Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Addressing EO-1 Spacecraft Pulsed Plasma Thruster EMI Concerns

The Pulsed Plasma Thruster (PPT) Experiment on the Earth Observing One (EO-1) spacecraft has been designed to demonstrate the capability of a new generation PPT to perform spacecraft attitude control. Results from PPT unit level radiated electromagnetic interference (EMI) tests led to concerns about potential interference problems with other spacecraft subsystems. Initial plans to address these concerns included firing the PPT at the spacecraft level both in atmosphere, with special ground support equipment. and in vacuum. During the spacecraft level tests, additional concerns where raised about potential harm to the Advanced Land Imager (ALI). The inadequacy of standard radiated emission test protocol to address pulsed electromagnetic discharges and the lack of resources required to perform compatibility tests between the PPT and an ALI test unit led to changes in the spacecraft level validation plan. An EMI shield box for the PPT was constructed and validated for spacecraft level ambient testing. Spacecraft level vacuum tests of the PPT were deleted. Implementation of the shield box allowed for successful spacecraft level testing of the PPT while eliminating any risk to the ALI. The ALI demonstration will precede the PPT demonstration to eliminate any possible risk of damage of ALI from PPT operation.

Zakrzwski, C. M.↗

Overview of the Development and Testing of the Heatshield for Extreme Entry Environment Technology (HEEET) TPS

Over the last 5 years, the Heatshield for Extreme Entry Environment Technology (HEEET) project has been working to mature a 3-D Woven Thermal Protection System (TPS) to Technical Readiness Level (TRL) 6 to support future NASA missions to destinations such as Venus and Saturn. A key aspect of the project has been the development of the manufacturing and integration processes/procedures necessary to build a heat shield utilizing the HEEET 3D-woven material. This has culminated in the building of a 1-meter diameter Engineering Test Unit (ETU) representative of what would be used for a Saturn probe. The present talk provides an overview of recent testing of NASA's Heatshield for Extreme Entry Environment Technology (HEEET) 3D Woven TPS. Under the current program, the ETU has been subjected to Thermal and Mechanical loads typical of deep space mission to Saturn. Thermal testing of HEEET coupons has performance up to 4,500 watts per centimeter squared at 5 atmospheres stagnation pressure and successful shear performance up to 3000 pascals at 1,650 watts per centimeter squared at 2.6 atmospheres pressure.

HEEET↗

A Saturn launched X-ray astronomy experiment. Volume 1: S-027

The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

Source record↗

Percheron Power Archimedes Screw Turbine Analysis (Abstract)

The development of the Percheron Power (Percheron) composite Archimedes screw turbine (AST) is based upon employing newly developed theoretical mathematical models for optimizing the water volume carried through the AST for a given diameter, combined with minimizing efficiency losses due to bypass flow and friction. The key feasibility issues associated with producing the composite blades will be to understand the strength, fatigue, and wear performance of the AST blades and associated components, and how these factors change along the length of the turbine. To get to this understanding of material property requirements, Percheron needs free-surface computational fluid dynamics (CFD) models of the AST designs and to perform interactive modeling between the turbine blade optimization and component design based on finite element method stress analysis (FEA). The workscope and analyses requested by Percheron in the Small Business Voucher (SBV) program are well aligned with PNNL capability and recent work experience in performing CFD and FEA analysis for hydropower and marine energy turbines. The CFD analysis will provide estimates of power, efficiency, and surface forces on the blades. The forces on the blade will be transferred to the FEA analysis that will be used to evaluate the material stresses. The CFD and FEA analyses will be repeated for different AST designs provided to PNNL by Percheron. The work conducted in this SBV project will complement the existing Percheron FOA project by providing better defined parameters for design and material selection for the turbine unit prior to manufacture of initial test units.

