Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CESIUM ION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Operation and development status of the J-PARC ion source

A cesium-free H{sup −} ion source driven with a LaB{sub 6} filament is being operated at the Japan Proton Accelerator Research Complex (J-PARC) without any serious trouble since the restoration from the March 2011 earthquake. The H{sup −} ion current from the ion source is routinely restricted approximately 19 mA for the lifetime of the filament. In order to increase the beam power at the linac beam operation (January to February 2013), the beam current from the ion source was increased to 22 mA. At this operation, the lifetime of the filament was estimated by the reduction in the filament current. According to the steep reduction in the filament current, the break of the filament was predicted. Although the filament has broken after approximately 10 h from the steep current reduction, the beam operation was restarted approximately 8 h later by the preparation for the exchange of new filament. At the study time for the 3 GeV rapid cycling synchrotron (April 2013), the ion source was operated at approximately 30 mA for 8 days. As a part of the beam current upgrade plan for the J-PARC, the front end test stand consisting of the ion source and the radio frequency quadrupole is under preparation. The RF-driven H{sup −} ion source developed for the J-PARC 2nd stage requirements will be tested at this test stand.

43 PARTICLE ACCELERATORS↗

Initial Testing of Alkaline Earth Metal Ion Absorption on Crystalline Silicotitanate - 20440

The Tank Closure Cesium Removal process at the Savannah River Site (SRS) has processed aqueous tank waste using the inorganic ion exchange media IONSIV{sup TM} R9120-Ba (which is also known as Crystalline Silicotitanate (CST)). Salt-cake in Tank 10H at SRS was dissolved and processed through filters and ion exchange columns. The primary purpose of the process is to remove Cs-137 from the aqueous waste so that it can be disposed as low level waste. It is known that this inorganic media also absorbs strontium from solution, and that strontium competes with cesium ions for absorption sites. The strontium ion is actually more strongly absorbed than the cesium ion from typical tank waste. However, strontium is typically present in low concentrations so does not normally cause a significant impact. Strontium is present as both non-radioactive isotopes and the radioactive Sr-90 isotope; with the non-radioactive isotopes being much more abundant. Although the total strontium solubility is usually much lower than cesium, some tank waste compositions can have a high enough soluble strontium concentration to decrease the cesium absorption. Relatedly, some testing at SRS suggested that another alkaline earth metal, calcium, may also absorb onto CST and may decrease cesium absorption. Barium is also an important species in treatment of tank waste, but is also usually present at low concentrations. However, after the Cs-137 is absorbed onto CST, it emits a beta particle and converts to Ba-137m, which then decays to non-radioactive Ba-137 by emission of a gamma ray. If the Ba-137m were to desorb quickly, it could impact the dose rate in down-stream equipment. In order to understand the impact of these alkaline earth metals on CST, SRNL performed testing using simulants of SRS tank waste that contain soluble barium, strontium, and calcium. Testing examined both removal of the alkaline earth metals and their impact on removal of cesium. Testing involved first developing realistic waste simulant formulations and dissolving the alkaline earth metals to high enough concentrations to potentially impact the Cs absorption. Once the formulations were developed and prepared, computer modeling was used to calculate the expected Cs absorption behavior to determine if the alkaline earth metals impact the performance. Measurements of the alkaline earth metals absorption by the media is also important for disposition of spent media because of the added radionuclide inventory from the Sr-90. These initial tests are examining the general impact and will be used to determine if further testing or measurements are needed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent operation status of Japan Proton Accelerator Research Complex H{sup -} ion source

A cesium-free H{sup -} ion source driven with a LaB{sub 6} filament is being operated at the Japan Proton Accelerator Research Complex for approximately three years without any serious trouble. In the beam commissioning or supply runs, the ion source has been operated in two different modes such as low current mode of 5 mA and high current mode of 30 mA. The total interruption time during the runs due to the ion source failure is approximately 50 h, which correspond to the ion source availability of 99%. After a long-term operation, the surface of the filament and the plasma electrode become discolored with dark partially. The result of surface analysis with field emission scanning electron microscope showed that most of the dark material is formed with boron. At the beam test performed in the interval of the run, we demonstrated that the H{sup -} current increased by miniaturizing the LaB{sub 6} filament.

