Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2022”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 217 records · Page 12

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Double Asteroid Redirection Test (DART) Mission

NASA’s Double Asteroid Redirection Test (DART) mission was humanity’s first attempt to move a celestial body, demonstrating the capability to perform a kinetic impact on a planetary defense–relevant sized asteroid. DART was part of the international collaboration known as the Asteroid Impact & Deflection Assessment (AIDA), involving NASA, the European Space Agency (ESA), the Agenzia Spaziale Italiana (ASI), and scientists around the world. DART was a key step to demonstrating preparedness to respond to planetary defense scenarios, and it provides a crucial data point for likely outcomes. Near-Earth objects (NEOs) greater than 140 m in size are of particular interest to planetary defense because they have the potential to cause significant damage if they were to impact Earth, and also because they are difficult to detect, with less than 50% of the predicted population discovered as of 2022 (National Academies Press, 2022). With an appropriately sized spacecraft and enough warning (typically many years to decades), a kinetic impact can slightly alter the orbit of an asteroid in a way that, over time, prevents the asteroid from colliding with Earth in the future. DART’s target was Dimorphos, the smaller (~150-m-diameter) member of the binary asteroid system (65803) Didymos, which is a near-Earth, potentially hazardous, and well-characterized asteroid system. By simply observing changes to the system after impact and comparing them with a pre-impact reference, it was possible to use ground-based telescopes to observe the deflection in the orbit of Dimorphos after impact. Developed and operated by the Johns Hopkins University Applied Physics Laboratory (APL), the mission entered formulation in 2015 after multiple years of concept development. The project was administered according to NPR 7120.5, with technical oversight and funding through the Planetary Missions Program Office (PMPO) at Marshall Space Flight Center (MSFC) and overall support as a directed mission from NASA’s Planetary Defense Coordination Office (PDCO). The DART spacecraft hosted a singular payload, the Didymos Reconnaissance and Asteroid Camera for Optical navigation (DRACO), and a deployable CubeSat contributed by ASI named the Light Italian CubeSat for Imaging of Asteroids (LICIACube). On 11 September 2022, DART deployed LICIACube, which subsequently followed the DART spacecraft at a safe distance and observed the immediate aftermath of the DART impact. DART was designed to autonomously detect, navigate to, and impact Dimorphos. This autonomous design was chosen to maximize the probability of impact, since commanding from the ground could result in course corrections arriving too late. On the day of impact, 26 September 2022, the spacecraft’s autonomous systems successfully detected and locked on to Dimorphos, impacting its surface within 2 m of the center of the illuminated figure (Jensenius et al., 2023). No human intervention was required for a successful impact, demonstrating that humanity possesses the technology to perform a kinetic impact. Within 2 weeks of impact, it was clear that the orbit of Dimorphos had been significantly altered. On 11 October 2022, NASA Administrator Bill Nelson announced that the new orbital period of Dimorphos was shortened by approximately 32 ± 2 min, from 11 h and 55 min before impact to 11 h and 23 min after impact. With additional observations over the following months, the accuracy of this measurement improved to a –33.24 min ± 1.4 s orbital period change (Naidu et al., 2023; Scheirich et al., 2023), and Beta (β), the momentum transfer enhancement parameter, was reported to be 3.6 (Cheng et al., 2023). Subsequent studies examined the details of DART’s impact site, modeled the impact event, investigated the ejecta produced, and analyzed the dynamics of the Didymos system. These combined results clearly demonstrate that the project met all Level 1 mission requirements.

asteroid↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

KSC Headquarters Building Area SWMU 104 Soil Interim Measure Report for LOC 2D and LOC 2E Kennedy Space Center, Florida

