Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Laboratory Directed Research and Development Program: FY 2025 Completed Projects

Oak Ridge National Laboratory (ORNL) is the US Department of Energy’s (DOE’s) largest multiprogram science, technology, and energy laboratory. It possesses distinctive capabilities in a variety of fields, such as neutron science, computing, advanced materials, and nuclear science and technology. Using these capabilities, ORNL conducts basic and applied research and development (R&D) to support DOE’s overarching mission “to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions.” As a national resource, ORNL also applies its capabilities and skills to the specific needs of other federal agencies and customers through the DOE Strategic Partnership Projects (SPP) Program. Information about the laboratory and its programs is available on the ORNL website. The Laboratory Directed Research and Development (LDRD) Program at ORNL operates under the authority of DOE Order 413.2C, Laboratory Directed Research and Development, which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. The LDRD Program funds are obtained through a charge to all laboratory programs. Although it represents a relatively small portion of the overall research budget, the LDRD Program plays an essential role in maintaining the laboratory’s ability to respond to national needs. The program allows ORNL to improve its distinctive capabilities and enhance its ability to conduct cutting-edge R&D. In accordance with the DOE order, R&D projects funded through the LDRD Program at ORNL support the goals of • maintaining the scientific and technical vitality of the laboratory, • enhancing the laboratory’s ability to address future DOE missions, • fostering creativity and stimulating exploration of forefront areas of science and technology, • serving as a proving ground for new concepts in R&D, and • supporting high-risk, potentially high-value R&D. This report provides an overview of the LDRD Program at ORNL in FY 2025 and contains summaries of all the LDRD research projects that concluded between October 1, 2024, and September 30, 2025.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program: FY 2021 Completed Projects

Oak Ridge National Laboratory (ORNL) is the US Department of Energy’s (DOE’s) largest multiprogram science, technology, and energy laboratory. It possesses distinctive capabilities in neutron science, computing, advanced materials, nuclear science and technology, and other fields. Using these capabilities, ORNL conducts basic and applied R&D to support DOE’s overarching mission “to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions.”1 As a national resource, ORNL also applies its capabilities and skills to specific needs of other federal agencies and customers through the DOE Strategic Partnership Projects (SPP) Program. Information about the laboratory and its programs is available on the ORNL website.2 The Laboratory Directed Research and Development (LDRD) Program at ORNL operates under the authority of the DOE Order 413.2C, “Laboratory Directed Research and Development,”3 which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. The LDRD Program funds are obtained through a charge to all laboratory programs. Although it represents a relatively small portion of the overall research budget, the LDRD Program plays an essential role in maintaining the laboratory’s ability to respond to national needs. The program allows ORNL to improve its distinctive capabilities and to enhance its ability to conduct cutting-edge R&D. In accordance with the DOE order, R&D projects funded through the LDRD Program at ORNL support the following goals: (1) maintain the scientific and technical vitality of the laboratory; (2) enhance the laboratory’s ability to address future DOE missions; (3) foster creativity and stimulate exploration of forefront areas of science and technology; (4) serve as a proving ground for new concepts in R&D; and (5) support high-risk, potentially high-value R&D. This report provides an overview of the LDRD Program at ORNL in FY 2021 and contains summaries of all LDRD research projects that concluded between October 1, 2020, and September 30, 2021.

99 GENERAL AND MISCELLANEOUS↗

Laboratory Directed Research and Development Program: FY 2024 Completed Projects Report

Oak Ridge National Laboratory (ORNL) is the US Department of Energy’s (DOE’s) largest multiprogram science, technology, and energy laboratory. It possesses distinctive capabilities in a variety of fields, such as neutron science, computing, advanced materials, and nuclear science and technology. Using these capabilities, ORNL conducts basic and applied research and development (R&D) to support DOE’s overarching mission “to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions.” As a national resource, ORNL also applies its capabilities and skills to the specific needs of other federal agencies and customers through the DOE Strategic Partnership Projects (SPP) Program. Information about the laboratory and its programs is available on the ORNL website. The Laboratory Directed Research and Development (LDRD) Program at ORNL operates under the authority of DOE Order 413.2C, Laboratory Directed Research and Development,3 which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. The LDRD Program funds are obtained through a charge to all laboratory programs. Although it represents a relatively small portion of the overall research budget, the LDRD Program plays an essential role in maintaining the laboratory’s ability to respond to national needs. The program allows ORNL to improve its distinctive capabilities and to enhance its ability to conduct cutting-edge R&D. In accordance with the DOE order, R&D projects funded through the LDRD Program at ORNL support the goals of • maintaining the scientific and technical vitality of the laboratory; • enhancing the laboratory’s ability to address future DOE missions; • fostering creativity and stimulating exploration of forefront areas of science and technology; • serving as a proving ground for new concepts in R&D; and • supporting high-risk, potentially high-value R&D. This report provides an overview of the LDRD Program at ORNL in FY 2024 and contains summaries of all the LDRD research projects that concluded between October 1, 2023, and September 30, 2024.

