Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Centrosome structure and function is altered by chloral hydrate and diazepam during the first reproductive cell cycles in sea urchin eggs

This paper explores the mode of action of the tranquillizers chloral hydrate and diazepam during fertilization and mitosis of the first reproductive cell cycles in sea urchin eggs. Most striking effects of these drugs are the alteration of centrosomal material and the abnormal microtubule configurations during exposure and after recovery from the drugs. This finding is utilized to study the mechanisms of centrosome compaction and decompaction and the dynamic configurational changes of centrosomal material and its interactions with microtubules. When 0.1% chloral hydrate or 350-750 microM diazepam is applied at specific phases during the first cell cycle of sea urchin eggs, expanded centrosomal material compacts at distinct regions and super-compacts into dense spheres while microtubules disassemble. When eggs are treated before pronuclear fusion, centrosomal material aggregates around each of the two pronuclei while microtubules disappear. Upon recovery, atypical asters oftentimes with multiple foci are formed from centrosomal material surrounding the pronuclei which indicates that the drugs have affected centrosomal material and prevent it from functioning normally. Electron microscopy and immunofluorescence studies with antibodies that routinely stain centrosomes in sea urchin eggs (4D2; and Ah-6) depict centrosomal material that is altered when compared to control cells. This centrosomal material is not able to reform normal microtubule patterns upon recovery but will form multiple asters around the two pronuclei. When cells are treated with 0.1% chloral hydrate or 350-750 microM diazepam during mitosis, the bipolar centrosomal material becomes compacted and aggregates into multiple dense spheres while spindle and polar microtubules disassemble. With increased incubation time, the smaller dense centrosome particles aggregate into bigger and fewer spheres. Upon recovery, unusual irregular microtubule configurations are formed from centrosomes that have lost their ability to reform normal mitotic figures. These results indicate that chloral hydrate and diazepam affect centrosome structure which results in the inability to reform normal microtubule formations and causes abnormal fertilization and mitosis.

Non-NASA Center↗

Tapered plug foam spray apparatus

A two-component foam spray gun is readily disassembled for cleaning. It includes a body (1) with reactant (12, 14) and purge gas (16) inlet ports. A moldable valve packing (32) inside the body has a tapered conical interior surface (142), and apertures which match the reactant ports. A valve/tip (40) has a conical outer surface (48) which mates with the valve packing (32). The valve/tip (40) is held in place by a moldable packing washer (34), held at non-constant pressure by a screw (36, 38). The interior of the valve/tip (40) houses a removable mixing chamber (50). The mixing chamber (50) has direct flow orifices (60) and an auxiliary flow path (58, 60) which ameliorate pressure surges. The spray gun can be disassembled for cleaning without disturbing the seal, by removing the valve/tip (40) to the rear, thereby breaking it free of the conical packing. Rotation of the valve/tip (40) relative to the body (1) shuts off the reactant flow, and starts the purge gas flow.

Allen, Peter B.↗

Fiber Optic Sensing Monitors Strain and Reduces Costs

In applications where stress on a structure may vary widely and have an unknown impact on integrity, a common engineering strategy has been overbuilding to ensure a sufficiently robust design. While this may be appropriate in applications where weight concerns are not paramount, space applications demand a bare minimum of mass, given astronomical per-pound launch costs. For decades, the preferred solution was the tactic of disassembly and investigation between flights. Knowing there must be a better way, Dr. Mark Froggatt, of Langley Research Center, explored alternate means of monitoring stresses and damage to the space shuttle. While a tear-it-apart-and-have-a-look strategy was effective, it was also a costly and time consuming process that risked further stresses through the very act of disassembly and reassembly. An alternate way of monitoring the condition of parts under the enormous stresses of space flight was needed. Froggatt and his colleagues at Langley built an early-warning device to provide detailed information about even minuscule cracks and deformations by etching a group of tiny lines, or grating, on a fiber optic cable five-thousandths of an inch thick with ultraviolet light. By then gluing the fiber to the side of a part, such as a fuel tank, and shining a laser beam down its length, reflected light indicated which gratings were under stress. Inferring this data from measurements in light rather than in bonded gauges saved additional weight. Various shuttle components now employ the ultrasonic dynamic vector stress sensor (UDVSS), allowing stress detection by measuring light beamed from a built-in mini-laser. By measuring changes in dynamic directional stress occurring in a material or structure, and including phase-locked loop, synchronous amplifier, and contact probe, the UDVSS proved especially useful among manufacturers of aerospace and automotive structures for stress testing and design evaluation. Engineers could ensure safety in airplanes and spaceships with a narrower, not overbuilt, margin of safety. For this development, in 1997, Discover Magazine named Froggatt a winner in the "Eighth Annual Awards for Technological Innovation" from more than 4,000 entries.

