Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ADMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Experimental Test Bed to Enable Realistic Evaluations for Direct Transfer Trip Relaying via Private Wireless LTE Communications

Increasing penetration levels of inverter-based distributed energy resources (DERs) in distribution systems are creating challenges in system operation. Currently, wired or proprietary wireless communications are used by advanced distribution management systems (ADMS) to detect the state of the system and control the DERs for optimal operation. Wireless communications are an alternative solution that can enable connectivity between the dispersed assets used in distribution system applications. This paper demonstrates an experimental test bed to enable the realistic evaluation of communications system characteristics for direct transfer trip (DTT) relaying of a photovoltaic inverter system using a private 900-MHz spectrum wireless LTE network. Private LTE network communications can be deployed to many remote DERs and other grid-edge devices to prevent costly infrastructure upgrades across distribution systems. In addition, this paper provides a framework for evaluating the impact of signal strength and network traffic in communications systems. The results shown develop a better understanding of the best practices for using LTE communications systems across multiple utility applications, such as protective relaying, voltage regulation, and supervisory control and data acquisition system messages.

900-MHz LTE network↗

A Data Exchange Interface for a Standards Based Data Integration Platform

The modern electrical grid is a complex and a data rich system, requiring several sub-systems to provide the capability and support needed to perform functions such as distributed energy resource management, outage management, and fault location and isolation, to name a few. There is a need to develop software solutions and platforms that provide an integrated infrastructure to allow interoperability between these subsystems, while leveraging the abundant data available from today’s grid. In this paper, we present the development and deployment of an application service to integrate GridAPPS-D which is an open source, standards-based software platform with SurvalentONE, a commonly used DNP3 based ADMS platform that allows operation, monitoring, analysis, restoration, and optimization of network operations. We present details of the integration architecture, including its implementation, and provide results from functional testing of the architecture on a 13 bus IEEE system. The results validate that the integration is successful and is able to provide a two-way exchange of communication and translation between different communication protocols.

Singh, Alka↗

A Multi-Site Networked Hardware-in-Loop Platform for Evaluation of Interoperability and Distributed Intelligence at Grid-Edge

Electric power systems have experienced large increases in the number of intelligent, connected and controllable devices being deployed, leading to a high degree of distributed intelligence at the grid-edge. These devices, both utility-owned and consumer-owned, include but are not limited to: renewable generation sources, energy storage, remote switches, voltage regulators, and smart controllable loads such as electric vehicles. These new devices provide significant potential for increased operational flexibility that can be leveraged to achieve system reconfiguration, resiliency improvements, power quality improvements, and distribution system automation. However, there are two significant challenges that must be addressed before these assets can be leveraged for operations: interoperability and system level validation prior to deployment. Because of the complexity of distributed control systems, and their interactions with legacy centralized controls, a purely simulations-based approach for pre-deployment validation is not sufficient. It requires hardware-in-loop testing to emulate the operational hardware devices and evaluate their performance. Additionally, securely integrating multiple test facilities at utility operators and vendors might enable rapid scale-up of evaluation platforms, and remove the need for multiple expensive standalone installations. Presented in this paper, is the development of a multi-site evaluation platform that employs Advanced Distribution Management Systems (ADMS), distributed control devices, real-time hardware-in-loop assets, secure communication links, and protocol adapters. This platform uses standards-based approaches and open-source tools, and hence can serve as a template for other researchers and institutions to implement their multi-site evaluation frameworks for pre-deployment testing.

Essakiappan, Somasundaram↗

Analysis of System and Interoperability Impact from Securing Communications for Distributed Energy Resources

As the power grid incorporates increasing amounts of distributed energy resources (DER) that provide new generation sources, new opportunities are created for improving operation of the grid while large challenges also arise for preserving grid reliability and security. To improve grid performance, DERs can be utilized to provide important support functionality, such as supporting frequency and voltage levels, especially if they are assisted by communication schemes as part of an advanced distribution management system (ADMS). Unfortunately, such connectivity and grid support functionality also creates additional cyber security risk with the potential for degradation of grid services, especially under conditions with high amounts of distributed generation. This paper will first discuss the communications needed by DERs to support system and interoperability objectives, as well as the security requirements and impact of securing these communications. Some common security mechanisms are discussed in relation to DERs, and a simulated 15-bus model of a distribution feeder is used to demonstrate aspects of the DER communications and impact to grid performance. These results help to advance understanding of the benefits, requirements, and mechanisms for securely implementing DER communications while ensuring that grid reliability is maintained.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource-Cognizant Upgrade Paths to the Traditional Restoration Strategy of Utilities for Improved Load Restoration

