Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEPARTMENT OF STATE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Livermore Site Spill Prevention, Control and Countermeasures (SPCC) Plan

This Spill Prevention, Control, and Countermeasure (SPCC) Plan describes the measures that are taken at Lawrence Livermore National Laboratory’s (LLNL’s) Livermore Site in Livermore, California, to prevent, control, and handle potential spills from aboveground containers that can contain 55 gallons or more of oil. This SPCC Plan complies with the Oil Pollution Prevention regulation in Title 40 of the Code of Federal Regulations (40 CFR), Part 112 (40 CFR 112) and with 40 CFR 761.65(b) and (c), which regulates the temporary storage of polychlorinated biphenyls (PCBs). This Plan has also been prepared in accordance with Division 20, Chapter 6.67 of the California Health and Safety Code (HSC 6.67) requirements for oil pollution prevention (referred to as the Aboveground Petroleum Storage Act [APSA]), and the United States Department of Energy (DOE) Order No. 436.1. This SPCC Plan establishes procedures, methods, equipment, and other requirements to prevent the discharge of oil into or upon the navigable waters of the United States or adjoining shorelines for aboveground oil storage and use at the Livermore Site.

54 ENVIRONMENTAL SCIENCES↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS, AND THE FEDERAL GOVERNMENT - 11052

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS AND THE FEDERAL GOVERNMENT

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical processing canyons.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Transactive Campus Energy Systems: An R&D Testbed for Renewables, Integration, Efficiency, and Grid Services (CRADA 356 / Amendment 1)

The Clean Energy and Transactive Campus (CETC) work described in this report was done as part of Amendment 1 to Campus Cooperative Research and Development Agreement (CRADA) 356, the Transactive Campus CRADA with the Washington State Department of Commerce (Commerce) between the U.S. Department of Energy’s (DOE’s), Pacific Northwest National Laboratory (PNNL) and the Commerce through the Clean Energy Fund (CEF). The original project team consisted of PNNL, the University of Washington (UW) and Washington State University (WSU), to connect the PNNL, UW, and WSU campuses to construct and operate the testbed as both a regional flexibility resource and as a platform for research and development (R&D) for buildings/grid integration. Building on the foundational transactive system established by the Pacific Northwest Smart Grid Demonstration (PNWSGD), the purpose of the project was to construct the testbed as both a regional flexibility resource and as a platform for R&D on buildings/grid integration and information-based energy efficiency. The testbed supports the integration of renewables and other regional needs, using the flexibility provided by building loads, energy storage, and smart inverters for batteries and photovoltaic (PV) solar systems, at four physical scales: multiple campuses, campus, microgrid and building.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hanford Site Secondary Waste Roadmap

Summary The U.S. Department of Energy (DOE) is making plans to dispose of 54 million gallons of radioactive tank wastes at the Hanford Site near Richland, Washington. The high-level wastes and low-activity wastes will be vitrified and placed in permanent disposal sites. Processing of the tank wastes will generate secondary wastes, including routine solid wastes and liquid process effluents, and these need to be processed and disposed of also. The Department of Energy Office of Waste Processing sponsored a meeting to develop a roadmap to outline the steps necessary to design the secondary waste forms. Representatives from DOE, the U.S. Environmental Protection Agency, the Washington State Department of Ecology, the Oregon Department of Energy, Nuclear Regulatory Commission, technical experts from the DOE national laboratories, academia, and private consultants convened in Richland, Washington, during the week of July 21-23, 2008, to participate in a workshop to identify the risks and uncertainties associated with the treatment and disposal of the secondary wastes and to develop a roadmap for addressing those risks and uncertainties. This report describes the results of the roadmap meeting in Richland. Processing of the tank wastes will generate secondary wastes, including routine solid wastes and liquid process effluents. The secondary waste roadmap workshop focused on the waste streams that contained the largest fractions of the 129I and 99Tc that the Integrated Disposal Facility risk assessment analyses were showing to have the largest contribution to the estimated IDF disposal impacts to groundwater. Thus, the roadmapping effort was to focus on the scrubber/off-gas treatment liquids with 99Tc to be sent to the Effluent Treatment Facility for treatment and solidification and the silver mordenite and carbon beds with the captured 129I to be packaged and sent to the IDF. At the highest level, the secondary waste roadmap includes elements addressing regulatory and performance requirements, waste composition, preliminary waste form screening, waste form development, process design and support, and validation. The regulatory and performance requirements activity will provide the secondary waste-form performance requirements. The waste-composition activity will provide workable ranges of secondary waste compositions and formulations for simulants and surrogates. Preliminary waste form screening will identify candidate waste forms for immobilizing the secondary wastes. The waste form development activity will mature the waste forms, leading to a selected waste form(s) with a defensible understanding of the long-term release rate and input into the critical decision process for a secondary waste treatment process/facility. The process and design support activity will provide a reliable process flowsheet and input to support a robust facility design. The validation effort will confirm that the selected waste form meets regulatory requirements. The final outcome of the implementation of the secondary waste roadmap is the compliant, effective, timely, and cost-effective disposal of the secondary wastes. The work necessary to address the programmatic, regulatory, and technical risks and uncertainties identified through the Secondary Waste Roadmap Workshop are assembled into several program needs elements. Programmatic/Regulatory needs include: • Select and deploy Hanford tank waste supplemental treatment technology • Provide treatment capability for secondary waste streams from tank waste treatment • Develop consensus on secondary waste form acceptance. Technology needs include: • Define secondary waste composition ranges and uncertainties • Identify and develop waste forms for secondary waste immobilization and disposal • Develop test methods to characterize secondary waste form performance. Details for each of these program elements are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interspecific oral rabies vaccine bait competition in the Southeast United States

