Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Multiple IMU system test plan, volume 4

Operating procedures for this redundant system are described. A test plan is developed with two objectives. First, performance of the hardware and software delivered is demonstrated. Second, applicability of multiple IMU systems to the space shuttle mission is shown through detailed experiments with FDI algorithms and other multiple IMU software: gyrocompassing, calibration, and navigation. Gimbal flip is examined in light of its possible detrimental effects on FDI and navigation. For Vol. 3, see N74-10296.

Landey, M.↗

Top Down Implementation Plan for system performance test software

The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

Jacobson, G. N.↗

Propulsion technology needs for advanced space transportation systems

Plans have been formulated for chemical propulsion technology programs to meet the needs of advanced space transportation systems during the two decades from 1980 to the year 2000. The many possible vehicle applications have been reviewed and cataloged to isolate the common threads of primary propulsion technology that will satisfy near term requirements in the first decade and at the same time establish the technology groundwork for various potential far term applications in the second decade. Two thrust classes of primary propulsion engines are apparent: (1) 5,000 to 30,000 pounds thrust for upper stages and space maneuvering; (2) large booster engines of over 250,000 pounds thrust. Six major classes of propulsion systems and the important subdivisions of each class have been identified. The relative importance of each class is discussed in terms of the number of potential applications, the likelihood of that application materializing, and the criticality of the technology needed. Specific technology programs are described and scheduled to fulfill the anticipated primary propulsion technology requirements of the period.

Gregory, J. W.↗

APRES Prototype Mission Planner System Demonstration

Activity Planning with Resources for the Exploration of Space (APRES) is a mixed-initiative mission planning system for ground operations. APRES has been designed to support multi-spacecraft missions. The APRES Interface is browser-based and includes a plan editor, a timeline plan display, a temporal constraint editor, display of the state and numeric chronicles, and a violation resolution manager. Automation support is supplied by the APRES Service, which includes components that provide the following capabilities:(1) plan simulation, which determines the state and numeric chronicles (values of the model variables over time) and determines when "processes" are triggered and terminated based on world states in the execution trace, (2) violation detection of constraints and flight rules encoded in the domain model, and of the temporal constraints created by the user, (3) violation resolution suggestions as to how to fix the plan's violations via rescheduling. The user controls when and how to utilize the automation support. Demo video included with paper, runtime 8:54 in color with sound.

John L. Bresina↗

Methods and apparatus for graphical display and editing of flight plans

Systems and methods are provided for an integrated graphical user interface which facilitates the display and editing of aircraft flight-plan data. A user (e.g., a pilot) located within the aircraft provides input to a processor through a cursor control device and receives visual feedback via a display produced by a monitor. The display includes various graphical elements associated with the lateral position, vertical position, flight-plan and/or other indicia of the aircraft's operational state as determined from avionics data and/or various data sources. Through use of the cursor control device, the user may modify the flight-plan and/or other such indicia graphically in accordance with feedback provided by the display. In one embodiment, the display includes a lateral view, a vertical profile view, and a hot-map view configured to simplify the display and editing of the aircraft's flight-plan data.

Gibbs, Michael J.↗

Integrated charging infrastructure planning and charging scheduling for battery electric bus systems

We report studies on the electric bus system planning problem have typically focused exclusively on either the deployment of charging infrastructure or the scheduling of charging events; few have examined the impact of charging facility deployment on charging activities. Considering the interdependence of system design and operational strategies, this study proposes a two-phase optimization framework for charging infrastructure planning and charging scheduling for battery electric bus systems. An integrated optimization model is first developed to simultaneously optimize charger deployment, on-board battery capacity, and charging schedules. A charging scheduling model is further proposed and a rolling horizon approach is utilized in the second phase to optimize the real-time charging scheduling of electric buses. Compared to existing electric bus system planning methods, the proposed integrated model can reduce the total system cost by 19.5%. In addition, compared to uncontrolled charging, the proposed rolling horizon-based charging strategy can reduce the total charging cost by 68.3%.

25 ENERGY STORAGE↗

Test, Control and Monitor System maintenance plan

The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

Buehler, David P.↗

Guidance system operations plan for manned CM earth orbital missions using program SKYLARK 1. Section 4: Operational modes

The operational modes for the guidance system operations plan for Program SKYLARK 1 are presented. The procedures control the guidance and navigation system interfaces with the flight crew and the mission control center. The guidance operational concept is designed to comprise a set of manually initiated programs and functions which may be arranged by the flight crew to implement a large class of flight plans. This concept will permit both a late flight plan definition and a capability for real time flight plan changes.

Dunbar, J. C.↗

Speckle spectroscopy; an application for the multi-anode microchannel array detector system

Plans to combine the High Angular Resolution Imager/Spectrometer on the 4-meter Mayall telescope at the Kitt Peak National Observatory and the (256 x 1024)-pixel Multi-Anode Microchannel Array detector system to produce a unique instrument for speckle spectroscopy are described. The pulse-counting detector system will provide distortion-free imaging and will time tag each spatially-resolved photon event with an accuracy of 100 ns. The Imager/Spectrometer will provide a spatial resolution of 0.07 arcsec orthogonal to the plane of dispersion and 0.18 arcsec in the plane of dispersion.

