Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Nuclear Security: Quantifying Late Detection in MC&A

The objectives of this presentation are to understand the concept of late detection; review the statistics used in MC&A; specify the Pd and timelines for Pd for MC&A elements for item inventories; review elements of process control as they relate to bulk processes; and specify the timelines and detection thresholds for Pd for MC&A elements for bulk or Processing Operations.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

33 ADVANCED PROPULSION SYSTEMS↗

Additive Manufacturing of Tooling for Refrigeration Cabinet Foaming Processes

The primary objective of this project was to leverage the Big Area Additive Manufacturing (BAAM) process and materials into a long term, quick change tooling concept to drastically reduce product lead and development timelines and costs. Current refrigeration foam molds are complicated to manufacture involving casting several aluminum parts in an approximate shape, machining components of the molds and post fitting and shimming of the parts in an articulated fixture. The total process timeline can take over 6 months. The foaming process is slower than required for production, therefore multiple fixtures, 10 to 27, are required per refrigerator model. Molds are particular to a specific product configuration making mixed model assembly challenging for sequencing, mold changes or auto changeover features. The initial goal was to create a tool leveraging the ORNL materials and additive process to build a tool in 4 to 6 weeks or less. A secondary goal was to create common fixture cores and provide lightweight fixture sections that could be revised in a very short time to increase equipment flexibility reduce lead times, lower the barriers to first production trials, and reduce tooling costs.

3d Printing↗

Pulsed Power Science and Technology: A Strategic Outlook for the National Nuclear Security Administration (Summary)

Major advances in pulsed power technology and applications over the last twenty years have expanded the mission areas for pulsed power and created compelling new opportunities for the Stockpile Stewardship Program (SSP). This summary document is a forward look at the development of pulsed power science and technology (PPS&T) capabilities in support of the next 20 years of the SSP. This outlook was developed during a three-month-long tri-lab study on the future of PPS&T research and capabilities in support of applications to: (1) Dynamic Materials, (2) Thermonuclear Burn Physics and Inertial Confinement Fusion (ICF), and (3) Radiation Effects and Nuclear Survivability. It also considers necessary associated developments in next-generation codes and pulsed power technology as well as opportunities for academic, industry, and international engagement. The document identifies both imperatives and opportunities to address future SSP mission needs. This study was commissioned by the National Nuclear Security Administration (NNSA). A copy of the memo request is contained in the Appendix. NNSA guidance received during this study explicitly directed that it not be constrained by resource limitations and not attempt to prioritize its findings against plans and priorities in other areas of the national weapons program. That prioritization, including the relative balance amongst the three focus areas themselves, must of course occur before any action is taken on the observations presented herein. This unclassified summary document presents the principal imperatives and opportunities identified in each mission and supporting area during this study. Preceding this area-specific outlook, we discuss a cross-cutting opportunity to increase the shot capacity on the Z pulsed power facility as a near-term, cost-effective way to broadly impact PPS&T for SSP as well as advancing the science and technology to inform future SSMP milestones over the next 5-10 years. The final page of the summary presents two timelines that couch the opportunities discussed here in terms of the broader strategic timelines encapsulated in the fiscal year 2017 Stockpile Stewardship Management Plan (SSMP).

42 ENGINEERING↗

Roadmap for the international, accelerator-based neutrino programme

In line with its terms of reference the ICFA Neutrino Panel has developed a roadmap for the international, accelerator-based neutrino programme. A "roadmap discussion document" was presented in May 2016 taking into account the peer-group-consultation described in the Panel's initial report. The "roadmap discussion document" was used to solicit feedback from the neutrino community---and more broadly, the particle- and astroparticle-physics communities---and the various stakeholders in the programme. The roadmap, the conclusions and recommendations presented in this document take into account the comments received following the publication of the roadmap discussion document. With its roadmap the Panel documents the approved objectives and milestones of the experiments that are presently in operation or under construction. Approval, construction and exploitation milestones are presented for experiments that are being considered for approval. The timetable proposed by the proponents is presented for experiments that are not yet being considered formally for approval. Based on this information, the evolution of the precision with which the critical parameters governinger the neutrino are known has been evaluated. Branch or decision points have been identified based on the anticipated evolution in precision. The branch or decision points have in turn been used to identify desirable timelines for the neutrino-nucleus cross section and hadro-production measurements that are required to maximise the integrated scientific output of the programme. The branch points have also been used to identify the timeline for the R&D required to take the programme beyond the horizon of the next generation of experiments. The theory and phenomenology programme, including nuclear theory, required to ensure that maximum benefit is derived from the experimental programme is also discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