Here, the United States Department of Agriculture’s National Rabies Management Program (NRMP) has coordinated the use of oral rabies vaccination (ORV) to control the spread of raccoon rabies virus variant west of the Appalachian Mountains since 1997. Working with state and local partners, the NRMP deploys ORV baits containing a rabies vaccine, primarily targeting raccoon populations (Procyon lotor). Bait competition between raccoons and non-target species may limit the effectiveness of ORV programs, but the extent of bait competition remains poorly quantified, particularly in the southeastern United States. We placed placebo ORV baits in bottomland hardwood (n = 637 baits) and upland pine (n = 681 baits) habitats in South Carolina, USA during August-December 2019 and used remote cameras to examine bait competition between raccoons and non-target species. The estimated proportion of bait consumed by raccoons was 18.8 ± 2.1% in bottomland hardwood and 11.6 ± 2.1% in upland pine habitats. Vertebrate competition appeared to have a minimal effect on raccoon uptake as estimated consumption did not exceed 5% for any species or 8% of bait uptake events cumulatively. We estimated that raccoons were the primary consumer of baits in bottomland hardwood, whereas invertebrates were the primary consumer in upland pine (26.7 ± 1.3% of baits). Our results indicate a need to closely consider the effects of invertebrates on bait consumption to minimize their potential impact on ORV bait uptake by target species. Uptake probabilities by raccoons were relatively low but not primarily driven by competition with vertebrates. As such, strategies to increase the specificity of raccoon uptake may be needed to enhance the effectiveness of ORV baiting programs.

60 APPLIED LIFE SCIENCES↗

Of the final end state for decommissioning of reactors at SRS: collaboration between stakeholders, regulators, and the Federal Government - 15279

The Savannah River Site (SRS) is an 802 square-kilometer (310 square-miles) United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina. Nuclear weapons material production began in the early 1950's, utilizing five (5) production reactors. In the early 1990's all SRS production reactor operations were terminated. The first reactor closure end-state declaration was documented in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 29,543 square-meter (318,000 square-feet) 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost-effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized / immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the up-front planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 321 kilometer (200-mile) radius) with stakeholder and SRS Citizens Advisory Board (CAB) participation. These meetings were conducted over an eight- month period as the end-state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four (4) SRS reactors and other hardened facilities such as the chemical Separation Facilities (canyons). Closure of the SRS P Reactor Area was precedent setting and sets the stage for closure of other reactors and hardened facilities. The DOE, USEPA, and SCDHEC engaged in active, up-front, and timely involvement with the SRS. The SRS CAB, elected officials, and citizens of South Carolina and Georgia met to discuss the P reactor area closure and associated risks. Early public involvement gave SRS and the regulators assurance that the selected decision was valid and would not be overturned. Public input improved the process and ensured that the important decision on the final end-state of the reactor facilities was not made in isolation. ISD of P Reactor will provide adequate protection of human health and the environment and the lowest cost since short-term risk is minimized to remedial workers from exposure to contaminated equipment and facilities by leaving the reactor vessel in place allowing for radiological decay over time. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Decision-Making Process Using 'Weight of Evidence: An Evidence Integration Approach' by the State of Washington at the Hanford Site - 20163