This Interim Measure (IM) Report for Location of Concern (LOC) 2D and LOC 2E summarizes the activities associated with implementation of an IM to address soil and concrete contamination at the Kennedy Space Center (KSC) Headquarters Building Area (KHQA) located at KSC, Florida. KHQA has been designated Solid Waste Management Unit (SWMU) 104 under KSC’s Resource Conservation and Recovery Act Corrective Action Program. The IM consisted of excavating/removing residual polychlorinated biphenyl (PCB) contamination in soil and concrete from two separate areas, LOC 2D and LOC 2E, which were associated with electrical transformer locations. IM activities were conducted in accordance with the Interim Measure Work Plan (IMWP), Revision 1, for KHQA dated June 2018, which was approved by the Florida Department of Environmental Protection in a correspondence letter dated April 2016 and the United States Environmental Protection Agency in a correspondence letter dated August 2018. The objective of the IM was to remove all remaining contaminated media with total PCB concentrations greater than the State of Florida Residential Soil Cleanup Target Level (RSCTL) (0.5 milligrams per kilogram [mg/kg]). This cleanup goal meets unrestrictive re-use conditions in Florida, and is below federal regulations for PCB Bulk Remediation Waste Cleanup of 1 mg/kg for high occupancy, unrestricted use areas, as outlined in 40 Code of Federal Regulations (CFR) 761.61(a). The timeline of the IM was coordinated with demolition of the former KSC Headquarters Building (demolished in 2021) in order to safely remove contaminated media after electrical equipment was de-energized and removed from the site. Excavation activities were conducted between January 10, 2022, and February 8, 2022, and included two waste streams for off-site disposal: (1) PCB-remediation waste greater than or equal to 50 mg/kg, and (2) PCB-remediation waste less than 50 mg/kg. A total of approximately 347 cubic yards (478 tons) of PCB-contaminated soil and concrete was initially removed from the LOC 2D and LOC 2E areas, as defined in the IMWP. An additional 4.35 tons of soil and concrete were removed based on verification sampling, which was conducted until the cleanup goal was achieved. The total area of excavation from both LOC 2D and LOC 2E was approximately 5,186 square feet (0.12 acres), and excavation depths ranged from 0.5 to 4.0 feet below land surface Excavated soils and concrete were stockpiled based on waste stream and subsequently transported and disposed of at Waste Connections of Osceola County, LLC – JED Landfill in St. Cloud, Florida (PCBs less than 50 mg/kg) or the Chemical Waste Management Landfill in Emelle, Alabama (PCBs greater than or equal to 50 mg/kg). Following excavation, clean backfill was brought to the site and provided to the Demolition Contractor to complete backfill and grading in conjunction with their final site restoration activities from building demolition. Post-IM groundwater sampling was conducted in May 2022 at three monitoring wells installed in April 2022 to confirm that PCBs did not leach into groundwater. These wells were installed where the highest PCB concentrations were detected at LOC 2D, LOC 2E, and from the Building Perimeter IM (previously completed in 2020). All PCB results in groundwater were non-detect. Volatile organic compounds were also analyzed based on potential past use of solvents in transformers with PCB-dielectric fluids and the potential release of dielectric fluids containing volatile organic compounds, and all results were non-detect. Based on completion of a successful IM at LOC 2D and LOC 2E, as well as previous remedial actions that have addressed other contamination at KHQA (SWMU 104), No Further Action without controls will be recommended for SWMU 104. NASA will submit separate Site Rehabilitation Completion Order request documentation for SWMU 104 to support an NFA without controls recommendation.

PCB↗

Fire Station #2, Former Sewage Treatment Plant #17, and Towway Area-SWMU 114 PFAS Site Assessment Progress Report Kennedy Space Center, Florida