43 PARTICLE ACCELERATORS↗

Ion-Exchange Modeling of Crystalline Silicotitanate for Cesium Removal - 20283

The Tank Closure Cesium Removal (TCCR) system is a Savannah River Site (SRS) demonstration 'at-tank' process designed to remove {sup 137}Cs from the high-level aqueous tank waste so that the decontaminated solution can be disposed as low-level waste. Cesium is removed by ion exchange (IX) columns using engineered IONSIV{sup TM} R9120-B form of the Crystalline Silicotitanate (CST) media. The TCCR system is deployed at Tanks 10 and Tank 11 in the SRS H Tank Farm. Water is added to the salt-cake in Tank 10 H to dissolve it. The dissolved salt solution waste is pumped out of Tank 10H (feed tank), through filters and IX columns. The decontaminated salt solution is transferred to Tank 11 (receipt tank), and on to Tank 50H for final disposal in the Saltstone Production Facility. The current TCCR can accommodate lead-lag (two-column) or lead-lag-guard (three-column) configurations to optimize media utilization and achieve the target decontamination. To assist the TCCR operations, a parametric study was conducted to evaluate the impact of different parameters (e.g., column configurations (single column, two columns or three columns in series), waste characteristics, operating temperature, process flow rate, CST average particle size) on the IX column performance including CST bed utilization. The initial results indicate that the IX column performance is improved at slower process flow rate, at lower operating temperature, and with smaller CST average particle size. Multi-column configurations are recommended, because the single-column configuration does not utilize CST bed effectively. This paper demonstrates the versatility of the ion exchange modeling to evaluate the effects of CST characteristics and operational parameters on IX column performances. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RHEOLOGY OF SETTLED SOLIDS IN THE SMALL COLUMN ION EXCHANGE PROCESS

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. This process adds monosodium titanate (MST) to a waste tank containing salt solution (and entrained sludge solids). While the process is operating, the solid particles will begin to settle at temperatures up to 45 C. Previous testing has shown that sludge-MST slurries that sit for extended periods (i.e., 1-61 days) at elevated temperatures (i.e., 23-80 C) can develop large shear strengths which could make them difficult to resuspend and remove from the tank. The authors are conducting rheological testing of mixtures containing various concentrations of sludge, MST, and crystalline silicotitanate (CST, ground and unground) that have been aged at different times (i.e., 0 to 13 weeks) and isothermally heated to 30, 45, or 60 C. Additional tests are being conducted that will allow the solid particles to settle at 45 C for 6, 12, and 24 months. The objectives of this task are to determine the impact of settling time and temperature on the shear strength, yield stress, and consistency of the slurries and to determine the impact of radiation on slurry rheology. The testing will determine the relative impact of these parameters rather than predict the shear strength, yield stress, and consistency as a function of feed and operating conditions. This document describes the rheology of slurries containing MST and simulated sludge that sat at elevated temperatures (i.e., up to 60 C) for up to 13 weeks. Rheology of CST-containing slurries, as well as results of the long term settling (6, 12, and 24 months) and irradiation tests (10 and 100 MRad), will be reported later. The conclusions from this analysis follow: (1) MST only slurries that sat at elevated temperatures had larger shear strength, yield stress, and consistency than MST plus sludge slurries that settled at elevated temperatures. (2) The addition of sludge to an MST slurry reduces the shear strength, yield stress, and consistency. (3) The impact of settling time and temperature on slurry rheology is inconclusive at this time. The authors are collecting additional data to attempt to determine the impact of settling time and temperature on slurry shear strength, yield stress, and consistency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PILOT SCALE TESTING OF MONOSODIUM TITANATE MIXING FOR THE SRS SMALL COLUMN ION EXCHANGE PROCESS - 11224

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and select actinides from Savannah River Site (SRS) Liquid Waste using an existing waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending monosodium titanate (MST), crystalline silicotitanate (CST), and simulated sludge. The purpose of this pilot scale testing is to determine the requirements for the pumps to suspend the MST particles so that they can contact the strontium and actinides in the liquid and be removed from the tank. The pilot-scale tank is a 1/10.85 linear scaled model of SRS Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX program (Risers B5 and B2 for two pump configurations and Risers B5, B3, and B1 for three pump configurations). The conclusions from this work follow: (i) Neither two standard slurry pumps nor two quad volute slurry pumps will provide sufficient power to initially suspend MST in an SRS waste tank. (ii) Two Submersible Mixer Pumps (SMPs) will provide sufficient power to initially suspend MST in an SRS waste tank. However, the testing shows the required pump discharge velocity is close to the maximum discharge velocity of the pump (within 12%). (iii) Three SMPs will provide sufficient power to initially suspend MST in an SRS waste tank. The testing shows the required pump discharge velocity is 66% of the maximum discharge velocity of the pump. (iv) Three SMPs are needed to resuspend MST that has settled in a waste tank at nominal 45 C for four weeks. The testing shows the required pump discharge velocity is 77% of the maximum discharge velocity of the pump. Two SMPs are not sufficient to resuspend MST that settled under these conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium exhibits different mesoscale segregation and ion pairing than lithium, sodium, or potassium in concentrated alkaline aqueous nitrite solutions

