Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Capabilities of the Materials Contamination Team at Marshall Space Flight Center

The Materials Contamination Team of the Environmental Effects Group, Materials, Processes, and Manufacturing Department, has been recognized for its contribution to space flight, including space transportation, space science and flight projects, such as the reusable solid rocket motor, Chandra X-Ray Observatory, and the International Space Station. The Materials Contamination Team s realm of responsibility encompasses all phases of hardware development including design, manufacturing, assembly, test, transportation, launch-site processing, on-orbit exposure, return, and refurbishment if required. Contamination is a concern in the Space Shuttle with sensitivity bondlines and reactive fluid (liquid oxygen) compatibility as well as for sensitive optics, particularly spacecraft such as Hubble Space Telescope and Chandra X-Ray Observatory. The Materials Contamination Team has a variety of facilities and instrumentation capable of contaminant detection identification, and monitoring. The team addresses material applications dealing with environments, including production facilities, clean rooms, and on-orbit exposure. The team of engineers and technicians also develop and evaluates new surface cleanliness inspection technologies. Databases are maintained by the team for proces! materials as well as outgassing and optical compatibility test results for specific environments.

Burns, H. D.↗

Cathodes Delivered for Space Station Plasma Contactor System

The International Space Station's (ISS) power system is designed with high-voltage solar arrays that typically operate at output voltages of 140 to 160 volts (V). The ISS grounding scheme electrically ties the habitat modules, structure, and radiators to the negative tap of the solar arrays. Without some active charge control method, this electrical configuration and the plasma current balance would cause the habitat modules, structure, and radiators to float to voltages as large as -120 V with respect to the ambient space plasma. With such large negative floating potentials, the ISS could have deleterious interactions with the space plasma. These interactions could include arcing through insulating surfaces and sputtering of conductive surfaces as ions are accelerated by the spacecraft plasma sheath. A plasma contactor system was baselined on the ISS to prevent arcing and sputtering. The sole requirement for the system is contained within a single directive (SSP 30000, paragraph 3.1.3.2.1.8): "The Space Station structure floating potential at all points on the Space Station shall be controlled to within 40 V of the ionospheric plasma potential using a plasma contactor." NASA is developing this plasma contactor as part of the ISS electrical power system. For ISS, efficient and rapid emission of high electron currents is required from the plasma contactor system under conditions of variable and uncertain current demand. A hollow cathode plasma source is well suited for this application and was, therefore, selected as the design approach for the station plasma contactor system. In addition to the plasma source, which is referred to as a hollow cathode assembly, or HCA, the plasma contactor system includes two other subsystems. These are the power electronics unit and the xenon gas feed system. The Rocketdyne Division of Boeing North American is responsible for the design, fabrication, assembly, test, and integration of the plasma contactor system. Because of technical and schedule considerations, the NASA Lewis Research Center was asked to manufacture and deliver the engineering model, the qualification model, and the flight HCA units for the plasma contactor system as government furnished equipment. To date, multiple units have been built. One cathode has demonstrated approximately 28 000-hr lifetime, two development HCA units have demonstrated over 15 000-hr lifetime, and one HCA unit has demonstrated more than 38 000 ignitions. All eight flight HCA's have been manufactured, acceptance tested, and are ready for delivery to the flight contractor.

Patterson, Michael J.↗

Capability 9.3 Assembly and Deployment

Large space systems are required for a range of operational, commercial and scientific missions objectives however, current launch vehicle capacities substantially limit the size of space systems (on-orbit or planetary). Assembly and Deployment is the process of constructing a spacecraft or system from modules which may in turn have been constructed from sub-modules in a hierarchical fashion. In-situ assembly of space exploration vehicles and systems will require a broad range of operational capabilities, including: Component transfer and storage, fluid handling, construction and assembly, test and verification. Efficient execution of these functions will require supporting infrastructure, that can: Receive, store and protect (materials, components, etc.); hold and secure; position, align and control; deploy; connect/disconnect; construct; join; assemble/disassemble; dock/undock; and mate/demate.