Source record↗

Performance and Analysis of Perfluoropolyalkyl Ether Grease Used on Space Shuttle Actuators--A Case Study

Actuators used on the United States space shuttle fleet are lubricated with unspecified amounts of Braycote 601 (Castrol Braycote) grease consisting of a perfluoropolyalkyl ether (PFPAE) base oil thickened with a polytetrafluoroethylene (PTFE) filler. Each shuttle has four body flap actuators (BFAs) (two on each wing) on a common segmented shaft and four rudder speed brake (RSB) actuators. The actuators were designed to operate for 10 years and 100 flights without periodic relubrication. Visible inspection of two partially disassembled RSB actuators in continuous use for 19 years raised concerns over possible grease degradation due to discoloration of the grease on several places on the surfaces of the gears. Inspection revealed fretting, micropitting, wear and corrosion of the bearings and gears. A small amount of oil dripped from the disassembled actuators. Whereas new grease is beige in appearance, the discolored grease consisted of both grey and reddish colors. Grease samples taken from the actuators together with representative off-the-shelf new and unused grease samples were analyzed by gravimetry for oil content; by inductively coupled plasma spectroscopy (ICP) for metals content; Fourier transform infrared (FTIR) spectroscopy for base oil decomposition; and by size exclusion chromatography (SEC) for determination of the molecular weight distributions of the grease oil. The Braycote 601 grease was stable after 19 years of continuous use in the sealed RSB actuators and was fit for its intended purpose. There were no significant chemical differences between the used grease samples and new and unused samples. Base oil separation was not significant within the sealed actuators. No corrosive effect in the form of iron fluoride was detected. The grey color of grease samples was due to metallic iron. The red color was due to oxidation of the metallic wear particles from the gears and the bearings comprising the actuators.

Morales, Wilfredo↗

Microsoft Kinect Sensor Evaluation

My summer project evaluates the Kinect game sensor input/output and its suitability to perform as part of a human interface for a spacecraft application. The primary objective is to evaluate, understand, and communicate the Kinect system's ability to sense and track fine (human) position and motion. The project will analyze the performance characteristics and capabilities of this game system hardware and its applicability for gross and fine motion tracking. The software development kit for the Kinect was also investigated and some experimentation has begun to understand its development environment. To better understand the software development of the Kinect game sensor, research in hacking communities has brought a better understanding of the potential for a wide range of personal computer (PC) application development. The project also entails the disassembly of the Kinect game sensor. This analysis would involve disassembling a sensor, photographing it, and identifying components and describing its operation.

Billie, Glennoah↗

Aerospace News: Space Shuttle Commemoration. Volume 2, No. 7

The complex space shuttle design was comprised of four components: the external tank, two solid rocket boosters (SRB), and the orbiter vehicle. Six orbiters were used during the life of the program. In order of introduction into the fleet, they were: Enterprise (a test vehicle), Columbia, Challenger, Discovery, Atlantis and Endeavour. The space shuttle had the unique ability to launch into orbit, perform on-orbit tasks, return to earth and land on a runway. It was an orbiting laboratory, International Space Station crew delivery and supply replenisher, satellite launcher and payload delivery vehicle, all in one. Except for the external tank, all components of the space shuttle were designed to be reusable for many flights. ATK s reusable solid rocket motors (RSRM) were designed to be flown, recovered, and the metal components reused 20 times. Following each space shuttle launch, the SRBs would parachute into the ocean and be recovered by the Liberty Star and Freedom Star recovery ships. The recovered boosters would then be received at the Cape Canaveral Air Force Station Hangar AF facility for disassembly and engineering post-flight evaluation. At Hangar AF, the RSRM field joints were demated and the segments prepared to be returned to Utah by railcar. The segments were then shipped to ATK s facilities in Clearfield for additional evaluation prior to washout, disassembly and refurbishment. Later the refurbished metal components would be transported to ATK s Promontory facilities to begin a new cycle. ATK s RSRMs were manufactured in Promontory, Utah. During the Space Shuttle Program, ATK supported NASA s Marshall Space Flight Center whose responsibility was for all propulsion elements on the program, including the main engines and solid rocket motors. On launch day for the space shuttle, ATK s Launch Site Operations employees at Kennedy Space Center (KSC) provided lead engineering support for ground operations and NASA s chief engineer. It was ATK s responsibility to have a representative in Firing Room 2 at KSC in case of potential motor problems. However, the last time ATK was responsible for a space shuttle launch slip was 1989. During launch, engineers were also stationed in Promontory on teleconference with counterparts at KSC in the event their support was required.