Butcher, H. R.↗

A Nonlinear Regression Method for Composite Protection Modeling of Induction Motor Loads

Protection equipment are used to prevent damages to induction motor loads by isolating those from the power network in the event of severe faults. Modeling the response of induction motor loads and their protection is vital for power system planning and operation, especially in understanding system's response moments after a fault has occurred. This article proposes an optimization based framework to generate composite protection models for commercial building motor loads. Introducing a mathematical abstraction, the task of finding a suitable (simplified) model of the composite protection scheme is formulated as a nonlinear regression problem. Numerical examples are provided to illustrate the application of the framework.

Kundu, Soumya↗

Future SAR Imaging Systems: Goals, Plans, Challenges and Opportunities

Synthetic Aperture Radar (SAR) Earth observation data are becoming increasingly ubiquitous as new spaceborne systems become operational and their data are made available to scientists and applications users. The characteristic of active sensors like SAR to be able to observe Earth independent of weather or solar illumination, coupled with regular data acquisition, fosters reliability and encourages the investment in algorithm and product development toward a beneficial result. As SAR systems typically contain proprietary or nationally important technologies, civilian SAR systems are typically developed with a national focus, or in the case of the European Union, with the Union’s focus. As a result, when viewed from a global perspective, SAR programs can be generally viewed as independent developments, each with their own requirements, schedules, development approaches, and data policies. At the same time, these systems can be expensive, and particularly in an era of increasingly open data policies, coordination of programs could reduce redundancy in observations, increase sampling density and measurement diversity, and improve dependability of data streams in the long term. Since 2018, agency representatives from NASA, ESA, DLR, JAXA, ISRO, ASI, and CONAE have been evaluating the possibilities for programmatic and technical coordination of future SAR systems, data sharing, and scientific exploitation. In this paper, we describe the work in discovering trends and possibilities associated with flight systems, by evaluating current and future plans for SAR systems around the world, and identifying opportunities for coordination.

Zink, Manfred↗

IBM PC/IX operating system evaluation plan

An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

Dominick, Wayne D.↗

Advances in Distributed Operations and Mission Activity Planning for Mars Surface Exploration

A centralized mission activity planning system for any long-term mission, such as the Mars Exploration Rover Mission (MER), is completely infeasible due to budget and geographic constraints. A distributed operations system is key to addressing these constraints; therefore, future system and software engineers must focus on the problem of how to provide a secure, reliable, and distributed mission activity planning system. We will explain how Maestro, the next generation mission activity planning system, with its heavy emphasis on portability and distributed operations has been able to meet these design challenges. MER has been an excellent proving ground for Maestro's new approach to distributed operations. The backend that has been developed for Maestro could benefit many future missions by reducing the cost of centralized operations system architecture.

Mars Exploration Rover (MER)↗

Risk-based System Upgrade Planning for AOT-IC [Capstone Project]

The Accelerator Operations and Technology Instrumentation and Controls Group (AOT IC) at the Los Alamos Neutron Science Center (LANSCE) has established a comprehensive risk-based system upgrade planning strategy which has been utilized as a tool to prioritize system upgrade projects for the past several years. A challenge with the current system is that the group often lacks the data to quantify the probability and impact of system failures, so the group often relies instead on qualitative risk assessments as well as evaluations of a potential upgrade project’s alignment with group strategy and vision to prioritize projects. A proposed framework to enable quantitative risk probability and impact assessments has been developed and tested on three pilot systems chosen to broadly represent the types and conditions of equipment used by the group. The proposed framework incorporates availability data gathered from the LANSCE control room logbooks and the LANSCE work control system, as well as a system health evaluation which is conducted from a variety of resources to assess the probability of equipment failure. The impact of system failure is viewed from the perspective of impact on mission and schedule, where spares status, system documentation status, and the functional distribution of deployed systems are used to quantify these impacts.

43 PARTICLE ACCELERATORS↗

Planning for New Primary Airports in the United States: A Survey of Metropolitan Planning Organizations

Airport congestion at primary airports in major metropolitan areas was analyzed in a report prepared by the Transportation Research Board (TRB) in 1990. Taking the top twenty-three most congested airports from this study, a questionnaire was prepared and sent to the metropolitan planning organizations (MPOS) for twenty of the twenty-three metropolitan areas represented in the TRB study. The questionnaire focused on the role of the MPOs in planning for new primary airports in the United States, including questions about the status of the most recent MPO airport system plan, whether or not the latest plan recommends a new primary airport, and whether or not any other entities in the MPO areas are recommending new primary airports. The results indicated that 44.4 percent of the eighteen respondent MPOs have airport system plans that are five years old or older. Also, only two of the respondent MPOs have recommended a new primary airport in their latest regional airport system plan and only one of these two is a common recommendation in the Federal Aviation Administration's National Plan of Integrated Airport System.

NewMeyer, David A.↗

Planning for New Primary Airports in the United States: A Survey of Metropolitan Planning Organizations

Airport congestion at primary airports in major metropolitan areas was analyzed in a report prepared by the Transportation Research Board (TRB) in 1990. Taking the top twenty-three most congested airports from this study, a questionnaire was prepared and sent to the metropolitan planning organizations (MPOs) for twenty of the twenty-three metropolitan areas represented in the TRB study, The questionnaire focused on the role of the MPOs in planning for new primary airports in the United States, including questions about the status of the most recent MPO airport system plan, whether or not the latest plan recommends a new primary airport, and whether or not any other entities in the MPO areas are recommending new primary airports. The results indicated that 44.4 percent of the eighteen respondent MPOs have airport system plans that are five years old or older. Also, only two of the respondent MPOs have recommended a new primary airport in their latest regional airport system plan and only one of these two is a common recommendation in the Federal Aviation Administration's National Plan of Integrated Airport System.

NewMyer, David A.↗