99 GENERAL AND MISCELLANEOUS↗

SkyMine Carbon Mineralization Pilot Project

This Topical Report addresses accomplishments achieved during Phase 1 of the SkyMine{reg_sign} Carbon Mineralization Pilot Project. The primary objectives of this project are to design, construct, and operate a system to capture CO{sub 2} from a slipstream of flue gas from a commercial coal-fired cement kiln, convert that CO{sub 2} to products having commercial value (i.e., beneficial use), show the economic viability of the CO{sub 2} capture and conversion process, and thereby advance the technology to a point of readiness for commercial scale demonstration and proliferation. The project will also substantiate market opportunities for the technology by sales of chemicals into existing markets, and identify opportunities to improve technology performance and reduce costs at commercial scale. The primary objectives of Phase 1 of the project were to elaborate proven SkyMine{reg_sign} process chemistry to commercial pilot-scale operation and complete the preliminary design ('Reference Plant Design') for the pilot plant to be built and operated in Phase 2. Additionally, during Phase 1, information necessary to inform a DOE determination regarding NEPA requirements for the project was developed, and a comprehensive carbon lifecycle analysis was completed. These items were included in the formal application for funding under Phase 2. All Phase 1 objectives were successfully met on schedule and within budget.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Light Water Reactor Sustainability Program Development of an Initial Business Case Framework for Fleet-Based Control Room Modernization

This milestone report presents a plan or framework for developing a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing power plants (NPP). The decision fund CRM activities often depends on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce operations and maintenance (O&M) or capital costs. The proposed Business Case Methodology (BCM) thus addresses the fact that the lack of a business case is often cited by utilities as a barrier to pursuing large-scale CRM activities. Using past BCM analyses for CRM as a model for this framework, this BCM proposes to base cost savings on advanced digital instrumentation and control (I&C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. The technologies employed in CRM include large overview displays, task-based operator displays, computer- based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others, but this initial plan will also focus only on a subset of these technologies. Thus, under this BCM model, labor savings can be harvested in terms of reduced overtime and redistribution of work. In short, the BCM addresses the benefits of the technology as opposed to the investment costs of the utility. The methodology provides the means to determine the maximum investment that will result in a positive return. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Introduction to Space Station Freedom

NASA field centers and contractors are organized to develop 'work packages' for Space Station Freedom. Marshall Space Flight Center and Boeing are building the U.S. laboratory and habitation modules, nodes, and environmental control and life support system; Johnson Space Center and McDonnell Douglas are responsible for truss structure, data management, propulsion systems, thermal control, and communications and guidance; Lewis Research Center and Rocketdyne are developing the power system. The Canadian Space Agency (CSA) is contributing a Mobile Servicing Center, Special Dextrous Manipulator, and Mobile Servicing Center Maintenance Depot. The National Space Development Agency of Japan (NASDA) is contributing a Japanese Experiment Module (JEM), which includes a pressurized module, logistics module, and exposed experiment facility. The European Space Agency (ESA) is contributing the Columbus laboratory module. NASA ground facilities, now in various stages of development to support Space Station Freedom, include: Marshall Space Flight Center's Payload Operations Integration Center and Payload Training Complex (Alabama), Johnson Space Center's Space Station Control Center and Space Station Training Facility (Texas), Lewis Research Center's Power System Facility (Ohio), and Kennedy Space Center's Space Station Processing Facility (Florida). Budget appropriations impact the development of the Space Station. In Fiscal Year 1988, Congress appropriated only half of the funds that NASA requested for the space station program ($393 million vs. $767 million). In FY 89, NASA sought $967 million for the program, and Congress appropriated $900 million. NASA's FY 90 request was $2.05 billion compared to an appropriation of $1.75 billion; the FY 91 request was $2.45 billion, and the appropriation was $1.9 billion. After NASA restructured the Space Station Freedom program in response to directions from Congress, the agency's full budget request of $2.029 billion for Space Station Freedom in FY 92 was appropriated. For FY 93, NASA is seeking $2.25 billion for the program; the planned budget for FY 94 is $2.5 billion. Further alterations to the hardware configuration for Freedom would be a serious setback; NASA intends 'to stick with the current baseline' and continue planning for utilization.

