Space rescue operations. Volume 2: technical discussion
Contingency planning, rescue vehicle requirements, operational considerations, and system analysis for space rescue operations - Vol. 2
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Contingency planning, rescue vehicle requirements, operational considerations, and system analysis for space rescue operations - Vol. 2
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)
The mid-lift-to-drag ratio (mid-L/D) lifting body is a fully autonomous spacecraft under design at NASA for enabling a rapid return of scientific payloads from the International Space Station (ISS). For contingency planning and risk assessment for the Earth-return trajectory, an entry demise analysis was performed to examine three potential failure scenarios: (1) nominal entry interface conditions with loss of control, (2) controlled entry at maximum flight path angle, and (3) controlled entry at minimum flight path angle. The objectives of the analysis were to predict the spacecraft breakup sequence and timeline, determine debris survival, and calculate the debris dispersion footprint. Sensitivity analysis was also performed to determine the effect of the initial pitch rate on the spacecraft stability and breakup during the entry. This report describes the mid-L/D lifting body and presents the results of the entry demise and sensitivity analyses.
The conversion of carbon dioxide and water into fuels in a solar refinery presents a potential solution for reducing greenhouse gas emissions, while providing a sustainable source of fuels and chemicals. Towards realizing such a solar refinery, there are many technological advances that must be met in terms of capturing and sourcing the feedstocks (namely CO2, H2O, and solar energy) and in catalytically converting CO2 and H2O. In the first part of this paper, we review the state-of-the-art in solar energy collection and conversion to solar utilities (heat, electricity, and as a photon source for photo-chemical reactions), CO2 capture and separation technology, and non-biological methods for converting CO2 and H2O to fuels. The two principal methods for CO2 conversion include (1) catalytic conversion using solar-derived hydrogen and (2) direct reduction of CO2 using H2O and solar energy. Both hydrogen production and direct CO2 reduction can be performed electro-catalytically, photo-electrochemically, photo-catalytically, and thermochemically. All four of these methods are discussed. In the second part of this paper, we utilize process modeling to assess the energy efficiency and economic feasibility of a generic solar refinery. The analysis demonstrates that the realization of a solar refinery is contingent upon significant technological improvements in all areas described above (solar energy capture and conversion, CO2 capture, and catalytic conversion processes).
Online transient analysis plays an increasingly important role in dynamic power grids as the renewable generation continues growing. Traditional numerical methods for transient analysis not only are computationally intensive but also require precise contingency information as input, and therefore, are not suitable for online applications. Existing online transient assessment studies focus on the determination of post-contingency system stability or stability margin. Here, this paper develops a novel graph-learning framework, Deep-learning Neural Representation or DNR, for online prediction, of the time-series trajectories of the system states using initial system responses that can be measured by phasor measurement units (PMUs). The proposed DNR framework consists of two sequential modules: a Network Constructor that captures network dependencies among generators, and a Dynamics Predictor that predicts the system trajectories. The key to improved prediction performance is the introduction of the spatio-temporal message-passing operations into graph neural networks with structural knowledge. Its effectiveness and scalability are validated through comparative studies, demonstrating the prediction performance under different contingency scenarios for systems of different sizes. This framework provides a solution to online predicting post-fault system dynamics based on real-time PMU measurements. Additionally, it can also be applied to facilitate the offline transient simulation without simulating the entire trajectories.
CO2 Washout refers to the suit’s ability to remove exhaled metabolic waste gases from the helmet before the crewmember’s next consecutive inhale. Efficient removal of such waste gases is paramount as it prevents crewmember fatigue as well as hypoxia. A variety of hardware and conditions inside the suit contribute to the efficiency at which CO2 washout occurs including (but not limited to) the shape of the helmet bubble, crewmember head position, breathing type and metabolic rate, the configuration of the oxygen vent inside the helmet, etc. While designing the oxygen vent inside the helmet of the Extravehicular Mobility Unit (xEMU) both nominal and contingency scenarios were considered in order to optimize CO2 washout. During nominal Extravehicular Activity (EVA), the pressure gradient created by the vent loop inlets located in the arms and legs of the Pressure Garment Subsystem (PGS) aids in washout by pulling the metabolic waste out of the helmet. However, in the event that a contingency scenario occurs, where the flow of oxygen to the crewmember, or the removal of metabolic waste is disrupted, the primary oxygen regulator fails open and removal of waste is no longer performed by the vent loop, but rather by the Low Flow Purge Valve (LFPV) located in the helmet. The paper to follow will provide an overview of the analysis, design, and testing performed to optimize washout for both nominal and contingency scenarios for the most current design iteration of the xEMU.