This PFAS Site Assessment Progress Report (SAPR) presents the findings of the 2022 PFAS investigation conducted from November 2021 through August 2022 at Solid Waste Management Unit (SWMU) 114 located within Kennedy Space Center (KSC), Florida. SWMU 114 includes area around Fire Station #2, Former Sewage Treatment Plant #17, the southern portion of the Shuttle Landing Facility Runway, Remote Launch Vehicle Hangar, and the Towway area. Fire Station #2 was constructed in 2008 and is currently active, housing fire station personnel and equipment, including aqueous film forming foam (AFFF). Releases of AFFF has occurred at SWMU 114. Previous environmental assessments have been performed at SWMU 114, including soil, groundwater, and surface water sampling for volatile organic compounds, polycyclic aromatic hydrocarbons, total petroleum hydrocarbons, and metals. No active remediation has been performed at the SWMU 114. PFAS site assessment field activities were conducted at SWMU 114 from November 2021 through August 2022. During the 2021-2022 Site Assessment, 124 direct-push samples were collected from 27 locations, 17 surface water samples were collected from 15 locations, 41 groundwater samples were collected from 37 newly installed monitoring wells, five concrete samples were collected from four locations, and one asphalt sample was collected. Additionally, two soil borings were advanced to 60 feet for lithologic descriptions, ten staff gauges were installed, and one round of water level measurements were collected from monitoring wells and staff gauges for groundwater flow determination. All groundwater and surface water samples were analyzed for 25 PFAS analytes by USEPA Method 537M. Concrete, and asphalt samples were analyzed by synthetic precipitation leaching procedure (SPLP) PFAS analysis by USEPA Modified Method 537M. Groundwater results were compared to the most recent Regional Screening Levels (RSLs) published by USEPA for residential tap water (USEPA, 2022a) to determine the extent of PFAS contamination at SWMU 114 for six PFAS analytes (PFOA, PFNA, PFBS, PFHxS, PFOS, and GenX). Surface water results were compared to the FDEP surface water screening levels (SW SLs) (FDEP, 2020) for PFOA and PFOS. The PFAS investigation concluded that groundwater exceeding RSLs extends east and south to Banana Creek and west to approximately the center of the SLF runway. The extent of PFAS is approximated to the north, to an area between Sharkey Road and Astronaut Road, where samples below the RSLs do not fully bound SWMU 114. At least two distinct PFAS source areas are located near Fire Station #2 and along Towway, at S114-MW0007S, within SWMU 114. Groundwater head measurements indicate that flow at SWMU 114 is generally similar across the shallow and intermediate water tables. A northeast to southwest trending groundwater divide is located near the middle of Towway where groundwater southeast of the divide flows to the south and groundwater northwest of the divide flows to the west. The groundwater divide generally separates the two areas of higher PFAS concentrations. Surface water samples indicated concentrations of PFOS above the SW SLs in surface water bodies across the site. Further assessment and sampling are required to better understand the interaction between groundwater and surface water at SWMU 114. Concrete and asphalt samples collected confirm that a significant release of AFFF occurred near the stormwater pond northwest of Fire Station #2. Additional concrete samples surrounding Fire Station #2 and at the northwest and southeast edges of the SLF tarmac indicate elevated PFOS concentrations. These results indicate that discharges of AFFF in these locations have infiltrated into asphalt and concrete and may act as a continuing source of PFAS to groundwater and surface water after rain events. Additional direct-push samples are required to delineate PFAS at SWMU 114. Samples may need to extend beyond the Former SLF Rescue Building and Morpheous Test Site to delineate PFAS in groundwater. Monitoring wells should be sampled and gauged quarterly to determine if seasonal impacts are observable, especially in shallow wells near surface water features. Furthermore, surface water samples should be collected from additional ditches to further define the extent of surface water impacts at SWMU 114 and extending along the SLF runway. Staff gauges should be gauged quarterly with groundwater gauging to determine surface water flow and interaction with groundwater. The PFAS sampling results and path forward for SWMU 114 were presented to the KSC Remediation Team in October 2022. Once the PFAS SAPR is approved, it will be submitted to the Florida Department of Environmental Protection.

Howard Franklin Fowler↗

Capitol Reef Ecological Conservation: Mapping Vegetation Functional Groups to Inform Invasive Vegetation Management, Ecological Conservation and Restoration in Capitol Reef National Park

Invasive exotic plant (IEP) species have been found within the park boundaries of Capitol Reef National Park (CARE) in Utah. Currently, remotely sensed datasets such as the Rangeland Analysis Platform (RAP) from the United States Department of Agriculture (USDA) have been used to investigate IEP species within the park, but validation of the national RAP program is necessary for informing decisions at a local scale. CARE seeks a remote monitoring solution that can precisely target managerial efforts within the park’s challenging terrain and hard-to-reach locations. To fulfill this objective, we harnessed Landsat 8 Operational Land Imager (OLI) imagery and leveraged Random Forest (RF) modeling to generate classification maps characterizing vegetation functional groups for 2013 and 2022 within the park. Subsequently, the Land Change Modeler (LCM) in Idrisi TerrSet facilitated the production of a predicted classification map for 2033. The team also devised an annual grass probability map to accentuate areas impacted by exotic grasses. A comparative assessment between the RF classification map and the RAP map for 2022 revealed an overall agreement of 47.41%, with disparities primarily arising from differences in bare soil and shrub areas. Significantly, the 2022 RF-generated classification map showcased an impressive overall accuracy of 92.17%. In short, the probability map, the land cover change detection spanning 2013 to 2022, and the forecasting of observed trends into the future aids in the evaluation of invasive plant impacts and facilitation of CARE’s preparedness for potential ecological disturbances. Notably, in comparison to the RAP, the RF classification method generates functional group maps that are more representative of the study area.