Kohrs, Richard↗

Office of the Chief Financial Officer Annual Report 2010

In March, a review team consisting of CFOs from other national laboratories, industry, and members of the University of California Office of the President (UCOP) convened for three days to conduct a comprehensive peer review of the OCFO. This was the first time in almost a decade that the financial operations of the Laboratory had been reviewed. The Committee relayed their observations on our strengths, and their very thoughtful recommendations for improvement, which we are actively pursuing. These improvements, when implemented, will benefit the entire Laboratory for many years to come. The complete report is available on the OCFO website (www.lbl.gov/Workplace/CFO). In August, the senior management team of the OCFO participated in a strategic planning retreat. The purpose of the two and a half day exercise was, of course, to update our strategic plan, but instead of spending days developing a written document, we enlisted the expertise of a seasoned journalist who also happens to be a very talented graphic artist. He listened carefully to our ideas and committed them to a visual roadmap. All members of the OCFO, Business Managers, and the Laboratory Leadership Team reviewed this draft roadmap. By having a completely visual strategic plan that is posted widely throughout the OCFO, all employees can easily see and identify with the goals that we are all working towards. FY2010 was an extraordinary year. The Laboratory welcomed its seventh Director, Dr. Paul Alivisatos, who wasted no time communicating his vision and priorities for Berkeley Lab. They include five very ambitious initiatives: Carbon Cycle 2.0, The Next Generation Light Source, a Safe and Efficient Lab, Building Community, and Space. In response, the Office of the Chief Financial Officer (OCFO) developed twelve specific initiatives that align completely with these five priorities. We will be very focused on these in the coming fiscal year, but for now, let's review what happened in FY2010. FY2010 was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research Administration (eSRA) project. In early FY2010, the implementation of the Institutional Review Board (IRB) module, responsible for the human subjects review process, began and should be completed in early FY2011. OSPIP also began implementation of the grants and contracts module and we expect an early go-live of 'Grants Express' in mid-FY2011 with a full completion date in FY2012. The peer review's most substantial recommendation for improvement involved the Laboratory's central financial systems. To quote: 'financial reporting system is outdated and inadequate. There is an inability to easily extract data; the field has little confidence in data; people spend more time mining data than analyzing data; requires field users to create & rely upon shadow systems; causes proliferation of program administrators and resource analysts. These issues impact the quality & execution of research; and the data warehouse lacks understanding & ownership.'

99 GENERAL AND MISCELLANEOUS↗

Addressing an aging facility: improving reliability of the defense waste processing facility at the Savannah River Site - 15539

The High Level Waste program at the Savannah River Site significantly reduces environmental risks associated with the storage of radioactive waste from legacy efforts to separate fissionable nuclear material from irradiated targets and fuels. The Defense Waste Processing Facility treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. Construction of the facility began in 1983 and radioactive operations commenced in 1996. In an effort to support the disposition of radioactive waste and accelerate tank closure for the balance of the Savannah River Site mission, the Defense Waste Processing Facility recently underwent an extensive reliability review in 2013 to understand future needs as well as to address aging infrastructure. As a product of this review, a Performance Improvement Plan was developed to systematically address three major focus areas including, a) asset preservation, b) facility housekeeping, and 3) process improvements. Since issuance of the plan, significant progress has been made in each of these areas to improve the reliability and predictability of the Defense Waste Processing Facility. Providing consistent, constructive, and concise communications is vital in the face of a changing budgetary environment. The Savannah River Site case study provides an example of the U.S. Department of Energy - Savannah River (DOE-SR) and SRR partnering to inform stakeholders about cleanup progress at the site. DOE-SR and SRR periodically and consistently provide both annual written progress reports under the Federal Facility Agreement and quarterly written progress reports under the landfill permit to the government regulators. Through the Liquid Waste System Plans, DOE-SR and SRR constructively and concisely summarize both the significant progress made and explain how a changed budget can impact the goals moving forward. Furthermore, DOE-SR and SRR informs the community and general public about the Site's progress and future during Citizens Advisory Board meetings. In addition, through the new proposed model for complex-wide communications, stakeholders can better understand how budget constraints will affect them. The set-aside program would also encourage stakeholder participation and involvement in helping each state and site obtain extra funding through performance evaluations. Waste management organizations can benefit in a number of ways from an effective partnership approach to communicate with stakeholders about available funding. Keeping an open and honest dialogue with regulatory agencies can help preserve confidence, thus mitigating or completely avoiding costly and distracting fines and penalties. Informing the public not only promotes trust, but also spurs the public to exercise its right to demand more information and voice any concerns to elected or DOE officials. With this approach, DOE can receive better understanding and cooperation from stakeholders in a changing budgetary landscape. Furthermore, a set-aside competitive program would encourage efficiency and innovation that could lead to further cost savings for the government while providing extra funding for cleanup efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Support of US CLIVAR Project Office 2012

Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and development of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals

99 GENERAL AND MISCELLANEOUS↗

Cost Comparison in 2015 Dollars for Radioisotope Power Systems -- Cassini and Mars Science Laboratory

Radioisotope power systems (RPSs) have enabled missions requiring reliable, long-lasting power in remote, harsh environments such as space since the early 1960s. Costs for RPSs are high, but are often misrepresented due to the complexity of space missions and inconsistent charging practices among the many and changing participant organizations over the years. This paper examines historical documentation associated with two past successful flight missions, each with a different RPS design, to provide a realistic cost basis for RPS production and deployment. The missions and their respective RPSs are Cassini, launched in 1997, that uses the general purpose heat source (GPHS) radioisotope thermoelectric generator (RTG), and Mars Science Laboratory (MSL), launched in 2011, that uses the multi-mission RTG (MMRTG). Actual costs in their respective years are discussed for each of the two RTG designs and the missions they enabled, and then present day values to 2015 are computed to compare the costs. Costs for this analysis were categorized into two areas: development of the specific RTG technology, and production and deployment of an RTG. This latter category includes material costs for the flight components (including Pu-238 and fine weave pierced fabric (FWPF)); manufacturing of flight components; assembly, testing, and transport of the flight RTG(s); ground operations involving the RTG(s) through launch; nuclear safety analyses for the launch and for the facilities housing the RTG(s) during all phases of ground operations; DOE’s support for NEPA analyses; and radiological contingency planning. This analysis results in a fairly similar 2015 normalized cost for the production and deployment of an RTG—approximately $118M for the GPHS-RTG and $109M for the MMRTG. In addition to these two successful flight missions, the costs for development of the MMRTG are included to serve as a future reference. Note that development costs included herein for the MMRTG do not include costs from NASA staff or facilities for their development efforts—they only include the amounts costed by DOE and DOE contractors. The 2015 value for MMRTG development is $83M. Both of the RPS types analyzed herein use the general purpose heat source (GPHS) module as the “heart of the RPS.” The estimates presented herein do not include development costs for the GPHS. These estimates also do not include the RPS infrastructure cost to maintain the facilities, equipment, and personnel necessary to enable the production of RPSs, except to the extent that the infrastructure is utilized during the production campaigns to provide RPSs for missions. It was not until after the Cassini mission that an RPS infrastructure funding structure was defined and funded separately from mission-specific elements. The information presented herein could allow for more accurate budget planning estimates for space missions being considered over the next decade and beyond.

07 ISOTOPE AND RADIATION SOURCES↗

START Analysis for ESAS Capability Needs Prioritization

START is a tool to optimize research and development primarily for NASA missions. It was developed within the Strategic Systems Technology Program Office, a division of the Office of the Chief Technologist at NASA's Jet Propulsion Laboratory. START is capable of quantifying and comparing the risks, costs, and potential returns of technologies that are candidates for funding. START can be enormously helpful both in selecting technologies for development -- within the constraints of budget, schedule, and other resources -- and in monitoring their progress. START's methods are applicable to everything from individual tasks to multiple projects comprising entire programs of investigation. They can address virtually any technology assessment and capability prioritization issue. In this report, START is used to analyze the capability needs using data from NASA's Exploration Systems Architecture Study (ESAS).

optimization↗

Leveraging T&TA Plans to Support State Workforce Development Needs

This presentation talks about how to maximize training and technical assistance (T&TA) budgets within the Weatherization Assistance Program (WAP). Grantees share creative ways they've used T&TA funds to support workforce recruitment and retention, staff training, work quality, monitoring, and more.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION,↗