Understanding ion pairing in concentrated alkaline electrolytes facilitates the prediction and control of chemical processes in nuclear waste. While sodium is the dominant alkali metal in such systems, cesium often exhibits distinct bulk behavior relative to lighter alkali cations. Aqueous mixtures of cesium hydroxide and sodium nitrite were compared to alkali hydroxide analogs using small-angle x-ray scattering, revealing that cesium disrupts the sodium nitrite electrolyte structure, forming cesium-rich domains. This mesoscale segregation contrasts with the near-ideal mixing observed in other mixed hydroxide–nitrite systems. Raman spectroscopy indicates cesium–nitrite ion pairing, evidenced by vibrational shifts distinct from those associated with sodium. Multinuclear magnetic resonance spectroscopy further supports cesium–nitrite and cesium–hydroxide association, revealing a distinct local environment for nitrite in cesium-containing solutions. Together, these findings show that cesium promotes a unique solution structure dominated by specific ion pairing within segregated domains. This structural organization may influence radical generation pathways in high-ionic-strength alkaline media relevant to nuclear waste processing and management.

Nienhuis, Emily T. [Pacific Northwest National Lab↗

Cavity Ring-Down System for Density Measurement of Negative Hydrogen Ion on Negative Ion Source

A Cavity Ring-Down (CRD) system was applied to measure the density of negative hydrogen ion (H{sup -}) in vicinity of extraction surface in the H{sup -} source for the development of neutral beam injector on Large Helical Device (LHD). The density measurement with sampling time of 50 ms was carried out. The measured density with the CRD system is relatively good agreement with the density evaluated from extracted beam-current with applying a similar relation of positive ion sources. In cesium seeded into ion-source plasma, the linearity between an arc power of the discharge and the measured density with the CRD system was observed. Additionally, the measured density was proportional to the extracted beam current. These characteristics indicate the CRD system worked well for H{sup -} density measurement in the region of H{sup -} and extraction.

43 PARTICLE ACCELERATORS↗

Microstructure of Cs-implanted zirconia: Role of temperature

The aim of this study was to identify experimentally the phase which includes cesium in yttria stabilized zirconia (YSZ). The solubility and retention of cesium in YSZ were studied at high temperature (HT). Cesium was ion implanted (at 300 keV) into YSZ at room temperature (RT), 750 deg. C, or 900 deg. C at fluences up to 5x10{sup 16} cm{sup -2}. The temperature dependence of the radiation-induced damage and of the cesium distribution in YSZ single crystals was investigated by Rutherford backscattering spectrometry and ion channeling. Transmission electron microscopy (TEM) studies were performed in order to determine the damage nature and search for a predicted ternary phase of cesium zirconate. Whatever the implantation temperature, the thickness of the damaged layer increases inwards with ion fluence. At RT, amorphization occurs, caused by the high Cs concentration (7 at. %). In situ TEM during postannealing shows recrystallization of cubic zirconia after release of cesium. A high implantation temperature has a significant influence on the nature of radiation defects and on the retained Cs concentration. At HT, dislocation loops and voids are formed but no amorphization is observed whereas polygonization occurs at high fluence. The implanted cesium concentration reaches a saturation value of 1.5 at. % above which Cs can no longer be retained in the matrix and is then released at the surface. At that concentration, cesium forms a solid solution in YSZ; no other phase is formed, neither during irradiation nor after thermal annealing.

36 MATERIALS SCIENCE↗

A north-south stationkeeping ion thruster system for ATS-F.

An ion thruster system is being developed for the ATS-F satellite to demonstrate the application of ion thruster technology to the synchronous satellite north-south stationkeeping mission. The cesium bombardment ion thruster develops one millipound thrust at 2600 seconds specific impulse and provides thrust vectoring by accelerator electrode displacement. The propellant system is sized for two years operation at 25 percent duty cycle. Power conditioning circuitry is based on transistor inverters switching at 10 kHz. Thirteen command channels allow flexibility in operation; 12 telemetry channels provide information on system performance. Input power is less than 150 watts.

Worlock, R.↗