Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Building Science Corporation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Progress report for FACETS (Framework Application for Core-Edge Transport Simulations): C.S. SAP

The mission of the Computer Science Scientific Application Partnership (C.S. SAP) at LLNL is to develop and apply leading-edge scientific component technology to FACETS software. Contributions from LLNL's fusion energy program staff towards the underlying physics modules are described in a separate report. FACETS uses component technology to combine selectively multiple physics and solver software modules written in different languages by different institutions together in an tightly-integrated, parallel computing framework for Tokamak reactor modeling. In the past fiscal year, the C.S. SAP has focused on two primary tasks: applying Babel to connect UEDGE into the FACETS framework through UEDGE's existing Python interface and developing a next generation componentization strategy for UEDGE which avoids the use of Python. The FACETS project uses Babel to solve its language interoperability challenges. Specific accomplishments for the year include: (1) Refined SIDL interfaces for UEDGE to meet satisfy the standard interfaces required by FACETS for all physics modules. This required consensus building between framework and UEDGE developers. (2) Wrote prototype C++ driver for UEDGE to demonstrate how UEDGE can be called from C++ using Babel. (3) Supported the FACETS project by adding new features to Babel such as release number tagging, porting to new machines, and adding new configuration options. Babel modifications were delivered to FACETS by testing and publishing development snapshots in the projects software repository. (4) Assisted Tech-X Corporation in testing and debugging of a high level build system for the complete FACETS tool chain--the complete list of third-party software libraries that FACETS depends on directly or indirectly (e.g., MPI, HDF5, PACT, etc.). (5) Designed and implemented a new approach to wrapping UEDGE as a FACETS component without requiring Python. To get simulation results as soon as possible, our initial connection from the FACETS framework to UEDGE uses a Forthon-generated Python layer that sits on top of the UEDGE Fortran code. To run on leadership class machines that do not support shared libraries such as Franklin (NERSCS) and Jaguar (ORNL), FACETS requires a more direct connection to the UEDGE Fortran that eliminates the Python layer. We designed and developed an extension for Forthon to provide a direct connection from C++ to the UEDGE Fortran using Babel. This also required added annotations to the Forthon '.v' input files to indicate how function parameters are used.

99 GENERAL AND MISCELLANEOUS↗

Comfort monitoring? Environmental assessment follow-up under community-industry negotiated environmental agreements

Negotiated environmental agreements are becoming common practice in the mining industry. In principle, negotiated environmental agreements are said to respond to many of the shortcomings of environmental impact assessment by providing for improved follow-up of project impacts through, among other things, data provision, engaging stakeholders in the monitoring and management of project impacts, and building capacity at the local level to deal with project-induced environmental change. In practice, however, little is known about the efficacy of follow-up under negotiated environmental agreements between proponents and communities and the demonstrated value added to project impact management. This paper examines follow-up practice under negotiated environmental agreements with a view to understanding whether and how community-based monitoring under privatized agreements actually contributes to improved follow-up and impact management. Based on lessons emerging from recent experiences with environmental agreements in Canada's uranium industry, we show that follow-up under negotiated agreements may be described as 'comfort monitoring'. While such monitoring does improve community-industry relations and enhance corporate image, it does little to support effects-based management. If follow-up under negotiated agreements is to be credible over the long term, there is a need to ensure that monitoring results are useful for, and integrated with, regulatory-based monitoring and project impact management practices.

