Site Remediation Technology InfoBase: A Guide to Federal Programs, Information Resources, and Publications on Contaminated Site Cleanup Technologies. First Edition

Table of Contents: Federal Cleanup Programs; Federal Site Remediation Technology Development Assistance Programs; Federal Site Remediation Technology Development Electronic Data Bases; Federal Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Other Electronic Resources for Site Remediation Technology Information; Selected Bibliography: Federal Publication on Alternative and Innovative Site Remediation; and Appendix: Technology Program Contacts.

INFORMATION RESOURCES↗

Vicinity Property Assessments at Formerly Utilized Sites Remedial Action Program Project Sites in the New York District - 13420

The Formerly Utilized Sites Remedial Action Program (FUSRAP) has addressed sites across the nation for almost 4 decades. Multiple stake holder pressures, multiple regulations, and process changes occur over such long time periods. These result in many challenges to the FUSRAP project teams. Initial FUSRAP work was not performed under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Records of Decision (ROD). The ROD identifies the remedy decision and ultimately the criteria to be used to release a site. Early FUSRAP projects used DOE Orders or the Uranium Mill Tailings Radiation Control Act (UMTRCA) standards. Under current RODs, regulations may differ, resulting in different cleanup criteria than that used in prior Vicinity Property (VP) remediation. The USACE, in preparation for closeout of Sites, conducts reviews to evaluate whether prior actions were sufficient to meet the cleanup criteria specified in the current ROD. On the basis of these reviews, USACE has conducted additional sampling, determined that prior actions were sufficient, or conducted additional remediation consistent with the selected remedy in the ROD. As the public pressures, regulations, and processes that the FUSRAP encounters continue to change, the program itself continues to evolve. Assessment of VPs at FUSRAP sites is a necessary step in the life cycle of our site management. (authors)

54 ENVIRONMENTAL SCIENCES↗

Development of Methane Emissions Model to Assess Fuel Recovery Potential at Gas Well Sites Using On Site Compression

The U.S. natural gas production and consumption has increased 85.5% since 2005 primarily due to the unconventional production methods of horizontal drilling and hydraulic fracturing. Natural gas used as a fuel has a lower greenhouse gas (GHG) footprint than coal and petroleum due to lower Carbon Dioxide (CO2) emissions when combusted. However, the “greener” benefit to natural gas may be negated by leaks in production and transmission systems. Methane (CH4), the primary hydrocarbon in natural gas, has an estimated Global Warming Potential (GWP) of 28-36 over 100 years, meaning it can absorb 28-36 more energy than CO2 which has a GWP of 1.0. Natural gas well sites are prone to methane emissions, or leaks and irregular gas releases, vented to atmosphere throughout production and transmission. The U.S. Department of Energy (DOE) and the National Energy Technology Laboratory (NETL) has recently granted West Virginia University (WVU) funding under agreement DE-FOA-0002005, to “Advance technologies to mitigate methane emissions and increase the efficiency of the natural gas transportation infrastructure”. As part of this funding WVU was tasked with identifying and quantifying sources of methane emissions at unconventional well sites, processing this data, and developing a system to recapture these emissions. A 0-D Simulink model was developed, utilizing standardized methodologies, data from previously conducted studies, as well as collected data from well sites in the Marcellus shale play region. The model was developed to predict emission rates from various components at natural gas well sites as well as the potential to utilize these emissions as fuel for the natural gas powered compressor engines on-site. This model was utilized to run high, medium, and low cases for four identified emission sources, engine size, pneumatic controller count, liquid level production which dictates tank emissions, and compressor packing vent emissions. Due to discrepancies in transient tank emission data, a high and low emission factor for tanks was used, resulting in two sets of 81 executed cases, and 162 unique cases of total site emissions and potential for fuel consumption. Each of the cases were run over 86,400 seconds at a 1 Hz, representative of a full 24 hour day of operation. The fuel consumption offset an average of 557% of fuel consumption on an energy density basis across all 81 cases with the high tank emission factor with a maximum offset of 2334%. The fuel consumption offset was an average of 82.9% for all 81 cases with the low tank emission factor with a maximum offset of 337%. This study highlights flaws in the use of publicly available methane number calculations to determine natural gas’s suitability as an engine fuel as well as the lack of public data for transient liquid storage tank emissions.