Climate change has resulted in increasingly impactful and more frequent occurrences of extreme weather events. This trend poses a significant challenge for distribution utilities and system operators to ensure that there is uninterrupted power supply to critical loads in their networks under fault scenarios; however, currently, utilities deploying the automated fault location, isolation and restoration (FLISR) function in their advanced distribution management system (ADMS) do not take into account the available generation and load-modification capabilities of distributed energy resources present in the disconnected network due to an upstream isolated fault. This results in the network reconfiguration and restoration to result in sub-optimal load restoration. Therefore, this paper presents two approaches that can upgrade the existing FLISR capabilities of distribution utilities to significantly increase the restoration of critical loads. The performance of the proposed approaches is evaluated on a numerical model of a real distribution feeder in Georgia, USA.

DER↗

Alternative Database Designs for the Distribution Common Information Model

The distribution Common Information Model (CIM) offers a means for interoperable distribution system applications. Adoption has been slow in part because of the steep learning curve, and the mismatch between CIM’s object-oriented schema and widely-used relational database schemas. We evaluated alternative database technologies, and tested a triple-store database with SPARQL queries on a set of IEEE distribution test feeders. These alternative queries were much simpler to design and use, so they should help lower one of the important barriers to CIM adoption. An open-source platform has been provided for other developers to work with CIM in this way. One use case is to more rapidly develop interoperable ADMS and DERMS applications. Another use case is to convert feeder models between commercial CIM-compliant products and research software like GridLAB-D and OpenDSS.

lenses, computational modeling, relational databas↗

Bi-Level Volt-VAR Optimization to Coordinate Smart Inverters with Voltage Control Devices

Conservation voltage reduction (CVR) uses voltage control to reduce customer power demand and help improve the operational efficiency of the electric power distribution system. With the advent of advanced distribution management systems (ADMS), the underlying data and control-rich platform can be utilized to enable a centralized Volt-VAR optimization (VVO) scheme that includes smart inverter controls along with legacy voltage control devices such as voltage regulators and capacitor banks to ensure a maximum CVR benefit. The objective of this paper to present a VVO approach that controls system’s legacy voltage control devices and coordinates their operation with smart inverter control. An optimal power flow (OPF) formulation is proposed by developing linear and nonlinear power flow approximations for a three-phase unbalanced electric power distribution system. A bi-level VVO approach is proposed where, Level-1 optimizes the control of legacy devices and smart inverters using a linear approximate three-phase power flow. In Level-2, the control parameters for smart inverters are adjusted to obtain an optimal and feasible solution by solving the approximate nonlinear OPF model. Level-1 is modeled as a Mixed Integer Linear Program (MILP) while Level-2 as a Quadratically Constrained Quadratic Program (QCQP). The proposed approach is validated using IEEE test cases and the results demonstrate the applicability of the framework in achieving the CVR objective.

Jha, Rahul Ranjan↗

Formulation of Three-Phase State Estimation Problem Using a Virtual Reference

State Estimation (SE) is the backbone of modern Energy Management System (EMS) due its capability of processing real time measurements and provide reliable information to system operators. Since its introduction to power systems in the 70’s, SE has been widely used in transmission networks. Distribution grids on the other hand lack sufficient number of real time measurements, and for that reason SE has not been widely implemented on these systems. The recent increase in the number of renewable energy sources connected to the grid at lower voltage levels, the advent of Distribution Automation (DA) and Smart Grids necessitate closer monitoring of distribution networks and thus forcing utilities to upgrade their operations and deploy Advanced Distribution Management Sytems (ADMS). Therefore, Distribution System State Estimation (DSE) is paramount to provide real time monitoring of active distribution grids. This papers investigates the formulation of the three-phase distribution state estimation where in the most general case, none of the system buses may have balanced three phase voltages. In such a case, the choice and definition of the slack bus need to be revisited. Most of the existing work arbitrarily assign the root bus of the distribution feeder as the balanced three-phase reference which may not be realistic for today’s active distribution systems. This paper addresses this shortcoming of the existing SE formulations by introducing a virtual reference bus. Here, the proposed approach is effectively validated by simulations carried out on distribution test systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Iterative metal artifact reduction for x-ray computed tomography using unmatched projector/backprojector pairs