54 ENVIRONMENTAL SCIENCES↗

Enhancing laboratory capacity during Ebola virus disease (EVD) heightened surveillance in Liberia: lessons learned and recommendations

Following a declaration by the World Health Organization that Liberia had successfully interrupted Ebola virus transmission on May 9th, 2015; the country entered a period of enhanced surveillance. The number of cases had significantly reduced prior to the declaration, leading to closure of eight out of eleven Ebola testing laboratories. Enhanced surveillance led to an abrupt increase in demand for laboratory services. We report interventions, achievements, lessons learned and recommendations drawn from enhancing laboratory capacity. Using archived data, we reported before and after interventions that aimed at increasing laboratory capacity. Laboratory capacity was defined by number of laboratories with Ebola Virus Disease (EVD) testing capacity, number of competent staff, number of specimens tested, specimen backlog, daily and surge testing capacity, and turnaround time. Using Stata 14 (Stata Corporation, College Station, TX, USA), medians and trends were reported for all continuous variables. Our results show that between May and December 2015, interventions including recruitment and training of eight staff, establishment of one EVD laboratory facility, implementation of ten Ebola GeneXpert diagnostic platforms, and establishment of working shifts yielded an 8-fold increase in number of specimens tested, a reduction in specimens backlog to zero, and restoration of turn-around time to 24 hours. This enabled a more efficient surveillance system that facilitated timely detection and containment of two EVD clusters observed thereafter. In conclusion, effective enhancement of laboratory services during high demand periods requires a combination of context-specific interventions. Building and ensuring sustainability of local capacity is an integral part of effective surveillance and disease outbreak response efforts.

60 APPLIED LIFE SCIENCES↗

Covenant Deferral Request for the Proposed Transfer of Land Parcel ED-8 at the East Tennessee Technology Park, Oak Ridge, Tennessee - Final - May 2009

The United States Department of Energy (DOE) is proposing to transfer a land parcel (hereinafter referred to as 'the Property') designated as Land Parcel ED-8 at the East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee, by deed, and is submitting this Covenant Deferral Request (CDR) pursuant to Section 120(h)(3)(C) of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, and applicable U. S. Environmental Protection Agency (EPA) guidance. The Oak Ridge Reservation (ORR), which includes ETTP, was placed on the National Priorities List (NPL) in November 1989. Environmental investigation and cleanup activities are continuing at ETTP in accordance with CERCLA, the National Contingency Plan (NCP), and the Federal Facility Agreement (FFA). The FFA was entered into by the DOE-Oak Ridge Office (ORO), EPA Region 4, and the Tennessee Department of Environment and Conservation (TDEC) in 1991. The FFA establishes the schedule and milestones for environmental remediation of the ORR. The proposed property transfer is a key component of the Oak Ridge Performance Management Plan (ORPMP) for accelerated cleanup of the ORR. DOE, using its authority under Section 161(g) of the Atomic Energy Act of 1954 (AEA), proposes to transfer the Property to Heritage Center, LLC, a subsidiary of the Community Reuse Organization of East Tennessee (CROET), hereafter referred to as 'Heritage Center.' CROET is a 501(c)(3) not-for-profit corporation established to foster the diversification of the regional economy by re-utilizing DOE property for private-sector investment and job creation. The Property is located in the southern portion of ETTP and consists of approximately 84 acres proposed as the potential site for new facilities to be used for office space, industrial activities, or other commercial uses. The parcel contains both grassy fields located outside the ETTP 'main plant' area and infrastructure located inside the 'main plant' area. No buildings are included in the proposed ED-8 transfer. The buildings in ED-8 have already been transferred (Buildings K-1007, K-1580, K-1330, and K-1000). These buildings are not included in the transfer footprint of Land Parcel ED-8. A number of temporary structures, such as trailers and tents (non-real property), are located within the footprint. These temporary structures are not included in the transfer. DOE would continue to be responsible for any contamination resulting from DOE activities that is present on the property at the time of transfer but found after the date of transfer. The deed transferring the Property contains various restrictions and prohibitions on the use of the Property that are subject to enforcement pursuant to State Law Tennessee Code Annotated (T.C.A.) 68-212-225 and state real property law. These restrictions and prohibitions are designed to ensure protection of human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

CRADA Number NFE-22-09333 with Holocene Climate Corporation (CRADA Final Report:)