Vanchy Li↗

Results of the 2023 Mental Health Survey of the Planetary Science Community

Several recent studies have recognized mental health concerns in academia and in the research field more broadly [e.g., 1,2]. In planetary science, a 2022 survey found that the prevalence of clinically significant anxiety and depressive symptoms among our community is higher than in the general United States public, especially among graduate students, postdoctoral researchers, soft money researchers, and tenure-track faculty. Further, 76% of planetary science participants in the 2022 survey noted that their anxiety and/or depressive symptoms impacted their work, their ability to take care of things at home, and interpersonal relationships. Thus, these symptoms may play a role in decreased research quality and productivity. Interpretations of the 2022 mental health survey of planetary science also noted potential diversity, equity, and inclusion concerns. There were indications of statistically significant greater severities of anxiety, depression, and stress among women, people of color, and those who identify as LGBTQ+ compared to the dominant groups in planetary science. Furthermore, survey participants who identify as LGBTQ+ reported a greater likelihood of considering leaving the planetary science field. With the growing recognition of these mental health concerns, including evidence from the 2022 mental health survey of planetary science, the planetary science community advocated that NASA should further recognize the impact of mental health on science products and composition and work to address these issues including regular monitoring of the health of the community. With the 2023 survey, we shed light on the factors that may contribute to these mental health concerns, which may help the planetary science community and NASA on how to address the issue.

D Trang↗

Analysis of Hot-Wire Probe Ice Water Content Measurements in High Ice Water Content Conditions

During the 2022 High Ice Water Content (HIWC) Flight Campaign, ice water content (IWC) measurements were made at various locations on the NASA DC-8 Airborne Science Laboratory using the Isokinetic Probe Version 2 (IKP2), Ice Crystal Detectors (ICD), and Robust Probe. Correlations of a wing mounted ICD to IKP2 were made to determine the collision/retention efficiency of the ICD total water content (TWC) element in glaciated conditions. Similarly, correlations of a nose mounted ICD near the pitot probes were made to the IKP2 and to the wing-mounted ICD to estimate the ice concentration factor near the DC-8 pitot probes. Results from the 2022 flight campaign were compared to results from the HIWC RADAR II flight campaign in 2018. There was an apparent reduction in the ICD TWC collision/retention efficiency during the 2022 flight campaign. Although reasons for this discrepancy were explored, more analyses are needed to fully understand the causes. However, it was concluded that an estimated ice concentration factor at the nose of 2.5 was consistent between the two flight campaigns. Additionally, a correlation model was developed to relate measurements from a Nose ICD to freestream IWC as measured by the IKP2 to support IWC measurements from the 2022 Convective Processes Experiment - Cabo Verde (CPEX-CV) flight campaign.

Icing↗

Analysis of Hot-Wire Probe Ice Water Content Measurements in High Ice Water Content Conditions

During the 2022 High Ice Water Content (HIWC) Flight Campaign, ice water content (IWC) measurements were made at various locations on the NASA DC-8 Airborne Science Laboratory using the Isokinetic Probe Version 2 (IKP2), Ice Crystal Detectors (ICD), and Robust Probe. Correlations of a wing mounted ICD to IKP2 were made to determine the collision/retention efficiency of the ICD total water content (TWC) element in glaciated conditions. Similarly, correlations of a nose mounted ICD near the pitot probes were made to the IKP2 and to the wing-mounted ICD to estimate the ice concentration factor near the DC-8 pitot probes. Results from the 2022 flight campaign were compared to results from the HIWC RADAR II flight campaign in 2018. There was an apparent reduction in the ICD TWC collision/retention efficiency during the 2022 flight campaign. Although reasons for this discrepancy were explored, more analyses are needed to fully understand the causes. However, it was concluded that an estimated ice concentration factor at the nose of 2.5 was consistent between the two flight campaigns. Additionally, a correlation model was developed to relate measurements from a Nose ICD to freestream IWC as measured by the IKP2 to support IWC measurements from the 2022 Convective Processes Experiment - Cabo Verde (CPEX-CV) flight campaign.

