Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “temperature verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Analysis of the MODIS Above-Cloud Aerosol Retrieval Algorithm Using MCARS

The Multi-sensor Cloud and Aerosol Retrieval Simulator (MCARS) presently produces synthetic radiance data from Goddard Earth Observing System version 5 (GEOS-5) model output as if the Moderate Resolution Imaging Spectroradiometer (MODIS) was viewing a combination of atmospheric column inclusive of clouds, aerosols and a variety of gases and land/ocean surface at a specific location. In this paper we use MCARS to study the MODIS Above-Cloud AEROsol retrieval algorithm (MOD06ACAERO). MOD06ACAERO is presently a regional research algorithm able to retrieve aerosol optical thickness over clouds, in particular absorbing biomass burning aerosols overlying marine boundary layer clouds in the Southeastern Atlantic Ocean. The algorithm’s ability to provide aerosol information in cloudy conditions makes it a valuable source of information for modeling and climate studies n an area where current clear sky-only operational MODIS aerosol retrievals effectively have a data gap between the months of June and October. We use MCARS for a verification and closure study of the MOD06ACAERO algorithm. The purpose of this study is to develop a set of constraints a model developer might use during assimilation of MOD06ACAERO data. Our simulations indicate that the MOD06ACAERO algorithm performs well for marine boundary layer clouds in the SE Atlantic provided some specific screening rules are observed. For the present study, a combination of five simulated MODIS data granules was used for a dataset of 13.5 million samples with known input conditions. When pixel retrieval uncertainty was less than 30%, optical thickness of the underlying cloud layer was greater than 4 and scattering angle range within the cloud bow was excluded, MOD06ACAERO retrievals agreed with the underlying ground truth (GEOS-5 cloud and aerosol profiles used to generate the synthetic radiances) with a slope of 0.913, offset of 0.06, and RMSE=0.107. When only near-nadir pixels were considered (view zenith angle within +/-20 degrees) the agreement with source data further improved (0.977, 0.051 and 0.096 respectively). Algorithm closure was examined using a single case out of the five 38 used for verification. For closure, the MOD06ACAERO code was modified to use GEOS-5 temperature and moisture profiles as ancillary. Agreement of MOD06ACAERO retrievals with source data for the closure study had a slope of 0.996 with offset -0.007 and RMSE of 0.097 at pixel uncertainty level of less than 40%, illustrating the benefits of high-quality ancillary atmospheric data for such retrievals.

MODIS↗

[Presentation Slides] Code-to-Code Benchmark Study for Thermal Stress Modeling and Preliminary Analysis of the High-temperature Single Heat-Pipe Experiment

In the heat-pipe-cooled microreactor, heat pipes remove heat from the reactor core as a passive heat-transfer device, so the fluid circulation is not required for cooling, which can substantially simplify the overall reactor design. However, given the extremely high temperatures in the core region and potentially large temperature gradients across the structure materials, thermal stresses need to be well-analyzed to ensure structural integrity during normal operations and accident scenarios. This presentation slides discuss finite element method-based thermal-stress analysis for the high-temperature single heat-pipe test article in the Single Primary Heat Extraction and Removal Emulator (SPHERE) facility at Idaho National Laboratory (INL), using two commercial software packages, Abaqus and Star-CCM+. A code-to-code benchmark study was performed to crosscheck the model setup and capability of each code and to gain preliminary insights into the potential thermal stress concerns from the current experimental setup. It is observed the significant thermal stresses happen at the inner surface of the heat pipe hole surrounded by electric heaters where the largest temperature gradients appear. The temperature fields have good agreements between Abaqus and Star-CCM+, while the induced thermal stresses show modest deviations probably due to differences of meshing engines used in these two codes. It is found that the local maximum thermal stresses may reach close to the ultimate tensile strength and yield strength of structural material depending on the heater power. Ultimately, the coupled thermal-structural analysis will help guide the current experimental plan and ensure the facility safety for future experimental study.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strainrange Partitioning - A tool for characterizing high-temperature low-cycle fatigue

The basic concepts of Strainrange Partitioning are reviewed, with particular reference to the areas requiring expanded verification. A cooperative program is proposed for achieving this broader verification through the additional experience provided by the participants in this program. The suggested program includes verification of the four basic life relationships (for PP, CC, PC, and CP type inelastic strainranges) for a variety of materials chosen by the participating organizations. The four relationships are then used in conjunction with the Interaction Damage Rule to predict the cyclic lives of tests involving various combinations of the basic strainrange components. The testing program also includes evaluation of the degree of insensitivity of these relationships to temperature as well as their utility in representing bounds on life.