42 ENGINEERING↗

Development of an electronically-scanned pressure module for operation at cryogenic temperatures

Pressure and temperature characteristics were measured for a number of multichannel electronically scanned pressure sensors. The tests were made on commercially available units designed to operate in a controlled temperature environment. Measurements of zero shift, sensitivity, and nonlinearity for each transducer were taken over a temperature range from 100 K to 340 K using a computer controlled data acquisition system. The units tested failed to meet accuracy specifications over the complete temperature range, which was expected. However, the sensors showed acceptable and predictable behavior over the temperature range from approximately -40 C (233 K) to 70 C (343 K). It was determined that a combination of local heating and accurate temperature monitoring can result in a device that can be compensated for temperature as well as its other physical properties. The design of a prototype for operation in a cryogenic environment is proposed, and a method for compensation is developed.

Johnson, Preston B.↗

Validation of NSSC-I software for the Hubble Space Telescope

This paper describes the simulation and test methods used to ensure that the NASA Standard Spacecraft Computer, Model 1, (NSSC-I) flight software for the Hubble Space Telescope properly carries out its requirements for control of scientific observations and for monitoring the health and safety of the payload. The hardware and software test environment is discussed. The different kinds of tests (unit, special real time, and stress tests) that are performed before the software is incorporated into the flight system are described, and the kinds of errors that each test category is best suited to find are listed. Finally, the limitations of the tests are discussed, and current plans for enhancing the test environment are outlined.

Foley, Glenn↗

Thermal Vacuum Testing of a Novel Loop Heat Pipe Design for the Swift BAT Instrument

An advanced thermal control system for the Burst Alert Telescope on the Swift satellite has been designed and an engineering test unit (ETU) has been built and tested in a thermal vacuum chamber. The ETU assembly consists of a propylene loop heat pipe, two constant conductance heat pipes, a variable conductance heat pipe (VCHP), which is used for rough temperature control of the system, and a radiator. The entire assembly was tested in a thermal vacuum chamber at NASA/GSFC in early 2002. Tests were performed with thermal mass to represent the instrument and with electrical resistance heaters providing the heat to be transferred. Start-up and heat transfer of over 300 W was demonstrated with both steady and variable condenser sink temperatures. Radiator sink temperatures ranged from a high of approximately 273 K, to a low of approximately 83 K, and the system was held at a constant operating temperature of 278 K throughout most of the testing. A novel LHP temperature control methodology using both temperature-controlled electrical resistance heaters and a small VCHP was demonstrated. This paper describes the system and the tests performed and includes a discussion of the test results.

Ottenstein, Laura↗

RESOLVE Project

The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph- mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize C!Jmponent and integrated system performance. Ray will be assisting with component testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments. He will be developing procedures to guide these tests and test reports to analyze and draw conclusions from the data. In addition, he will gain experience with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis Ray will conduct include: pneumatic analysis to calculate the WOO's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. In this Research and Technology environment, Ray will be asked to problem solve real-time as issues arise. Since LAVA is a scientific subsystem, Ray will be utilizing his chemical engineering background to operate the near-infrared spectrometer and GC-MS instruments during ETU testing. Ray will be working with Modified Commercial off the Shelf (MCOTS) instruments and characterizing their analytical behavior for optimization. Ray will be offered the opportunity to suggest testing modifications or configuration changes at any time to improve the experimental effectiveness. He will gain many skills needed for working in a technical team setting requiring flexibility and critical thinking.

Parker, Ray O.↗

RESOLVE Project

The RESOLVE project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer, WDD, Sample Delivery System, and GC-MS in the vacuum chamber. This testing will provide hands-on exposure to a flight forward spaceflight subsystem, the processes associated with testing equipment in a vacuum chamber, and experience working in a laboratory setting. Examples of specific analysis conducted include: pneumatic analysis to calculate the WDD's efficiency at extracting water vapor from the gas stream to form condensation; thermal analysis of the conduction and radiation along a line connecting two thermal masses; and proportional-integral-derivative (PID) heater control analysis. Since LAVA is a scientific subsystem, the near-infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.

