Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Coal Power Generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

Development of Miniaturized High-Temperature Multi-Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings.

20 FOSSIL-FUELED POWER PLANTS↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Investigating Benefits and Challenges of Converting Retiring Coal Plants into Nuclear Plants

A coal-to-nuclear (C2N) transition means siting a nuclear reactor at the site of a recently retired coal power plant. Three overarching questions from the C2N transition guide this research: where in the United States are retired coal facilities located and what factors make a site feasible for transition; what factors of technology, cost, and project timeline drive investor economics over such a decision; and how will C2N impact local communities? The study team evaluated the siting characteristics of recently retired plants and those operating coal-fired power plant sites run by a utility or an independent power producer utilizing publicly available data to screen U.S. coal power plant sites to nuclear-feasible locations. After screening all retired coal sites to a set of 157 potential candidates and screening operating sites to a set of 237 candidates, the study team estimates that 80% of retired and operating coal power plant sites that were evaluated have the basic characteristics needed to be considered amenable to host an advanced nuclear reactor. For the recently retired plant sites evaluated, this represents a capacity potential of 64.8 GWe to be backfit at 125 sites. For the operating plant sites evaluated, this represents a capacity potential of 198.5 GWe to be backfit at 190 sites. This report evaluates a case study for the detailed impacts and potential outcomes from a C2N transition. Based on the nuclear technology choices and sizes evaluated to replace a large coal plant of 1,200 MWe generation capacity at the case study site, nuclear overnight costs of capital could decrease by 15% to 35% when compared to a greenfield construction project, through the reuse of infrastructure from the coal facility. Nuclear replacement designs can have a lower capacity size because nuclear power plants run at higher capacity factors than coal power plants. In the case study replacing coal capacity with 924 GWe of nuclear capacity, the study team found regional economic activity could increase by as much as $\$275 million$ and add 650 new, permanent jobs to the region of analysis. The evaluated site choice in the report is hypothetical for analysis purposes only and based on available data and documented assumptions. Consequently, the findings only inform at a general level. A community, investor, or other interested stakeholder can use these results to set up a detailed, in-depth analysis for a specific application of interest, such as evaluating a C2N transition of a specific coal power plant and a specific nuclear technology design. The report was subjected to independent peer reviews by experts in systems engineering and regional economic modeling to evaluate analysis and assumptions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Cost and Performance Baseline for Fossil Energy Plants Volume 3: Low Rank Coal and Natural Gas to Electricity

This report presents an independent assessment of the cost and performance of select fossil energy power systems—pulverized coal (PC), circulating fluidized bed (CFB), and natural gas combined cycle (NGCC) plants—using a systematic, transparent technical and economic approach. This is Volume 3 of a five-volume series, which comprise the following reports: Volume 1: Bituminous Coal and Natural Gas to Electricity; Volume 2: Coal to Synthetic Natural Gas and Ammonia (Various Coal Ranks); Volume 3: Low Rank Coal and Natural Gas to Electricity; Volume 4: Bituminous Coal to Liquid Fuels; and Volume 5: Natural Gas Electricity Generating Units for Flexible Operation. The cost and performance of fossil fuel-based generation technologies represented in this report (and the series at large) are important inputs to assessments and determinations of technology combinations to be utilized to meet the projected demands of future power markets. In addition to informing technology comparisons, the reference plant configurations found in this report provide perspective for regulators and policy makers. From a research and development perspective, this report is used to assess goals and metrics and to provide a consistent basis for comparing developing technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Gasification of Coal and Biomass: The Route to Net-Negative-Carbon Power and Hydrogen

