Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

First e⁻/γ Commissioning Results for the GlueX Experiment/Hall D at CEBAF

Experimental Hall D, with flagship experiment GlueX, was constructed as part of the 12 GeV CEBAF upgrade. A new magnetically extracted electron beam line was installed to support this hall. Bremsstrahlung photons from retractable radiators are delivered to the experiment through a series of collimators following a long drift to allow for beam convergence. Coherent Bremsstrahlung generated by interaction with a diamond radiator will achieve a nominal 40% linear polarization and photon energies between 8.5 and 9 GeV from 12.1 GeV electrons, which are then tagged or diverted to a medium power 60kW electron dump. The expected photon flux is 10 7 -10 8 Hz. This paper discusses the experimental line design, commissioning experience gained since first beam in spring 2014, and the present results of beam commissioning by the experiment.

43 PARTICLE ACCELERATORS↗

Best Practices for Enhancing Performance Contracts with Monitoring-Based Commissioning

Fact sheet highlights best practices for incorporating monitoring-based commissioning (MBCx), a type of energy management information system (EMIS), in performance contracts. It draws from the Federal Energy Management Program (FEMP) report, Enhancing Performance Contracts Using Monitoring-based Commissioning. MBCx is commercially available, yet is underutilized in performance contracts. MBCx can result in significant benefits for both a federal facility and the performance contractor.

EMIS↗

Panel Session 32: Panel: Bringing First-of-a-Kind Treatment Facilities On-Line: Idaho IWTU Commissioning Approach (2/5)

This panel discussed the activities of bringing a first-of-a-kind treatment facility online: The Integrated Waste Treatment Unit (IWTU). The design was designed to treat 900,000 gallons of sodium-bearing liquid waste. Construction of this first-of-a-kind treatment facility was completed in 2012. A new approach was adopted in 2016 after multiple challenges were encountered during facility commissioning. This session focused on the Integrated Waste Treatment Unit (IWTU), which was constructed to convert the remaining 900,000 gallons of liquid sodium-bearing waste at the Idaho National Laboratory Site, Idaho, USA, to a granular solid. The liquid waste was generated during historic spent nuclear fuel reprocessing campaigns at the Idaho Nuclear Technology and Engineering Center and was transferred to three underground storage tanks. The waste was not first-cycle waste but was rather the liquid rinse waste from flushing waste transfer lines between reprocessing runs. IWTU will employ a steam-reforming process to treat the liquid waste. The resulting granular solid will be transferred to stainless steel canisters and then to concrete vaults, which will be stored on site until an off-site national geologic repository is available to accept the waste. Presentation proposed: Bringing First-of-a-Kind Treatment Facilities On-Line: Idaho IWTU Commissioning Approach (Joel Case, US DOE (USA), Leo Thompson, Sterling Engineering and Consulting Group, LLC (USA), Joseph Giebel, Fluor Idaho, LLC (USA), Richard Boardman, Idaho National Laboratory (USA), Kevin O'Neill, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning of the LCLS LINAC

The Linac Coherent Light Source (LCLS) X-ray free electron laser project is currently under construction at the Stanford Linear Accelerator Center (SLAC). A new injector and upgrades to the existing accelerator were installed in two phases in 2006 and 2007. We report on the commissioning of the injector, the two new bunch compressors at 250MeV and 4.3 GeV, and transverse and longitudinal beam diagnostics up to the end of the existing linac at 13.6 GeV. The commissioning of the new transfer line from the end of the linac to the undulator is scheduled to start in November 2008 and for the undulator in March 2009 with first light to be expected in July 2009.

43 PARTICLE ACCELERATORS↗

Blue Ribbon Commission Tour of Hanford Site

The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Commissioning of the LHC Low Level RF System Remote Configuration Tools

The LHC Low Level RF system (LLRF) is a complex multi-loop system used to regulate the superconductive cavity gap voltage as well as to reduce the impedance presented by RF stations to the beam. The RF system can have a profound impact on the stability of the beam; a mis-configured RF system has the potential of causing longitudinal instabilities, beam diffusion and beam loss. To configure the RF station for operation, a set of parameters in the LLRF multi-loop system have to be defined. Initial system commissioning as well as ongoing operation requires a consistent method of computer based remote measurement and model-based design of each RF station feedback system. This paper describes the suite of Matlab tools used for configuring the LHC RF system during the start up in Nov2009-Feb2010. We present a brief overview of the tool, examples of commissioning results, and basics of the model-based design algorithms. This work complements our previous presentation, where the algorithms and methodology followed in the tools were described.

