At least 199 records · Page 11

Integrated Advanced Microwave Sounding Unit-A(AMSU-A). Performance Verification Report, METSAT Phase Locked Oscillator Assembly, P/N 1348360-1, S/N's F07 and F08

Two Flight Model AMSU-A Phase Locked Oscillators (PIN 1348360-1, S/N F07 and F08) have been tested per AES Test Procedure AE-26758 Rev. B, which include full functional testing, vibration testing, thermal testing, and AM/FM Noise testing. Both assemblies satisfactorily passed all performance requirements of the AE-26633 Product Specification. During the thermal cycling of both units, spurs developed 1 MHz from the carrier when the units were cold, and TARs were written to document the anomaly. The symptoms observed in both cases were consistent with inadequate tuning. The units were successfully re-tuned. In the case of F08, re-tuning required a design change which allowed a greater range of possible values for tuning resisters. Both units completed thermal cycling without further delay. The results of the required tests are presented in the following section as test data. As indicated on the test data sheets, all measured data passed all requirements.

Pines, D.↗

Materials selection for long life in LEO: A critical evaluation of atomic oxygen testing with thermal atom systems

The use of thermal atom test methods as a materials selection and screening technique for low-Earth orbit (LEO) spacecraft is critically evaluated. The chemistry and physics of thermal atom environments are compared with the LEO environment. The relative reactivities of a number of materials determined to be in thermal atom environments are compared to those observed in LEO and in high quality LEO simulations. Reaction efficiencies measured in a new type of thermal atom apparatus are one-hundredth to one-thousandth those observed in LEO, and many materials showing nearly identical reactivities in LEO show relative reactivities differing by as much as a factor of 8 in thermal atom systems. A simple phenomenological kinetic model for the reaction of oxygen atoms with organic materials can be used to explain the differences in reactivity in different environments. Certain specific thermal test environments can be used as reliable materials screening tools. Using thermal atom methods to predict material lifetime in LEO requires direct calibration of the method against LEO data or high quality simulation data for each material.

Koontz, S. L.↗

FY2023 NSTTF Annual Report

The National Solar Thermal Test Facility (NSTTF) is a DOE Core Capability and Technology Deployment Center located in Albuquerque, NM. It is operated by Sandia National Laboratories (Sandia) for the U.S. Department of Energy (DOE). The NSTTF is the only multi-mission, multi-use, multi-story test facility of its type in the United States. The NSTTF was founded in 1978 and began testing with high heat flux that same year. Over the past 45 years, the NSTTF has been at the forefront of the research, design, fabrication, and testing of many of the critical Concentrating Solar Power (CSP) technologies. These technologies have allowed costs to be dramatically reduced from over $\$ $0.40 /kWh to $\$$0.12 /kWh since the conception of this renewable energy technology. The NSTTF has worked to make the Solar Energy Generating Systems (SEGS) parabolic trough plants successful, while also working with the Solar One and Solar Two facilities for successful implementation. Over the four decades since its founding, the mission of the NSTTF has grown to include new receiver technologies, like our generation 3 falling particle system (G3P3 Tower), optical metrology techniques like SOFAST, molten salt testing, thermal energy storage, solar thermal chemistry, and more. We continue to expand our capabilities in pursuit of the DOE SETO mission and the DOE SunShot 2030 goals: unsubsidized LCOE of $\$$0.05/kWh for CSP that includes 12 or more hours of thermal energy storage. To support both the DOE SETO mission and support the CSP sector as a whole, we are working to develop our operations and maintenance framework to provide a world class testing facility in support of our technological achievements. To accomplish both of these missions, the NSTTF draws on the decades of experience and expertise of our staff along with the world-class facilities at Sandia National Laboratories to further the science of concentrated solar thermal technologies in diverse applications. We remain a trusted partner for high-quality and impactful research in both fundamental and applied arenas. We are able to provide our partners with both one-of-a-kind testing platforms as well as world-class analytics.

14 SOLAR ENERGY↗

Evaluation of Safety and Performance of Sony Lithium Ion Cells

This paper reports on results of the tests of the Sony Lithium Ion Cells. The physical, electrochemical, and Canon Battery (BP-927) characteristics of the cells are reported. The tests given include overcharge, overdischarge, high temperature, drop tests, external short circuit, crush test, thermal tests on battery pack, overcharging and overdischarging, unbalanced configuration, heat to vent, and the vibration test. The tests are described, and the results of the tests are reviewed.

Jeevarajan, Judith A.↗

High-Speed Wind Tunnel Tests of a Full-Scale Proprotor on the Tiltrotor Test Rig

The Tiltrotor Test Rig (TTR) is a NASA project, joint with the U.S. Army and Air Force, to develop a new, large scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The first wind-tunnel entry was completed in November 2018 with a modern, 26-ft diameter proprotor. The primary purpose was to complete the development of the TTR, including systems integration with the NFAC. The TTR and rotor were tested up to 273 knots in axial flow. This is the highest airspeed ever achieved by a full-scale proprotor in any wind tunnel. Extensive conversion-mode data were also acquired, and hover/climb conditions were explored. Additional testing included aerodynamic tares, motor tests, thermal tests, modal vibration tests, and other checkout activities. This paper summarizes the results of the test, including examples of the most significant data.