Hirschberg, M. H.↗

First-Order SPICE Modeling of Extreme-Temperature 4H-SiC JFET Integrated Circuits

A separate submission to this conference reports that 4H-SiC Junction Field Effect Transistor (JFET) digital and analog Integrated Circuits (ICs) with two levels of metal interconnect have reproducibly demonstrated electrical operation at 500 C in excess of 1000 hours. While this progress expands the complexity and durability envelope of high temperature ICs, one important area for further technology maturation is the development of reasonably accurate and accessible computer-aided modeling and simulation tools for circuit design of these ICs. Towards this end, we report on development and verification of 25 C to 500 C SPICE simulation models of first order accuracy for this extreme-temperature durable 4H-SiC JFET IC technology. For maximum availability, the JFET IC modeling is implemented using the baseline-version SPICE NMOS LEVEL 1 model that is common to other variations of SPICE software and importantly includes the body-bias effect. The first-order accuracy of these device models is verified by direct comparison with measured experimental device characteristics.

JFET↗

Analysis of Conduction Cooling Strategies for Wire Arc Additive Manufacturing

Metal additive manufacturing (AM) processing consists of numerous parameters which take time to optimize for various geometries. One aspect of the metal AM process that continues to be explored is the control of thermal energy accumulation during component manufacturing due to the melting and solidification of the feedstock. Excessive energy accumulation causes thermal failure of the component while minimal energy accumulation causes lack of fusion with the build plate or previous layer. The ability to simulate the thermal response of an AM component can increase research efficiency by reducing the time to optimize thermal energy accumulation. This paper presents an effective implementation of finite element analysis to determine the thermal response of a wire arc additive manufactured component with various build plate sizes and cooling methods including, integral build plate cooling, oversized build plates with passive cooling, and non-integral build plate cooling. The use of integral build plate cooling channels was shown to decrease the interpass temperature at the conclusion of the build process by 55% and build plate temperature by 96% compared to the conventionally deposited sample with 20 second dwell time. The use of a tall build plate with passive cooling was shown to reduce the interpass temperature by 32% as compared to the conventionally deposited sample with 20 second dwell time. Each cooling strategy evaluated decreased the interpass temperature within a range of 20–55% which enables higher deposition rates and decreased dwell times during depositions. The cooling strategies are designed to be implemented in a hybrid or retrofit AM platform to mitigate concerns of the thermal input from the additive process having detrimental effects on the precision of the machining process. This paper shows that accurate simulations of all strategies can be used to accurately predict the thermal response of the various strategies discussed. These cooling strategies will allow for increased deposition rates with comparable interpass temperature and decreased dwell time, increasing deposition efficiency. This model and these simulations are verified by experimental results. It is concluded that passive strategies, such as the over-sized tall build plate, can be used when liquid coolant in the AM environment could negatively affect the deposition process. Active cooling strategies, such as the integral build plate cooling could be used if low thermal conductivity materials are deposited or higher material deposition rates are desired. This paper discusses the use of active and passive cooling used during AM and shows how a simulation model can be used to make design choices for cooling strategies. The model also enables verification of select critical process parameters such as dwell times for a desired interpass temperature.

Heinrich, Lauren↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Comparison of Exploration Portable Life Support Subsystem (xPLSS) Thermal Modeling to Thermal Vacuum Testing