Source record↗

Nuclear Thermal Propulsion Ground Test History

Nuclear Thermal Propulsion (NTP) was started in ~1955 under the Atomic Energy Commission as project Rover and was assigned to Los Alamos National Laboratory. The Nevada Test Site was selected in 1956 and facility construction began in 1957. The KIWI-A was tested on July 1, 1959 for 5 minutes at 70MW. KIWI-A1 was tested on July 8, 1960 for 6 minutes at 85MW. KIWI-A3 was tested on October 10, 1960 for 5 minutes at 100MW. The National Aeronautics and Space Administration (NASA) was formed in 1958. On August 31, 1960 the AEC and NASA established the Space Nuclear Propulsion Office and named Harold Finger as Director. Immediately following the formation of SNPO, contracts were awarded for the Reactor In Flight Test (RIFT), master plan for the Nuclear Rocket Engine Development Station (NRDS), and the Nuclear Engine for Rocket Vehicle Application (NERVA). From December 7, 1961 to November 30, 1962, the KIWI-B1A, KIWI-B1B, and KIWI-B4A were tested at test cell A. The last two engines were only tested for several seconds before noticeable failure of the fuel elements. Harold Finger called a stop to any further hot fire testing until the problem was well understood. The KIWI-B4A cold flow test showed the problem to be related to fluid dynamics of hydrogen interstitial flow causing fuel element vibrations. President Kennedy visited the NTS one week after the KIWI-B4A failure and got to see the engine starting to be disassembled in the maintenance facility. The KIWI-B4D and KIWI-B4E were modified to not have the vibration problems and were tested in test cell C. The NERVA NRX program started testing in early 1964 with NRX-A1 cold flow test series (unfueled graphite core), NRX-A2 and NRX-A3 power test series up to 1122 MW for 13 minutes. In March 1966, the NRX-EST (Engine System Test) was the first breadboard using flight functional relationship and total operating time of 116 minutes. The NRX-EST demonstrated the feasibility of a hot bleed cycle. The NRX-A5 had multiple start-ups in May-June 1966 with 30.75 minutes accumulative operating time at or above 1GW. The NRX-A6 was tested in December 1969 and ran for 62 minutes at 1100 MW. Each engine had post-test examination and found various structure anomalies which were identified for correction and the fuel element corrosion rate was reduced. The Phoebus series of research reactors began testing at test cell C, in June 1965 with Phoebus 1A. Phoebus 1A operated for 10.5 minutes at 1100 MW before unexpected loss of propellant and leading to an engine breakdown. Phoebus 1B ran for 30 minutes in February of 1967. Phoebus 2A was the highest steady state reactor built at 5GW. Phoebus 2A ran for 12 minutes at 4100 MW demonstrating sufficient power is available. The Peewee test bed reactor was tested November- December 1968 in test cell C for 40 minutes at 500MW with overall performance close to pre-run predictions. The XE' engine was the only engine tested with close to a flight configuration and fired downward into a diffuser at the Engine Test Stand (ETS) in 1969. The XE' was 1100 MW and had ~28 start-ups. The nuclear furnace NF-1 was operated at 44 MW with multiple test runs at 90 minutes in the summer of 1972. The NF-1 was the last NTP reactor tested. The Rover/NERVA program was cancelled in 1973. However, before cancellation, a lot of other engineering work was conducted by Aerojet on a 75, 000 lbf prototype flight engine and by Los Alamos on a ~16,000 lbf "Small Engine" nuclear rocket design. The ground test history of NTP at the NRDS also offers many lessons learned on how best to setup, operate, emergency shutdown, and post-test examine NTP engines. The reactor and engine maintenance and disassembly facilities were used for assembly and inspection of radioactive engines after testing. Most reactor/ engines were run at test cell A or test cell C with open air exhaust. The Rover/NERVA program became aware of a new environmental regulation that would restrict the amount of radioactive particulates allowed to be release in open air and successfully demonstrated a scrubber concept with the NF-1. The ETS stand was the only one with a high altitude test chamber used for XE'. The ETS and other test cells showed the effects the engine's radiation had on the facility materials and instrumentation as well as side effects the ground test facility has back on the engine operation. The breakdown of Phoebus 1A at test cell C showed how the site was cleaned up and back to operation for five more engines before the program was cancelled.

