact of AdvSMR designs on operational and human factors considerations, such as workload, situation awareness, human reliability, staffing levels, and the appropriate allocation of functions between the crew and various automated plant systems. Existing human factors and systems engineering design standards and methodologies are not current in terms of human interaction requirements for dynamic automated systems and are no longer suitable for the analysis of evolving operational concepts. New models and guidance for operational concepts for complex socio-technical systems need to adopt a state-of-the-art approach such as Cognitive Systems Engineering (CSE) that gives due consideration to the role of personnel. This approach we report on helps to identify and evaluate human challenges related to non-traditional concepts of operations. A framework - defining operational strategies was developed based on the operational analysis of Argonne National Laboratory’s Experimental Breeder Reactor-II (EBR-II), a small (20MWe) sodium-cooled reactor that was successfully operated for thirty years. Insights from the application of the systematic application of the methodology and its utility are reviewed and arguments for the formal adoption of CSE as a value-added part of the Systems Engineering process are presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Human Factors Principles in Information Dashboard Design

When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state concepts for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.

3D Modeling↗

Evaporation Submodel Development for Volume of Fluid (eVOF) Method Applicable to Spray-Wall Interaction Including Film Characteristics with Validation at High Pressure and Temperature Conditions

Internal combustion engines have seen a great evolution over the last several decades through application of high pressure direct injection, multiple injections, and other technologies to reduced fuel consumption, NOx, and PM. Although combustion systems with advanced injection strategies have been studied extensively, there exists a significant fundamental knowledge gap on the fuel-spray interactions with the piston surface and chamber walls. Advanced computational codes validated with experimental techniques have to be developed for accurate representation of the drop impingement, fuel film formation, and vaporization. Current engine CFD (Computational Fluid Dynamics) spray models utilize a Lagrangian framework for modeling which lacks critical considerations of the physics pertaining to these interactions and thus requiring extensive parameterization, tuning and validation. The team from Michigan Technological University, University of Massachusetts Dartmouth, and Argonne National Laboratory is composed of experts in sprays, combustion, engines and CFD with a wide spectrum of knowledge including specific expertise in the area under consideration. In the proposed work, a VOF (Volume of Fluid) modeling approach has been adopted for the spray-wall interaction, film formation and spreading, and vaporization. With the inclusion of a vaporization submodel, a more predictive and accurate simulation of the spray-film was performed without extensive need of parameterization and tuning. Extensive experimentation of the spray-wall interaction under the range of conditions matching the thermodynamic and surface temperatures that occur in diesel and gasoline engines were conducted to validate the SWI submodels and for development of the evaporation submodel, which has been implemented in the flow solver.

42 ENGINEERING↗

A Comprehensive Review and Qualitative Analysis of Micro-Combined Heat and Power Modeling Approaches

Concurrent production of electrical and thermal energy from a Combined Heat and Power (CHP) device is an attractive tool to address the growing energy needs of the planet. Micro CHP (µCHP) systems can reduce a building’s primary energy consumption, reduce carbon footprint, and enhance resiliency. Modeling of the µCHP helps understand the system from multiple perspectives and helps discover errors earlier, improves impact analysis and simulation of system solutions for ease of integration with the building. Consequently, there is a need for analysis of the impact of µCHP modeling approach on its reliability and flexibility. The primary objective of this paper is to review the state-of-the art models in the µCHP space with a focus towards internal combustion engine as the primary mover (PM) and limit the study to system modeling, calibration, and validation methodologies. Based on the analysis, recommendations for further model considerations and refinements are presented.

42 ENGINEERING↗