Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Checklist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

A Geophysicist's Guide to the Fairfield Nodes

This report details how to successfully use the Fairfield Nodal ZLand seismic instruments to collect data, including preparation steps prior to deploying the instruments, how to record data during a field campaign, and how to retrieve recorded data from the instruments after their deployment. This guide will walk through each step for the novice user, as well as provide a checklist of critical steps for the advanced user to ensure successful, efficient field campaigns and seismic data collection. Currently, use of the seismic nodal instruments is highly limited due to the detailed nature and prior knowledge required to successfully set up, use, and retrieve data from these instruments. With this guide, all interested users will have the knowledge required to perform a seismic deployment and collect data with the Fairfield Nodal instruments.

47 OTHER INSTRUMENTATION↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Agile Training [Slides]

The purpose of this course is to help you recognize the main characteristics of the Agile approach to training and to implement the Agile Training Checklist in training development.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

SolarAPP+ Performance Review (2023 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to AHJs at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2023, the National Renewable Energy Laboratory (NREL) had contacted over 1,700 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 793 AHJs had expressed interest in the platform as of the end of 2023. 161 AHJs had begun piloting the platform and 97 of these had publicly launched the platform by the end of 2023. In 2023, 668 installers submitted 18,906 permits through the SolarAPP+ platform, including 4,834 permits submitted as part of a solar plus storage program. SolarAPP+ permits accounted for around 43% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 14.5 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 7,200 hours of AHJ staff time in 2023. Finally, we estimate that SolarAPP+ eliminated over 150,000 business days in permitting-related delays in 2023.

14 SOLAR ENERGY↗

A Tutorial Set to Prepare for Science with the Vera C. Rubin Observatory

In this poster the Rubin Observatory's Community Science team (CST) presents its current suite of tutorials, which are designed to help people make use of simulated data sets in preparation for the upcoming Legacy Survey of Space and Time (LSST). We will show examples of the tutorial contents, provide custom learning modules for different astronomical fields, and describe the online environment for data analysis (the Rubin Science Platform; RSP). We will also supply a checklist for how to obtain an RSP account and access the tutorials. All are welcome to drop by the poster or the Rubin booth in the exhibit hall with questions.

79 ASTRONOMY AND ASTROPHYSICS↗

Use Case-Informed Framework for Utility Cloud Migration

This white paper presents a comprehensive methodology for assessing utilities’ cloud postures and frameworks. It aims to produce a roadmap and strategy for a cloud-enabled grid future, providing guidance for integrators, asset owners, and operators. Instead of offering a yes or no answer for cloud implementation, this framework offers strategic guidance on responsibly preparing for and deploying cloud solutions. This paper delves into cloud-service models pertinent to the electric sector, dissecting the shared responsibility model and elucidating what on-premise infrastructure as a service (IaaS), platform as a service (PaaS), and software as a service (SaaS) entail. A pivotal consideration within the context of the shared responsibility model is the allocation of responsibility for foundational security aspects—a decision that will be informed by a comprehensive risk assessment. The ensuing discussion will present a checklist of certifications necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and with a strategic roadmap. Furthermore, the paper outlines gaps in understanding the U.S. government’s role in shaping technology development and responsible use. Its purpose is to aid decision-making by offering support for risk-informed solutions that benefit those managing assets and operating in the cloud environment. The primary objective is to enhance the resilience and future readiness of a decarbonized electric grid, with cloud solutions as one viable option. The paper synthesizes information on current and future grid architectures and applications, considering both conservative and progressive energy transitions, along with scalable and distributed computing considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing Cloud Cybersecurity: Prescriptive Controls for Operational Technology

This whitepaper provides strategic insights and recommendations into security cloud-based solutions for electric utilities, encompassing operational technology (OT), virtual power plants (VPP), distributed energy resources (DERs), applications, networks, and data storage as they transition to and leverage cloud infrastructure through managed service providers (MSPs) and cloud service providers (CSPs). Principles derived from established frameworks serve as a foundation for best practices across cybersecurity projects and remove the constraints of settling on a single framework. For organizations that prefer not to integrate a specific framework altogether, elements of the proposed approach could be adopted or tailored to best fit defined requirements and expected functionalities. The Cirrus assessment, a utility cloud feasibility tool, and the roadmap it provides serve as a precursor to this paper, which seeks to be a valuable resource for defining next steps following cloud technology integration feasibility appraisal. With its comprehensive approach to adoption, the Cirrus framework offers strategic guidance on responsibly preparing for or deploying a utility cloud solution. The previously published whitepaper, “Use Case-Informed Framework for Utility Cloud Migration,” details the guiding strategy, research, and deployment of cloud solutions within electric and interconnected grid systems. Before implementing the controls suggested in this document, it is recommended that stakeholders complete Cirrus's cloud integration assessment and pair the results with their unique cybersecurity controls to form a comprehensive cloud-based utility cybersecurity plan. The Cirrus outcome will consider a series of future architectures for the grid before and after the energy transition and evaluate the arguments for and against cloud applications for each electric and interconnected grid layer. This document is a companion to the original whitepaper, "Use Case-Informed Framework for Utility Cloud Migration" to further identify and recommend security controls based on Cirrus’s cloud integration assessment output. The following whitepaper outlines the cybersecurity controls that secure cloud-service models pertinent to the electric sector using the predefined categories identify, protect, detect, and respond and recover. The objective is to outline prescriptive security controls based on the type of architecture and data stored in the cloud. The focus includes dissecting the shared responsibility model and elucidating what on-premises Infrastructure as a Service (IaaS), Platform as a Service (PaaS), and Software as a Service (SaaS) entail. A pivotal consideration in this context is allocating responsibility for foundational cybersecurity aspects—having used Cirrus for the cloud integration assessment. The ensuing controls detailed herein also represent a checklist of controls necessary for a secure cloud transition, equipping utilities with the knowledge to navigate this digital transformation with confidence and strategic foresight in a safe and responsible manner.