Parker, Ray↗

RESOLVE (Regolith & Environmental Science Oxygen & Lunar Volatile Extraction) Project

The RESOLVE Project is a lunar prospecting mission whose primary goal is to characterize water and other volatiles in lunar regolith. The Lunar Advanced Volatiles Analysis (LAVA) subsystem is comprised of a fluid subsystem that transports flow to the gas chromatograph - mass spectrometer (GC-MS) instruments that characterize volatiles and the Water Droplet Demonstration (WDD) that will capture and display water condensation in the gas stream. The LAVA Engineering Test Unit (ETU) is undergoing risk reduction testing this summer and fall within a vacuum chamber to understand and characterize component and integrated system performance. Testing of line heaters, printed circuit heaters, pressure transducers, temperature sensors, regulators, and valves in atmospheric and vacuum environments was done. Test procedures were developed to guide experimental tests and test reports to analyze and draw conclusions from the data. In addition, knowledge and experience was gained with preparing a vacuum chamber with fluid and electrical connections. Further testing will include integrated testing of the fluid subsystem with the gas supply system, near-infrared spectrometer for the Surge Tank (NIRST), WDD, Sample Delivery System, and GC-MS in the vacuum chamber. Since LAVA is a scientific subsystem, the near infrared spectrometer and GC-MS instruments will be tested during the ETU testing phase.

LAVA↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Obtaining cryogenic molecular transport data for analysis

The James Webb Space Telescope (JWST) has a primary mirror, made of 18 segments, and a secondary mirror (SM) that are used to direct the light of desired targets. While on orbit, the secondary mirror assembly (SMA) was stowed for approximately 10 days and was subject to molecular contamination outgassing from the cavity of the secondary mirror support structure (SMSS) in-board hinge (IBH) which contains cables, motors, resolvers, and coatings. The main concern during this period before SMA deployment is the accumulation of ice due to the lack of a heater on the SMA. The temperature differentials between the IBH surfaces and SMA could cause redistribution of contaminants. To address this concern, single layer insulation (SLI) was used to create adequate venting and path redirection of outgassing from the IBH. Two separate thermal vacuum tests were performed to quantify this contamination: one Z307 ASTM E 1559 materials test of the radiator paint used on the motor of the IBH and a separate test on a primary mirror backplane assembly (PMBA) qualification engineering test unit (ETU) of the IBH. These tests approximately followed the predicted SMA pre-deployment thermal environment. To quantify source rates in case of a leak, the motor and resolver sides were separated and quartz crystal microbalances (QCM) were used to measure the deposition of water. The SLI redesign and implementation and outgassing measurements to understand leak effects from the IBH were essential to mitigate the deposition of contamination on the SMA.

James Webb Space Telescope, contamination, cleanro↗

Obtaining Cryogenic Molecular Transport Data for Analysis

The James Webb Space Telescope (JWST) has a primary mirror, made of 18 segments, and a secondary mirror (SM) that are used to direct the light of desired targets. While on orbit, the secondary mirror assembly (SMA) was stowed for approximately 10 days and was subject to molecular contamination outgassing from the cavity of the secondary mirror support structure (SMSS) in-board hinge (IBH) which contains cables, motors, resolvers, and coatings. The main concern during this period before SMA deployment is the accumulation of ice due to the lack of a heater on the SMA. The temperature differentials between the IBH surfaces and SMA could cause redistribution of contaminants. To address this concern, single layer insulation (SLI) was used to create adequate venting and path redirection of outgassing from the IBH. Two separate thermal vacuum tests were performed to quantify this contamination: one Z307 ASTM E 1559 materials test of the radiator paint used on the motor of the IBH and a separate test on a primary mirror backplane assembly (PMBA) qualification engineering test unit (ETU) of the IBH. These tests approximately followed the predicted SMA pre-deployment thermal environment. To quantify source rates in case of a leak, the motor and resolver sides were separated and quartz crystal microbalances (QCM) were used to measure the deposition of water. The SLI redesign and implementation and outgassing measurements to understand leak effects from the IBH were essential to mitigate the deposition of contamination on the SMA. "