Gerrish, Harold P.↗

Forward Skirt Structural Testing on the Space Launch System (SLS) Program

Structural testing was performed to evaluate heritage forward skirts from the Space Shuttle program for use on the Space Launch System (SLS) program. One forward skirt is located in each solid rocket booster. Heritage forward skirts are aluminum 2219 welded structures. Loads are applied at the forward skirt thrust post and ball assembly. Testing was needed because SLS ascent loads are roughly 40% higher than Space Shuttle loads. Testing objectives were to determine margins of safety, demonstrate reliability, and validate analytical models. Two forward skirts were structurally tested using the test configuration. The test stand applied loads to the thrust post. Four hydraulic actuators were used to apply axial load and two hydraulic actuators were used to apply radial and tangential loads. The first test was referred to as FSTA-1 (Forward Skirt Structural Test Article) and was performed in April/May 2014. The purpose of FSTA-1 was to verify the ultimate capability of the forward skirt subjected to ascent ultimate loads. Testing consisted of two liftoff load cases taken to 100% limit load followed by an ascent load case taken to 110% limit load. The forward skirt was unloaded to no load after each test case. Lastly, the forward skirt was tested to 140% limit and then to failure using the ascent loads. The second test was referred to as FSTA-2 and performed in July/August of 2014. The purpose of FSTA-2 was to verify the ultimate capability of the forward skirt subjected to liftoff ultimate loads. Testing consisted of six liftoff load cases taken to 100% limit load followed by the six liftoff cases taken to 140% limit load. Two ascent load cases were then tested to 100% limit load. The forward skirt was unloaded to no load after each test case. Lastly, the forward skirt was tested to 140% limit and then to failure using the ascent loads. The forward skirts on FSTA-1 and FSTA-2 successfully carried all applied liftoff and ascent load cases. Both FSTA-1 and FSTA-2 were tested to failure by increasing the ascent loads. Failure occurred in the forward skirt thrust post radius. The forward skirts on FSTA-1 and FSTA-2 had nearly identical failure modes. FSTA-1 failed at 1.72 times limit load and FSTA-2 failed at 1.62 times limit load. This difference is primarily attributed to variation in material properties in the thrust post region. Test data were obtained from strain gages, deflection gages, ARAMIS digital strain measurement, acoustic emissions, and high-speed video. Strain gage data and ARAMIS strain were compared to finite element (FE) analysis predictions. Both the forward skirt and tooling were modeled. This allows the analysis to simulate the loading as close as possible to actual test configuration. FSTA-1 and FSTA-2 were instrumented with over 200 strain gages to ensure all possible failure modes could be captured. However, it turned out that three gages provided critical strain data. One was located in the post bore and two on the post radius. More gages were not specified due to space limitations and the desire to not interfere with the use of the ARAMIS system on the post radius. Measured strains were compared to analysis results for the load cycle to failure. Note that FSTA-1 gages were lost before failure was reached. FSTA-2 gages made it to the failure load but one of the radius gages was lost before testing began. This gage was not replaced because of the time and cost associated with disassembly of the test structure. Correlation to analysis was excellent for FSTA-1. FSTA-2 was not quite as good because there was more residual strain from previous load cycles. FSTA-2 was loaded and unloaded with 12 liftoff cases and two ascent cases before taking the skirt to failure. FSTA-1 only had two liftoff cases and one ascent case before taking the skirt to failure. The ARAMIS system was used to determine strain at the post radius by processing digital images of a speckled paint pattern. Digital cameras recorded images of the speckled paint pattern. ARAMIS strain results for FSTA-2 just prior to failure. Note a high strain location develops near the left side. This high strain compares well to analysis prediction for both FSTA-1 and FSTA-2. The strain at this location was also plotted versus limit load. Both FSTA-1 and FSTA-2 had excellent correlation between ARAMIS and analysis strains. Acoustic emission (AE) sensors were used to monitor for damage formation that may occur during testing (e.g., crack formation and growth or propagation). AE was very important because after disassembly of FSTA-1, a crack was observed in the ball fitting radius. The ball fitting did not crack on FSTA-2. AE data was used to reconstruct when the crack occurred. The AE energy versus time plot for FSTA. The energy increased considerably at 850 seconds (152% limit load), indicating a crack could have formed at this point. The only visual evidence found that could have corresponded to this was the crack that initiated in the ball fitting. The cracks in the forward skirt aluminum structures would likely have been lower energy due to a lower modulus and all that were found after failure correlated to occurring after the initial crack in the post radius. This was verified by high-speed cameras used to record the failure.