Wind Tunnel Tests↗

Wind Tunnel Performance Tests of a Full-Scale Proprotor on the Tiltrotor Test Rig

The Tiltrotor Test Rig (TTR) is a new, large-scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The TTR was jointly developed by NASA, the U. S. Army and the U. S. Air Force. The first wind-tunnel entry was completed in November 2018 with a modern, 26-ft diameter proprotor. The primary purpose was to complete the development of the TTR, including systems integration with the NFAC. The TTR and rotor were tested up to 273 knots in axial flow, which is the highest airspeed ever achieved by a full-scale proprotor in any wind tunnel. The entry constitutes the first full-scale wind-tunnel test of a gimballed, coning-flexure rotor. Extensive conversion-mode data were also acquired, and hover/climb conditions were explored. Additional testing included aerodynamic tares, motor tests, thermal tests, modal vibration tests, and other checkout activities. This report summarizes the results of the test, including examples of the most significant data.

Tiltrotor Test Rig↗

Tiltrotor Test Rig Wind-Tunnel Test Data Catalog

The Tiltrotor Test Rig (TTR) is a large-scale proprotor test system for the National Full-Scale Aerodynamics Complex (NFAC). The first wind-tunnel entry was completed in November 2018 with a modern, 26-ft diameter proprotor. The rotor tested was the Bell Model 699, an AW609 rotor modified specifically for wind-tunnel testing. The primary purpose was to complete the development of the TTR, including systems integration with the NFAC. Testing included axial flow up to 273 knots, conversion mode from 30 to 100 deg nacelle angle, and hover/vertical climb conditions. Additional testing included aerodynamic tares, motor tests, thermal tests, modal vibration tests, and other checkout activities. This report lists the test conditions achieved and the types of data acquired and saved in the database.

NFAC↗

Precise thermal control test demonstration on simulated space telescope main ring

A simulated section of the main ring of the Space Telescope, (ST) the part that holds the primary mirror, was manufactured and tested for thermal stability characteristics in a complex structural assembly. The other telescope subassemblies are also mounted on the main ring, which is constructed of a titanium alloy. The entire ring is wrapped in heater elements around the outside diameter to reduce the external temperature gradient effects by two orders of magnitude. A thermal vacuum test was performed using a stainless steel alloy tailored to represent the titanium ring's thermal characteristics. The tests examined the thermal performance and controllability of the test ring, the effects of a 24-hr slew manuever that produced worst-case environment changes, hot and cold simulation of predicted ST orbital thermal environments, and the effects of heater failure. Pointing and thermal control features were verified, but a heater failure on the 'on' side was found to quickly lead to exceeding the thermal design limits.

Bettini, R. G.↗

Development of the GPM Observatory Thermal Vacuum Test Model

A software-based thermal modeling process was documented for generating the thermal panel settings necessary to simulate worst-case on-orbit flight environments in an observatory-level thermal vacuum test setup. The method for creating such a thermal model involved four major steps: (1) determining the major thermal zones for test as indicated by the major dissipating components on the spacecraft, then mapping the major heat flows between these components; (2) finding the flight equivalent sink temperatures for these test thermal zones; (3) determining the thermal test ground support equipment (GSE) design and initial thermal panel settings based on the equivalent sink temperatures; and (4) adjusting the panel settings in the test model to match heat flows and temperatures with the flight model. The observatory test thermal model developed from this process allows quick predictions of the performance of the thermal vacuum test design. In this work, the method described above was applied to the Global Precipitation Measurement (GPM) core observatory spacecraft, a joint project between NASA and the Japanese Aerospace Exploration Agency (JAXA) which is currently being integrated at NASA Goddard Space Flight Center for launch in Early 2014. From preliminary results, the thermal test model generated from this process shows that the heat flows and temperatures match fairly well with the flight thermal model, indicating that the test model can simulate fairly accurately the conditions on-orbit. However, further analysis is needed to determine the best test configuration possible to validate the GPM thermal design before the start of environmental testing later this year. Also, while this analysis method has been applied solely to GPM, it should be emphasized that the same process can be applied to any mission to develop an effective test setup and panel settings which accurately simulate on-orbit thermal environments.

Yang, Kan↗

NASA Plum Brook's B-2 Test Facility: Thermal Vacuum and Propellant Test Facility

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal vacuum facility. It is the largest designed to store and transfer large quantities of liquid hydrogen and liquid oxygen, and is perfectly suited to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of large lightweight structures, Cryogenic Fluid Management (CFM) systems, electric propulsion test programs, and other In-Space propulsion programs. A recently completed integrated system test demonstrated the refurbished thermal vacuum capabilities of the facility. The test used the modernized data acquisition and control system to monitor the facility. The heat sink provided a uniform temperature environment of approximately 77 K. The modernized infrared lamp array produced a nominal heat flux of 1.4 kW/sq m. With the lamp array and heat sink operating simultaneously, the thermal systems produced a heat flux pattern simulating radiation to space on one surface and solar exposure on the other surface.