Dorsey, John↗

PP after PREVCOM

This viewgraph presentation reviews the recommendations and implications for Planetary Protection (PP) as recomended by the Mars Exploration Program Analysis Group (MEPAG). This study was formulated in 17 recommendations to NASA in a report Preventing the Forward Contamination of Mars (PREVCOM). Particular attention is paid to the recommendation number 5 that states "Require routine collection of phylogenetic data and require systematic archiving of environmental samples from Assembly, Test, and Launch Operations (ATLO) environments and spacecraft."

planetary protection↗

SIM Planetquest Science and Technology: A Status Report

Optical interferometry will open new vistas for astronomy over the next decade. The Space Interferometry Mission (SIM-PlanetQuest), operating unfettered by the Earth's atmosphere, will offer unprecedented astrometric precision that promises the discovery of Earth-analog extra-solar planets as well as a wealth of important astrophysics. Results from SIM will permit the determination of stellar masses to accuracies of 2% or better for objects ranging from brown dwarfs through main sequence stars to evolved white dwarfs, neutron stars, and black holes. Studies of star clusters will yield age determinations and internal dynamics. Microlensing measurements will present the mass spectrum of the Milky Way internal to the Sun while proper motion surveys will show the Sun's orbital radius and speed. Studies of the Galaxy's halo component and companion dwarf galaxies permit the determination of the Milky Way's mass distribution, including its Dark Matter component and the mass distribution and Dark Matter component of the Local Group. Cosmology benefits from precision (1-2%) determination of distances to Cepheid and RR Lyrae standard candles. The emission mechanism of supermassive black holes will be investigated. Finally, radio and optical celestial reference frames will be tied together by an improvement of two orders of magnitude. Optical interferometers present severe technological challenges. The Jet Propulsion Laboratory, with the support of Lockheed Martin Advanced Technology Center (LM ATC) and Northrop Grumman Space Technology (NGST), has addressed these challenges with a technology development program that is now complete. The requirements for SIM have been satisfied, based on outside peer review, using a series of laboratory tests and appropriate computer simulations: laser metrology systems perform with 10 picometer precision; mechanical vibrations have been controlled to nanometers, demonstrating orders of magnitude disturbance rejection; and knowledge of component positions throughout the whole test assembly has been demonstrated to the required picometer level. Technology transfer to the SIM flight team is now well along.

astrometry↗

Analyses of the Integration of Carbon Dioxide Removal Assembly, Compressor, Accumulator and Sabatier Carbon Dioxide Reduction Assembly

A tool has been developed by the Sabatier Team for analyzing/optimizing CO2 removal assembly, CO2 compressor size, its operation logic, water generation from Sabatier, utilization of CO2 from crew metabolic output, and Hz from oxygen generation assembly. Tests had been conducted using CDRA/Simulation compressor set-up at MSFC in 2003. Analysis of test data has validated CO2 desorption rate profile, CO2 compressor performance, CO2 recovery and CO2 vacuum vent in CDRA desorption. Optimizing the compressor size and compressor operation logic for an integrated closed air revitalization system Is being conducted by the Sabatier Team.

Jeng, Frank F.↗

Transforming a Single-Use Spaceport to Multi-Use

The end of the Space Shuttle program brought new challenges as well as new opportunities to the John F. Kennedy Space Center. The challenge is to engineer a more flexible Spaceport to be capable of supporting manufacturing, assembly, testing, processing and launch operations for multiple spacecrafts and launch vehicle configurations. The new spaceport must support multiple commercial as well as government entities while leveraging existing infrastructure to the greatest extent possible. This paper addresses key engineering challenges during Spaceport design and development and will look at possible engineering solutions while considering reusability of legacy systems and infrastructure adaptability with emphasis on flexibility and reduction of operating cost.

Delgado, Hector N.↗

Propulsive Reaction Control System Model

This software models a propulsive reaction control system (RCS) for guidance, navigation, and control simulation purposes. The model includes the drive electronics, the electromechanical valve dynamics, the combustion dynamics, and thrust. This innovation follows the Mars Science Laboratory entry reaction control system design, and has been created to meet the Mars Science Laboratory (MSL) entry, descent, and landing simulation needs. It has been built to be plug-and-play on multiple MSL testbeds [analysis, Monte Carlo, flight software development, hardware-in-the-loop, and ATLO (assembly, test and launch operations) testbeds]. This RCS model is a C language program. It contains two main functions: the RCS electronics model function that models the RCS FPGA (field-programmable-gate-array) processing and commanding of the RCS valve, and the RCS dynamic model function that models the valve and combustion dynamics. In addition, this software provides support functions to initialize the model states, set parameters, access model telemetry, and access calculated thruster forces.