Why do most space life support research groups build and investigate large models for systems simulation? The need for them seems accepted, but are we asking the right questions and solving the real problems? The modeling results leave many questions unanswered. How then should space life support be modeled and simulated? Life support system research and development uses modeling and simulation to study dynamic behavior as part of systems engineering and analysis. It is used to size material flows and buffers and plan contingent operations. A DoD sponsored study used the systems engineering approach to define a set of best practices for modeling and simulation. These best practices describe a systems engineering process of developing and validating requirements, defining and analyzing the model concept, and designing and testing the model. Other general principles for modeling and simulation are presented. Some specific additional advice includes performing a static analysis before developing a dynamic simulation, applying the mass and energy conservation laws, modeling on the appropriate system level, using simplified subsystem representations, designing the model to solve a specific problem, and testing the model on several different problems. Modeling and simulation is necessary in life support design but many problems are outside its scope.
This research employs numerical modeling to analyze how CO 2 plumes and pressure fronts evolve when CO 2 is injected into a single storage formation from multiple projects located in proximity. Here, this analysis also evaluates the extent to which injection well spacing alleviates pressure buildup in the absence of active pressure management tactics. The simulation approach was based on a single, homogenous saline aquifer in which CO 2 injection occurs under a one-injector baseline case and several multi-well cases where well spacing varies. Analysis results show that the extent of pressure buildup is in the range of tens or a few hundreds of kilometers and contingent upon the defining pressure buildup demarcating the front edge. For the geological setting evaluated in this paper, our analysis suggests that without active basin pressure management strategies, commercial-scale projects would likely need to be sited far apart to avoid pressure interference from one another. Analysis results show the radius of CO 2 plume varies approximately from 2 to 3 km from injection wells (each injecting 1 Mt/year for 30 years) depending on cases and modeling parameters assumed. Given the pressure interference, this paper thus draws attention to the importance of greater coordination among storage operators and regulatory stakeholders. Because this analysis assumes a very specific geologic setting, this exploratory analysis bears further investigations across other geologic scenarios.
The results of the Independent Orbiter Assessment (IOA) of the Failure Modes and Effects Analysis (FMEA) and Critical Items List (CIL) are presented. The IOA approach features a top-down analysis of the hardware to determine failure modes, criticality, and potential critical items. To preserve independence, this analysis was accomplished without reliance upon the results contained within the NASA FMEA/CIL documentation. This report documents the independent analysis results corresponding to the Orbiter Displays and Controls (D and C) subsystem hardware. The function of the D and C hardware is to provide the crew with the monitor, command, and control capabilities required for management of all normal and contingency mission and flight operations. The D and C hardware for which failure modes analysis was performed consists of the following: Acceleration Indicator (G-METER); Head Up Display (HUD); Display Driver Unit (DDU); Alpha/Mach Indicator (AMI); Horizontal Situation Indicator (HSI); Attitude Director Indicator (ADI); Propellant Quantity Indicator (PQI); Surface Position Indicator (SPI); Altitude/Vertical Velocity Indicator (AVVI); Caution and Warning Assembly (CWA); Annunciator Control Assembly (ACA); Event Timer (ET); Mission Timer (MT); Interior Lighting; and Exterior Lighting. Each hardware item was evaluated and analyzed for possible failure modes and effects. Criticality was assigned based upon the severity of the effect for each failure mode.
Project cost risk is the uncertainty in final project cost, contingent on initial budget, requirements and schedule. For a proposed mission, a dynamic simulation model relying for some of its input on a simple risk elicitation is used to identify and quantify systemic cost risk.