Holocene Climate Corporation has developed and scaled up a novel technology for Direct Air Capture (DAC) that is based on cutting-edge research initiated at Oak Ridge National Laboratory (ORNL). According to the IPCC, carbon dioxide capture from the air and its sequestration are necessary to keep global temperature rise below 1.5°C by 2050. DAC is a viable and practical way to reach this goal. DAC can happen anywhere in the world, takes up a fraction of the land of forests, and along with the sequestration of CO 2 , provides permanent and verifiable removal of carbon from the atmosphere. The proposed project aimed to facilitate knowledge transfer from ORNL to Holocene focusing on (i) the synthesis of the ORNL patented material which builds the cornerstone of the DAC technology, and (ii) required analytical methods needed to conduct crystallization bench-scale experimentation and technology development. Furthermore, ORNL conducted research centered around CO 2 absorption using an air-liquid contacting structure with an aqueous amino acid solution. The achievements under this project comprise successful knowledge transfer from ORNL to the entire Holocene team to jump-start their internal R&D and technological development activities.

54 ENVIRONMENTAL SCIENCES↗

Contingency interim measure for the public water supply at Barnes, Kansas.

This document presents a conceptual design for a contingency interim measure (IM) for treatment of the public water supply system at Barnes, Kansas, should this become necessary. The aquifer that serves the public water supply system at Barnes has been affected by trace to low concentrations of carbon tetrachloride and its degradation product, chloroform. Investigations conducted on behalf of the CCC/USDA by Argonne National Laboratory (Argonne 2008a) have demonstrated that groundwater at the Barnes site is contaminated with carbon tetrachloride at concentrations exceeding the Kansas Tier 2 risk-based screening level (RBSL) and the EPA maximum contaminant level (MCL) of 5.0 {micro}g/L for this compound. The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) formerly operated a grain storage facility in Barnes, approximately 800 ft east-southeast of the public water supply wells. Carbon tetrachloride was used in the treatment of grain. Another potential source identified in an investigation conducted for the KDHE (PRC 1996) is the site of a former agriculture building owned by the local school district (USD 223). This building is located immediately east of well PWS3. The potential contingency IM options evaluated in this report include the treatment of groundwater at the public water supply wellheads and the provision of an alternate water supply via Washington County Rural Water District No.2 (RWD 2). This document was developed in accordance with KDHE Bureau of Environmental Remediation (BER) Policy No.BER-RS-029 (Revised) (KDHE 2006a), supplemented by guidance from the KDHE project manager. Upon the approval of this contingency IM conceptual design by the KDHE, the CCC/USDA will prepare a treatment system design document that will contain the following elements: (1) Description of the approved contingency IM treatment method; (2) Drawings and/or schematics provided by the contractor and/or manufacturer of the approved technology; (3) A detailed work schedule with a generic timetable; (4) A detailed operations and maintenance plan; (5) A proposed performance monitoring plan; and (6) A fact sheet associated with a community relations plan.

54 ENVIRONMENTAL SCIENCES↗

The CHIMERAS project: design framework for the Collisionless HIgh-beta Magnetized Experiment Researching Astrophysical Systems

From the near-Earth solar wind to the intracluster medium of galaxy clusters, collisionless, high-beta, magnetized plasmas pervade our universe. Energy and momentum transport from large-scale fields and flows to small-scale motions of plasma particles is ubiquitous in these systems, but a full picture of the underlying physical mechanisms remains elusive. The transfer is often mediated by a turbulent cascade of Alfvénic fluctuations as well as a variety of kinetic instabilities; these processes tend to be multi-scale and/or multi-dimensional, which makes them difficult to study using spacecraft missions and numerical simulations alone. Meanwhile, existing laboratory devices struggle to produce the collisionless, high ion beta (β i ≳ 1), magnetized plasmas across the range of scales necessary to address these problems. As envisioned in recent community planning documents, it is therefore important to build a next generation laboratory facility to create a β i ≳ 1, collisionless, magnetized plasma in the laboratory for the first time. A working group has been formed and is actively defining the necessary technical requirements to move the facility towards a construction-ready state. Recent progress includes the development of target parameters and diagnostic requirements as well as the identification of a need for source-target device geometry. As the working group is already leading to new synergies across the community, we anticipate a broad community of users funded by a variety of federal agencies (including National Aeronautics and Space Administration, Department of Energy and National Science Foundation) to make copious use of the future facility.

