Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM LOSS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Experimental Study of Beam Dynamics in the PIP-II MEBT Prototype

The Proton Improvement Plan, Stage Two (PIP-II) [1] is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a 10 m Medium Energy Beam Transport (MEBT) have been assembled and commissioned. The MEBT bunch-by-bunch chopping system and the requirement of a low uncontrolled beam loss put stringent limitations on the beam envelope and its variation. Measurements of transverse and longitudinal beam dynamics in the MEBT were performed in the range of 1- 10 mA of the RFQ beam current. Almost all measurements are made with 10 μs beam pulses in order to avoid damage to the beam line. This report presents measurements of the transverse optics with differential trajectories, reconstruction of the beam envelope with scrapers and an Allison emittance scanner, as well as bunch length measurements with a Fast Faraday Cup.

43 PARTICLE ACCELERATORS↗

The Integrable Optics Test Accelerator

The Integrable Optics Test Accelerator (IOTA) at the Fermilab Accelerator Science & Technology (FAST) Facility is beginning operations, with an experimental program aimed at developing technology to enable future high intensity particle beams. The results garnered from IOTA should allow for better control of beam losses, leading to higher safely achievable beam power. This will be particularly useful for future accelerator based neutrino experiments. Two of the R&D efforts at IOTA, Nonlinear Integrable Optics and Electron Column-based space charge compensation, are discussed here.

43 PARTICLE ACCELERATORS↗

Powerloads on the front end components and the duct of the heating and diagnostic neutral beam lines at ITER

The heating and current drive beam lines (HNB) at ITER are expected to deliver ∼16.7 MW power per beam line for H beams at 870 keV and D beams at 1 MeV during the H-He and the DD/DT phases of ITER operation respectively. On the other hand the diagnostic neutral beam (DNB) line shall deliver ∼2 MW power for H beams at 100 keV during both the phases. The path lengths over which the beams from the HNB and DNB beam lines need to be transported are 25.6 m and 20.7 m respectively. The transport of the beams over these path lengths results in beam losses, mainly by the direct interception of the beam with the beam line components and reionisation. The lost power is deposited on the surfaces of the various components of the beam line. In order to ensure the survival of these components over the operational life time of ITER, it is important to determine to the best possible extent the operational power loads and power densities on the various surfaces which are impacted by the beam in one way or the other during its transport. The main factors contributing to these are the divergence of the beamlets and the halo fraction in the beam, the beam aiming, the horizontal and vertical misalignment of the beam, and the gas profile along the beam path, which determines the re-ionisation loss, and the re-ionisation cross sections. The estimations have been made using a combination of the modified version of the Monte Carlo Gas Flow code (MCGF) and the BTR code. The MCGF is used to determine the gas profile in the beam line and takes into account the active gas feed into the ion source and neutraliser, the HNB-DNB cross over, the gas entering the beamline from the ITER machine, the additional gas atoms generated in the beam line due to impacting ions and the pumping speed of the cryopumps. The BTR code has been used to obtain the power loads and the power densities on the various surfaces of the front end components and the duct modules for different scenarios of ITER operation. The gas profile and the magnetic field distribution for each scenario has been considered in these evaluations. The worst case power loads and power densities for each surface have been used to study their thermo-mechanical behaviour and manufacturing feasibility. The details of these calculations and results obtained are presented and discussed.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Beam transport and space charge compensation strategies (invited)

The transport of intense ion beams is affected by the collective behavior of this kind of multi-particle and multi-species system. The space charge expressed by the generalized perveance dominates the dynamical process of thermalisation, which leads to emittance growth. To prevent changes of intrinsic beam properties and to reduce the intensity dependent focusing forces, space charge compensation seems to be an adequate solution. In the case of positively charged ion beams, electrons produced by residual gas ionization and secondary electrons provide the space charge compensation. The influence of the compensation particles on the beam transport and the local degree of space charge compensation is given by different beam properties as well as the ion beam optics. Especially for highly charged ion beams, space charge compensation in combination with poor vacuum conditions leads to recombination processes and therefore increased beam losses. Strategies for providing a compensation-electron reservoir at very low residual gas pressures will be discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Accelerator Real-time Edge AI for Distributed Systems (READS) (Proposal)