Brugarolas, Paul↗

Where's My Data - WMD

WMD provides a centralized interface to access data stored in the Mission Data Processing and Control System (MPCS) GDS (Ground Data Systems) databases during MSL (Mars Science Laboratory) Testbeds and ATLO (Assembly, Test, and Launch Operations) test sessions. The MSL project organizes its data based on venue (Testbed, ATLO, Ops), with each venue's data stored on a separate database, making it cumbersome for users to access data across the various venues. WMD allows sessions to be retrieved through a Web-based search using several criteria: host name, session start date, or session ID number. Sessions matching the search criteria will be displayed and users can then select a session to obtain and analyze the associated data. The uniqueness of this software comes from its collection of data retrieval and analysis features provided through a single interface. This allows users to obtain their data and perform the necessary analysis without having to worry about where and how to get the data, which may be stored in various locations. Additionally, this software is a Web application that only requires a standard browser without additional plug-ins, providing a cross-platform, lightweight solution for users to retrieve and analyze their data. This software solves the problem of efficiently and easily finding and retrieving data from thousands of MSL Testbed and ATLO sessions. WMD allows the user to retrieve their session in as little as one mouse click, and then to quickly retrieve additional data associated with the session.

Quach, William L.↗

Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements

KSC-DE-512-SM establishes overall requirements and best design practices to be used at the John F. Kennedy Space Center (KSC) for the development of ground systems (GS) in support of operations at launch, landing, and retrieval sites. These requirements apply to the design and development of hardware and software for ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F-GSS) used to support the KSC mission for transportation, receiving, handling, assembly, test, checkout, servicing, and launch of space vehicles and payloads and selected flight hardware items for retrieval. This standards manual supplements NASA-STD-5005 by including KSC-site-specific and local environment requirements. These requirements and practices are optional for equipment used at manufacturing, development, and test sites.

Ground Support Systems↗

Perserving Samples and Their Scientific Integrity - Insights into MSR from the Astromaterials Acquisition and Curation Office at NASA Johnson Space Center

The Astromaterials Acquisition and Curation Office at NASA Johnson Space Center (JSC), in Houston, TX (henceforth Curation Office) manages the curation of all past, present, and future extraterrestrial samples returned by NASA missions and shared collections from international partners, preserving their integrity for future scientific study while providing the samples to the international community in a fair and unbiased way. The Curation Office also curates flight and non-flight reference materials and other materials from spacecraft assembly of sample return missions that would have the potential to cross-contaminate a present or future NASA astromaterials collection. These materials are primarily collected during the assembly, test, and launch operations (ATLO) phase and after flight during the recovery and curation phase. In addition, the Curation Office curates non-flight, flight-like, and flown witness plates for sample return missions. These reference materials and witness plates provide the scientific community with the fundamental ability to reconstruct the contamination/alteration history of the sample collection through the course of the mission, with the overall goal of strengthening the scientific conclusions drawn from the study of returned materials.