astrophysical plasmas↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

Chemical Industry Corrosion Management: A Comprehensive Information System (ASSET 2). Final Report

The research sponsored by this project has greatly expanded the ASSET corrosion prediction software system to produce a world-class technology to assess and predict engineering corrosion of metals and alloys corroding by exposure to hot gases. The effort included corrosion data compilation from numerous industrial sources and data generation at Shell Oak Ridge National Laboratory and several other companies for selected conditions. These data were organized into groupings representing various combinations of commercially available alloys and corrosion by various mechanisms after acceptance via a critical screening process to ensure the data were for alloys and conditions, which were adequately well defined, and of sufficient repeatability. ASSET is the largest and most capable, publicly-available technology in the field of corrosion assessment and prediction for alloys corroding by high temperature processes in chemical plants, hydrogen production, energy conversion processes, petroleum refining, power generation, fuels production and pulp/paper processes. The problems addressed by ASSET are: determination of the likely dominant corrosion mechanism based upon information available to the chemical engineers designing and/or operating various processes and prediction of engineering metal losses and lifetimes of commercial alloys used to build structural components. These assessments consider exposure conditions (metal temperatures, gas compositions and pressures), alloy compositions and exposure times. Results of the assessments are determination of the likely dominant corrosion mechanism and prediction of the loss of metal/alloy thickness as a function of time, temperature, gas composition and gas pressure. The uses of these corrosion mechanism assessments and metal loss predictions are that the degradation of processing equipment can be managed for the first time in a way which supports efforts to reduce energy consumption, ensure structural integrity of equipment with the goals to avoid premature failure, to quantitatively manage corrosion over the entire life of high temperature process equipment, to select alloys for equipment and to assist in equipment maintenance programs. ASSET software operates on typical Windows-based (Trademark of Microsoft Corporation) personal computers using operating systems such as Windows 2000, Windows NT and Vista. The software is user friendly and contains the background information needed to make productive use of the software in various help-screens in the ASSET software. A graduate from a university-level curriculum producing a B.S. in mechanical/chemical/materials science/engineering, chemistry or physics typically possesses the background required to make appropriate use of ASSET technology. A training/orientation workshop, which requires about 3 hours of class time was developed and has been provided multiple times to various user groups of ASSET technology. Approximately 100 persons have been trained in use of the technology. ASSET technology is available to about 65 companies representing industries in petroleum/gas production and processing, metals/alloys production, power generation, and equipment design.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

March-June 2009 monitoring results for Barnes, Kansas.

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Barnes, Kansas, during most of the interval 1949-1974. Carbon tetrachloride contamination was initially detected in 1986 in the town's public water supply wells. In 2006-2007, the CCC/USDA conducted a comprehensive targeted investigation at and near its former property in Barnes to characterize this contamination. Those results were reported previously (Argonne 2008a). In November 2007, the CCC/USDA began quarterly groundwater monitoring at Barnes. The monitoring is being conducted on behalf of the CCC/USDA by Argonne National Laboratory, in accord with the recommendations made in the report for the 2006-2007 targeted investigation (Argonne 2008a). The objective is to monitor the carbon tetrachloride contamination identified in the groundwater at Barnes. The sampling is presently conducted in a network of 28 individual monitoring wells (at 19 distinct locations), 2 public water supply wells, and 1 private well (Figure 1.1). The results of the 2006-2007 targeted investigation and the subsequent monitoring events (Argonne 2008a-d, 2009) demonstrated the presence of carbon tetrachloride contamination in groundwater at levels exceeding the Kansas Department of Health and Environment (KDHE) Tier 2 risk-based screening level (RBSL) of 5.0 {micro}g/L for this compound. The contaminant plume appears to extend from the former CCC/USDA property northwestward, toward the Barnes public water supply wells. Information obtained during the 2006-2007 investigation indicates that at least one other potential source might have contributed to the groundwater contaminant plume (Argonne 2008a). The former agriculture building owned by the local school district, located immediately east of well PWS3, is also a potential source of the contamination. This current report presents the results of the fifth and sixth quarterly monitoring events, conducted in March and June 2009. During these two monitoring events, low-flow sampling methods were used to purge and sample all wells. These were the fourth and fifth events at Barnes during which the low-flow sampling method was used.