42 ENGINEERING↗

Economic Evaluation of Modernization Expenditures for Electric Utility Distribution Systems: A Guide for Utility Regulators

Cost-effectiveness evaluation of potential grid modernization solutions is integral to integrated distribution system planning (IDSP). This report synthesizes and updates prior cost-effectiveness approaches identified by the U.S. Department of Energy for grid modernization investments, incorporating multi-objective decision-making. The structure of the report follows the IDSP process, from identifying objectives and priorities to prioritizing grid solutions. The report details two methods for conducting initial cost-effectiveness screening of individual and interdependent grid components: (1) Lowest Reasonable Cost and (2) Benefit-Cost Analysis. Drawing on solutions that passed the initial cost-effectiveness screen, the utility prioritizes grid solutions based on policy objectives and priorities, regulatory compliance, operational efficiencies, and other factors to develop a portfolio of distribution solutions. The utility uses multi-objective decision-making to assess each proposed expenditure against each objective and respective metric. The utility applies a weighting factor, reflecting the priority ranking of the objective, to the total numerical “score” based on the contribution of the proposed solution to addressing each objective. Ultimately, the utility ranks each expenditure from highest to lowest priority using the final score for each solution as well as its cost. The report includes examples of emerging best practices for states and utilities and a cost-effectiveness process checklist.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Connectivity Troubleshooting Guide for Advanced Electricity Meters

This guide is designed to walk users through a troubleshooting process for disconnected advanced electricity meters. The guide centers on two connectivity troubleshooting decision trees related to power issues and network connectivity issues, respectively. Additionally, it contains additional background information such as definitions, diagrams, and checklists that can help a user prepare to troubleshoot meter connectivity issues.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Solar Ready Buildings Planning Guide

This guide offers a checklist for building design and construction to enable installation of solar photovoltaic and heating systems at some time after the building is constructed.

14 SOLAR ENERGY↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada Test Site, Nevada, for Fiscal Year 2009

This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): · CAU 90, Area 2 Bitcutter Containment · CAU 91, Area 3 U-3fi Injection Well · CAU 92, Area 6 Decon Pond Facility · CAU 110, Area 3 WMD U-3ax/bl Crater · CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2009 (October 2008–September 2009). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0021 and summarized in each CAU-specific section in Section 1.0 of this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly at CAUs 92, 110, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches in a 24-hour period. Inspections include an evaluation of the condition of the units and identification of any deficiencies that may compromise the integrity of the units. The condition of covers, fencing, signs, gates, and locks is documented. In addition, soil moisture monitoring and subsidence surveys are conducted at CAU 110. The results of the inspections, summary of maintenance activities, results of vegetations surveys, and analysis of monitoring data are presented in this report. Copies of the inspection checklists are included as Appendix A. Field notes completed during each inspection are included in Appendix B. Photographs taken during the site inspections are included in Appendix C.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2009

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Unit (CAU) sites located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2009 and includes inspection and repair activities completed at the following seven CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 426: Cactus Spring Waste Trenches (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 484: Surface Debris, Waste Sites, and Burn Area (TTR) · CAU 487: Thunderwell Site (TTR) The annual post-closure inspections were conducted May 5–6, 2009. All inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Attachment B, with the exception of CAU 400. CAU 400 does not require post-closure inspections, but inspections of the vegetation and fencing are conducted as a best management practice. The inspection checklists for each site inspection are included in Attachment C, the field notes are included in Attachment D, and the site photographs are included in Attachment E. Vegetation monitoring of CAU 400, CAU 404, CAU 407, and CAU 426 was performed in June 2009, and the vegetation monitoring report is included in Attachment F. Maintenance was performed at CAU 453. Animal burrows observed during the annual inspection were backfilled, and a depression was restored to grade on June 25, 2009. Post-closure site inspections should continue as scheduled. Vegetation survey inspections have been conducted annually at CAUs 400, 404, 407, and 426. Discontinuation of vegetation surveys is recommended at the CAU 400 Bomblet Pit and CAU 426, which have been successfully revegetated. Discontinuation of vegetation surveys is also recommended at CAU 404, which has been changed to an administrative closure with no inspections required. Vegetation monitoring at the CAU 400 Five Points Landfill and CAU 407 should continue.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