Purpose: Metal artifact reduction (MAR) is a major problem and a challenging issue in x-ray computed tomography (CT) examinations. Iterative reconstruction from sinograms unaffected by metals shows promising potential in detail recovery. This reconstruction has been the subject of much research in recent years. However, conventional iterative reconstruction methods easily introduce new artifacts around metal implants because of incomplete data reconstruction and inconsistencies in practical data acquisition. Hence, this work aims at developing a method to suppress newly introduced artifacts and improve the image quality around metal implants for the iterative MAR scheme. Methods: The proposed method consists of two steps based on the general iterative MAR framework. An uncorrected image is initially reconstructed, and the corresponding metal trace is obtained. The iterative reconstruction method is then used to reconstruct images from the unaffected sinogram. In the reconstruction step of this work, an iterative strategy utilizing unmatched projector/backprojector pairs is used. A ramp filter is introduced into the back-projection procedure to restrain the inconsistency components in low frequencies and generate more reliable images of the regions around metals. Furthermore, a constrained total variation (TV) minimization model is also incorporated to enhance efficiency. The proposed strategy is implemented based on an iterative FBP and an alternating direction minimization (ADM) scheme, respectively. The developed algorithms are referred to as “iFBP-TV” and “TV-FADM,” respectively. Two projection-completion-based MAR methods and three iterative MAR methods are performed simultaneously for comparison. Results: The proposed method performs reasonably on both simulation and real CT-scanned datasets. This approach could reduce streak metal artifacts effectively and avoid the mentioned effects in the vicinity of the metals. The improvements are evaluated by inspecting regions of interest and by comparing the root-mean-square errors, normalized mean absolute distance, and universal quality index metrics of the images. Both iFBP-TV and TV-FADM methods outperform other counterparts in all cases. Unlike the conventional iterative methods, the proposed strategy utilizing unmatched projector/backprojector pairs shows excellent performance in detail preservation and prevention of the introduction of new artifacts. Conclusions: Qualitative and quantitative evaluations of experimental results indicate that the developed method outperforms classical MAR algorithms in suppressing streak artifacts and preserving the edge structural information of the object. In particular, structures lying close to metals can be gradually recovered because of the reduction of artifacts caused by inconsistency effects.

60 APPLIED LIFE SCIENCES↗

A Novel Approach to Realize of All Optical Frequency Encoded Dibit Based XOR and XNOR Logic Gates Using Optical Switches with Simulated Verification

Since last few decades optics has already proved its strong potentiality for conducting parallel logic, arithmetic and algebraic operations due to its super-fast speed in communication and computation. So many different logical and sequential operations using all optical frequency encoding technique have been proposed by several authors. Here, we have keened out all optical dibit representation technique, which has the advantages of high speed operation as well as reducing the bit error problem. Exploiting this phenomenon, we have proposed all optical frequency encoded dibit based XOR and XNOR logic gates using the optical switches like add/drop multiplexer (ADM) and reflected semiconductor optical amplifier (RSOA). Also the operations of these gates have been verified through proper simulation using MATLAB (R2008a).

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Gravitating Hopfions

We construct solutions of the 3 + 1 dimensional Faddeev–Skyrme model coupled to Einstein gravity. The solutions are static and asymptotically flat. They are characterized by a topological Hopf number. We investigate the dependence of the ADM masses of gravitating Hopfions on the gravitational coupling. When gravity is coupled to flat space solutions, a branch of gravitating Hopfion solutions arises and merges at a maximal value of the coupling constant with a second branch of solutions. This upper branch has no flat space limit. Instead, in the limit of a vanishing coupling constant, it connects to either the Bartnik–McKinnon or a generalized Bartnik–McKinnon solution. We further find that in the strong-coupling limit, there is no difference between the gravitating solitons of the Skyrme model and the Faddeev–Skyrme model.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Constraints in Quantum Geometrodynamics