Lohrer, J. D.↗

Analysis of Performance Degradation of Silica Gels After Extended Use Onboard the ISS

The disassembly of two flight desiccant beds from the Carbon Dioxide Removal Assembly (CDRA) revealed significant discoloration of the silica gel near the bed inlet as well as a coincidental performance loss. This material was analyzed for the presence of chemical contaminants, physical porosity changes, and adsorption performance. The material characteristics are compared against the location in the bed from which they were sampled in order to develop profiles through the bed. Additional testing of the beds prior to disassembly provided more data points. Possible mechanisms for the loss of capacity are provided though no root cause has been confirmed. Extrapolation of the performance loss is used to estimate the required oversizing of the silica gel layer for long-term operation.

Cmarik, Gregory E.↗

The Assembly, Test, and Integration of LOFTID (Low-Earth Orbit Flight Test of an Inflatable Decelera-tor)

R.J. Bodkin Biography Mr. Bodkin worked in industry for a rapid prototype company focusing on UAVs and manned experimental aircraft. Later he served as the Inflation System Lead on IRVE-II and 3 and the Re-Entry Vehicle Lead for LOFTID at NASA Langley Research Center. Introduction: The Low-Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID), developed in partnership with United Launch Alliance (ULA) and flown in conjunction with the National Oceanic and Atmospheric Administration (NOAA) Joint Polar Satellite System-2 (JPSS-2) satellite, demonstrated Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology has progressed and is ready for mission infusion. LOFTID’s success demonstrates that aeroshells are not limited to the internal diame-ter of the launch vehicle payload fairing, allowing larger payloads to be deployed to the surfaces of planetary bodies with atmospheres. The challenges of assembling, integrating, and testing this revolutionary spacecraft will be dis-cussed as well as issues associated with doing this with a fixed launch date the project did not control. Assembly: Because LOFTID flew as a rideshare partner with JPSS-2, it was constrained with addi-tional schedule, milestone, and technical require-ments that were beyond the project’s control. As-sembly of the LOFTID hardware was challenged with the normal mechanical fit issues while also having to navigate the SARS-COVID-II pandemic. Challenges ranged from availability of team per-sonnel required on-site for vehicle assembly to dif-ficulties associated with team collaboration while working remotely and increased costs and lead times of components due to supply chain con-straints. Numerous additional challenges cascaded from the additional time required. Integration: LOFTID flew as a secondary pay-load to JPSS-2 in a mission-unique configuration, directly under JPSS-2 primary payload, inside the Payload Adapter that integrated JPSS-2 to the Atlas V launch vehicle. A mission unique Payload Adapt-er Separation System (PASS) was required to sepa-rate the Payload Adapter from the Launch Vehicle prior to the start of the LOFTID flight demonstra-tion. Development of this system was challenging due to a shortened development schedule resulting from the iterative nature of Payload Adapter devel-opment with the partners at ULA. Preparations to integrate the main segments of the LOFTID vehicle posed unique challenges of having to accommodate issues with a fixed launch date that led to some cre-ative solutions to the integration. The partnership agreement with ULA and JPSS-2 resulted in a mass simulator designed to be installed late in the inte-gration in the event the LOFTID vehicle was not ready in time.. Test: LOFTID testing was carried out in several phases. Some components were tested at the com-ponent level, others at the sub-system levels and then finally the integrated vehicle level. This culmi-nated with the Complete Systems Test (CST) per-formed in a vacuum chamber as one of the final checkouts prior to disassembly for re-packing of the aeroshell. CST challenges will be discussed as well as obstacles encountered post-CST. After CST, the vehicle was disassembled so the HIAD could be repacked, and the vehicle was reassembled for ac-ceptance vibration testing. Testing concluded with the fully assembled vehicle being shipped to the launch site for final testing and integrations with the Payload Adapter to JPSS-2 for launch and opera-tions. Conclusion: The challenges posed by the AI&T for LOFTID could inform the planetary community of some of the opportunities and challenges of de-veloping technologies on a rideshare with a rela-tively small budget.