Over the last decade, Machine Learning (ML) technologies have slowly made their way into the accelerator community. Rapid advances in recent years in deep learning, particularly reinforcement learning for control system applications and the accessibility of deep learning in embedded hardware, have generated renewed interest and spawned a number of applications. The Fermilab Accelerator Complex, shown in Fig. 1, has provided High Energy Physics (HEP) experiments with proton beams for nearly fifty years. The current focus of the laboratory is its world-class experimental program at the intensity frontier. While increasing beam intensity certainly presents its own challenges, preserving beam size while minimizing beam losses – particles lost through interactions with the beam vacuum pipe – turns out to be, in many ways, the main challenge. The accelerator is controlled via a complex system of hundreds of thousands of devices. Enabling fine tuning and real-time optimization of their parameters using ML methods and stepping beyond experience-based reasoning of human operators are key to the success of future intensity upgrades. Our objective will be to integrate ML into accelerator operations and furthermore, provide an accessible framework, which can also be used by a broad range of other accelerator systems with dynamic tuning needs.

43 PARTICLE ACCELERATORS↗

Abort Gap Cleaning for LHC Run 2

To minimize the beam losses at the moment of an LHC beam dump the 3 μs long abort gap should contain as few particles as possible. Its population can be minimised by abort gap cleaning using the LHC transverse damper system. The LHC Run 1 experience is briefly recalled; changes foreseen for the LHC Run 2 are presented. They include improvements in the observation of the abort gap population and the mechanism to decide if cleaning is required, changes to the hardware of the transverse dampers to reduce the detrimental effect on the luminosity lifetime and proposed changes to the applied cleaning algorithms.

43 PARTICLE ACCELERATORS↗

Recent performance of and plasma outage studies with the SNS H{sup −} source

Spallation Neutron Source ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised radio frequency quadrupole (RFQ), which requires higher radio frequency power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H{sup −} beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ∼55-kW 2-MHz plasma pulses reflecting ∼90% of the continuous ∼300 W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly detuned 13-MHz match. Lowering the H{sub 2} gas also increased the H{sup −} beam current to ∼55 mA and increased the RFQ transmission by ∼7% (relative)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The UA9 experimental layout

The UA9 experimental equipment was installed in the CERN-SPS in March '09 with the aim of investigating crystal assisted collimation in coasting mode. Its basic layout comprises silicon bent crystals acting as primary collimators mounted inside two vacuum vessels. A movable 60 cm long block of tungsten located downstream at about 90 degrees phase advance intercepts the deflected beam. Scintillators, Gas Electron Multiplier chambers and other beam loss monitors measure nuclear loss rates induced by the interaction of the beam halo in the crystal. Two Roman pots installed in the path of the deflected particles are equipped with a Medipix detector to reconstruct the transverse distribution of the impinging beam. Finally UA9 takes advantage of an LHC-collimator prototype installed close to the first Roman pot to help in setting the beam conditions and to analyze the efficiency to deflect the beam. This paper describes in details the hardware installed to study the crystal collimation during 2010.

43 PARTICLE ACCELERATORS↗

Beam-beam observations in the Relativistic Heavy Ion Collider

The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory has been operating since 2000. Over the past decade, thanks to the continuously increased bunch intensity and reduced β*s at the interaction points, the maximum peak luminosity in the polarized proton operation has been increased by more than two orders of magnitude. In this article, we first present the beam-beam observations in the previous RHIC polarized proton runs. Then we analyze the mechanisms for the beam loss and emittance growth in the presence of beam-beam interaction. The operational challenges and limitations imposed by beam-beam interaction and their remedies are also presented. In the end, we briefly introduce head-on beam-beam compensation with electron lenses in RHIC.