One promising process that is a candidate for meeting the goals of the US Department of Energy’s 21st Century Power Plant initiative is to gasify a mixture of coal and biomass to yield a syngas, which can have CO2 removed and then be used to produce hydrogen as well as an off-gas that can be used to flexibly produce power. This concept would overall be carbon net-negative and readily meet the 21st Century Power Plant initiative targets of smaller scale MW generation, high ramp rates and turndown, feedstock flexibility, and high efficiency—at a reasonable cost. Moreover, adding the large-scale production of “ultra-green” hydrogen yields a system tailored for the coming hydrogen economy, providing long-term energy storage and an attractive co-product for sale. The objective of the work being led by the Electric Power Research Institute, Inc. (EPRI), with support by Bechtel Corporation (Bechtel), Gas Technology Institute (GTI), Hamilton Mauer International, Inc. (HMI), Nebraska Public Power District (NPPD), NexantECA, Inc. (Nexant), and Wärtsilä, is to perform a front-end design and engineering (FEED) study on an oxygen-blown gasification system coupled with water-gas shift, pre-combustion CO2 capture, and pressure-swing adsorption working off a coal/biomass mix to yield high-purity hydrogen and a fuel off-gas that can generate power. Several designs are being considered that will be capable of producing 50 MW net from a flexible generator, over 8500 kg/hr of hydrogen, and net-negative CO2 emissions, at an efficiency of 50% net HHV. The plant would be hosted at an NPPD site, where opportunities for enhanced oil recovery and sequestration have been investigated and the need for low-carbon power and hydrogen is imminent. The principal biomass to be used is corn stover—prevalent in Nebraska where the plant will be located—mixed with Powder River Basin (PRB) coal, necessitating a gasifier that can use this feedstock and be flexible to allow other types. Waste plastics will also be reviewed for use. Two oxygen-blown gasifiers have been identified as candidates that have done testing with biomass including corn stover: the GTI gasifier—a high-pressure, fluidized-bed type—and HMI’s, a lower pressure moving-bed type. Both have relative advantages that are being investigated in the Phase I design study, with a resultant down select of one system for which the FEED will be performed in Phase II. The technical tasks for the proposed project are: • Design Development: Completion of design activities necessary to provide inputs for the FEED study. Multiple design cases will be assessed with the selection of the optimal one for the FEED. • Investment Case Preparation: Development of the draft investment case for the proposed process with business cases performed for the proposed host site and two other locations. • Host Site Selection: Evaluation of the two potential host sites within NPPD’s portfolio to select the preferred candidate based on technical, economic, and environmental considerations. • Environmental Information Volume (EIV) Development: Completion of the EIV for the host site. • FEED Study: Completion of a FEED study based on the design selected in Phase I. A Greenhouse Gas Life Cycle Analysis will also be performed for the process. • Update Investment Case: Finalization of the investment case based on findings from the FEED. The advantages of the proposed project are significant. Having an engaged U.S. power utility willing to provide a host site that will produce energy from coal plus a deep and experienced team is critical; the process meets all the goals of DOE’s 21st Century Power Plant initiative at an estimated total plant cost of ~$880M and a production cost of hydrogen of ~$2/kg-H2 while producing net-negative carbon power. If developed, this process has real commercial potential in the United States—supported by EPRI’s initial review of the considerable interest from selected U.S. utilities—and elsewhere around the globe. The process has fewer environmental hurdles compared to other concepts, lowering regulatory and protest risks—providing a pathway to preserving the viability of a critical indigenous energy source by transforming its use to match a changing world. This presentation will outline the motivation for the effort, summarize project plans, work completed to date, results of the Design Development task, and detailed work scope for the remainder of the project.

01 COAL, LIGNITE, AND PEAT↗

Clean Water Production in Cooling Towers

This project developed and demonstrated a novel technology that produces clean water from cooling tower recirculating water by using the natural evaporation and condensation cycle inside cooling towers. The system captures the escaping plume and converts blowdown quality water into high purity water suitable for on-site reuse such as boiler feed. The technology uses electric fields to ionize exhaust plumes, charge the entrained droplets, and direct them toward collection electrodes where they coalesce and flow downward. This allows water recovery at a low energy cost while reducing visible plume emissions. In addition, we developed a complementary software platform that improves overall cooling tower performance. The system uses wireless sensors and physics-based machine learning algorithms to optimize key parameters of the cooling process. For power generation facilities, this increases the thermal efficiency of the cooling loop and condenser, resulting in measurable cycle efficiency gains. Improvements of one percent or more can deliver significant increases in electricity production for the same fuel input.

01 COAL, LIGNITE, AND PEAT↗

Application of a Heat Integrated Post-combustion CO 2 Capture System with Hitachi Advanced Solvent into Existing Coal-Fired Power Plant (Final Technical Report)

The goal of this final project report is to comprehensively summarize the work conducted on project DE-FE0007395. In accordance with the Project Management Plan (PMP), Revision F dated 5/10/2019, and Statement of Project Objectives (SOPO) within, the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) has successfully demonstrated a unique, versatile CO 2 capture system (CCS) using a heat integrated process combined with two-stage stripping for process intensification, heat recovery and demineralized (DM) water generation. This project involved the design, fabrication, installation, testing of and data analysis from the UK CAER 0.7 MWe small pilot scale CO2 capture process installed at Kentucky Utilities (KU) E.W. Brown Generating Station in Harrodsburg, KY. During each of the four project Budget Periods (BPs), UK CAER met all project deliverables, all project milestones, with National Energy Technology Laboratory (NETL) approved adjustments made to the campaign long-term hours during BP4. The CCS was constructed in modular skids. Two solvent campaigns were initially conducted; the first with a 30 wt% monoethanolamine (MEA) as a baseline, and the second with the Hitachi H3-1 advanced solvent. Additional tests were performed with two advanced solvents including CAER and Proprietary Solvent C. Short-period testing with a higher concentration of 40 wt% MEA was conducted to evaluate the potential saving with high alkalinity. From the various solvent campaigns, unique aspects of the UK CAER CCS technology, as well as its flexibility and versatility were experimentally validated and demonstrated. With respect to solvent evaluation efforts in identifying candidates with significant operational and capital cost savings potential, performance of solvents were evaluated to determine the energy requirements for regeneration; environmental impacts from secondary emissions and degradation products; degradation rates, solvent make-up rates and stability. The assessments were done from parametric tests that determined optimum operating conditions for the individual solvents to maximize process efficiency and minimize the parasitic load of the power plant, and from long term campaigns (1000 hours for 30 wt% MEA and 1000 hours for H3-1) which collectively informed the techno-economic analyses (TEA) of the process. The long term campaigns included corrosion studies which used three types of metal coupons in different sections of the process: (absorber, primary stripper, lean carbon-loaded and rich carbon loaded flow streams in process) to mimic heat and flow dynamics process equipment were exposed to. The estimated corrosion rates were used to elucidate corrosion mechanisms and to further guide process material selection for potential capital cost savings.