Performance Assessment and Environmental Impact Statement Modeling, Human and Ecological Risk Assessments are the tools used by the Washington State Department of Ecology (Ecology) to make regulatory decisions for permitting and cleanup. These efforts all inherently have large amounts of uncertainty no matter how many alternative approaches are attempted. Professional feedback from tribal governments, stakeholders, federal and state regulators, the public and independent peer review groups are taken into account in this process of informed decision making. The process also includes full evaluation of the comments and the associated reviews made by the various peer review groups such as the Low -Level Waste Disposal Facility Federal Review Group (DOE order 435.1) and the Nuclear Regulatory Commission (NRC). The evolution of technology has produced quicker and more efficient fate and transport modeling tools with related quantification of uncertainties and their significance. Groundwater and vadose zone models have been expanded across the entire Hanford site. Many of the technical approaches identified in the Washington State Regulations are updated using current knowledge to better understand the complexities of the Hanford Site using the latest state of the art tools for risk assessment and modeling. More emphasis and time are directed on defining uncertainty and then managing the uncertainty. One added tool is to run sensitivity cases based on informed decision making. The weight of evidence approach considers all relevant information in an integrative assessment that takes into account the kinds of evidence available, the quality and quantity, the uncertainty and error associated with each type, and how they fit together. Evidence of integration involves looking at systematic reviews and evaluating their strengths and weaknesses. In conclusion, Ecology, Washington State's lead regulatory agency at the Hanford site, has had to modify its site closure approach compared to the rest of the state. A more holistic approach dealing with the Hanford site as an integrated system has evolved leading to a defensible informed approach for regulatory closure decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Site Rare Plant Monitoring Report for Calendar Year 2015

In 2015, two separate rare plant monitoring efforts occurred on the portion of the Hanford Site managed by the U.S. Department of Energy (DOE) (referred to herein as Central Hanford). 1. Upland plants of conservation concern were inventoried concurrently with efforts to map plant communities on Central Hanford. Plants were selected based on 2015 status with the Washington State Department of Natural Resources Natural Heritage Program (WNHP) listings, which are summarized in the bullets below. This effort was led by Mission Support Alliance (MSA) and subcontracted personnel from SEE Botanical Consulting.

54 ENVIRONMENTAL SCIENCES↗

Integrated Mid-Continent Stacked Carbon Storage Hub Project Phase II (Final Summary Report)

The Phase II Integrated Midcontinent Stacked Carbon Storage Hub (IMSCS-HUB) is part of the Carbon Storage Assurance Facility Enterprise (CarbonSAFE) established by the United States Department of Energy (DOE) National Energy Technology Laboratory (NETL). CarbonSAFE is phased to support the development of commercial-scale (50 million metric tonnes [Mt] over a 30-year period) carbon capture, utilization, and storage (CCUS) in the United States. The IMSCS-HUB study area comprises carbon dioxide (CO 2 ) sources in Iowa, Kansas, and Nebraska (the source corridor), and CO 2 sinks in Kansas and Nebraska (the storage corridor), representing the first large-scale project for the Midcontinent region. The stacked storage corridor is characterized by alternating sequences of deep saline formations, oil-bearing reservoirs, shale, and evaporite units that are conducive to vertically stacked CO 2 injection for geologic storage and enhanced oil recovery (EOR). Three sites within the IMSCS-HUB stacked storage corridor were evaluated in Phase II for commercial CCUS feasibility: one in southwest-central Nebraska, Sleepy Hollow Field (SHF), a second in southwestern Nebraska near Madrid (Madrid), and a third in southwestern Kansas, the Patterson Site (composed of the Patterson, Heinitz, Hartland, and Oslo fields). In Phase II, the team assessed the feasibility of storage complexes at the potential storage sites in Nebraska and Kansas to support a commercial-scale storage hub that integrates proven CO 2 capture technology and transport from nearby ethanol sources. Building on lessons learned from the DOE-NETL Regional Carbon Sequestration Partnerships (RCSPs), the Project Team has identified a clear strategy to meet DOE’s 2025 objective of commercial carbon capture and storage (CCS) implementation by developing a CO 2 market and infrastructure that relies on multiple ethanol-based CO 2 sources in the short term and the incorporation of multiple coal-fired power plant CO 2 sources when commercial capture is economically viable. The team also leveraged the updated 45Q tax credit to develop capture and transport infrastructure. Commercial-scale CCUS is feasible at two candidate storage sites studied, the Madrid, Nebraska Site and the Patterson Site in Kearny County, Kansas. The Sleepy Hollow Field in Nebraska was found to be an attractive candidate for stacked storage with CO 2 -EOR (Battelle 2020e). Outreach efforts facilitated engagement from industry, government, and research sectors (Battelle and GPI, 2020) and an outreach plan for future phases of the project was developed to address issues that are of concern in the IMSCS-HUB project area (Battelle, 2020f). All components of a CCUS project were determined to be feasible in the IMSCS-HUB region and Risk Mitigation Plan was developed and includes strategies to mitigate risks associated with each project component (Battelle, 2020j). A roadmap was developed to obtain the required UIC permits for an integrated CCUS project (Battelle, 2020k). The regional storage resource characterization demonstrated significant opportunity for commercial-scale projects in the IMSCS-HUB storage corridor with 577.4 Mt of stacked CO 2 storage capacity and the potential to produce 181.9 MMbbls of oil via EOR across 17 individual storage areas (Battelle and ARI, 2020). The pipeline assessment study found viable pipeline routes that connected 45Q-eligible ethanol plants, coal fired power plants, and other sources in the IMSCS-HUB corridor. The comprehensive results of subsurface characterization, modeling efforts, outreach assessment, and regulatory analysis from were integrated to develop a Detailed Commercial Development Plan for the IMSCS-HUB (Battelle, 2020n). Commercialization efforts will involve obtaining Class VI UIC permits, establishing and finalizing the pipeline route, and evaluating capture projects at participating CO 2 sources. Phases I and II of the IMSCS-HUB CarbonSAFE provide a strong foundation for safely, efficiently, and cost-effectively characterizing and permitting commercial-scale project sites in the region. The plan for implementation of commercial-scale CCUS projects in the IMSCS-HUB is aligned with the objectives of CarbonSAFE Phase III: Site Characterization and CO 2 Capture Assessment.