HIGH EFFICIENCY HIGH DENSITY GAN BASED 6.6KW BI-DIRECTIONAL ON-BOARD CHARGER FOR PEVS

Executive Summary: In the 4th quarter of 2014, a program was formally initiated at Delta Products to develop and commercialize a lightweight, compact and high efficiency bi-directional on-board Charger (OBC) for plug-in electric vehicle use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE- EE0006834. Delta products was the prime contractor to DOE during the three-year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Transphorm, Inc., The Center for Power Electronics Systems (CPES) at Virginia Tech, and Fiat Chrysler Automobiles. The OBC uses novel control schemes enabled by Gallium Nitride (GaN) switches to obtain charger efficiency of 95% and reduce volume and mass by 50% of the existing state-of-the-art silicon (Si) based chargers and inverters. A Si-based bidirectional OBC is typically implemented with two separate modules: a charger and an inverter. A GaN-based bidirectional OBC can integrate both functions into a single module. It will result in substantial reductions in size, weight and cost. This enables the introduction of WBG devices in automotive production programs. The inverter function integrated with PHEV can act as emergency power source in case of power interruption. This increases the power security when the electric infrastructure is damaged by extreme weather conditions. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of OBC prototypes is described in detail. After the program history is reviewed, the key attributes of the resulting OBC are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this OBC to meet or exceed DOE's targets for this program, including: • Construction of a working product-intent prototype of a bi-directional on-board Charger (OBC); • Peak efficiency of 95% and volume reduction of 50% compared to a recent production modules of similar ratings. • Bi-directional operation at 120Vac and 240Vac in vehicle. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

30 DIRECT ENERGY CONVERSION↗

Opportunities for Simultaneous Efficiency Improvement and Refrigerant Transition in Air Conditioning

In October of 2016, nearly 200 Parties agreed to amend the Montreal Protocol in Kigali, Rwanda, to phase-down consumption and production of hydrofluorocarbons (HFCs) by 2050. Growth in the use of HFCs, including those currently used as refrigerants in air-conditioning systems, is being driven by demand from emerging economies, hot climates, and rising incomes that are also undergoing rapid urbanization and electrification. Air conditioners (ACs), as an energy-intensive end-use technology, are also covered by a growing number of energy efficiency standards, labeling, procurement, incentive, and other supporting efficiency programs. Therefore, improving room AC energy efficiency and transitioning to low-global warming potential (GWP) refrigerants simultaneously presents significant opportunities to deploy energy efficient technology and reduce the energy and emissions impacts of room ACs, while keeping costs low for consumers. This report aims to provide an initial sense of the opportunities to improve efficiency and transition to low-GWP refrigerants by reviewing the HCFC and HFC regulatory framework and energy efficiency standards and labeling programs in 19 economies that account for roughly 65 percent of global room AC demand. Based on this analysis, we identified key opportunities for coordinated action on efficiency improvement and refrigerant transition for the domestic room AC sector (i.e., ductless mini-split ACs), such as: - implementing or revising standards and labeling programs to improve efficiency levels with the possibility of adding a low-GWP criterion. - combining fixed speed and inverter AC product categories to account for seasonal variations in climate and part-load operating conditions, and using seasonal energy efficiency ratio (SEER) instead of energy efficiency ratio (EER) to better reflect performance of inverter ACs. - implementing market transformation programs, such as bulk procurement programs, to drive down the costs of efficient technology through economies of scale. - aligning timelines for implementing efficiency standards with timelines for refrigerant management plans to coordinate policy actions. - maximizing the energy efficiency improvements of Montreal Protocol investments by coordinating efforts to help keep costs low for consumers and manufacturers during equipment redesign and manufacturing line retooling for refrigerant transition. In order to realize the significant peak load, energy saving and climate benefits of these opportunities associated with improving energy efficiency in tandem with the refrigerant transition, some risks may need to be mitigated, principally safety concerns over risks of accidental ignition with refrigerants rated flammable. This can be mitigated by continuing and accelerating the development of safety standards currently being updated, for example, by the International Electrotechnical Commission (IEC) and improving training for production, installation and maintenance during the use of flammable refrigerants. While some low-GWP refrigerants may cost more than the current baseline refrigerants, the cost of refrigerants is only ~1% of lifecycle costs for an AC. Costs can also be reduced through manufacturing advances and efficiency improvements, particularly if they are supported by policies that encourage technological development through deployment of superefficient ACs at scale. Finally, during the transition, there is a risk of obsolete technology being deployed in markets that either have not updated their standards or have later compliance dates. This risk can be mitigated by updating standards and reviewing them periodically to ensure their effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