Icing↗

NASA 5.2%-Scale Semispan High Lift Common Research Model Wind Tunnel Test at the 14- by 22-Foot Subsonic Tunnel

A wind tunnel test of the NASA 5.2%-scale Semispan High Lift Common Research Model (CRM-HL) was conducted at the 14- by 22-Foot Subsonic Tunnel (14x22) in the fall of 2022. The main purpose of the test was a model checkout before shipping it overseas. The model was shipped to Germany in the spring of 2023, and the team wanted to be sure that instrumentation in the model was working, all of the model parts fit together well, and model changes could be done smoothly, as designed while installed in a wind tunnel. Force and moment and pressure data were collected during the test, and while these data were a secondary objective, they can be used for for tunnel-to-tunnel verification of the model, and for database supplementation for the NASA CRM-HL ecosystem. The test was run from August 15, 2022 through September 8, 2022. Eight configurations were tested at Mach 0.2 and 0.26, over an alpha range from -4deg to +24deg. All of the configurations that were tested accomplished testing of all model parts. This test campaign was a unique opportunity to test a complicated model design in a wind tunnel that is less expensive to test in and has easier model access than the tunnel that it was designed to run in. The test was invaluable in providing lessons learned about building up and running the model, and the model was returned to the model manufacturer from December 2022 to February 2023 for updates to make model changes easier, to make design fixes on the model, and to do clean up work on the model.

CRM-HL↗

NASA 5.2%-Scale Semispan High Lift Common Research Model Wind Tunnel Test at the 14- by 22-Foot Subsonic Tunnel

A wind tunnel test of the NASA 5.2%-scale Semispan High Lift Common Research Model (CRM-HL) was conducted at the 14- by 22-Foot Subsonic Tunnel (14x22) in the fall of 2022. The main purpose of the test was a model checkout before shipping it overseas. The model was shipped to Germany in the spring of 2023, and the team wanted to be sure that instrumentation in the model was working, all of the model parts fit together well, and model changes could be done smoothly, as designed while installed in a wind tunnel. Force and moment and pressure data were collected during the test, and while these data were a secondary objective, they can be used for for tunnel-to-tunnel verification of the model, and for database supplementation for the NASA CRM-HL ecosystem. The test was run from August 15, 2022 through September 8, 2022. Eight configurations were tested at Mach 0.2 and 0.26, over an alpha range from -4deg to +24deg. All of the configurations that were tested accomplished testing of all model parts. This test campaign was a unique opportunity to test a complicated model design in a wind tunnel that is less expensive to test in and has easier model access than the tunnel that it was designed to run in. The test was invaluable in providing lessons learned about building up and running the model, and the model was returned to the model manufacturer from December 2022 to February 2023 for updates to make model changes easier, to make design fixes on the model, and to do clean up work on the model.

Semispan↗

NASA’s Space Launch System Successfully Launches Artemis I Mission and Hardware Progress Continues for Next Artemis Missions

NASA’s Artemis I mission will be the first flight of the agency’s Space Launch System (SLS) rocket. It will launch an uncrewed Orion spacecraft to the Moon, where it will enter a highly elliptical retrograde orbit. In 2022, final tests, checkouts, and preparations were on schedule to be completed, including the vital wet dress rehearsal (WDR) at Kennedy Space Center’s (KSC) Launch Complex 39B. Following successful completion of WDR, which is expected in summer 2022, the Artemis I launch vehicle will be returned to the Vehicle Assembly Building (VAB) at KSC where it will be prepared for launch. Important data were collected during launch and will be shared as applicable. While the Artemis I hardware and mission took center stage in 2022, significant progress was made on hardware and software for future Artemis missions, including for the first crewed launch and the following SLS Block 1B and Block 2 variants of the rocket.

John Honeycutt↗

X-Ray Computed Tomography During Preliminary Examination of Apollo Drive Tube 73001