We compare different treatments of the constraints in canonical quantum gravity. The standard approach on the superspace of 3-geometries treats the constraints as the sole carriers of the dynamic content of the theory, thus rendering the traditional dynamical equations obsolete. Quantization of the constraints in both the Dirac and ADM square root Hamiltonian approaches leads to the well known problems of time evolution. These problems of time are of both an interpretational and technical nature. In contrast, the geometrodynamic quantization procedure on the superspace of the true dynamical variables separates the issues of quantization from the enforcement of the constraints. The resulting theory takes into account states that are off-shell with respect to the constraints, and thus avoids the problems of time. We develop, for the first time, the geometrodynamic quantization formalism in a general setting and show that it retains all essential features previously illustrated in the context of homogeneous cosmologies.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

GRIDAPPSD/GOSS-GridAPPS-D

GridAPPS-D provides a method for developers to run their new applications on a real-time simulator with extensive modeling and tool support. GridAPPS-D is built around standard data models like the CIM. It readily interfaces to existing software products, which may also 1) use components of GridAPPS-D and 2) supplement or replace the built-in distribution simulator, facilitating the deployment of new ADMS applications to existing software products.

Allwardt, Craig↗

Lignin as a facilitator, not a barrier, during saccharification by brown rot fungi

This research focused on the biology of a group of wood-degrading fungi that cause brown rot in wood, with particular attention to the potential to mimic this biological approach ex situ for bioprocessing lignocellulosic biomass. Supported by the long-standing theory that these fungi use a two-step oxidative/enzymatic approach during brown rot, our team’s objectives were as follows: 1) to determine the discrete timing of lignin modifications, 2) to correlate these alterations with biocatalyst efficiency and ingress into plant cell walls, and 3) to reproduce modifications prior to saccharification for efficient bioprocessing. The core findings of our research were that 1) lignin modifications occur nearly coincident with enzyme secretion during brown rot and 2) there is no specificity to the benefit that a brown rot pretreatment has on the efficacy of cellulases – it is a general enhancement best predicted by chemical changes to lignin and side-chain hemicellulose sugars. In our work, this meant we could attain and predict broad improvements in saccharification using commercial cellulase cocktails, in some cases more than three-fold of that in untreated biomass. This project was completed with minimal variance from the original project management plan (PMP), resulting in fourteen presentations and posters, four peer-reviewed publications, and one additional publication now in review. The publications have been valuable to other scientists working toward similar goals and have been cited in thirteen peer-reviewed publications written by others since 2010. We are working with ADM to advance application options for industry, building on the lessons learned during this DOE award period.

09 BIOMASS FUELS↗

Final Report - Energy Reduction and Advanced Water Removal via Membrane Solvent Extraction Technology

3M and Archer Daniels Midland (ADM) collaborated with the U.S. Department of Energy (DOE) to develop and demonstrate a novel membrane solvent extraction (MSE) process that can substantially reduce energy and water consumption in ethanol production, and accelerate the fermentation process. A cross-flow membrane module was developed, using porous membrane manufactured by 3M. A pilot process was developed that integrates fermentation, MSE and vacuum distillation. Extended experiments of 48-72 hours each were conducted to develop the process, verify its performance and begin establishing commercial viability.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Brine Extraction and Treatment Strategies to Enhance Pressure Management and Control of CO 2 Plumes in Deep Geologic Formations