NRAP Recommended Practices for Containment Assurance and Leakage Risk Quantification

This report presents recommendations for quantitatively assessing and managing leakage risk and effective containment assurance at geologic carbon storage (GCS) sites, amidst uncertainty in site characteristics and performance. These recommended practices are a product of the U.S. Department of Energy’s (DOE) Office of Fossil Energy and Carbon Management’s National Risk Assessment Partnership (NRAP)—a multi-year collaborative research effort of Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Los Alamos National Laboratory, National Energy Technology Laboratory, and Pacific Northwest National Laboratory. These recommended practices are organized as a set of conceptual workflows that correspond with the stages of the GCS project lifecycle. They consider aspects of site characterization, quantification of potential leakage, assessing the spatial extent of potential environmental impacts, optimizing monitoring design for detection of potential leakage, evaluation of concordance between monitored and forecasted reservoir response, assessing conformance with expected/accepted performance, and determination of the timeline over which risk of impactful leakage can be expected to abate. These conceptual workflows are intended to aid stakeholders in making risk management decisions at GCS sites and to support development of sound, risk-based justifications for characterizing the subsurface, defining area of potential leakage impact, designing site monitoring plans, selecting leakage risk management/mitigation alternatives, and estimating site closure timelines.

54 ENVIRONMENTAL SCIENCES↗

Performance Assessment for the E-Area Low-Level Radioactive Waste Disposal Facility at the Savannah River Site: Appendix F

As a supplement to Chapter 6, Section 6.1.1.3, Table F-1 through Table F-24 provide tabular results of the sensitivity analysis calculations for waste disposal timing (Sensitivity Case S6) in NR07E (Cases 3 and 4) and NR26E (Cases 1 through 4). The title of each table identifies the DU, sensitivity case, and performance measure. Section F.1.1 (Table F-1 through Table F-8) presents results for NR07E and Section F.1.2 (Table F-9 through Table F-24) presents results for NR26E. In each table, radionuclides are sorted from highest to lowest nominal concentration or dose factor. Nominal values are when waste disposal occurs at the start of operations; timeline values are when waste disposal occurs at the end of operations. The differences (Δ values) in the last column of each table equal the timeline concentration or dose factor minus the nominal concentration or dose factor, where DF and CF are shorthand designations for dose factor and concentration factor, respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotics Plan in Support of DOME Testbed Operations

Various robotic tooling options have been evaluated for the NRIC DOME concept of operations (ConOps). Framatome was contracted to develop a wide-ranging list of commercial off the shelf (COTS) and custom robotic systems to be considered for performing the DOME ConOps functions. Subsequent project tasks from Framatome narrowed down the list and scored the most viable options. The abbreviated list, and associated scoring, has been reviewed and assessed to provide formal recommendations for the robotic ConOps functions of DOME. The overhead telescoping mast & Kraft arm assembly is recommended as the primary system for reactor demobilization and removal. The estimated cost is $\$700$K with a timeline to develop and deliver of about 2.5 years. The mast & Kraft arm would still require an overhead lift system for mobilization and installation. Either the refurbished polar crane or a new gantry crane delivery platform could both serve as the overhead lift and delivery system. The estimated costs for the refurbishment polar crane and new gantry crane systems are, respectively, $\$4.4$M and $\$3$M with about 2.5 years to develop and deliver. A Brokk + Kraft crawler & arm is recommended as a secondary robotic system to support the overhead mast & Kraft arm system. The Brokk + Kraft crawler & arm would cost an estimated $\$726$k and would take about 1.5 years to develop and deliver. The Boston Dynamics SPOT robot is also recommended for the in-service monitoring during experimentation operations. The estimated cost is $\$220$K with a timeline to deliver of 8-14 months. The Elios 3 aerial drone is recommended to perform large area radiation dose rate mapping and visual inspections. The estimated cost is a $\$100$K and will also need about 8-14 months to develop and deliver. A mockup rig is also recommended to be procured an employed to test & verify the robotic capabilities as well as provide needed training for operations personnel. It is estimated that a mockup rig would cost about $\$500$k and would take up to a year to develop and build.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Abstract for CRADA between National Energy Technology Laboratory and Blacksand Technology, LLC

The National Energy Technology Laboratory (NETL) and Black Sand Technology, LLC (Participant) will collaborate in the optimization of low-cost manufacturing routes to produce ultralow-oxygen reactive metal powders of M=Ti, Zr, and Nb using Mg or Ca as reduction agents. Reactive metals have a strong chemical affinity to oxygen, making it very challenging to produce high-purity metal powders of these elements with extremely low oxygen content. This project integrates multiscale modeling and experimental validation to provide fundamental understanding of the thermodynamic limits on the deoxygenation process through HDH and optimize the key deoxygenation parameters to achieve ultralow oxygen content ≤0.1 wt.% in the reactive metal powders. The collaboration will significantly expedite the optimization of deoxygenation processes, reducing the timeline for refining deoxygenation techniques for Ti, Zr and Nb and other reactive refractory metals by about 0.5 and 2 years, respectively. This accelerated timeline translates to substantial cost savings estimated at $\$$3 million in research and development expenditures.