Kudlac, Maureen T.↗

LANL Activities Supporting Electron Accelerator Production of 99 Mo for NorthStar Medical Radioisotopes, LLC

Summary of LANL FY12 Activities are: (1) Preparation, performance, and data analysis for the FY12 accelerator tests at ANL - (a) LANL designed and installed a closed-loop helium target cooling system at ANL for the FY12 accelerator tests, (b) Thermal test was performed on March 27, (c) 24 h production test to follow the accelerator upgrade at ANL; (2) Local target shielding design and OTR/IR recommendations - (a) Target dose rate and activation products were calculated with MCNPX, (b) 206 Pb(γ,2n) 204m Pb vs 204g Pb branching ratio unpublished, will measure using the LANL microtron, (c) OTR system nearing final configuration, (d) IR prototype system demonstrated during the recent thermal test at ANL; (3) Target housing lifetime estimation - Target housing material specifications and design to be finalized following the thermal test, lifetime not believed to be an issue; and (4) Target cooling system reliability - Long duration system characterizations will begin following the thermal test.

42 ENGINEERING↗

Performance Test on Polymer Waste Form - 12137

Polymer solidification was attempted to produce stable waste form for the boric acid concentrates and the dewatered spent resins. The polymer mixture was directly injected into the mold or drum which was packed with the boric acid concentrates and the dewatered spent resins, respectively. The waste form was produced by entirely curing the polymer mixture. A series of performance tests was conducted including compressive strength test, water immersion test, leach test, thermal stability test, irradiation stability test and biodegradation stability test for the polymer waste forms. From the results of the performance tests for the polymer waste forms, it is believed that the polymer waste form is very stable and can satisfy the acceptance criteria for permanent disposal. At present, performance tests with full scale polymer waste forms are being carried out in order to obtain qualification certificate by the regulatory institute in Korea. Polymer waste forms were prepared with the surrogate of boric acid concentrates and the surrogate of spent ion exchange resins respectively. Waste forms were also made in lab scale and in full scale. Lab. scale waste forms were directly subjected to a series of the performance tests. In the case of full scale waste form, the test specimens for the performance test were taken from a part of waste form by coring. A series of performance tests was conducted including compressive strength test, thermal stability test, irradiation stability test and biodegradation stability test, water immersion test, leach test, and free standing water for the polymer waste forms. In addition, a fire resistance test was performed on the waste forms by the requirement of the regulatory institute in Korea. Every polymer waste forms containing the boric acid concentrates and the spent ion exchange resins had exhibited excellent structural integrity of more than 27.58 MPa (4,000 psi) of compressive strength. On thermal stability testing, biodegradation testing and water immersion testing, no degradation was observed in the waste forms. Also, by measuring the compressive strength after these tests, it was confirmed that the structural integrity was still retained. A leach test was performed by using non radioactive cobalt, cesium and strontium. The leaching of cobalt, cesium and strontium from the polymer waste forms was very low. Also, the polymer waste forms were found to possess adequate fire resistance. From the results of the performance tests, it is believed that the polymer waste form is very stable and can satisfy the acceptance criteria for permanent disposal. At present, Performance tests with full scale polymer waste forms are on-going in order to obtain qualification certificate by the regulatory institute in Korea. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermal verification testing of commercial printed-circuit boards for spaceflight

A method is discussed developed to verify commercial printed-circuit boards for a shuttle orbital flight. The Space Acceleration Measurement System Project used this method first with great success. The test sequence is based on early fault detection, desire to test the final assembly, and integration with other verification testing. A component thermal screening test is performed first to force flaws in design, workmanship, parts, processes, and materials into observable failures. Then temperature definition tests are performed that consist of infrared scanning, thermal vacuum testing, and preliminary thermal operational testing. Only the engineering unit is used for temperature definition testing, but the preliminary thermal operational testing is performed on the flight unit after the temperature range has been defined. In the sequence of testing, vibration testing is performed next, but most vibration failures cannot be detected without subsequent temperature cycling. Finally, final assembly testing is performed to simulate the shuttle flight. An abbreviated thermal screening test is performed as a check after the vibration test, and then a complete thermal operational test is performed. The final assembly test finishes up with a burn-in of 100 hours of trouble-free operation. Verification is successful when all components and final assemblies have passed each test satisfactory. This method was very successful in verifying that commercial printed-circuit boards will survive in the shuttle environment.

Foster, William M., II↗

Evaluation of the infrared test method for the olympus thermal balance tests

The performance of the infrared (IR) rig used for the thermal balance testing of the Olympus S/C thermal model is discussed. Included in this evaluation are the rig effects themselves, the IRFLUX computer code used to predict the radiation inputs, the Monitored Background Radiometers (MBR's) developed to measure the absorbed radiation flux intensity, the Uniform Temperature Reference (UTR) based temperature measurement system and the data acquisition system. A preliminary set of verification tests were performed on a 1 m x 1 m zone to assess the performance of the IR lamps, calrods, MBR's and aluminized baffles. The results were used, in part, to obtain some empirical data required for the IRFLUX code. This data included lamp and calrod characteristics, the absorptance function for various surface types, and the baffle reflectivities.

Donato, M.↗