R.J. Bodkin↗

USE OF CEMENTITIOUS MATERIALS FOR SRS REACTOR FACILITY IN-SITU DECOMMISSIONING - 11620

The United States Department of Energy (US DOE) concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., producing (reactor facilities), processing (isotope separation facilities) or storing radioactive materials. The Savannah River Site 105-P and 105-R Reactor Facility ISD requires about 250,000 cubic yards of grout to fill the below grade structure. The fills are designed to prevent subsidence, reduce water infiltration, and isolate contaminated materials. This work is being performed as a Comprehensive Environmental Response, Compensations and Liability Act (CERCLA) action and is part of the overall soil and groundwater completion projects for P- and R-Areas. Cementitious materials were designed for the following applications: (1) Below grade massive voids/rooms: Portland cement-based structural flowable fills for - Bulk filling, Restricted placement and Underwater placement. (2) Special below grade applications for reduced load bearing capacity needs: Cellular portland cement lightweight fill (3) Reactor vessel fills that are compatible with reactive metal (aluminum metal) components in the reactor vessels: Calcium sulfoaluminate flowable fill, and Magnesium potassium phosphate flowable fill. (4) Caps to prevent water infiltration and intrusion into areas with the highest levels of radionuclides: Portland cement based shrinkage compensating concrete. A system engineering approach was used to identify functions and requirements of the fill and capping materials. Laboratory testing was performed to identify candidate formulations and develop final design mixes. Scale-up testing was performed to verify material production and placement as well as fresh and cured properties. The 105-P and 105-R ISD projects are currently in progress and are expected to be complete in 2012. The focus of this paper is to describe the (1) grout mixes for filling the reactor vessels, and (2) a specialty grout mix to fill a selected portion of the P-Reactor Disassembly Basin. Details of the grout mixes designed for ISD of he SRS Reactor Disassembly Basins and below grade portions of the 105-Buildings was described elsewhere. Material property test results, placement strategies, full-scale production and delivery systems will also be described.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tailorable Adhesives for Multi-material Joining, Facile Repair and Re-assembly

Joining of materials and components is inevitable as it allows versatility in assembly and repair along with reduction in time and cost of manufacturing. This work uses ‘active adhesives’ that inherit all the benefits of bonded joints, such as lightweight, eliminate holes and associated stress-concentrations, and overcomes the shortcomings of disassembly and repair. Thermoplastic adhesives modified by the incorporation of electrically conductive graphene nanoplatelets at a concentration above the percolation point provide a unique synergy of mechanical, thermal and electrical properties. While the choice of the thermoplastic is governed by the desired application the addition of the graphene nanoplatelets allows energy to be deposited primarily in the adhesive. The percolated network of graphene particles in the adhesive at less than 2% can quickly couple to high frequency radiation (microwave, or MW) via non-contact methods and increase the adhesive temperature to above the required processing temperatures. The adhesive melts and flows over the adherends and upon cooling forms a structural adhesive bond. Furthermore, the process can be used to disassemble the adhesive joint if repair or reworking is required. In this work, the concept of aforementioned active adhesives was studied using varying graphene contents in nylon-6 adhesive. Activation and re-assembly was studied on in-plane (lap-shear) joints. Structural behavior of re-assembled joints was found to be similar to thermally bonded joints. Overall, active adhesives such as the ones attempted in this work have a great potential in a wide range of applications wherein in-situ repair, re-assembly and recyclability are essential.

36 MATERIALS SCIENCE↗

Modular assemblies and systems for cell cultures and methods thereof

The present invention relates to modular assemblies and systems for conducting cell analyses. In particular embodiments, an assembly has micron-scale fluidic structures, thereby minimizing sample use, and possesses a modular architecture that facilitates disassembly of the apparatus. Thus, one such modular assembly facilitates on-chip cell growth and on-chip assays; and then, as needed, the assembly can be disassembled to provide direct access to the cells that were incubated and treated within the chip. Methods of making and using such assemblies, as well as systems thereof, are further described herein.