36 MATERIALS SCIENCE↗

Description of FY25 Theory and Simulation Performance Target: Development of an integrated modeling framework for fusion reactor design and assessment

The urgency to deliver fusion power is growing now more than ever, with increasing pressure for both public programs and private companies to meet milestones timelines and overcome significant remaining technical challenges to ensure growth of a nascent fusion industry in time to meet rapidly growing clean energy demands. With incredible advancements in computation and years of investment in fusion model development and validation, integrated modeling is poised to fill a key role in accelerating the timeline to a fusion pilot plant (FPP). Future fusion pilot plants will operate in regimes far beyond current experience, and device design will rely on physics-based prediction and extrapolation. Many concepts will also rely on simulation to assess safety (shielding, tritium management, materials activation and lifetimes), economics and scalability before the decision to build. Importantly, integrated simulation can be used to reveal and solve the complexities of system integration that may otherwise not be apparent in physical components or models developed in isolation. New experimental test facilities that produce relevant conditions to validate and resolve key technical challenges for various subsystems (materials, blankets, fuel cycle, etc.) have been repeatedly called for by the fusion community but are not yet realized. Integrated modeling has an important role in identifying realistic load conditions (thermal, electromagnetic, plasma, neutron and photon loads, etc.) and defining the components and experiments for these test facilities in order to ensure meaningful validation that sufficiently reduces modeling uncertainties and technical risk for the full integrated reactor. The Fusion REactor Design and Assessment (FREDA) SciDAC project is building a component-based integrated modeling framework & data structure to enable self-consistent, multi-fidelity, iterative optimization workflows for the fusion reactor design process. FREDA aims to shorten the time to viable designs by providing a set of flexible workflows to support the various stages of the design process using an integrated model hierarchy, ranging from the simple analytic descriptions to the highest fidelity, theory-based plasma and engineering modeling developed by the fusion and fission communities. These tools are expected to be needed for timely support of FPP design in the milestone program and in the FIRE collaboratives. The plasma simulation backbone of FREDA is IPS-FASTRAN with newly developed coupled Core-Edge Pedestal-SOL (CESOL) workflows, which is being extended to the far-SOL region up to the plasma facing components. FREDA incorporates the FERMI engineering modeling suite and will enable self-consistent evaluation of the thermal shields, limiters, blanket, magnets, and other surrounding structures with predictions of temperatures, erosion, dpa, activation, tritium generation and transport, creep, corrosion, material degradation, etc. Parametric generation of 3D CAD enables rapid iteration of component geometry in response to plasma and loading specifications.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

CWMD Nuclear Forensics Quarterly Report

Analysis and evaluation of nuclear debris is a key component to identify forensic signatures in a post-detonation environment. Currently, methods exist and are practiced in obtaining signatures from post-detonation debris. However, efforts to reduce the timeline in obtaining signatures is continuous within nuclear forensics research and will be forwarded by this research. This education and research project will explore combined material chemistry and separations of radionuclides to provide actionable signatures in less time than standard methods. The research will use the phase distribution of radionuclides in debris to develop targeted and rapid dissolution methods. These dissolution methods will be coupled with microfluidics to achieve samples suitable for analysis within reduced timelines.

and nuclear chemistry↗

Nuclear history, politics, and futures from (A)toms-to(Z)oom: Design and deployment of a remote-learning special-topics course for nuclear engineering education