43 PARTICLE ACCELERATORS↗

Building analytics and monitoring-based commissioning: industry practice, costs, and savings

As building energy and system-level monitoring becomes more common, facility teams are faced with an overwhelming amount of data. This data does not typically lead to insights, corrective actions, and energy savings unless it is stored, organized, analyzed, and prioritized in automated ways. The Smart Energy Analytics Campaign is a public-private sector partnership program focused on supporting commercially available energy management and information systems (EMIS) technology use and monitoring-based commissioning (MBCx) practices. MBCx is an ongoing commissioning process with focus on analyzing large amounts of data on a continuous basis. EMIS tools are used in the MBCx process to organize, present, visualize, and analyze the data. With campaign data from over 400 million square feet (sq. ft.) of installed space, this paper presents the results achieved by owners that are implementing EMIS, along with associated technology costs. The study’s EMIS users that reported savings achieved the median cost savings of $0.19/sq. ft. and 7% annually, with savings shown to increase over time. For 35 portfolio owners, the median base cost to install an EMIS was $0.03/sq. ft., with an annual recurring software cost of $0.02/sq. ft. and an estimated annual labor cost of $0.03/sq. ft. Two types of EMIS systems -- energy information systems and fault detection and diagnostic systems -- are defined in the body of the paper. Of the two, we find that fault detection and diagnostic systems have both higher savings and higher costs. The paper offers a characterization of EMIS products, MBCx services, and trends in the industry.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an integrated platform for hardware-in-the-loop evaluation of microgrids prior to site commissioning

This paper presents an integrated hardware-in-the-loop (HIL) platform for testing the operation and control of a real-world microgrid system prior to site commissioning. The proposed testing approach shows the value of setting up an integrated HIL platform to test multiple hardware devices (including the system-level controller, device controllers, and field devices). A test bed developed for the Borrego Springs community microgrid is used as an example to demonstrate the feasibility of the integrated platform. Comprehensive tests are carried out using the Borrego Springs test bed to validate the platform, meet the test objectives, and gain valuable insight prior to site commissioning. The selected test scenarios, initial conditions, events, test metrics, etc., are similar to those defined in IEEE P2030.8. The test objectives are to evaluate the microgrid controller and the operation of the microgrid. The HIL platform presented in this paper shows good value for microgrid testing in terms of its flexibility and scalability for testing various microgrids; its accuracy in its representation of the field; the comprehensiveness of the testing capability; and the efficiency of testing, which can reduce risks prior to field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Off-line commissioning of the St. Benedict radiofrequency quadrupole cooler-buncher

The St. Benedict ion trapping system, which aims to measure the β - v angular correlation parameter in superallowed-mixed mirror transitions, is under construction at the University of Notre Dame. These measurements will provide much-needed data to improve the accuracy of the V ud element of the CKM matrix. One of the major components of this system is the radio frequency quadrupole cooler-buncher, which is necessary to create low-emittance ion bunches for injection into the measurement Paul trap. The off-line commissioning of the cooler-buncher, using a potassium ion source, determined that the device could produce cooled ion bunches characterized by a 50-ns full-width-half-maximum time width at its exit. The commissioning results also determined the trapping efficiency to be 93(1)% and the trapping half-life to be 20.0(5) s.

Paul trap↗

Initial tests of Accelerator Mass Spectrometry with the Argonne Gas-Filled Analyzer and the commissioning of the MONICA detector

As the scope of Accelerator Mass Spectrometry (AMS) expands, there is an increased need to extend the capability of isobaric separation to the medium-heavy mass region. Existing AMS facilities are limited in their ability to separate radioactive nuclei in the A = 100–200 range of interest from their neighboring stable isobars, as such measurements require higher energies than available in most facilities. ATLAS is one of the highest energy system used for AMS based experiments and has enabled isobaric discrimination for medium to heavy nuclides, notably via the Gas-Filled Magnet technique. Further, a preparatory experiment performed in November, 2019, successfully demonstrated isobaric separation of 92 Zr- 92 Mo using the Argonne Gas-Filled Analyzer (AGFA) with high magnetic rigidity. Since that time, MONICA, an eight-anode ionization chamber that measures both energy loss and position with two sets of split anodes, has been developed to aid in AMS experiments at AGFA and has undergone four commissioning runs at the Nuclear Science Laboratory at the University of Notre Dame utilizing Si, Fe/Ni, and Mn beams. This report presents the AGFA AMS run (November 2019) and the subsequent commissioning runs of the MONICA detector, including preliminary measurements on the long-lived isotopes 39 Ar (268 y) and for the first time on 42 Ar (33 y).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design, Project Execution, and Commissioning of the 1.8 K Superfluid Helium Refrigeration System for SRF Cryomodule Testing