The overall goal of the this project is to develop and validate pressure management and carbon dioxide (CO 2 ) plume control strategies that can address technical and economic barriers to commercial deployment of CO 2 storage technologies, based on computational and field demonstration work at the Archer Daniels Midland Company (ADM) facility where the Illinois Basin–Decatur Project (IBDP) and the Illinois-Industrial Carbon Capture and Storage (IL-ICCS) projects are located. To accomplish the overall goal, the ISGS designed a brine extraction storage test (BEST) that could be completed in two phases. The goal of BEST Phase I was to evaluate the feasibilities of extraction well(s) placement, the brine extraction to CO 2 injection rate ratio, extraction well completion, and brine treatment and handling. The goal of BEST Phase II would be to validate the brine extraction and treatment options deemed feasible in Phase I by (1) demonstrating the efficacy of brine extraction (BE) in managing pressure (i.e., formation) and the CO 2 plume, and (2) demonstrating treatment of extracted brine with high total dissolved solids (TDS; >200,000 mg/L) using multiple advanced treatment technologies. This report details work done in Phase I. Several brine extraction and treatment scenarios were tested, simulated, and analyzed for their effectiveness in extracting brine. Initially a vertical well was studied; however, geologic modeling, reservoir modeling, and the existing facility and wellbore infrastructure dictated that the location of a vertical brine extraction well was limited to an area with no existing monitoring wells and where the well would be in relative proximity to an existing CO 2 plume. Consequently, a vertical well was excluded, and a horizontal brine extraction well placed above the existing CO 2 plume near two existing wells was studied. The horizontal well option allows the project to leverage the availability of cased-hole logs and cross-well tomography to monitor CO 2 saturation and plume distribution, respectively. Because of the proximity of the horizontal well option to two existing wells, no additional monitoring well (or caprock penetration) is required. The recommended brine extraction pilot design options are (1) a horizontal extraction well at the base of the Middle Mt. Simon, which is 350–520 ft (107–158 m) above the CO 2 plume at CCS#1 and VW#1; or (2) a vertical extraction well 0.5 mi (0.8 km) from CCS#2 in a direction approximately southeast of CCS#2, perpendicular to the direction of high hydraulic connectivity. A horizontal extraction well has advantages over a vertical extraction well, including less risk of drilling into an existing CO 2 plume and it can be located between two other wells that can be used for monitoring. Thus, because the two existing wells can serve as monitoring wells, it eliminates the need for a third verification well and allows for a lower extraction rate to control the CO 2 plume and pressure. Managing pressure and the CO 2 plume distribution via brine extraction creates the obvious and important challenge of handling and treating the extracted brine. There were three options for brine disposal: (1) underground injection control (UIC) disposal well, (2) brine treatment and industrial use, and (3) brine pretreatment and discharge into municipal wastewater system. The primary design elements were budget and permitting requirements. The disposal well would be a vertical well drilled and completed into the Potosi Dolomite. For the range of extraction rates anticipated, the cost of this well is relatively constant. The cost of brine treatment is highly depends on the extraction rate, which depends on the well orientation. If relatively high rates are required, the vertical disposal well option is more favorable; for relatively lower rates, the two brine treatment options have lower costs. Life-cycle-analysis studies on extracted brine handling options suggest that a UIC well has a lower environmental impact than brine treatment. Both brine disposal options using brine treatment require removal of suspended solids from the extracted brine. The most suitable commercially available technology and the most promising emerging and innovative technology are recommended for implementation in Phase II. Though the challenges of this project are written specific to Decatur, every CO 2 storage site considering the use of brine extraction integrated with CO 2 storage will have similar, if not identical, technical and logistical challenges.

58 GEOSCIENCES↗

GridAPPS-D Conceptual Design v1.0

The purpose of this document is to provide a conceptual design of the distribution system application development platform being developed for the U.S. Department of Energy’s Advanced Distribution Management System (ADMS) Program by the Grid Modernization Laboratory Consortium project GM0063. The platform will be referred to as GridAPPS-D. This document provides a high level, conceptual view of the platform and provides related background and contextual information. This document is intended to both educate readers about the technical work of the project and to serve as a point of reference for the project team. The document will be updated as the project progresses.

97 MATHEMATICS AND COMPUTING↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Report for Task 11 & 12: Components and Capabilities of the Resiliency Driven Outage Management and Feeder Restoration System (Deliverable D8))

This report provides progress update for the development of a outage management, feeder restoration, and restoration action feasibility check modules as part of the AGGREGATE project. Details for integration with controllability module, data driven situational awareness of network and distributed energy resources as well cyber security plan for these modules integrated with GE ADMS are also presented in the report. These three modules for outage management, feeder restoration, and restoration action feasibility check modules are developed in MATLAB and validated with a modified IEEE 123-node feeder. Results demonstrate ability of these new modules to improve the restoration process post-disaster to enhance the system resilience.

42 ENGINEERING↗