03 NATURAL GAS↗

Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses (2012 Annual Summary Report)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (RD) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and RD activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and RD results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and RD activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term RD efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Report for Corrective Action Unit 548: Areas 9, 10, 18, 19, and 20 Housekeeping Sites, Nevada National Security Site, Nevada

This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 548, Areas 9, 10, 18, 19, and 20 Housekeeping Sites, and complies with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 548 consists of the following Corrective Action Sites (CASs), located in Areas 9, 10, 12, 18, 19, and 20 of the Nevada National Security Site: · CAS 09-99-02, Material Piles (2) · CAS 09-99-04, Wax, Paraffin · CAS 09-99-05, Asbestos, Vermiculite · CAS 09-99-07, Tar Spill · CAS 10-22-02, Drums · CAS 10-22-05, Gas Block · CAS 10-22-07, Gas Block · CAS 10-22-34, Drum · CAS 10-22-38, Drum; Cable · CAS 12-99-04, Epoxy Tar Spill · CAS 12-99-08, Cement Spill · CAS 18-14-01, Transformers (3) · CAS 19-22-01, Drums · CAS 19-22-11, Gas Block (2) · CAS 19-44-01, Fuel Spill · CAS 20-22-07, Drums (2) · CAS 20-22-09, Drums (3) · CAS 20-22-14, Drums (2) · CAS 20-22-16, Drums (2) · CAS 20-24-09, Battery Closure activities began in July 2011 and were completed in December 2011 and included removal and disposal of material piles, spills, sanitary debris, a lead acid battery, lead and steel shot, and stained soil. Activities were conducted according to the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003). Closure activities generated sanitary waste, hydrocarbon waste, low-level waste, hazardous waste, and mixed waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 548 · The transfer of CAU 548 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233( 233 U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233 U waste stream requires a special analysis because the concentrations of thorium- 229 ( 229 Th), 230 Th, 232 U, 233 U, and 234 U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233 U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233 U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233 U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233 U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233 U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95 th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of compliance with all performance objectives. Tier II results indicate that the long-term performance of the OR CEUSP 233 U waste stream is protective of human health and the environment. The Area 5 RWMS is located in one of the least populated and most arid regions of the U.S. Site characterization data indicate that infiltration of precipitation below the plant root zone at 2.5 meters (8.2 feet) ceased 10,000 to 15,000 y ago. The site is not expected to have a groundwater pathway as long as the current arid climate persists. The national security mission of the NNSS and the location of the Area 5 RWMS within the Frenchman Flat Corrective Action Unit require that access controls and land use restrictions be maintained indefinitely. PA modeling results for 10,000 to 60,000 y also indicate that the OR CEUSP 233 U waste stream is acceptable for near-surface disposal. The mean resident air pathway annual total effective dose (TED), the resident all-pathways annual TED, and the acute drilling TED are less than their performance objectives for 10,000 y after closure. The mean radon-222 (222Rn) flux density exceeds the performance objective at 4,200 y, but this is due to waste already disposed at the Area 5 RWMS and is only slightly affected by disposal of the CEUSP 233 U. The peak resident all-pathways annual TED from CEUSP key radionuclides occurs at 48,000 y and is less than the 0.25 millisievert performance objective. Disposal of the OR CEUSP 233 U waste stream in a typical SLB trench slightly increases PA results. Increasing the depth was found to eliminate any impacts of the OR CEUSP 233 U waste stream. Containers could not be shown to have any significant impact on performance due to the long half-life of the waste stream and a lack of data for pitting corrosion rates of stainless steel in soil. The results of the SA indicate that all performance objectives can be met with disposal of the OR CEUSP 233 U waste stream in the SLB units at the Area 5 RWMS. The long-term performance of the OR CEUSP 233 U waste stream disposed in the near surface is protective of human health and the environment. The waste stream is recommended for disposal without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Investigation Plan for Corrective Action Unit 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 573 is located in Area 5 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 573 is a grouping of sites where there has been a suspected release of contamination associated with non-nuclear experiments and nuclear testing. This document describes the planned investigation of CAU 573, which comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives.