The Fermilab Cryomodule Test Facility (CMTF) provides a test bed to measure the performance of superconducting radiofrequency (SRF) cryomodules (CM). These SRF components form the basic building blocks of future high intensity accelerators such as the International Linear Collider (ILC) and a Muon Collider. Linde Kryotechnik AG and Linde Cryogenics have designed, constructed and commissioned the superfluid helium refrigerator needed to support SRF component testing at the CMTF Facility. The hybrid refrigerator is designed to operate in a variety of modes and under a wide range of boundary conditions down to 1.8 Kelvin set by CM design. Special features of the refrigerator include the use of warm and cold compression and high efficiency turbo expanders.This paper gives an overview on the wide range of the challenging cooling requirements, the design, fabrication and the commissioning of the installed cryogenic system.

43 PARTICLE ACCELERATORS↗

Commissioning and First Operation of Superconducting Links at the Large Hadron Collider (LHC)

The Large Hadron Collider (LHC) now under commissioning at CERN is a 26.7 km collider based on several thousand high-field superconducting magnets, the majority of which operating in superfluid helium below 2 K and some isolated magnets operating i n normal helium at 4.5 K. Four superconducting links (DSLs) of about 76 m in length and one of about 517 m in length, were designed, constructed and installed over a three year period. Their purpose is to transport current over long distances whenever und erground LHC space constraints prevents to put power converters, current feed boxes and magnets in each others' proximity. The four 76 m long DSLs transport current between current feed boxes and several of the isolated magnets, whereas the 517 m long DSL transports current between two current feed boxes. The links are comprised of cryogenic, vacuum-insulated, transfer lines housing one or more superconducting cables. The operating temperatures are about 5 K for the DSL part that houses the cable and abou t 60 K for the heat shield. Their commissioning and performance results at first operational experience in the beginning of 2008 are discussed.

43 PARTICLE ACCELERATORS↗

Test bench to commission a third ion source beam line and a newly designed extraction system

The HIT (Heidelberg Ion Beam Therapy Center) is the first hospital-based treatment facility in Europe where patients can be irradiated with protons and carbon ions. Since the commissioning starting in 2006 two 14.5 GHz electron cyclotron resonance ion sources are routinely used to produce a variety of ion beams from protons up to oxygen. In the future a helium beam for regular patient treatment is requested, therefore a third ion source (Supernanogan source from PANTECHNIK S.A.) will be integrated. This third ECR source with a newly designed extraction system and a spectrometer line is installed at a test bench at HIT to commission and validate this section. Measurements with different extraction system setups will be presented to show the improvement of beam quality for helium, proton, and carbon beams. An outlook to the possible integration scheme of the new ion source into the production facility will be discussed.

43 PARTICLE ACCELERATORS↗

Commissioning of a Varian Clinac iX 6 MV photon beam using Monte Carlo simulation

Monte Carlo modelling of a linear accelerator is the first and most important step in Monte Carlo dose calculations in radiotherapy. Monte Carlo is considered today to be the most accurate and detailed calculation method in different fields of medical physics. In this research, we developed a photon beam model for Varian Clinac iX 6 MV equipped with MilleniumMLC120 for dose calculation purposes using BEAMnrc/DOSXYZnrc Monte Carlo system based on the underlying EGSnrc particle transport code. Monte Carlo simulation for this commissioning head LINAC divided in two stages are design head Linac model using BEAMnrc, characterize this model using BEAMDP and analyze the difference between simulation and measurement data using DOSXYZnrc. In the first step, to reduce simulation time, a virtual treatment head LINAC was built in two parts (patient-dependent component and patient-independent component). The incident electron energy varied 6.1 MeV, 6.2 MeV and 6.3 MeV, 6.4 MeV, and 6.6 MeV and the FWHM (full width at half maximum) of source is 1 mm. Phase-space file from the virtual model characterized using BEAMDP. The results of MC calculations using DOSXYZnrc in water phantom are percent depth doses (PDDs) and beam profiles at depths 10 cm were compared with measurements. This process has been completed if the dose difference of measured and calculated relative depth-dose data along the central-axis and dose profile at depths 10 cm is ≤ 5%. The effect of beam width on percentage depth doses and beam profiles was studied. Results of the virtual model were in close agreement with measurements in incident energy electron 6.4 MeV. Our results showed that photon beam width could be tuned using large field beam profile at the depth of maximum dose. The Monte Carlo model developed in this study accurately represents the Varian Clinac iX with millennium MLC 120 leaf and can be used for reliable patient dose calculations. In this commissioning process, the good criteria of dose difference in PDD and dose profiles were achieve using incident electron energy 6.4 MeV.