Harrington, A. D.↗

The Evolution of Planetary Protection Implementation on Mars Landed Missions

NASA has developed requirements dedicated to the prevention of forward and backward contamination during space exploration. Historically, international agreements provided guidelines to prevent contamination of the Moon and other celestial bodies, as well as the Earth (e.g., sample return missions). The UN Outer Space Treaty was established in 1967 and the Committee on Space Research (COSPAR) maintains a planetary protection policy complying with Article IX of this treaty. By avoiding forward contamination, the integrity of scientific exploration is preserved. Planetary Protection mission requirements are levied on missions to control contamination. These requirements are dependent on the science of the mission and on the celestial bodies encountered or targeted along the way. Consequently, categories are assigned to missions, and specific implementation plans are developed to meet the planetary protection requirements. NASA missions have evolved over time with increasingly more demanding scientific objectives and more complex flight systems to achieve those objectives and, thus, planetary protection methods and processes used for implementation have become much more intricate, complicated, and challenging. Here, we will portray the evolution of planetary protection implementation at JPL in several important areas throughout the course of NASA sponsored robotic Mars lander or rover missions, starting from Mars Pathfinder through the beginning of Mars 2020. Highlighted in the discussion will be process changes in planetary protection requirements development and flow down. Development and implementation of new and improved methods used in the reduction of spacecraft bioburden will be discussed as well as approaches and challenges that come along with setting up remote laboratories to perform bioassays. The consequences and forward planning of delays on missions will be highlighted as well as lessons learned on the impact of communication and training in achieving planetary protection requirements. The evolution of methods used for the detection of microbial bioburden on spacecraft hardware will be considered. These methods use standard microbiology as well as the adaptation of advances in biotechnology, molecular biology, and bioinformatics. Technical approaches developed for the prevention of contamination and recontamination of hardware during Assembly, Test, and Launch Operations will be discussed.

Kazarians, Gayane A.↗

Characteristics of a high-power ion beam deflection system necessary to deflect the hypothetical asteroid 2017 PD

The July 2027 impact date for the hypothetical asteroid 2017 PDC, that is the subject of an emergency response exercise, leaves just over ten years to implement a deflection approach. The analyses herein allocates four years to the design, fabrication, assembly, test and launch of a notional high-power Ion Beam Deflection (IBD) vehicle to meet a launch readiness date no later than May 2021. Using this launch date along with estimates for the vehicle mass and performance characteristics of the electric propulsion system, low-thrust trajectory analyses indicate a 2.56-year flight time to rendezvous with 2017 PDC. This would leave 3.6 years to execute the actual deflection phase. A 160-kW IBD vehicle could deflect 2017 PDC by at least one Earth radius within this time provided the asteroid’s actual diameter was less than about 140 m and its density was 2 g/cm3 or less. Larger diameters and/or higher densities would require a higher power IBD vehicle, multiple IBD vehicles, or a longer deflection phase. Ion beam deflection is largely independent of the characteristics of the threat object, but its effectiveness, like all deflection approaches, is sensitive to both the asteroid mass and the time available for deflection. The characteristics of IBD, i.e., large standoff distance between the spacecraft and the asteroid surface, as well as ion beam divergence angles of a few degrees, facilitates the possible simultaneous use of multiple IBD vehicles to improve the performance and robustness of the asteroid deflection. The 65-cm diameter, 20-kW NEXIS ion thruster developed in support of the Jupiter Icy Moons Orbiter mission concept is particularly well suited for application to a high-power IBD system. It has demonstrated an ion beam divergence angle of approximately 2 degrees and operation at 20 kW for over 2,000 hours. Completion of the development and flight qualification of this technology would significantly reduce the risk and time necessary to respond to the discovery of potentially hazardous asteroid in the size range of 50- to 100-m diameter.

Reeves, David↗

Unlocking the Spacecraft and Human Habitat Microbiome to Enable the Next Generation of Space Exploration

Planetary protection is the discipline that prevents harmful contamination of the solar system during exploration activities. The current international guidelines and NASA policy addressing biological contamination on spacecraft surfaces contains prescriptive guidelines of spore requirements (e.g., 300 spores/m2, 5×105 spores per spacecraft) applicable to spacecraft bound for Mars. To verify these requirements spacecraft engineers sample spacecraft surfaces throughout the assembly, test and launch operations phase of the mission using damp water cotton swabs and polyester wipes. After sampling, the potential biological contamination is enumerated using a series of traditional microbiology techniques to include sonication, heat shocking at 80°C for 15min to select for spores, and growth on tryptic soy agar at 32°C for 72 hours. To enable crewed missions to Mars and robotic exploration of the Ocean Worlds a risk informed decision making / performance-based approach to assess biological contamination offers a promising solution in the trade space. Recognizing the need for a performance-based approach, NASA’s new Planetary Protection policies now incorporate the agility for missions to be able to leverage a performance or prescriptive approach. One of top contenders in the option space is a coupled quantitative, descriptive and functional based approach to be able to assess the quantity, types and capabilities of the biological contamination present on spacecraft surfaces. A tailored, mission by mission assurance case could then be formulated by building an argument around the target body, projected capabilities surrounding the types of organisms their potential for survival and proliferation, and ability to be transported on the target body to contaminate an area of biological interest. A performance-based requirement would then be used to demonstrate the mission’s compliance in protecting the planetary environment safety objectives. This symposium talk will showcase the background and need case for NASA to develop such a capability as well as provide an update on the efforts underway in developing a transparent and responsible performance-based approach to biological contamination assessments on spacecraft surfaces.