James Webb Space Telescope↗

Initial Testing Results and Forward Design Considerations for the Tri-Rotor Hand Controller

The Lunar Terrain Vehicle (LTV) is one of the key elements of NASA’s Artemis return to the Moon. As an unpressurized rover, the LTV hand controller must take into account the limitations of the spacesuit worn by the crew as well as lessons learned operating the Apollo Lunar Roving Vehicle and preliminary NASA simulations. Because the NASA Ground Test Unit (GTU) design features omnidirectional steering, NASA engineers developed the TriRotor is an innovation to minimize crew fatigue and discomfort. NASA conducted a series of tests, initially with 3D printed mockup controllers, and expanding to a functional prototype used in an LTV video wall simulation. The Tri-Rotor compared favorably with legacy Apollo T-Handles, though numerous test subject comments were collected to improve the controller’s usability. Several options to improve the Tri-Rotor’s usability are also discussed, along with opportunities to test the Tri-Rotor in Virtual Reality, a motion table, and in field analogs.

Hand Controller↗

Characterization of Nancy Grace Roman Space Telescope Slitless Spectrometer (grism)

We have published the optical design and early test results of the Roman Space Telescope grism spectrometer in previous SPIE proceedings. We report the follow-on activity of the spectral and radiometric calibrations, including the calibration methods, experiment designs, and test equipment calibration, such as the light source and detectors used in the test. The grism calibration includes the throughput versus wavelength, which is largely determined by the diffraction efficiency of the two diffractive surfaces. It also includes spectral resolution, point spread function, and relative radiometric measurements. The measured results are presented. The comparisons between the test data and the theoretical simulations are also presented. The tests and results presented are from the engineering test unit in ambient room temperature environment. The thermal/vacuum tests are planned to verify the results when the flight unit is ready.

Qian Gong↗

Testing of the United Stirling 4-95 solar Stirling engine on test bed concentrator

The objectives with the testing, test set-ups, component designs, and the results of the testing of the solar Stirling engine in a parabolic dish system are presented. The most important tests are characterization of receivers, full day performance of complete system, cavity and aperture window test including influence from windeffects, control system tests, radiator system tests and special temperature measurements with infrared camera. The influence on performance of flux distribution depnding on concentrator alignment, and the optimum receiver operating criteria when balancing flux and temperatures on cooled receiver surface while avoiding flux on uncooled surfaces are also discussed.

Nelving, H. G.↗

Manned maneuvering unit applications for automated rendezvous and capture

Automated Rendezvous and Capture (AR&C) is an important technology to multiple National Aeronautics and Space Administration (NASA) programs and centers. The recent Johnson Spacecraft Center (JSC) AR&C Quality Function Deployment (QFD) has listed on-orbit demonstration of related technologies as a near term priority. Martin Marietta has been evaluating use of the Manned Maneuvering Unit (MMU) for a low cost near term on-orbit demonstration of AR&C technologies such as control algorithms, sensors, and processors as well as system level performance. The MMU Program began in 1979 as the method of repairing the Space Shuttle (STS) Thermal Protection System (the tiles). The units were not needed for this task, but were successfully employed during three Shuttle flights in 1984: a test flight was flown in in February as proof of concept, in April the MMU participated in the Solar Max Repair Mission, and in November the MMU's returned to space to successfully rescue the two errant satellites, Westar and Palapa. In the intervening years, the MMU simulator and MMU Qualification Test Unit (QTU) have been used for Astronaut training and experimental evaluations. The Extra-Vehicular Activities (EVA) Retriever has used the QTU, in an unmanned form, as a free-flyer on the Johnson Space Center (JSC) Precision Air Bearing Floor (PABF). Currently, the MMU is undergoing recertification for flight. The two flight units were removed from storage in September, 1991 and evaluation tests were performed. The tests demonstrated that the units are in good shape with no discrepancies that would preclude further use. The Return to Flight effort is currently clearing up recertification issues and evaluating the design against the present Shuttle environments.

Brehm, Donald L.↗