61 RADIATION PROTECTION AND DOSIMETRY↗

Off-line commissioning of EBIS and plans for its integration into ATLAS and CARIBU

An Electron Beam Ion Source Charge Breeder (EBIS-CB) has been developed at Argonne to breed radioactive beams from the CAlifornium Rare Isotope Breeder Upgrade (CARIBU) facility at Argonne Tandem Linac Accelerator System (ATLAS). The EBIS-CB will replace the existing ECR charge breeder to increase the intensity and significantly improve the purity of reaccelerated radioactive ion beams. The CARIBU EBIS-CB has been successfully commissioned offline with an external singly charged cesium ion source. The performance of the EBIS fully meets the specifications to breed rare isotope beams delivered from CARIBU. The EBIS is being relocated and integrated into ATLAS and CARIBU. A long electrostatic beam transport system including two 180° bends in the vertical plane has been designed. The commissioning of the EBIS and the beam transport system in their permanent location will start at the end of this year.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning of the PRIOR proton microscope

Recently, a new high energy proton microscopy facility PRIOR (Proton Microscope for FAIR Facility for Anti-proton and Ion Research) has been designed, constructed, and successfully commissioned at GSI Helmholtzzentrum für Schwerionenforschung (Darmstadt, Germany). As a result of the experiments with 3.5–4.5 GeV proton beams delivered by the heavy ion synchrotron SIS-18 of GSI, 30 μm spatial and 10 ns temporal resolutions of the proton microscope have been demonstrated. A new pulsed power setup for studying properties of matter under extremes has been developed for the dynamic commissioning of the PRIOR facility. This study describes the PRIOR setup as well as the results of the first static and dynamic protonradiography experiments performed at GSI.

36 MATERIALS SCIENCE↗

Development of the high energy engineering X-ray (HEX) superconducting wiggler, magnetic measurement, installation, and commissioning

The High energy Engineering X-ray (HEX) diffraction beamline at the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Lab (BNL) is the first high-energy beamline capable of reaching 200 keV for a monochromatic beam. With the 3 GeV electron beam energy for the NSLS-II ring, only the superconducting wiggler (SCW) producing greater than 4 T peak field can cover these ranges with a sufficient number of photons. The 1.2 m-long HEX-SCW has a period length of 70 mm and a field strength on-axis of 4.3 T. It utilizes no liquid helium, and the vertical aperture size of the electron beam vacuum chamber is 8 mm. Unlike regular undulators/wigglers, there is no standard configuration for the magnetic measurement system for superconducting insertion devices. The NSLS-II Insertion Devices group has developed, in collaboration with the vacuum group, a novel in-vacuum Hall mapper with a 1.75 m in-vacuum linear motor and an in-vacuum flip coil system utilizing many commercial-off-the-shelf products. The measurements were conducted at the BNL, and the device was installed in the ring and commissioned. Here, this paper provides a description of the SCW and its magnetic measurement systems, as well as a brief account of the installation and commissioning efforts.

36 MATERIALS SCIENCE↗

Design and commissioning of resistive foil bolometer diagnostics on the ST40 tokamak

Following successful campaigns on the compact high field spherical tokamak ST40, resistive gold foil bolometers have now been installed to measure the radiated power profile. Positioned on the midplane, two bolometer cameras offer perspectives of the horizontal and vertical planes, while the third camera, situated above the midplane, provides a vertical view of the top divertor plates, including the X-point and the strike points. Further, these cameras use a commercial off-the-shelf data acquisition platform with modules specifically designed for bolometers in a Wheatstone bridge configuration, providing both phase sensitive detection and in situ calibration. This paper presents an overview of the design and functionality of all three cameras and the commissioning of the horizontal plane camera. The commissioning of the horizontal camera shows data from a range of plasma pulses, presenting a positive correlation between the relative profiles measured from the bolometer camera and an absolute extreme ultraviolet diode camera viewing along similar lines of sight.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