54 ENVIRONMENTAL SCIENCES↗

October 2008 monitoring results for Barnes, Kansas.

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Barnes, Kansas, during most of the interval 1949-1974. Carbon tetrachloride contamination was initially detected in 1986 in the town's public water supply wells. In 2006-2007, the CCC/USDA conducted a comprehensive targeted investigation at and near its former property in Barnes to characterize this contamination. Those results were reported previously (Argonne 2008a). In November 2007, the CCC/USDA began quarterly groundwater monitoring at Barnes. The monitoring is being conducted on behalf of the CCC/USDA by Argonne National Laboratory, in accord with the recommendations made in the report for the 2006-2007 targeted investigation (Argonne 2008a). The objective is to monitor the carbon tetrachloride contamination identified in the groundwater at Barnes. The sampling is presently conducted in a network of 28 individual monitoring wells (at 19 distinct locations), 2 public water supply wells, and 1 private well (Figure 1.1). The results of the 2006-2007 targeted investigation and the subsequent monitoring events in November 2007 (Argonne 2008b), March 2008 (Argonne 2008c), and July 2008 (Argonne 2008d) demonstrated the presence of carbon tetrachloride contamination in groundwater at levels exceeding the Kansas Department of Health and Environment (KDHE) Tier 2 risk-based screening level (RBSL) of 5.0 {micro}g/L for this compound. The contaminant plume appears to extend from the former CCC/USDA property northwestward, toward the Barnes public water supply wells. Information obtained during the 2006-2007 investigations indicates that at least one other potential source might have contributed to the groundwater contaminant plume (Argonne 2008a). The former agriculture building owned by the local school district, located immediately east of well PWS3, is also a potential source of the contamination. This current report presents the results of the fourth monitoring event, conducted in October 2008. During this fourth monitoring event, low-flow sampling methods were used to purge and sample all wells. This was the third event at Barnes during which low-flow sampling methods were used.