Habitat Microbiome↗

Flight Software Dictionary Development for the Mars2020 Rover

The Mars2020 project, developed and operated by the Jet Propulsion Laboratory (JPL), successfully landed the Perseverance rover and its flying companion Ingenuity on the surface of Mars on February 18th 2021. Perseverance combines heritage and cutting-edge flight software and hardware to accomplish crucial mission requirements related to Martian surface sampling. The design, development, and operation of NASA’s large strategic science missions require the ability to communicate spacecraft capabilities to hundreds of engineers across multiple disciplines. The interaction between flight and ground software development, Verification and Validation (V&V), Assembly, Test, and Launch Operations (ATLO), and management each demand quick understanding of unique slices of information for each discipline. This information includes the current capabilities of the flight system as well as future capabilities and their status as they are developed and tested. Despite the fundamental and critical nature of this information, the flight software dictionaries used to track it are a stumbling block for many projects. These dictionaries provide the cornerstone for the interpretation of data sent from the spacecraft, allowing for quick comprehension by engineers on the ground. During both spacecraft development and operations, flight software dictionary management includes significant challenges due to the large number of interfacing systems and the subtle yet distinct needs of each.The engineering of flight software dictionaries for Mars2020 had numerous challenges, most-notably: parallel dictionary development to support simultaneous separate flight software build campaigns for each mission phase (cruise and surface), managing requests for operations-enabling information without perturbing the heritage interface with the rover, and the introduction of new tools by the dictionary stakeholders that forced the dictionary team to innovate and redesign the heritage tool chain. These challenges generated guiding principles for the dictionary development effort: emphasize coding best practices and unit testing in the dictionary code development tool chain, use institutionally provided COTS (commercial-off-the-shelf) tools whenever possible, and maintain the heritage flight-ground interface all while advancing operations-enabling information via a loosely coupled interface.Throughout development and operations, the Mars2020 dictionary toolchain included IBM DOORS Next Generation, GitHub, Microsoft Excel, Docker, Jenkins, and a significant custom-built Python codebase. Significant interfaces included JPL’s command and control software, heritage flight software team tools and processes, and the many cloud-based ground tools developed for the mission.This paper will discuss the requirements for the Mars2020 dictionary development, the development team’s response to those requirements, lessons learned throughout the process, steps taken towards automated deliveries and continuous integration of stakeholder inputs, potential toolchain improvements for Mars2020, and key takeaways that could be applied to future missions.

Pyrzak, Guy↗

Managing Maintenance Error: Six Lessons From Aviation Maintenance

There are clear parallels between the ground processing of spacecraft and the maintenance of airline aircraft. In both cases, reliable human performance is critical to safe outcomes. Examples of human factors in airline maintenance and spacecraft ground processing illustrate the similarities between these two domains. The worldwide aviation industry began to pay close attention to human factors in maintenance after several maintenance-related disasters in the 1970s and 80s. Rather than simply applying solutions that had been developed for flight crew and air traffic controllers, the aviation industry developed human factors interventions specifically tailored for maintenance personnel. These interventions have led to safety improvements, greater reliability, and significant cost savings. Six human factors approaches from airline maintenance that can be usefully applied to enhance the quality and safety of ground processing are outlined. These are 1) Design for assembly, test, and maintenance, 2) Non technical skills training, 3) Improved design of documentation, 4) Reduction of iatrogenic quality lapses, 5) Barrier and control analysis, and 6) Continuous improvement based on learning from quality lapses.

maintenance human factors↗