43 PARTICLE ACCELERATORS↗

Optimization of a charge-state analyzer for electron cyclotron resonance ion source beams

A detailed experimental and simulation study of the extraction of a 24 keV He{sup +} beam from an ECR ion source and the subsequent beam transport through an analyzing magnet is presented. We find that such a slow ion beam is very sensitive to space-charge forces, but also that the neutralization of the beam's space charge by secondary electrons is virtually complete for beam currents up to at least 0.5 mA. The beam emittance directly behind the extraction system is 65 {pi} mm mrad and is determined by the fact that the ion beam is extracted in the strong magnetic fringe field of the ion source. The relatively large emittance of the beam and its non-paraxiality lead, in combination with a relatively small magnet gap, to significant beam losses and a five-fold increase of the effective beam emittance during its transport through the analyzing magnet. The calculated beam profile and phase-space distributions in the image plane of the analyzing magnet agree well with measurements. The kinematic and magnet aberrations have been studied using the calculated second-order transfer map of the analyzing magnet, with which we can reproduce the phase-space distributions of the ion beam behind the analyzing magnet. Using the transfer map and trajectory calculations we have worked out an aberration compensation scheme based on the addition of compensating hexapole components to the main dipole field by modifying the shape of the poles. The simulations predict that by compensating the kinematic and geometric aberrations in this way and enlarging the pole gap the overall beam transport efficiency can be increased from 16% to 45%.

43 PARTICLE ACCELERATORS↗

TRANSIENT BEAM LOADING EFFECTS IN RF SYSTEMS IN JLEIC

The pulsed electron bunch trains generated from the Continuous Electron Beam Accelerator Facility (CEBAF) linac to inject into the proposed Jefferson Lab Electron Ion Collider (JLEIC) e-ring will produce transient beam loading effects in the Superconducting Radio Frequency (SRF) systems that, if not mitigated, could cause unacceptably large beam energy deviation in the injection capture, or exceed the energy acceptance of CEBAF’s recirculating arcs. In the electron storage ring, the beam abort or ion clearing gaps or uneven bucket filling can cause large beam phase transients in the (S)RF cavity control systems and even beam loss due to Robinson instability. We have first analysed the beam stability criteria in steady state and estimated the transient effect in Feedforward and Feedback RF controls. Initial analytical models for these effects are shown for the design of the JLEIC e-ring from 3GeV to 12GeV.

Wang, Haipeng↗

Real-Time Inference For MI/RR Deblending

The Fermilab Main Injector (MI) and Recycler Ring (RR) share a common beam loss monitor (BLM) system, making loss events difficult to attribute to their source machine when beam is present in both simultaneously. The Real-time Edge AI for Distributed Systems (READS) project addresses this by deblending BLM readings in real time using machine learning (ML). The current FPGA based implementation meets the sub-3 ms latency requirement but carries a resource intensive hls4ml development cycle, motivating exploration of GPU based deployment. This paper characterizes inference latency on an NVIDIA Jetson Orin Nano and introduces a packet organization scheme for assembling synchronized event frames from seven distributed BLM DAQ streams. Using a Python based DAQ simulation with injected timing jitter in place of unavailable live beam data, the pipeline achieved an average end to end latency of 0.456 ms (σ = 0.122 ms) across 167,000 test frames, comfortably meeting the timing constraint. Early outliers were attributed to TensorRT warm-up rather than steady state limitations, suggesting GPU based inference is a viable alternative to the existing FPGA implementation.

Yu, Kellen [Cornell U.]↗

Recent Performance of and Plasma Outage Studies with the SNS H- Source

SNS ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised RFQ, which requires higher RF power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H- beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ~55-kW 2-MHz plasma pulses reflecting ~90% of the continuous ~300W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly-detuned 13-MHz match. Lowering the H2 also increased the H- beam current to ~55 mA, and increased the transmission by ~7%.

H- ion source↗

Injection Bucket Jitter Compensation Using Phase Lock System at Fermilab Booster

The extraction bucket position in the Fermilab Booster is controlled with a cogging process that involves the comparison of the Booster rf count and the Recycler Ring revolution marker. A one rf bucket jitter in the ex-traction bucket position results from the variability of the process that phase matches the Booster to the Recycler. However, the new slow phase lock process used to lock the frequency and phase of the Booster rf to the Recycler rf has been made digital and programmable and has been modified to correct the extraction notch position. The beam loss at the Recycler injection has been reduced by 20%. Beam studies and the phase lock system will be discussed in this paper.