54 ENVIRONMENTAL SCIENCES↗

100-KE REACTOR CORE REMOVAL PROJECT ALTERNATIVE ANALYSIS WORKSHOP REPORT

On December 15-16, 2009, a 100-KE Reactor Core Removal Project Alternative Analysis Workshop was conducted at the Washington State University Consolidated Information Center, Room 214. Colburn Kennedy, Project Director, CH2M HILL Plateau Remediation Company (CHPRC) requested the workshop and Richard Harrington provided facilitation. The purpose of the session was to select the preferred Bio Shield Alternative, for integration with the Thermal Shield and Core Removal and develop the path forward to proceed with project delivery. Prior to this workshop, the S.A. Robotics (SAR) Obstruction Removal Alternatives Analysis (565-DLV-062) report was issued, for use prior to and throughout the session, to all the team members. The multidisciplinary team consisted ofrepresentatives from 100-KE Project Management, Engineering, Radcon, Nuclear Safety, Fire Protection, Crane/Rigging, SAR Project Engineering, the Department of Energy Richland Field Office, Environmental Protection Agency, Washington State Department of Ecology, Defense Nuclear Facility Safety Board, and Deactivation and Decommission subject matter experts from corporate CH2M HILL and Lucas. Appendix D contains the workshop agenda, guidelines and expectations, opening remarks, and attendance roster going into followed throughout the workshop. The team was successful in selecting the preferred alternative and developing an eight-point path forward action plan to proceed with conceptual design. Conventional Demolition was selected as the preferred alternative over two other alternatives: Diamond Wire with Options, and Harmonic Delamination with Conventional Demolition. The teams preferred alternative aligned with the SAR Obstruction Removal Alternative Analysis report conclusion. However, the team identified several Path Forward actions, in Appendix A, which upon completion will solidify and potentially enhance the Conventional Demolition alternative with multiple options and approaches to achieve project delivery. In brief, the Path Forward was developed to reconsider potential open air demolition areas; characterize to determine if any zircaloy exists, evaluate existing concrete data to determine additional characterization needs, size the new building to accommodate human machine interface and tooling, consider bucket thumb and use ofshape-charges in design, and finally to utilize complex-wide and industry explosive demolition lessons learned in the design approach. Appendix B documents these results from the team's use ofValue Engineering process tools entitled Weighted Analysis Alternative Matrix, Matrix Conclusions, Evaluation Criteria, and Alternative Advantages and Disadvantages. These results were further supported with the team's validation of parking-lot information sheets: memories (potential ideas to consider), issues/concerns, and assumptions, contained in Appendix C. Appendix C also includes the recorded workshop flipchart notes taken from the SAR Alternatives and Project Overview presentations. The SAR workshop presentations, including a 3-D graphic illustration demonstration video have been retained in the CHPRC project file, and were not included in this report due to size limitations. The workshop concluded with a round robin close-out where each member was engaged for any last minute items and meeting utility. In summary, the team felt the session was value added and looked forward to proceeding with the recommended actions and conceptual design.

36 MATERIALS SCIENCE↗

Utica Shale Energy and Environment Laboratory Final Scientific/Technical Report

The Ohio State University (OSU) was awarded a contract on October 1, 2014, from the Department of Energy National Energy Technology Laboratory (DOE-NETL) to develop the Utica Shale Energy and Environment Laboratory (USEEL) in the Utica-Point Pleasant shale play of the Appalachian Basin. It was designed to be an environmental and technology development lab that would enable the academic, industry, government, and non-governmental organization (NGO) research communities to better understand unconventional oil and gas (UOG) engineering practices and technology to increase production and safety, and decrease environmental effects. Political and economic consequences necessitated changes in project site location and design, from the Ohio State Eastern Agricultural Research Station (EARS) and the Muskingum Watershed Conservancy District (MWCD) in east-central Ohio to a site located at an Energy Corporation of America (ECA) Marcellus drill pad in Greene County, Pennsylvania. Although the overall project progressed little beyond planning and administration before termination on September 18, 2017, significant research and MS or PhD investigations were completed or continue today. An experimental study design for site specific and regional baseline assessments was developed utilizing ecoregions, United States Geological Survey (USGS) Hydraulic Unit Code watersheds, and GIS technology and databases. This can be utilized to build a defensible and scalable management and research framework for UOG investigations that can be extrapolated for predictive and comparative analyses. The most commonly mentioned perceived risks of shale energy development identified in a socioeconomic analysis included impacts to the environment and water resources, traffic and road deterioration, and crime. Economic benefits, such as the windfall wealth to residents, job opportunities, and the demand for hotels and restaurants emerged, as the main positive impact to the community. Preliminary results of an analysis of the location and mechanisms for extremely high pore pressures of the deep Utica-Point Pleasant formations of southwestern Pennsylvania and their possible relationship to high initial production rates indicate that the overpressure is caused by a combination disequilibrium compaction and fluid expansion. Drilling fluids research designed a proof-of-concept device to evaluate desalination and solvent separation in hydraulic fracturing flowback water that could facilitate water recycling and potentially mitigate deep-well injection. A groundwater study was devised to characterize the subsurface aquifers in terms of the geological framework and groundwater chemistry, including the chemistry of dissolved gases and salts. Brines and gases associated with hydrocarbon migration in groundwater (including noble gases and hydrocarbons) were to be specifically fingerprinted for use as tracers of fluid migration. Trace element analysis of fish otoliths, using laser ablation inductively coupled plasma mass spectrometry (LA-ICP-MS), is being utilized to assess surface water quality. This methodology will be used to reconstruct the exposure histories of fish from watersheds and discriminate between the signatures associated with hydraulic fracturing and coal mining activities.