To support NASA’s goal to return to the Moon through the Artemis mission, the development of an exploration portable life support system (xPLSS) has been conducted at Johnson Space Center (JSC). As part of this development process, a large system level thermal/fluid model of the xPLSS was developed using Thermal Desktop and an in-house human model (METMAN). The xPLSS model was used throughout the design process to predict the performance and temperature of nearly all components within the xPLSS. In the fall of 2023, the design, verification, and testing (DVT) unit of the xPLSS was tested in a thermal vacuum (TVAC) chamber at JSC. This testing consisted of combining the xPLSS with an upper torso of the exploration pressure garment system (xPGS) and simulating five extravehicular activities (EVAs) in extreme thermal conditions (two cold EVAs and three hot EVAs). The data generated in this test series provided system level data of the xPLSS operating in vacuum and at flight-like environmental temperatures for the first time. This data was compared to results output by the xPLSS system model to assess the accuracy of previous analyses and improve the fidelity and accuracy of the xPLSS system model. The comparison between model and test hardware provides valuable insight that will help improve the design and fidelity of next generation space suits. In general, comparison between test data and model data generally showed slightly un-conservative values (model predicting colder temperatures than test in hot environments, and hotter temperatures than test in cold environments). Model assumptions and test assumptions were assessed to understand potential causes of some of these sources in error. Recommendations to improve the fidelity of the xPLSS model were also made based on the results presented in this paper.

xPLSS↗

Comparison of Exploration Portable Life Support Subsystem (xPLSS) Thermal Modeling to Thermal Vacuum Testing

To support NASA’s goal to return to the Moon through the Artemis Mission, the development of an Exploration Portable Life Support Subsystem (xPLSS) has been conducted at Johnson Space Center (JSC). As part of this development process, a large system level thermal/fluid model of the xPLSS was developed using Thermal Desktop and an in-house human model (METMAN). The xPLSS model was used throughout the design process to predict the performance and temperature of nearly all components within the xPLSS. In the fall of 2023, the Design, Verification, and Testing (DVT) unit of the xPLSS was tested in a thermal vacuum (TVAC) chamber at JSC. This testing consisted of combining the xPLSS with an upper torso of the Exploration Pressure Garment System (xPGS) and simulating five Extravehicular Activities (EVAs) in extreme thermal conditions (two cold EVAs and three hot EVAs). The data generated in this test series provided system level data of the xPLSS operating in vacuum and at flight-like environmental temperatures for the first time. These data were compared to results output by the xPLSS system model to assess the accuracy of previous analyses and improve the fidelity and accuracy of the xPLSS system model. The comparison between model and test hardware provides valuable insight that will help improve the design and fidelity of next generation space suits. In general, comparison between test data and model data generally showed slightly un-conservative values (model predicting colder temperatures than test in hot environments, and hotter temperatures than test in cold environments). Model assumptions and test assumptions were assessed to understand potential causes of some of these sources in error. Recommendations to improve the fidelity of the xPLSS model were also made based on the results presented in this paper.

xPLSS↗

Design, Build, and Testing of the Roman Space Telescope’s Wide Field Instrument Optical Stimulus System (SORC)

The Stimulus Of Ray Cones (SORC) is an optical stimulus system developed to verify, characterize, and calibrate the Roman Space Telescope’s (RST) Wide Field Instrument (WFI) under simulated operational conditions. SORC provides several critical test modes, the primary being point-source mode, which projects an image anywhere on the Focal Plane Assembly (FPA) detectors. This mode provides precise position knowledge of the FPA within WFI. Additional modes enable capturing WFI pupil alignment, evaluation of WFI’s selectable optical elements, and verification of focal plane fiber operation for higher-level system testing. The light source system incorporates a suite of narrowband and broadband fiber fed sources spanning the visible to near-infrared range, with options for pulsed or continuous wave illumination. SORC was designed and built at NASA’s Goddard Spaceflight Center (GSFC). Initial system-level testing occurred under ambient conditions in GSFC’s Spacecraft Systems Development and Integration Facility (SSDIF), followed by vacuum testing at operational temperatures (SORC at 214-222 K) in the Space Environment Simulator (SES). The system was then shipped to BAE Systems in Boulder, CO for post-shipment ambient and cryogenic testing before integration with WFI for two thermal vacuum test campaigns at cryogenic temperatures. This presentation will focus on design, development, and performance of SORC. Details of WFI verification and calibration using SORC, along with test results, have been published previously and will be referenced only as needed to describe SORC. The SORC ground test capability is critical to ensuring WFI meets stringent optical performance requirements, directly supporting the mission’s science objectives.