43 PARTICLE ACCELERATORS↗

Exploration of Real Time Inference for MI-RR Deblending on GPU/TPU Systems

The Fermilab Main Injector (MI) and Recycler Ring (RR) share a common beam loss monitor (BLM) system, making loss events difficult to attribute to their source machine when beam is present in both simultaneously. The Real-time Edge AI for Distributed Systems (READS) project addresses this by deblending BLM readings in real time using machine learning (ML). The current FPGA based implementation meets the sub-3 ms latency requirement but carries a resource intensive hls4ml development cycle, motivating exploration of GPU based deployment. This paper characterizes inference latency on an NVIDIA Jetson Orin Nano and introduces a packet organization scheme for assembling synchronized event frames from seven distributed BLM DAQ streams. Using a Python based DAQ simulation with injected timing jitter in place of unavailable live beam data, the pipeline achieved an average end to end latency of 0.456 ms (σ = 0.122 ms) across 167,000 test frames, comfortably meeting the timing constraint. Early outliers were attributed to TensorRT warm-up rather than steady state limitations, suggesting GPU based inference is a viable alternative to the existing FPGA implementation.

Yu, Kellen [Fermilab; Cornell U.]↗

Injection considerations for PIP-III Linac to Main Injector

The PIP-III linac produces 8 GeV H- beam for injection into the Recycler or Main Injector (MI). Stripping to H + is needed, in a system that is vulnerable to magnetic stripping of H - in magnetic fields. The High power beam will heat stripping foils, perhaps unacceptably. The injection pulse is much longer than the MI circumference, so multiturn pulses with resulting heating and beam diffusion are required. We discuss design considerations for the injection scenario, the stripper foil and its location, foil heating and related beam loss issues.

43 PARTICLE ACCELERATORS↗

Computer Vision Techniques Used to Monitor the Alignment of Cavities and Solenoids in the PIP-II Prototype SSR1 Cryomodule

The alignment of the SRF PIP-II string components is studied as the acceptable beam deflection, offset and defocusing, which may otherwise cause beam loss. Simulations and measurements established that the maximum deviation of the beam pipe from the reference orbit should not exceed a small fraction of the beam aperture. To observe the translations and rotations of each single component within the cryomodule, optical instruments (H-BCAM) surveying highly reflective targets, installed in the internal assembly of the module were used. The alignment monitoring concept for the PIP II SSR1 prototype cryomodule, along with relevant measurements of the components’ position monitoring during coldmass cooldown is presented in this contribution. This development paves the way to new computer vision applications in the field of cryomodule assemblies in cleanroom environment, in which robotically-assisted operations have the potential to dramatically reduce the risk of chemical and particulate contamination.

43 PARTICLE ACCELERATORS↗

Radiation Protection for the First Korea Heavy-ion Medical Accelerator (KHIMA) Facility - Paper 7

The number of particle therapy facilities is increasing worldwide due to the encouraging results obtained at research facilities such as the Lawrence Berkeley National Laboratory (USA), the Helmholtz Center for Heavy Ion Research GSI (Germany), and the Heavy Ion Medical Accelerator (HIMAC) in Chiba (Japan). The first hospital-based heavy-ion therapy facility is under construction in Busan, Korea, at the Korea Institute of Radiological and Medical Sciences [KIRAMS]. The project was originally designed to develop a compact superconducting cyclotron for hadron therapy able to deliver forefront beams of heavier ions, essentially carbon ions of energy, 430 MeV/u. Radiation protection issues play an important role in every stage of the project such as civil construction planning, control system design, and special technological plants. Monte Carlo transport codes are the best tools to solve these issues and the FLUKA2011 and MCNPX2.7.0 codes are used in this work. Beam loss distributions of cyclotron installations in combination with passive or active beam shaping methods have a particularly high implication on the protection layout of the facility. Methods for shielding and activation calculations are described with an emphasis on carbon ion beams. All the tools and databases require verification. Benchmarking is an instrumental process for verification. An overview of benchmarking efforts will also be given and the need for further benchmarks is discussed. (authors)

43 PARTICLE ACCELERATORS↗