54 ENVIRONMENTAL SCIENCES↗

Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada with ROTC 1

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to October 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

Site Selection Restart in Germany Results of the Site Selection Commission - 17017

Since 2011 Germany is pursuing a phase-out strategy concerning the use of nuclear power for electricity production. This decision was strongly influenced by the Fukushima event. In 2013 the federal government announced that they also had achieved an agreement with the Federal States in Germany on a law to restart the site selection for a repository for spent fuel and high-level heat-generating waste from scratch. The new law was passed in July 2013. At first a 34-member commission had been installed in April 2014 to evaluate the Site Selection Law [1] and to develop basic principles for site selection, including safety requirements and selection criteria for rock formations. The commission included representatives from the parliament, civil society organizations, industry, environmental organizations, trade unions and scientists. The commission forwarded its recommendations in summer 2016. The evaluated law should come into force in 2017. The stepwise approach for finding a suitable site for a repository for Germany's heat-generating waste might then start in 2017. As shown in publication [2], the site selection process will take several decades. The preferred solution based on the present state of the art is the final disposal in deep geological formations in a mine with the option 'Reversibility and Retrievability (R and R)'. The scientific challenges and the upcoming R and D program are complex. Therefore a 'step-back option' (learning process) is foreseen in the program. The R and D program has to react flexibly to new findings, demands or modifications of criteria or requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Atomically Dispersed Dual‐Metal Site Catalysts for Enhanced CO 2 Reduction: Mechanistic Insight into Active Site Structures

Abstract Carbon‐supported nitrogen‐coordinated single‐metal site catalysts (i.e., M−N−C, M: Fe, Co, or Ni) are active for the electrochemical CO 2 reduction reaction (CO 2 RR) to CO. Further improving their intrinsic activity and selectivity by tuning their N−M bond structures and coordination is limited. Herein, we expand the coordination environments of M−N−C catalysts by designing dual‐metal active sites. The Ni‐Fe catalyst exhibited the most efficient CO2RR activity and promising stability compared to other combinations. Advanced structural characterization and theoretical prediction suggest that the most active N‐coordinated dual‐metal site configurations are 2N‐bridged (Fe‐Ni)N 6 , in which FeN 4 and NiN 4 moieties are shared with two N atoms. Two metals (i.e., Fe and Ni) in the dual‐metal site likely generate a synergy to enable more optimal *COOH adsorption and *CO desorption than single‐metal sites (FeN 4 or NiN 4 ) with improved intrinsic catalytic activity and selectivity.

Li, Yi↗

Vapor-Phase Hydrodeoxygenation of Guaiacol to Aromatics over Pt/HBeta: Identification of the Role of Acid Sites and Metal Sites on the Reaction Pathway

Hydrodeoxygenation of guaiacol, a phenolic compound derived from lignin fraction of biomass, over a Pt/HBeta catalyst at 350 °C and atmospheric pressure produces benzene, toluene, xylenes, and C9+ aromatics with yield of 42%, 29%, 12%, and 5%, respectively. Reaction pathways for conversion of two functional groups (hydroxyl and methoxyl) over the bifunctional catalyst were studied. Both guaiacol and intermediate products (catechol and cyclopentanone) were fed onto zeolite HBeta and Pt/SiO2 to identify the individual role of acid site and metal site. Acid sites (mainly Brønsted acid site, BAS) catalyze transalkylation and dehydroxylation reactions in sequence, producing phenol, cresols and xylenols as the major products at high conversion. Pt sites catalyze demethylation reaction resulting in catechol as the primary product, which can either be deoxygenated to phenol followed by phenol to benzene, or decarbonylated to cyclopentanone and further to butane. The close proximity of Pt and BAS in bifunctional Pt/HBeta enables both transalkylation and deoxygenation reactions with inhibited demethylation and decarbonylation reactions, producing aromatics as major final products with a total yield > 85%. Both activity and stability of bifunctional Pt/HBeta during hydrodeoxygenation of guaiacol is improved compared to HBeta and Pt/SiO2. The addition of water to the feed further improves the activity and stability via hydrolysis of O-CH3 bond of guaiacol on BAS and removing coke around Pt.