Introduction: Starting in 2019, the Apollo Next Generation Sample Analysis (ANGSA) Program has enabled consortium studies of specially curated Apollo samples that were previously unstudied (or under studied). This began with unsealed core tube 73002 [1,2] that is the upper part of a station 3 double drive tube. More recently the pro-gram extended to the study of a variety of frozen Apollo 17 samples [3], as well as the gas extraction [4] and dis-section [5] of 73001, the lower half of the station 3 double drive tube, that was sealed under vacuum on the Moon. In this abstract we will examine the role of X-ray Computed Tomography (XCT) during the preliminary examination process for sealed core 73001, including: (1) engineering scans to aid in understanding the gas extraction process, whole-core scanning prior to opening to inform extrusion and dissection work, and (3) individual particle scanning to characterize rock fragment lithologies for follow on studies. Methodology: Sample 73001 is a 33 cm long, 4 cm diameter regolith sample collected inside a drive tube (~1 mm aluminum walls). That drive tube was sealed inside a 0.5 mm thick stainless steel (SS) Core Sample Vacuum Container (CSVC). XCT scans for engineering purposes were done on the Nikon XTH 320 system at Johnson Space Center using the 225 kV multi-metal reflection source at 215 kV, 179 A, and a 38.49 m voxel size. Individual >4 mm particles separated from the core during processing (then triply sealed in Teflon bags) were also scanned at JSC using the 180 kV source at 90 kV, 33 A, and a 2.98 – 10.65 m voxel size. Whole-core scans were done at the University of Texas High-Resolution X-ray Computed Tomography Facility (UTCT) on the 225 kV reflection source on the North Star Imaging cabinet XCT system. These scans included: (1) a series of 9 overlapping super-resolution scans each covering a ~4 cm length of the tube at 190 kV, 180 µA, and a 12.9 µm voxel size and (2) a lower resolution continuous helical scan of the entire core at 190 kV, 180 µA, and a 51.8 µm voxel size. Progress and Results: Before piercing and extracting the gas from sample 73001, an XCT scan of the bottom portion of the CSVC was used to confirm the location of the Teflon cap on the inner drive tube, to ensure it was not accidentally pierced during gas extraction. Similarly, after piercing, the bottom and top portions of the CSVC were scanned in order to capture engineering knowledge about the results of the piercing process, as well as the metal knife edge vacuum seal (SS into In-Ag alloy). Both scans will provide constraints on future work of this type, particularly for samples collected during the Artemis mission. Another finding from these "engineering" scans was that the device in the drive tube that immobilizes the regolith (the keeper) was not seated in the tube properly. This meant that (1) the drive tube could not be removed from the CSVC for the trip to UTCT, and (2) the procedure for opening and extruding the drive tube had to be modified. Had either of these things not been known prior to opening the CSVC, it could have led to an inability to XCT scan the whole core at high resolution and/or potential disruption of the core stratigraphy during extrusion. At UTCT, the entire length of the core was scanned at high resolution (12.9 microns per voxel). This scan serves multiple purposes: (1) A lower resolution (and uncorrected) version of these scans stitched together was used to help inform the processors of potential pitfalls during extrusion and dissection; and (2) the full resolution corrected data will serve as the permanent in situ record of the stratigraphy of the sample and will enable future researchers to perform a variety of analyses. So far, 92 of the 121 >4 mm particles separated during dissection pass 1 of sample 73001 have been individually scanned. These scans clearly show the lithology of each particle while keeping the particles in pristine condition. Because of the dust adhering to particle exteriors it would otherwise be impossible to determine lithologies in a non-contaminating way. Thus far the types of lithologies seen in sample 73001 (e.g., regolith breccias, impact-melt breccias, agglutinates, and basalts) are similar to those previously identified in sample 73002 [2]. By the time of the meeting, all particles from all 3 dissection passes will have been scanned and statistics on the different lithologies in 73001 compiled. References: [1] Shearer et al. (2020) 51st LPSC, abstract 1181. [2] Zeigler et al. (2020) 51st LPSC, abstract 3023. [3] Kent et al. (2022) This Volume. [4] McDonald et al. (2022) European Lunar Symposium. [5] Gross et al (2022) This volume.

Moon↗

X-Ray Computed Tomography of Apollo Drive Tube 73001 as Part of the Apollo Next Generation Sample Analysis Program