Hatch, Anson↗

Feasibility development program LEU-foil plate type target for the production of Mo-99

The University of Missouri Research Reactor and AREVA-CERCA have recently signed a Memorandum of Understanding to cooperate in a program to determine the feasibility of manufacturing a prototype LEU-foil target in a plate geometry for the production of molybdenum-99. The concept of a plate type target consists of transitioning Argonne National Laboratory's existing LEU-foil annular target design from a concentric tube geometry to a plate geometry. The objectives of the feasibility determination are: 1) Evaluate the structural integrity and geometric stability of a foil plate target during irradiation and post-irradiation by finite element analysis modeling. 2) Evaluate the heat transfer characteristics of a foil plate target with respect to thermal contact resistance at the foil / plate interfaces. 3) Determine the economics of manufacturing an LEU-foil plate target in comparison to that of a LEU dispersion plate type target on a commercial scale basis. 4) Determine the most effective and efficient method of disassembling the target to remove the foil component of the target for chemical processing. The results of the structural and thermal analyses will be used to determine if a comprehensive set of Safety Case documentation can be developed to support the irradiation and disassembly of a 'mini' (i.e., small scale) LEU-foil plate target as a trial demonstration. (author)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Surveillance of PLUS7{sup TM} fuel for PWR nuclear power plant

The surveillance program on the advanced nuclear fuel of PLUS{sup TM} developed for Optimized Power Reactors of 1000 MWe (OPR1000s) and Advanced Power Reactors of 1400 MWe (APR1400s) in Korea was completed in the early of 2011. This fuel had been jointly developed through the extensive out-of-pile tests with Westinghouse for three years since 1999. The irradiation tests for the in-reactor verification using four lead test assemblies (LTAs) had been started in Ulchin unit 3 in 2002. During the overhaul period after each irradiation test, the eight (8) burnup-dependent parameters were measured without disassembling using the precise measurement systems in pool-side. After three cycle irradiations, one test assembly was disassembled and the rod-wise inspection on twenty rods was performed. During this stage, five (5) parameters were measured and evaluated. Among these twenty rods, ten rods including skeleton were sent to hot-cell test facility for further detailed examination and are currently being examined. After in-reactor verifications during two cycles, this fuel was commercially supplied to eight (8) OPR1000s sequentially. Currently all eight (8) OPR1000s were replaced with this fuel. In addition, this fuel is going to be supplied to four (4) APR1400s being constructed in Braka, UAE as well as four(4) OPR1000s and four(4) APR1400s being constructed in Korea. In the meanwhile, the surveillance program for the commercially supplied fuel has been launched to confirm growth, creep, corrosion and deformation, etc. obtained during LTA irradiation. Four (4) limiting fuel assemblies, that is, two (2) assemblies to be discharged after 2 cycle irradiations and the other two (2) after 3 cycle irradiations were selected for this surveillance program. Irradiation data of commercially supplied fuels are compared and confirmed to LTA irradiation performance behaviors on this paper. Among the eight (8) burnup-dependent parameters, the interesting ones were irradiation-induced growths of grid width, rod and assembly lengths while cladding oxide thickness, rod creep and swelling followed the LTA results, and assembly bow/twist and rod bow were well below the design limits. The rod growths were on the lower bound of database and contributed to assembly growth. It was evaluated that these results were attributed to PLUS{sup TM} design characteristics which adopted Inconel top and bottom grids and conformal-shaped mid grid spring. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decommissioning an Active Historical Reactor Facility at the Savannah River Site - 13453