Nie, Lei↗

Single‐Atomic Site Catalyst with Heme Enzymes‐Like Active Sites for Electrochemical Sensing of Hydrogen Peroxide

Abstract Heme enzymes, with the pentacoordinate heme iron active sites, possess high catalytic activity and selectivity in biosensing applications. However, they are still subject to limited catalytic stability in the complex environment and high cost for broad applications in electrochemical sensing. It is meaningful to develop a novel substitute that has a similar structure to some heme enzymes and mimics their enzyme activities. One emerging strategy is to design the Fe‐N‐C based single‐atomic site catalysts (SASCs). The obtained atomically dispersed Fe‐N x active sites can mimic the active sites of heme enzymes effectively. In this work, a SASC (Fe‐SASC/NW) is synthesized by doping single iron atoms in polypyrrole (PPy) derived carbon nanowire via a zinc‐atom‐assisted method. The proposed Fe‐SASC/NW shows high heme enzyme‐like catalytic performance for hydrogen peroxide (H 2 O 2 ) with a specific activity of 42.8 U mg −1 . An electrochemical sensor based on Fe‐SASC/NW is developed for the detection of H 2 O 2 . This sensor exhibits a wide detection concentration range from 5.0 × 10 −10 m to 0.5 m and an excellent limit of detection (LOD) of 46.35 × 10 −9 m . Such excellent catalytic activity and electrochemical sensing sensitivity are attributed to the isolated Fe‐N x active sites and their structural similarity with natural metalloproteases.

Ding, Shichao↗

Geomechanical and Hydrogeological Evaluation of a Shallow Hydraulic Fracture at the Devine Fracture Pilot Site, Medina County, Texas

UT-Austin’s Devine Fracture Pilot Site, 50 miles southwest of San Antonio, Texas, has been targeted for a comprehensive, multidisciplinary development of fracture diagnostic techniques that are cross-validated by ground-truth data acquisition near a recently created, 175-ft-deep, horizontal hydraulic fracture (Ahmadian et al. 2018 Demonstration of proof of concept of electromagnetic geophysical methods for high resolution illumination of induced fracture networks. In Proceedings of the SPE Hydraulic Fracturing Technology Conference and Exhibition, The Woodlands, Texas, USA, 23–25 January 2018. SPE-189858-MS.). To evaluate the fracture diagnostic methods at this site, we conducted injection tests with a predefined volumetric flow-rate profile, resembling a diagnostic fracture injection test on September 2020. Subsequently, we developed hydrogeological and geomechanical models based on flow-rate and bottomhole-pressure measurements. History-matching efforts using a simplified layer-cake hydrogeological model resulted in the field-scale formation permeability of 9.87 × 10 –15 m 2 (10 mD) and Darcy-scale fracture permeability. The analysis of the bottomhole pressure and injection-rate history showed that (1) the newly created horizontal fracture was closed adjacent to the injection well pre-injection and (2) the initial pump-pressure increase at a nominal volumetric injection rate led to near-well fracture reopening, fluid conductivity increase, and abrupt injection-rate increase. To overcome hydrogeological-model limitations of predicting fracture reopening throughout injection, we extended the modeling to a finite-element, poroelastic analysis of horizontal-fracture growth using a cohesive-zone model. Using this fracture-reopening model, we improved the history match of the transient-pressure response during the experiment by adjusting the hydromechanical properties. Furthermore, post-injection pressure transient analyses helped reduce uncertainty in the overburden-stress gradient, and the initial hydraulic-fracturing simulation verified the plausibility of achieving the surveyed propped fracture area.

02 PETROLEUM↗

Ribosome Structure Reveals Preservation of Active Sites in the Presence of a P-Site Wobble Mismatch

Translation initiation in the P site occasionally occurs at atypical (non-AUG) start codons, including those forming a mismatch in the third (wobble) position. During elongation, however, a pyrimidine-pyrimidine wobble mismatch may trigger a translation quality-control mechanism, whereby the P-site mismatch is thought to perturb the downstream A-site codon or the decoding center, thereby reducing translation fidelity and inducing termination of aberrant translation. We report a crystal structure of the 70S initiation complex containing an AUC codon in the ribosomal P site. Remarkably, the ribosome stabilizes the mismatched codon-anticodon helix, arranging a normally disruptive cytosine-cytosine pair into a Watson-Crick-like conformation. Here, the translation-competent conformations of the tRNA, mRNA, and decoding center suggest that a P-site wobble-position mismatch in the 70S initiation complex does not pre-arrange the mRNA or decoding center to favor subsequent miscoding events.

59 BASIC BIOLOGICAL SCIENCES↗