Stimulus of Ray Cones↗

NASA Low-Speed Centrifugal Compressor for Fundamental Research

A centrifugal compressor facility being built by the NASA Lewis Research Center is described; its purpose is to obtain benchmark experimental data for internal flow code verification and modeling. The facility will be heavily instrumented with standard pressure and temperature probes and have provisions for flow visualization and laser Doppler velocimetry. The facility will accommodate rotational speeds to 2400 rpm and will be rated at pressures to 1.25 atm. The initial compressor stage for testing is geometrically and dynamically representative of modern high-performance stages with the exception of Mach number levels. Design exit tip speed for the initial stage is 500 ft/sec with a pressure ratio of 1.17. The rotor exit backsweep is 55 deg from radial.

Wood, J. R.↗

NASA low-speed centrifugal compressor for fundamental research

A new centrifugal compressor facility being built by the NASA Lewis Research Center is described; its purpose is to obtain 'benchmark' experimental data for internal flow code verification and modeling. The facility will be heavily instrumented with standard pressure and temperature probes and have provisions for flow visualization and laser Doppler velocimetry. The facility will accommodate rotational speeds to 2400 rpm and will be rated at pressures to 1.25 atm. The initial compressor stage for testing is geometrically and dynamically representative of modern high-performance stages with the exception of Mach number levels. Design exit tip speed for the initial stage is 500 ft/sec with a pressure ratio of 1.17. The rotor exit backsweep is 55 deg from radial. The facility is expected to be operational in the first half of 1985.

Wood, J. R.↗

Observing system simulation experiments related to space-borne Lidar wind profiling. Part 1: Forecast impacts of highly idealized observing systems

Simulation experiments comparing the relative importance of an idealized LIDAR wind profiling system with idealized temperature and pressure sounding systems on 12 h forecasts are studied for three "nature' fields representing the true evolving atmospheric states. The three fields are obtained respectively from: (1) a long integration of the GLAS 4th Order Model (4 deg lat x 5 deg lon x 9 levels), (2) a continuous sequence of NMC operational analysis and, (3) a long integration of the ECMWF high resolution (1.875 deg 1 lat x 1.875 deg lon x 15 layers) operational forecast model. These fields are interpolated to the grid of the GLAS model and used for simulating the observed global analysed fields of winds, temperature, moisture and surface pressure. The same interpolated fields are also used for verification of forecast impact. The effects of clouds, aerosol concentrations, and instrument accuracies on the simulated observation will be discussed.

Halem, M.↗

Reusable Solid Rocket Motor Nozzle Joint-4 Thermal Analysis

This study provides for development and test verification of a thermal model used for prediction of joint heating environments, structural temperatures and seal erosions in the Space Shuttle Reusable Solid Rocket Motor (RSRM) Nozzle Joint-4. The heating environments are a result of rapid pressurization of the joint free volume assuming a leak path has occurred in the filler material used for assembly gap close out. Combustion gases flow along the leak path from nozzle environment to joint O-ring gland resulting in local heating to the metal housing and erosion of seal materials. Analysis of this condition was based on usage of the NASA Joint Pressurization Routine (JPR) for environment determination and the Systems Improved Numerical Differencing Analyzer (SINDA) for structural temperature prediction. Model generated temperatures, pressures and seal erosions are compared to hot fire test data for several different leak path situations. Investigated in the hot fire test program were nozzle joint-4 O-ring erosion sensitivities to leak path width in both open and confined joint geometries. Model predictions were in generally good agreement with the test data for the confined leak path cases. Worst case flight predictions are provided using the test-calibrated model. Analysis issues are discussed based on model calibration procedures.