This paper investigates the discursive construction of the substantive purposes of environmental assessment (EA). It addresses these purposes by exploring the complex and often multifaceted linkages between political factors and plural views of democracy, public participation, and the role of science that are embedded in environmental and sustainability discourses. The interaction between policy-making and public actors leads to the formulation of divergent and potentially competing rationales for public participation, and for social appraisal more generally. Participatory approaches have also given impetus to the development of several interpretations on the role of science in assessment procedures. Science is important in mediating public participation and the two are therefore reciprocally linked. This leads to discourses that become manifest in the construction of substantive purposes. Discourse analysis in EA is a relevant method for examining trends and patterns in sustainable development. It is argued that public participation is an important, if not decisive, variable in the articulation and civil legitimacy of certain purposes. A general proposition that results from this paper is that EA, although typically presented as an objective scientific tool, is an intrinsically normative process. Enhanced knowledge on the construction, and reconstruction over time, of substantive purposes is required if environmental and sustainability discourses are to be used and understood as meaningful analytical instruments to assess the socio-political implications of EA. - Highlights: Black-Right-Pointing-Pointer Substantive purposes related to environmental assessment may be best analyzed through discourse analysis. Black-Right-Pointing-Pointer Environmental and sustainability discourses are contingent on the level of participatory democracy and civic science. Black-Right-Pointing-Pointer Public participation is a decisive variable in the construction of the substantive purpose of environmental assessment.
Highlights: • Composite waste fuels were prepared for characterizing fuel property and reactivity. • Characterization of the composite fuels can be predicted by individual components. • A simple methodology for characterizing multi-component solid wastes was validated. • Plastic components increase carbon content and HHV of solid waste fuels. • Effects of fuel composition on syngas production and composition were explored. - Abstract: The solid waste generated from military contingency bases (CBs) is a potential fuel for appropriately-scaled, waste to energy (WTE) systems. To inform WTE system design, fuel properties of seventeen components of synthetic contingency-base waste recipes from the literature were characterized for ultimate analysis, heating values, proximate analysis and reactivity in a steam atmosphere at three temperature typical of gasification conditions. A simple mathematical approach was applied to predict the properties and reactive behavior of composite mixtures using the weighted sum of the corresponding components, assuming negligible interaction between components. The method was validated using prepared composite mixture samples. In addition, chemical equilibrium calculations for steam gasification of the composite samples were conducted to explore the effects of waste composition variability on syngas production and composition.
There is significant interest in the development of supercritical carbon dioxide (sCO 2 ) power cycles because of the potential for smaller and more energy efficient systems than a steam Rankine cycle. Heat exchanger designs typically use empirical correlations, but the applicability of these correlations near the CO 2 critical point is a potential issue. Though numerous correlations have been proposed in the literature, there are some disagreements when it comes to the accuracy. The current work recognizes the role of thermophysical properties, and its impacts on the heat transfer correlations and cycle efficiency. Heat transfer correlations proposed for horizontal flow inside circular pipes were analyzed with the help of numerical simulations. Steady state RANS simulations were performed using SST k-w turbulence model to evaluate the Nusselt number empirical correlations. It was found that the most of correlations (except Yoon) produced a Nusselt number that differed significantly with the one predicted numerically. Some of the correlations were developed for pure forced convection regime and as mentioned in Lin et al. do not account for mixed convection or free convection effects. Based on the limited observation, it appears that Yoon et al. predictions match well with the numerically predicted Nusselt Numbers. However, further analysis is required understand the applicability of various correlations and is contingent on accurate measurements or predictions of wall temperature profiles in the axial and the circumferential directions.
The evolution of the nominal rendezvous-maneuver plan for the lunar landing missions is presented along with a summary of the significant development for the lunar module abort and rescue plan. A general discussion of the rendezvous dispersion analysis that was conducted in support of both the nominal and contingency rendezvous planning is included. Emphasis is placed on the technical developments from the early 1960's through the Apollo 15 mission (July to August 1971), but pertinent organizational factors also are discussed briefly. Recommendations for rendezvous planning for future programs relative to Apollo experience also are included.
The analysis and selection of food items and primary packaging, the development of menus, the nutritional analysis of diet, and the analyses of alternate food mixes and contingency foods is reported in terms of the overall food system design for space shuttle flight. Stowage weights and cubic volumes associated with each alternate mix were also evaluated.