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions (SRNS). In 2004, DOE recognized SRS as structure within the Cold War Historic District of national, state and local significance composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. This reactor has five primary areas within it, including a Disassembly Basin (DB) that received irradiated materials from the reactor, cooled them and prepared the components for loading and transport to a Separation Canyon for processing. The 6,317 square meter area was divided into numerous work/storage areas. The walls between the individual basin compartments have narrow vertical openings called 'slots' that permit the transfer of material from one section to another. Data indicated there was over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 M liters of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The need for an action was identified in 2010 to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. DOE, its regulators [U. S. Environmental Protection Agency (USEPA)-Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC)] and the SC Historical Preservation Office (SHPO) agreed/concurred to perform a non-time critical removal action for the In Situ Decommissioning (ISD) of the 105-C Disassembly Basin. ISD consisted of stabilization/isolation of remaining contaminated water, sediment, activated reactor equipment, and scrap metal by filling the DB with underwater non-structural grout to the appropriate (-4.877 meter) grade-level, thence with dry area non-structural grout to the final -10 centimeter level. The roof over the DB was preserved due to its potential historical significance and to prevent the infiltration of precipitation. Forced evaporation was the form of treatment implemented to remove the approximately 9.1 M liters of contaminated basin water. Using specially formulated grouts, irradiated materials and sediment were treated by solidification/isolation thus reducing their mobility, reducing radiation exposure and creating an engineered barrier thereby preventing access to the contaminants. Grouting provided a low permeability barrier to minimize any potential transport of contaminants to the aquifer. Efforts were made to preserve the historical significance of the Reactor in accordance with the National Historic Preservation Act. ISD provides a cost effective means to isolate and contain residual radioactivity from past nuclear operations allowing natural radioactive decay to reduce hazards to manageable levels. This method limits release of radiological contamination to the environment, minimizes radiation exposure to workers, prevents human/animal access to the hazardous substances, and allows for ongoing monitoring of the decommissioned facility. Field construction was initiated in August 2011; evaporator operations commenced January 2012 and ended July 2012 with over 9 M liters of water treated/removed. Over 8,525 cubic meters of grout were placed, completing in August 2012. The project completed with an excellent safety record, on schedule and under budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of European Large Component Technology in the United States - 12561

The European nuclear community currently has safer, more environmentally-friendly disposal options for large component disposal than the United States. The technology and innovation that makes these options viable will soon be available stateside. The removal and replacement of steam generators is a large and complicated task making volume reduction a vital service for the nuclear power industry. As plants age, the replacement of certain components is required in order to maintain plant efficiency and public safety. Currently in the United States, there are 3 options for the disposal of these items including: on-site storage, direct-disposal at a licensed (low-level radioactive waste) LLWR site, and volume reduction prior to disposal. If today's nuclear plants are to be used by future generations, waste stored on-site will eventually have to be disposed of to make room for newer, more advanced technology. Also, the space at LLWR disposal sites is finite, so all waste sent for disposal should be minimized whenever possible. Reducing the volume of decommissioned steam generators prior to final disposal shows the public that the nuclear industry is doing everything that it can to minimize its waste and conserve the environment. Additionally, many steam generators are massive and are not easily transported to a disposal site. When there is no practical transportation route, the size and weight of the component must be reduced. For various reasons including public safety, cost, and technical expertise, size reduction cannot be practically performed at the site of generation. However, since most facilities have some kind of access to a waterway, the components can be safely transported to another facility with barge access for size reduction. The size reduction process for steam generators has evolved over the past 5 years. Because of reductions to the amount of final waste, the dose to personnel, and the processing time, it is now an environmentally and economically friendly alternative to on-site storage and direct disposal. The major operations of this process include: - removal of the carbon steel steam generator dome; - removal of the channel head and majority of tube sheet to free the tubes from the tube sheet and gain access to all of the tubes for grit blasting; - grit blast decontamination of the steam generator tubes to allow disassembly; - removal of the U-Bend Section of the tubes to allow for tube pulling - tube pulling operations; - disassembly of the remainder of the steam generator shell and tube support assemblies; - size reduction of the steam generator resultant materials. All of the equipment for the American market is based on previous designs but has been adapted to meet the size requirements for processing of larger steam generators. This includes a large horizontal band saw, a tube pulling machine, tube blasting equipment, and a diamond wire saw frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Concept of Nuclear Fuel Cycle Facility - 18255

As the Korean Nuclear Safety Act was revised, it is urgent to prepare a decommissioning plan for the nuclear fuel cycle facilities operated by the Korea Atomic Energy Research Institute, KAERI. First, the basic concepts necessary for dismantling each facility and the order of dismantling for each dismantling work were determined. In this paper, we consider the disassembly order of the nuclear fuel cycle facilities such as the post irradiation fuel examination facility, the research reactor fuel production facility, the radioactive waste treatment facility, the radioactive waste form examination facility. The decommissioning plan for the research nuclear fuel cycle facilities will be based on the abovementioned dismantling basic concept and disassembly sequences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