Clayton, J. Louie↗

The New LOTIS Test Facility

The Large Optical Test and Integration Site (LOTIS) at the Lockheed Martin Space Systems Company in Sunnyvale, CA is designed for the verification and testing of optical systems. The facility consists of an 88 foot temperature stabilized vacuum chamber that also functions as a class 10k vertical flow cleanroom. Many problems were encountered in the design and construction phases. The industry capability to build large chambers is very weak. Through many delays and extra engineering efforts, the final product is very good. With 11 Thermal Conditioning Units and precision RTD s, temperature is uniform and stable within 1oF, providing an ideal environment for precision optical testing. Within this chamber and atop an advanced micro-g vibration-isolation bench is the 6.5 meter diameter LOTIS Collimator and Scene Generator, LOTIS alignment and support equipment. The optical payloads are also placed on the vibration bench in the chamber for testing. This optical system is designed to operate in both air and vacuum, providing test imagery in an adaptable suite of visible/near infrared (VNIR) and midwave infrared (MWIR) point sources, and combined bandwidth visible-through-MWIR point sources, for testing of large aperture optical payloads. The heart of the system is the LOTIS Collimator, a 6.5m f/15 telescope, which projects scenes with wavefront errors <85 nm rms out to a 0.75 mrad field of view (FOV). Using field lenses, performance can be extended to a maximum field of view of 3.2 mrad. The LOTIS Collimator incorporates an extensive integrated wavefront sensing and control system to verify the performance of the system.

Bell, R. M.↗

The Transition of High-Resolution NASA MODIS Sea Surface Temperatures into the WRF Environmental Modeling System

The NASA Short-term Prediction Research and Transition (SPoRT) Center has developed a Moderate Resolution Imaging Spectroradiometer (MODIS) sea surface temperature (SST) composite at 2-km resolution that has been implemented in version 3 of the National Weather Service (NWS) Weather Research and Forecasting (WRF) Environmental Modeling System (EMS). The WRF EMS is a complete, full physics numerical weather prediction package that incorporates dynamical cores from both the Advanced Research WRF (ARW) and the Non-hydrostatic Mesoscale Model (NMM). The installation, configuration, and execution of either the ARW or NMM models is greatly simplified by the WRF EMS to encourage its use by NWS Weather Forecast Offices (WFOs) and the university community. The WRF EMS is easy to run on most Linux workstations and clusters without the need for compilers. Version 3 of the WRF EMS contains the most recent public release of the WRF-NMM and ARW modeling system (version 3 of the ARW is described in Skamarock et al. 2008), the WRF Pre-processing System (WPS) utilities, and the WRF Post-Processing program. The system is developed and maintained by the NWS National Science Operations Officer Science and Training Resource Coordinator. To initialize the WRF EMS with high-resolution MODIS SSTs, SPoRT developed the composite product consisting of MODIS SSTs over oceans and large lakes with the NCEP Real-Time Global (RTG) filling data over land points. Filling the land points is required due to minor inconsistencies between the WRF land-sea mask and that used to generate the MODIS SST composites. This methodology ensures a continuous field that adequately initializes all appropriate arrays in WRF. MODIS composites covering the Gulf of Mexico, western Atlantic Ocean and the Caribbean are generated daily at 0400, 0700, 1600, and 1900 UTC corresponding to overpass times of the NASA Aqua and Terra polar orbiting satellites. The MODIS SST product is output in gridded binary-1 (GRIB-1) data format for a seamless incorporation into WRF via the WPS utilities. The full-resolution, 1-km MODIS product is sub-sampled to 2-km grid spacing due to limitations in handling very large dimensions in the GRIB-1 data format. The GRIB-1 files are posted online at ftp://ftp.nsstc.org/sstcomp/WRF/, which is directly accessed by the WRF EMS scripts. The MODIS SST composites are also downloaded to the EMS data server, which is accessible by the WRF EMS users and NWS WFOs. The SPoRT MODIS SST composite provides the model with superior detail of the ocean gradients around Florida and surrounding waters, whereas the operational RTG SST typically depicts a relatively smooth field and is not able to capture sharp horizontal gradients in SST. Differences of 2-3 C are common over small horizontal distances, leading to enhanced SST gradients on either side of the Gulf Stream and along the edges of the cooler shelf waters. These sharper gradients can in turn produce atmospheric responses in simulated temperature and wind fields as depicted in LaCasse et al. Differences in atmospheric verification statistics over a several month study were generally small in the vicinity of south Florida; however, the validation of SSTs at specific buoy locations revealed important improvements in the biases and RMS errors, especially in the vicinity of the cooler shelf waters off the east-central Florida coast. A current weakness in the MODIS SST product is the occurrence of occasional discontinuities caused by high latency in SST coverage due to persistent cloud cover. An enhanced method developed by Jedlovec et al. (2009, GHRSST User Symposium) reduces the occurrence of these problems by adding Advanced Microwave Scanning Radiometer -- EOS (AMSR-E) SST data to the compositing process. Enhanced SST composites are produced over the ocean regions surrounding the Continental U.S. at four times each day corresponding to Terra and Aqua equator crossing times. For a given day and overpass time, both MODInd AMSR-E data from the previous seven days form a collection used in the compositing. At each MODIS pixel, cloud-free SST values from the collection are used to form a weighted average based on their latency (number of days from the current day). In this way, recent SST data are given more weight than older data. One of the primary issues involved in incorporating the AMSR-E microwave data in the composites is the tradeoff between the decreased spatial resolution of the AMSR-E data (25 km) and the increased coverage due to its near all-weather capability. Currently, the AMSR-E is given a weight of 20% compared to MODIS data, thereby preserving the spatial structure observed in the MODIS data. Day-time (night-time) AMSR-E SST data from Aqua are used with both Terra and Aqua MODIS day-time (night-time) SST data sets.