03 NATURAL GAS↗

Global warming implications of facade parameters: A life cycle assessment of residential buildings in Bahrain

On a global scale, the Gulf Corporation Council Countries (GCCC), including Bahrain, are amongst the top countries in terms of carbon dioxide emissions per capita. Building authority in Bahrain has set a target of 40% reduction of electricity consumption and associated CO{sub 2} emissions to be achieved by using facade parameters. This work evaluates how the life cycle CO{sub 2} emissions of buildings are affected by facade parameters. The main focus is placed on direct and indirect CO{sub 2} emissions from three contributors, namely, chemical reactions during production processes (Pco{sub 2}), embodied energy (Eco{sub 2}) and operational energy (OPco{sub 2}). By means of the life cycle assessment (LCA) methodology, it has been possible to show that the greatest environmental impact occurs during the operational phase (80-90%). However, embodied CO{sub 2} emissions are an important factor that needs to be brought into the systems used for appraisal of projects, and hence into the design decisions made in developing projects. The assessment shows that masonry blocks are responsible for 70-90% of the total CO{sub 2} emissions of facade construction, mainly due to their physical characteristics. The highest Pco{sub 2} emissions factors are those of window elements, particularly aluminium frames. However, their contribution of CO{sub 2} emissions depends largely on the number and size of windows. Each square metre of glazing is able to increase the total CO{sub 2} emissions by almost 30% when compared with the same areas of opaque walls. The use of autoclaved aerated concrete (AAC) walls reduces the total life cycle CO{sub 2} emissions by almost 5.2% when compared with ordinary walls, while the use of thermal insulation with concrete wall reduces CO{sub 2} emissions by 1.2%. The outcome of this work offers to the building industry a reliable indicator of the environmental impact of residential facade parameters. - Highlights: Black-Right-Pointing-Pointer Life cycle carbon assessment of facade parameters. Black-Right-Pointing-Pointer Greatest environmental impact occurs during the operational phase. Black-Right-Pointing-Pointer Masonry blocks are responsible for 70-90% of the total CO2 emissions of facade construction. Black-Right-Pointing-Pointer Window contribution of CO2 emissions depends on the number and size of windows. Black-Right-Pointing-Pointer Without insulation, AAC walls offer more savings in CO2 emissions.

54 ENVIRONMENTAL SCIENCES↗

PETSc/TAO Users Manual Revision 3.23

This manual describes the use of the Portable, Extensible Toolkit for Scientific Computation (PETSc) and the Toolkit for Advanced Optimization (TAO) for the numerical solution of partial differential equations (PDEs) and related problems on high-performance computers. PETSc/TAO is a suite of data structures and routines that provide the building blocks for implementing large-scale application codes on parallel (and serial) computers. PETSc uses the MPI standard for all distributed memory communication.

97 MATHEMATICS AND COMPUTING↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PETSc/TAO Users Manual Revision 3.24

This manual describes the use of the Portable, Extensible Toolkit for Scientific Computation (PETSc) and the Toolkit for Advanced Optimization (TAO) for the numerical solution of partial differential equations (PDEs) and related problems on high-performance computers. PETSc/TAO is a suite of data structures and routines that provide the building blocks for implementing large-scale application codes on parallel (and serial) computers. PETSc uses the MPI standard for all distributed memory communication.

97 MATHEMATICS AND COMPUTING↗