To address the lack of familiarity with nuclear history common among nuclear engineers and physicists, we outline the design and deployment of a special-topics course entitled “NE290: Nuclear History, Politics, and Futures” throughout which we contextualize the importance of the field at its inception, in current affairs, and in future endeavors. We argue that understanding this history is paramount in internalizing a sense of respect for the scientific, technical, and sociological ramifications of an unlocked atom—as well as its perils. We begin by outlining the gaps in secondary educational offerings for nuclear history and their importance in consideration with nontechnical engineering guidelines. We then outline a number of ABET specifications as pedagogical goals for NE290 from which we derive a list of target student learning objectives. Next, we outline the NE290 syllabus in terms of assignments and an overview of course content in the form of a class timeline. We provide an extensive description of the materials and teaching methodologies for the four units of NE290: Twentieth-Century Physics, Physics in WWII, the Early Cold War, and the Late Cold War and Modern Era. We detail the sequence of lectures across the course and historical timelines leading up to a showcasing of NE290 final projects which mirror in creativity the novelty of course offering. Because NE290 was first offered during Spring 2021 during the COVID-19 pandemic, additional measures in the form of new tools were used to augment the mandate of remote learning. In particular, we leveraged the newfound ubiquity of videoconferencing technology to recruit geographically diverse guest lecturers and used the MIRO tool for virtual whiteboarding. Lastly, we provide an accounting of course outcomes drawn from student feedback which—in tandem with the complete distribution of course material—facilitates the integration of nuclear history into the curriculum for the wider nuclear engineering and physics communities.

Berliner, Aaron J.↗

Lessons Learnt From the COVID-19 Pandemic

The COVID-19 pandemic, caused by the novel coronavirus SARS-CoV-2, has been characterized by unprecedented rates of spatio-temporal spread. Here, we summarize the main events in the pandemic's timeline and evaluate what has been learnt by the public health community. We also discuss the implications for future public health policy and, specifically, the practice of epidemic control. We critically analyze this ongoing pandemic's timeline and contrast it with the 2002–2003 SARS outbreak. We identify specific areas (e.g., pathogen identification and initial reporting) wherein the international community learnt valuable lessons from the SARS outbreak. However, we also identify the key areas where international public health policy failed leading to the exponential spread of the pandemic. We outline a clear agenda for improved pandemic control in the future.

60 APPLIED LIFE SCIENCES↗

SPHERICAL HARMONIC ANALYSES OF INTENSITY MAPPING POWER SPECTRA

Intensity mapping is a promising technique for surveying the large-scale structure of our universe from z = 0 to z ∼ 150, using the brightness temperature field of spectral lines to directly observe previously unexplored portions of our cosmic timeline. Examples of targeted lines include the 21 cm hyperfine transition of neutral hydrogen, rotational lines of carbon monoxide, and fine-structure lines of singly ionized carbon. Recent efforts have focused on detections of the power spectrum of spatial fluctuations, but have been hindered by systematics such as foreground contamination. This has motivated the decomposition of data into Fourier modes perpendicular and parallel to the line of sight, which has been shown to be a particularly powerful way to diagnose systematics. However, such a method is well-defined only in the limit of a narrow-field, flat-sky approximation. This limits the sensitivity of intensity mapping experiments, as it means that wide surveys must be separately analyzed as a patchwork of smaller fields. In this paper, we develop a framework for analyzing intensity mapping data in a spherical Fourier–Bessel basis, which incorporates curved sky effects without difficulty. We use our framework to generalize a number of techniques in intensity mapping data analysis from the flat sky to the curved sky. These include visibility-based estimators for the power spectrum, treatments of interloper lines, and the “foreground wedge” signature of spectrally smooth foregrounds.

79 ASTRONOMY AND ASTROPHYSICS↗

LOCALIZATION AND BROADBAND FOLLOW-UP OF THE GRAVITATIONAL-WAVE TRANSIENT GW150914

A gravitational-wave (GW) transient was identified in data recorded by the Advanced Laser Interferometer Gravitational-wave Observatory (LIGO) detectors on 2015 September 14. The event, initially designated G184098 and later given the name GW150914, is described in detail elsewhere. By prior arrangement, preliminary estimates of the time, significance, and sky location of the event were shared with 63 teams of observers covering radio, optical, near-infrared, X-ray, and gamma-ray wavelengths with ground- and space-based facilities. In this Letter we describe the low-latency analysis of the GW data and present the sky localization of the first observed compact binary merger. We summarize the follow-up observations reported by 25 teams via private Gamma-ray Coordinates Network circulars, giving an overview of the participating facilities, the GW sky localization coverage, the timeline, and depth of the observations. As this event turned out to be a binary black hole merger, there is little expectation of a detectable electromagnetic (EM) signature. Nevertheless, this first broadband campaign to search for a counterpart of an Advanced LIGO source represents a milestone and highlights the broad capabilities of the transient astronomy community and the observing strategies that have been developed to pursue neutron star binary merger events. Detailed investigations of the EM data and results of the EM follow-up campaign are being disseminated in papers by the individual teams.

79 ASTRONOMY AND ASTROPHYSICS↗