Case, Jonathan L.↗

Icarus Application to Dragonfly Heatshield

Icarus, an in-house material response solver developed at NASA Ames, is applied to perform 2-D bondline-temperature analysis on the heatshield surface of the latest Dragonfly entry system design for a mission to Titan. Two axisymmetric domains are used: the near-shoulder region and the entire heatshield. The heatshield consists of a PICA TPS bonded to a layered system of Aluminum honeycomb wrapped by an M55J carbon-fiber facesheet. The backshell, which is also included for more accurate analysis, consists of similar materials layered. Icarus simulations using both domains indicate that the in-plane thermal conductivity property of the M55J facesheet is observed to play a dominant role in bondline temperature. Similarly, the maximum bondline temperature is found around the PICA-tile-interface region instead of the near-shoulder region or the stagnation point based on the current trajectory using the orthotropic properties of M55J. Therefore, these findings indicate the significance of 2-D or higher-dimensional material modeling analysis in fully understanding how bondline temperature behaves across the heatshield and obtaining a basis for TPS design locations. Verification at different radial locations ahead of the shoulder, where thermal conduction is close to 1-D, between Icarus (2-D), Icarus (1-D), and FIAT is performed and good agreement is observed. With the entire heatshield domain, the total mass loss of the aeroshell materials is approximately 3% of their initial mass potentially due to thermal decomposition of phenolic resins inside PICA under the current high-heating environment.

TPS material modeling↗

Development of advanced Si and GaAs solar cells for interplanetary missions

The deep space and planetary exploration project have been acquiring more and more importance and some of them are now well established both in ESA and NASA programs. This paper presents the possibility to utilize both silicon and gallium arsenide solar cells as spacecraft primary power source for missions far from the Sun, in order to overcome the drawbacks related to the utilisation of radioisotope thermoelectric generators - such as cost, safety and social acceptance. The development of solar cells for low illumination intensity and low temperature (LILT) applications is carried out in Europe by ASE (Germany) and CISE (Italy) in the frame of an ESA programme, aimed to provide the photovoltaic generators for ROSETTA: the cometary material investigation mission scheduled for launch in 2003. The LILT cells development and testing objectives are therefore focused on the following requirements: insolation intensity as low as 0.03 Solar Constant, low temperature down to -150 C and solar flare proton environment. At this stage of development, after the completion of the technology verification tests, it has been demonstrated that suitable technologies are available for the qualification of both silicon and gallium arsenide cells and both candidates have shown conversion efficiencies over 25% at an illumination of 0.03 SC and a temperature of -150 C. In particular, when measured at those LILT conditions, the newly developed 'Hl-ETA/NR-LILT' silicon solar cells have reached a conversion efficiency of 26.3%, that is the highest value ever measured on a single junction solar cell. A large quantity of both 'Hl-ETA/NR-LILT' silicon and 'GaAs/Ge-LILT' solar cells are presently under fabrication and they will be submitted to a qualification test plan, including radiation exposure, in order to verify their applicability with respect to the mission requirements. The availability of two valid options will minimize the risk for the very ambitious scientific project. The paper describes how the technical achievements have been possible with Si and GaAs LILT solar cells (including a comparison between measured and modelled l-V characteristics) and it presents the technology verification tests results.

Strobl, G.↗