Introduction: Starting in 2019, the Apollo Next Generation Sample Analysis (ANGSA) Program has enabled consortium studies of specially curated Apollo samples that were previously unstudied (or under studied). This program was intended as a participating scientist program for these Apollo samples, as well as a preparation for upcoming lunar sample return missions (e.g., Artemis). The work began with studies of unsealed core tube 73002 [1,2] that is the upper ~35 cm of an Apollo 17 double drive tube (~70 cm total depth) collected on the landslide deposit near Lara Crater at Station 3 in the Taurus Littrow Valley. More recently the program extended to the study of a variety of frozen Apollo 17 samples [3], as well as the gas extraction [4] and dissection [5] of 73001, the lower half of the station 3 double drive tube. Sample 73001 was sealed under vacuum on the Moon in a Core Sample Vacuum Container (CSVC). In this abstract we will examine the role of X-ray Computed Tomography (XCT) during the preliminary examination process for sealed core 73001, including: (1) engineering scans to aid in understanding the gas extraction process, (2) whole-core scanning prior to opening to inform extrusion and dissection work, and (3) individual particle scanning to characterize rock fragment lithologies for follow on studies. Methodology: Sample 73001 is a 33 cm long, 4 cm diameter regolith sample collected inside a lunar drive tube (~1 mm aluminum walls). That drive tube was sealed inside a 0.5 mm thick stainless steel (SS) CSVC. XCT scans for engineering purposes were done on the Nikon XTH 320 system at Johnson Space Center using the 225 kV multi-metal reflection source at 215 kV, 179 A, and a 38.49 m voxel size. Individual >4 mm particles separated from the core during processing (then triply sealed in Teflon bags) were also scanned at JSC using the 180 kV source at 90 kV, 33 A, and a 2.98 – 10.65 m voxel size. Whole-core scans were done at the University of Texas High-Resolution X-ray Computed Tomography Facility (UTCT) on the 225 kV reflection source on the North Star Imaging cabinet XCT system. These scans included: (1) a series of 9 overlapping super-resolution scans each covering a ~4 cm length of the tube at 190 kV, 180 µA, and a 12.9 µm voxel size and (2) a lower resolution continuous helical scan of the entire core at 190 kV, 180 µA, and a 51.8 µm voxel size. Progress and Results: Before piercing and extracting the gas from sample 73001, an XCT scan of the bottom portion of the CSVC was used to confirm the location of the Teflon cap on the inner drive tube and whether there was an “air” gap between the Teflon cap and the CSVC. This was to ensure the Teflon cap (which immobilized the soil inside the drive tube) was not accidentally pierced during gas extraction. Similarly, after piercing, the bottom and top portions of the CSVC were scanned in order to capture engineering knowledge about the results of the piercing process, as well as the metal knife edge vacuum seal (SS into an In-Ag alloy). Both scans will provide constraints on future work of this type, both for the design of tools used on the lunar surface during Artemis, as well as how we open future samples of this type. An unexpected finding from these engineering scans was that the device in the drive tube that immobilizes the regolith (the keeper) was not seated in the tube properly. This meant that (1) the drive tube could not be removed from the CSVC for the trip to UTCT, and (2) the procedure for opening and extruding the drive tube had to be modified. Had either of these things not been known prior to opening the CSVC, it could have led to an inability to XCT scan the whole core at high resolution and/or potential disruption of the core stratigraphy during extrusion. At UTCT, the entire length of the core was scanned at high resolution (12.9 microns per voxel). This scan serves multiple purposes: (1) A lower resolution (and uncorrected) version of these scans stitched together was used to help inform the processors of potential pitfalls during extrusion and dissection (voids, angular fragments at the edges of the sample, etc.); and (2) the full resolution corrected data will serve as the permanent in situ record of the stratigraphy of the sample and will enable future researchers to perform a variety of analyses. All 121 >4 mm particles separated during dissection pass 1 of sample 73001 have been individually scanned. These scans clearly show the lithology of each particle while keeping the particles in pristine condition (they are individually triply bagged in Teflon within our N2 purged processing cabinets). Because of the dust adhering to particle exteriors, it would otherwise be impossible to determine lithologies in a non-contaminating way. Thus far the types of lithologies seen in sample 73001 (e.g., regolith breccias, impact-melt breccias, agglutinates, and bas-alts) are similar to those previously identified in sample 73002 [2]. By the time of the meeting, all particles from all 3 dissection passes will have been scanned and statistics on the different lithologies in 73001 compiled. References: [1] Shearer et al. (2020) 51st LPSC, abstract 1181. [2] Zeigler et al. (2020) 51st LPSC, abstract 3023. [3] Kent et al. (2022) This Volume. [4] McDonald et al. (2022) European Lunar Symposium. [5] Gross et al (2022) This volume.

Moon↗

From Apollo to Artemis: How Processing ANGSA Core Samples 73001/2 Can Help to Prepare for Future Sample Return Missions to the Moon and Beyond.