Landsat MSS data were input to a discriminant analysis of 21 crops on each of eight dates in 1979 using a total of 4,142 fields in southern Fresno County, California. The 21 crops, which together account for over 70 percent of the agricultural acreage in the southern San Joaquin Valley, were analyzed to quantify the spectral separability, defined as omission error, between all pairs of crops. On each date the fields were segregated into six groups based on the mean value of the MSS7/MSS5 ratio, which is correlated with green biomass. Discriminant analysis was run on each group on each date. The resulting contingency tables offer information that can be profitably used in conjunction with crop calendars to pick the best dates for a classification. The tables show expected percent correct classification and error rates for all the crops. The patterns in the contingency tables show that the percent correct classification for crops generally increases with the amount of greenness in the fields being classified. However, there are exceptions to this general rule, notably grain.
A Spacecraft Position Optimal Tracking (SPOT) program was developed to process Global Positioning System (GPS) data, sent via telemetry from a spacecraft, to generate accurate navigation estimates of the vehicle position and velocity (state vector) using a Kalman filter. This program uses the GPS onboard receiver measurements to sequentially calculate the vehicle state vectors and provide this information to ground flight controllers. It is the first real-time ground-based shuttle navigation application using onboard sensors. The program is compact, portable, self-contained, and can run on a variety of UNIX or Linux computers. The program has a modular objec-toriented design that supports application-specific plugins such as data corruption remediation pre-processing and remote graphics display. The Kalman filter is extensible to additional sensor types or force models. The Kalman filter design is also strong against data dropouts because it uses physical models from state and covariance propagation in the absence of data. The design of this program separates the functionalities of SPOT into six different executable processes. This allows for the individual processes to be connected in an a la carte manner, making the feature set and executable complexity of SPOT adaptable to the needs of the user. Also, these processes need not be executed on the same workstation. This allows for communications between SPOT processes executing on the same Local Area Network (LAN). Thus, SPOT can be executed in a distributed sense with the capability for a team of flight controllers to efficiently share the same trajectory information currently being computed by the program. SPOT is used in the Mission Control Center (MCC) for Space Shuttle Program (SSP) and International Space Station Program (ISSP) operations, and can also be used as a post -flight analysis tool. It is primarily used for situational awareness, and for contingency situations.
Within the UK there is a general trend towards adopting Design Basis Accident (DBA) methodology for the assessment of radiological hazards, including criticality. DBA is a single fault methodology and comprises identifying the initiating event, its frequency and consequence. A fault with a very low initiating event frequency will not require further analysis. A fault sequence that terminates in a sub-critical configuration would also not require further analysis; although the identified passive features ensuring sub-criticality are subjected to engineering substantiation. Where faults do not pass this initial screening, two safety measures are generally required to ensure the fault does not progress to a criticality incident. This methodology provides a robust approach to single faults ensuring that an appropriate level and range of plant measures are identified and subjected to appropriate substantiation. However, a criticality is a cliff-edge effect and is dependent on multiple parameters. It is entirely possible under DBA to evaluate several single fault sequences and conclude that no measures are required because the single faults terminate in a sub-critical configuration. Importantly, for criticality safety, under DBA, there is no requirement to prevent important parameters from deviating from normal or upper bound 'safe' levels leaving the plant at greater risk in the event that further faults initiate. The combination of two faults could lead to a criticality incident but there is no current driver within DBA methodology to analyze these coincident or double faults. There is, therefore, potential to significantly under estimate the risk of criticality. This understanding is embodied within other methodologies such as the Double Contingency Principle. However, within the UK the DBA methodology has so significantly improved the analysis of single faults that, in some instances, consideration of double faults has taken a back seat. This is despite the UK regulator stating that 'criticality safety cases should employ the double contingency approach'. This paper presents a systematic approach to ensure that the potential for double faults or multiple parameter deviations to result in a criticality is effectively evaluated within the wider DBA methodology. The methodology determines which faults may be screened out from double fault analysis on the grounds of being 'unlikely' to initiate and being present for a 'short' duration. For those faults screened into double fault analysis, this guidance sets out the potential means of determining acceptable risk. These means include the specific evaluation of the risk of two criticality control parameters deviating simultaneously, the definition of additional safety measures and the definition of the boundary of safety for multiple parameters and the risk of exceeding this boundary. (authors)