20 FOSSIL-FUELED POWER PLANTS↗

Next generation safeguards initiative (NGSI) program plan for safeguards by design

Safeguards by Design (SBD) is defined as the incorporation of safeguards features early in the design phase of a new nuclear facility in order to avoid the need to redesign the facility at a later date, or retrofit the completed facility. Not only can SBD avoid the need for redesign or retrofit, but consideration of safeguards features early in the facility design effort can provide for a more efficient and effective safeguards design. A program has been initiated by the United States Department of Energy during the past several years to develop, demonstrate and institutionalization SBD. This plan has been developed in parallel with a similar effort at the IAEA while taking into account their achievements and future plans. The United States SBD program is focused on (1) identification of best practices that satisfy existing safeguards requirements, (2) identification of advanced concepts where best practices can be improved, and (3) institutionalizing SBD by gaining its acceptance as a global norm for the design of new nuclear facilities. SBD guidance documents are being prepared as an aid to industry for their design activities, to describe the relationship between requirements, best practices, and advanced concepts. SBD 'lessons learned' studies have been conducted to help identify the existing best practices and potential areas for improvement. Finally, acceptance as a global norm is being pursued by way of international workshops, engagement with industry and the IAEA, and setting an example by way of its use in new nuclear facilities in the United States.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Package Review Guide for Reviewing Safety Analysis Reports for Packages (Revision 4)

This Package Review Guide (PRG) provides guidance for Department of Energy (DOE) review and approval of packages to transport fissile and Type B quantities of radioactive material. It fulfills, in part, the requirements of DOE Order 460.1D for the Headquarters Certifying Official to establish standards and to provide guidance for the preparation of Safety Analysis Reports for Packages (SARP). This Package Review Guide is intended for use by the United States Department of Energy Headquarters Certifying Official and their staff, DOE Secretarial offices, operations/field offices, and applicants for Department of Energy package approval. This Package Review Guide is generally organized at the chapter-level in a format similar to that recommended in United States Nuclear Regulatory Commission Regulatory Guide 7.9. One notable exception is the addition of Chapter 9 Quality Assurance, which is not included as a separate chapter in Regulatory Guide 7.9. Within each chapter, this Package Review Guide addresses the technical and regulatory bases for the review, the manner in which the review is accomplished, and findings that are generally applicable for a package that meets the approval standards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Remediation of 130 mSv/hr. Soil Contamination Under a Hot Cell - 17301

Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M) is currently engineering a system to safely remove and dispose of highly contaminated soil underneath Building 324 located adjacent to the Columbia River on the Hanford Site in Washington State. Cleaning up the waste site will allow for the eventual demolition of the building, which is a top priority for DOE and CH2M due to the proximity of the Columbia River and City of Richland. Building 324 at Hanford was originally constructed in 1966 and was operated for a number of years serving various missions. One of the missions involved development of treatment processes for liquid high activity waste. As of result of one particular mission, liquid high activity waste was spilled in one of the building's hot cells (known as 'B' Cell) and the liquid leaked from a breach in a sump and through construction joints in the hot cell floor and into the soil. Sampling efforts using borehole technology revealed significant under-building contamination with dose rates measuring has high as 130 mSv/hr (13,000 R/hr.). The Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) between the Washington State, Department of Ecology (Ecology), the U.S. Environmental Protection Agency and the DOE has established a 2021 milestone for demolition and removal of the Building 324. Before building demolition can be undertaken, the highly contaminated soil must be removed from beneath the hot cell while the hot cell structure remains in place to provide shielding and containment during the soil remediation. CH2M will fabricate and install remotely operated equipment that will remove debris and grout in the cell, the floor of the hot cell, and the contaminated soil beneath the hot cell and package that soil for disposal. To ensure that the structure remains intact and does not shift during soil removal, support for the building structure must also be constructed as a prerequisite for the planned work. CH2M will use a full-scale mock-up of the Building 324 B Cell and airlock area to assist in the testing of the remotely operated equipment and the training of the soil removal team in a contamination-free environment to ensure efficient and safe performance of the challenging work of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning an Active Historical Reactor Facility at the Savannah River Site - 13453

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions (SRNS). In 2004, DOE recognized SRS as structure within the Cold War Historic District of national, state and local significance composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. This reactor has five primary areas within it, including a Disassembly Basin (DB) that received irradiated materials from the reactor, cooled them and prepared the components for loading and transport to a Separation Canyon for processing. The 6,317 square meter area was divided into numerous work/storage areas. The walls between the individual basin compartments have narrow vertical openings called 'slots' that permit the transfer of material from one section to another. Data indicated there was over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 M liters of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The need for an action was identified in 2010 to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. DOE, its regulators [U. S. Environmental Protection Agency (USEPA)-Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC)] and the SC Historical Preservation Office (SHPO) agreed/concurred to perform a non-time critical removal action for the In Situ Decommissioning (ISD) of the 105-C Disassembly Basin. ISD consisted of stabilization/isolation of remaining contaminated water, sediment, activated reactor equipment, and scrap metal by filling the DB with underwater non-structural grout to the appropriate (-4.877 meter) grade-level, thence with dry area non-structural grout to the final -10 centimeter level. The roof over the DB was preserved due to its potential historical significance and to prevent the infiltration of precipitation. Forced evaporation was the form of treatment implemented to remove the approximately 9.1 M liters of contaminated basin water. Using specially formulated grouts, irradiated materials and sediment were treated by solidification/isolation thus reducing their mobility, reducing radiation exposure and creating an engineered barrier thereby preventing access to the contaminants. Grouting provided a low permeability barrier to minimize any potential transport of contaminants to the aquifer. Efforts were made to preserve the historical significance of the Reactor in accordance with the National Historic Preservation Act. ISD provides a cost effective means to isolate and contain residual radioactivity from past nuclear operations allowing natural radioactive decay to reduce hazards to manageable levels. This method limits release of radiological contamination to the environment, minimizes radiation exposure to workers, prevents human/animal access to the hazardous substances, and allows for ongoing monitoring of the decommissioned facility. Field construction was initiated in August 2011; evaporator operations commenced January 2012 and ended July 2012 with over 9 M liters of water treated/removed. Over 8,525 cubic meters of grout were placed, completing in August 2012. The project completed with an excellent safety record, on schedule and under budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NA-213 Presentation.pdf

The Savannah River National Laboratory (SRNL) is one of 17 United States Department of Energy (DOE) National Laboratories. SRNL, a multi-program national laboratory, is a leading research and development institution for the Offices of Environmental Management and Legacy Management at the U.S. Department of Energy and the Weapons and Nonproliferation programs for the National Nuclear Security Administration. Battelle Savannah River Alliance, LLC (BSRA), a not-for-profit limited liability company, manages and operates SRNL for the DOE. BSRA board leadership includes Battelle Memorial Institute, Clemson University, University of South Carolina, South Carolina State University, University of Georgia, and Georgia Institute of Technology. Battelle Memorial Institute and the five universities are joined in partnership with preferred subcontractors TechSource and Longenecker & Associates with the singular purpose of maintaining SRNL as a best-in-class national laboratory. Scientists and Engineers at SRNL use leading edge science and technology to advance the Department of Energy’s critical mission outcomes.