gas separation↗

Effects of Production of Woody Pellets in the Southeastern United States on the Sustainable Development Goals

Wood-based pellets are produced in the southeastern United States (SE US) and shipped to Europe for the generation of heat and power. Effects of pellet production on selected Sustainability Development Goals (SDGs) are evaluated using industry information, available energy consumption data, and published research findings. Challenges associated with identifying relevant SDG goals and targets for this particular bioenergy supply chain and potential deleterious impacts are also discussed. We find that production of woody pellets in the SE US and shipments to displace coal for energy in Europe generate positive effects on affordable and clean energy (SDG 7), decent work and economic growth (SDG 8), industry innovation and infrastructure (SDG 9), responsible consumption and production (SDG 12), and life on land (SDG 15). Primary strengths of the pellet supply chain in the SE US are the provisioning of employment in depressed rural areas and the displacement of fossil fuels. Weaknesses are associated with potential impacts on air, water, and biodiversity that arise if the resource base and harvest activities are improperly managed. The SE US pellet supply chain provides an opportunity for transition to low-carbon industries and innovations while incentivizing better resource management.

09 BIOMASS FUELS↗

Energy Storage Improves Power Plant Flexibility and Economic Performance

Most existing coal-fired power plants were designed for sustained operation at full load to maximize efficiency, reliability, and revenue, as well as to operate air pollution control devices at design conditions. Depending on plant type and design, these plants can adjust output within a fixed range in response to plant operating or market conditions. The need for flexibility driven by increased penetration of variable and non-dispatchable power generation, such as wind and solar, is shifting the traditional mission profile of thermoelectric power plants in three ways: more frequent shutdowns when market or grid conditions warrant, more aggressive load ramp rates (rate of output change), and a lower minimum sustainable load, which provides a wider operating range and helps avoid costly plant shutdowns. Recent studies have shown that the flexibility of a coal-fired power plant can be improved by energy storage. The objective of this work was to analyze a set of energy storage options and determine their impact on the flexibility and economics of a representative coal-fired power plant. The effect of three energy storage systems integrated with a coal power plant on plant flexibility and economics was investigated. The results obtained in this project show that energy storage systems integrated with a thermal power plant improve plant flexibility and participation in the energy and ancillary services markets, which improves plant financial performance.

20 FOSSIL-FUELED POWER PLANTS↗

sCO2 Primary Power Large-Scale Pilot Plant FEED Summary

Echogen Power Systems and its project partners the Electric Power Research Institute, CDM Smith, Riley Power Inc. (a Babcock Power Inc. company), and the University of Missouri completed the Front-End Engineering Design (FEED) study of a nominal 10 MWe supercritical carbon dioxide (sCO2) large-scale pilot plant based on Recompression Brayton Cycle (RCBC) architecture. The FEED study was completed under Phase II of the U.S. Department of Energy Fossil Fuel Large-Scale Pilots program. The FEED study scope included the preliminary design of the combustion and environmental control systems, the primary heater, the sCO2 power cycle and its associated turbomachinery, and the balance of plant equipment to determine accurate cost and schedule requirements for fabrication and installation of the system at the University of Missouri’s Combined Cooling, Heat, and Power Plant, located in Columbia, Missouri. The RCBC sCO2 cycle presents superior thermodynamic efficiency compared to steam-Rankine cycles and is adaptable to a broad range of heat sources. The risk aversion of the power generation industry requires a successful large-scale pilot plant demonstration to enable financing and deployment of commercial-scale plants. Therefore, successful construction and demonstration of a 10 MWe RCBC sCO2 power plant would empower a transformational step forward for the efficiency of the next generation of utility power plants. This paper provides details on the primary heater, environmental control systems, and sCO2 power cycle design and performance.

01 COAL, LIGNITE, AND PEAT↗