Introduction: Apollo Sample 73001/2 is a ~71cm long double drive tube consisting of an upper part (73002) and a lower part (73001) that contains regolith collected near Lara Crater at the Apollo 17 site, Station 3. The double drive tube is believed to have penetrated a lunar landslide deposit that was transported from the slope of the South Massif into the Taurus-Littrow Valley [1]. As part of the ANGSA (Apollo Next Generation Sample Analyses) initiative, preparing a preliminary examination (PE) catalog of 73001/2 is a crucial first step for the early identification of material types such as rock fragments and potential stratigraphy within the core. Many new curation and scientific tools such as X-ray computed tomography (XCT) [3], multi-spectral imaging [4], and gas extraction manifold with piercing tool [5-7], have been applied to the ANGSA core to benefit curation strategy, PE efforts, sample allocation to the planetary science community, and ultimately help to prepare for future sample return missions like Artemis. 73001/2 Preliminary Examination and Processing: Sample 73002 was successfully opened and extruded in Nov. 2019 and fully dissected at the end of 2021. Sample 73001 (Fig. 1) was successfully extruded in March 2022 after careful planning before opening the Core Sample Vacuum Container (CSVC) that was holding the drive tube of 73001. XCT, as part of PE, was used to scan the bottom and top part of the 73001 core tube within the CSVC prior to opening it to 1) facilitate non-destructive, rapid detection of any contamination potentials due to piercing of the CSVC during gas extraction [7]; and 2) to aid in the Artemis sample tool development and provide data on the knife edge seal of the CSVC. This knowledge will help us connect the mechanics of the implemented design (i.e., XCT data) to the performance of the seal (i.e., data on the gas samples will tell us how well the seal preserved the volatile record of lunar samples). Both type of information will feed forward into Artemis tool and storage strategies for future samples. Results and Lessons learned: The XCT data of the CSVC and core tube within showed that the bottom Teflon cap was not pierced during gas extraction (Fig. 1c) and thus, the sample integrity remained guaranteed during piercing and subsequent gas extraction. However, the XCT scan of the top of the core (Fig. 1b) revealed that the drive tube was overfilled with lunar soil and the tool that keeps the soil constrained within the drive tube was not fully deployed. These preliminary data allowed us to implement the necessary steps to prevent loss of sample integrity, including any potential stratigraphy shifts during extrusion. Processing Apollo core 73001/2, creating an informative PE catalog, and applying new and refined tools and technologies for sample analyses are invaluable activities that will assist in circumventing any potential pitfalls, aid in the characterization of samples, and help in the assessment of how well any lunar material has been collected and preserved in the past. This will aid in designing future sample collections and curation procedures and help to prepare for future human exploration and sampling missions such as Artemis. References: [1] Schmitt H. (2017) Icarus 298, 2-33. [3] Zeigler et al. (2021) LPSC 52nd, #2632; [4] Sun et al. (2021), LPSC 52nd, #1789; [5] Parai et al. (2021), LPSC 52nd #2665; [6] Schild et al. (2021) LPSC 52nd #1888; [7] McDonald (2022) ESL 2022.

ANGSA↗

Interim Measure Report Revision 0: Un-Numbered Operational Areas PRL 229

This report documents the Interim Measure (IM) completed at Un-Numbered Operational Areas (UNOA) potential release location (PRL) 229, at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224. The purpose of this IM report is to document the field results of the 2022 IM conducted between December 13, 2021, and February 11, 2022, and to present the recommendations based on the IM findings. IM activities were completed at the UNOA PRL 229 to remove railroad ties and benzo(a)pyrene equivalent (BAPE)/total recoverable petroleum hydrocarbons (TRPH)-affected soil in accordance with the IM Work Plan (IMWP) (Jacobs/CORE, 2019a). The objectives of the IM were to mitigate human health risks by reducing site contaminants to the residential soil cleanup target level (SCTL) based on the 95 percent upper confidence limit on the mean. A second objective was to reduce low molecular weight and high molecular weight polynuclear aromatic hydrocarbon (PAH) concentrations below ecological screening values for terrestrial receptors. Prior to excavation operations, railroad ties from all areas were consolidated. In total, 50.67 tons of railroad ties were transported from the site to JED Landfill in St. Cloud, Florida. The cumulative excavation footprint spanned an area of 9,710 square ft. In total, 908.54 tons of soil was transported from the site to JED Landfill. To backfill the excavation area, 880 cubic yards of clean fill was trucked to the site from S&LMaterials, Inc. borrow pit in Christmas, Florida. Following completion of backfill, the site restoration activities included grading the disturbed areas to match the existing elevations and vegetation planting by the site restoration subcontractor. The IM implementation activities were presented to the KSC Remediation Team during its meeting on May 3, 2022. The Remediation Team reached consensus on the completion of the IM reducing the area affected by BAPE/TRPH above the State of Florida residential soil cleanup target levels.

PAHs↗