Hasty, Timothy C.↗

GTRI Remote Monitoring System: Training and Operational Needs Assessment Analysis Report

The mission of the United States Department of Energy (DOE) National Nuclear Security Administrations (NNSA's) Global Threat Reduction Initiative (GTRI) is to identify, secure, recover and facilitate the disposition of vulnerable nuclear and high-risk radioactive materials around the world that pose a threat to the United States and the international community. The GTRI's unique mission to reduce and protect vulnerable nuclear and radiological materials located at civilian sites worldwide directly addresses recommendations of the 9/11 Commission1, and is a vital part of the President's National Security Strategy and the Global Initiative. The GTRI Remote Monitoring System (RMS) is a standalone security system that includes radiation and tamper alarms, and CCTV; which can be transmitted securely over the Internet to multiple on-site and off-site locations. Through our experiences during installation of the system at 162 sites, plus feedback received from Alarm Response Training course participants, site input to project teams and analysis of trouble calls; indications were that current system training was lacking and inconsistent. A survey was undertaken to gather information from RMS users across the nation, to evaluate the current level of training and determine what if any improvements needed to be made. Additional questions were focused on the operation of the RMS software. The training survey was initially sent electronically to 245 users at the RMS sites and achieved a 37.6% return rate. Analysis of the resulting data revealed that 34.6% of the respondents had not received training or were unsure if they had, despite the fact that vendor engineers provide training at installation of the system. Any training received was referred to as minimal, and brief, not documented, and nothing in writing. 63.7% of respondents said they were either not at all prepared or only somewhat prepared to use the RMS software required to effectively operate the system. As a result of this analysis, a formal training curriculum will be designed and implemented to include several blended learning delivery options. This training will be piloted at RMS sites; initial training will become a required element of RMS installation and refresher training will be considered for sustainability of operations.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Corrigendum to “Cool Rooms for Indoor Heat Resilience: Evaluating Affordable Cooling Strategies in Heat-Stressed California Homes” [Building and Environment 287 (2026) 113877]

The authors regret an error in the acknowledgments section regarding the U.S. Department of Energy Solar Energy Technologies Office award number. The previously listed grant number, 2597–1625, was incorrect. The corrected acknowledgment should read: “This work was supported by the Assistant Secretary for Energy Efficiency and Renewable Energy, Office of Building Technologies of the United States Department of Energy (DOE), under Contract No. DE-AC02–05CH11231. This material is based upon work supported by the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) under the Solar Energy Technologies Office Award Number DE-EE00040384. Any opinions, findings, and conclusions or recommendations expressed in this material are those of the author(s) and do not necessarily reflect the views of the Department of Energy.” The authors would like to apologise for any inconvenience caused.

Malik, Jeetika↗

Integrating Cloud-Based Workflows in Continental-Scale Cropland Extent Classification

Accurate information on cropland spatial distribution is required for global-scale assessments and agricultural land use policies. Cloud computing platforms such as Google Earth Engine (GEE) provide unprecedented opportunities for large-scale classifications of Landsat data. We developed a novel method to fuse pixel-based random forest classification of continental-scale Landsat data on GEE and an object-based segmentation approach known as recursive hierarchical segmentation (RHSeg). Using our fusion method, we produced a continental-scale cropland extent map for North America at 30m spatial resolution for the nominal year 2010. The total cropland area for North America was estimated at 275.18 million hectares (Mha). The overall accuracies of the map are>90% across the continent. This map also compares well with the United States Department of Agriculture (USDA) cropland data layer (CDL), Agriculture and Agri-food Canada (AAFC) annual crop inventory (ACI), and the Mexican government agency Servicio de Informacion Agroalimentaria y Pesquera (SIAP)'s agricultural boundaries. Furthermore, our map compared well with sub-country statistics including state-wise and county-wise cropland statistics in regression models resulting in R2 > 0.84. This key contribution paves the way for more detailed products such as crop intensity, crop type, and crop irrigation, and provides a method for creating high-resolution cropland extent maps for other countries where spatial information about croplands are not as prevalent.

Massey, Richard↗