Network Resources and Training Site at Elizabeth City State University

The format of the annual report follows the same format as the quarterly report. In the annual report Elizabeth City State University (ECSU) has included responses to the items listed in the 'Critique of Quarterly Report Summary, and the 'Technical Recommendations for Consideration to NRTS/ECSU'. A budget for FY96-97 is included requesting $500,000.00 to cover the operating expenses of the Network Resources Training Site (NRTS) and its current partners as outlined in the original grant. The final attachment is a proposal to expand the partnerships and services of the NRTS at ECSU. This proposal would increase the number of predominantly minority attended secondary schools that this NRTS services and to support participation of these secondary schools in the GLOBE, ATLAS and Skymath projects. The proposal would also make Bennett College a full partner in the NRTS and it would increase the networking funds available to Virginia State University (HBCU/MI partner). Funds to increase the NRTS staff size to support the new partners and extended services is included in the extension budget. The NRTS Office Staff provides training and technical expertise to all its partners. In the appendix of the report, you will find technical soundness questionnaires and campus LAN Diagrams for the HBCU/MI Partners.

Hayden, Linda Bailey↗

Eltron Research & Development

This topical report covers technical work conducted under contract DE-FC26-05NT42469 between FY06 Q1 through FY14 Q2. The project evolved through several budget periods, budget revisions and continuation applications. This report covers work performed under the “base” program. In 2010 ARRA funding was added to the project. A separate report covering the ARRA portion of the project was submitted to DOE. The original project was focused on research and development for scale-up of hydrogen separation membrane for a FutureGen type power plant. The work included membrane testing and evaluation of metal alloy flat plates vs. tubes and metal membranes vs. cermet membranes. In addition, economic analysis and process modeling was performed. The original project team included CoorsTek, NORAM, and Praxair. In FY10Q2 a continuation application was filed for conducting a scale-up test at Eastman Chemical. In this part of the project a Subscale Engineering Prototype (SEP) membrane skid was designed, fabricated, and operated on a gasified coal slip-stream on Eastman’s site in Kingsport, TN. Following operation, the project was reorganized and a second continuation application with a new statement of work was initiated in FY12Q1. Finally, based on DOE’s decision not to proceed with a Process Development Unit (PDU) field test, a third continuation application and statement of work was initiated in FY13Q1 to close out the project.

08 HYDROGEN↗

NASP - Focus on technology

The major changes in the NASP program caused mostly by budget pressures are described and current technology developments are highlighted. Particular attention is given to the program funding, vehicle and engine design, and the technology program. It is concluded that the success of the X-30 vehicle design depends on the success of the technology development effort. The major accomplishments of the NASP technology program include the T-5 Shock Tunnel at California Institute of Technology and Mach 16 injection and mixing experiments conducted in this facility; the low speed component integration rig which provide data on engine operation from static conditions to Mach 3.5; the module to module interaction test which provided data on the effects of inlet unstart in one engine module on an adjacent module at Mach 4.3; and the direct-connect module used for fuel injection and mixing studies at Mach 6-8.

Waldman, Barry J.↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Z Facility Sustainment Status (November FY 2024) [Slides]

FY24 sustainment project list has been revised resulting in sixteen projects. Total budget for the finalized project list is $9,570,968 (includes FY23 Carryover and FY24). Key factors for project selection included: risk mitigation to address operations highest failure risk subsystems, purchase of long lead parts to address life limited parts, and completion of multi phase sustainment projects initiated in prior year. Given the backlog of projects and limited FY24 funding, there are identified projects that are not included in the final project list that could reduce future Z facility failure risk. Should additional budget become available, these identified projects can be kicked off.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Illinois Cleantech Ecosystem Consortium (ICE) for the Department of Energy Innovation Ecosystem Development Initiative

The DoE Innovation Ecosystem Initiative was a gamechanger for Clean Energy Trust. The grant accelerated our development from a concept to a real company in 2010, seeding us with the capital to begin our mission to “accelerate the growth of clean energy businesses in the Midwest”. Now three years later, we have scores and scores of partners which fund us through sponsorship donations to our programs, and we have played a key role in launching several new companies, and helping them acquire funding and reach their milestones. In three years we have grown from two people to nine, now with an annual budget of over $3M. We started with the following simple plan (verbatim from our original submission): “The short-term objective of ICE is to fortify and enhance the platform for collaboration necessary to create a robust ecosystem for clean energy innovation. This includes launching a number of initiatives designed to source, evaluate, and launch new clean energy businesses derived from university research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