Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

A 406 MHz geostationary satellite SARSAT experiment

A 406 MHz SARSAT experiment using the GOES system to demonstrate the utility of integrating a near-instantaneous distress alerting capability achievable by the geostationary satellites with the location capability of the low altitude, near-polar orbiting satellite system is described. Tests include the evaluation of technical performance of a variety of maritime, aviation, and land-based SARSAT beacons under operational environment conditions as well as a demonstration of system effectiveness in pseudo real distress incident situations. The technical performance tests parallel the CCIR coordinated trials program conducted at L-band frequencies using the INMARSAT satellites. Tests, including schedules, are outlined.

Friedman, M. L.↗

Integrated flexible manufacturing program for manufacturing automation and rapid prototyping

The Kansas City Division of Allied Signal Inc., as part of the Integrated Flexible Manufacturing Program (IFMP), is developing an integrated manufacturing environment. Several systems are being developed to produce standards and automation tools for specific activities within the manufacturing environment. The Advanced Manufacturing Development System (AMDS) is concentrating on information standards (STEP) and product data transfer; the Expert Cut Planner system (XCUT) is concentrating on machining operation process planning standards and automation capabilities; the Advanced Numerical Control system (ANC) is concentrating on NC data preparation standards and NC data generation tools; the Inspection Planning and Programming Expert system (IPPEX) is concentrating on inspection process planning, coordinate measuring machine (CMM) inspection standards and CMM part program generation tools; and the Intelligent Scheduling and Planning System (ISAPS) is concentrating on planning and scheduling tools for a flexible manufacturing system environment. All of these projects are working together to address information exchange, standardization, and information sharing to support rapid prototyping in a Flexible Manufacturing System (FMS) environment.

Brooks, S. L.↗

SPDE: Solar Plasma Diagnostic Experiment

The physics of the Solar corona is studied through the use of high resolution soft x-ray spectroscopy and high resolution ultraviolet imagery. The investigation includes the development and application of a flight instrument, first flown in May, 1992 on NASA sounding rocket 36.048. A second flight, NASA founding rocket 36.123, took place on 25 April 1994. Both flights were successful in recording new observations relevant to the investigation. The effort in this contract covers completion of the modifications to the existing rocket payload, its reflight, and the preliminary day reduction and analysis. Experience gained from flight 36.048 led us to plan several payload design modifications. These were made to improve the sensitivity balance between the UV and EUV spectrographs, to improve the scattered light rejection in the spectrographs, to protect the visible light rejection filter for the Normal Incidence X-ray Imager instrument (NIXI), and to prepare one new multilayer mirror coating to the NIXI. We also investigated the addition of a brassboard CCD camera to the payload to test it as a possible replacement for the Eastman type 101-07 film used by the SPDE instruments. This camera was included in the experimeter's data package for the Project Initiation Conference for the flight of NASA Mission 36.123, held in January, 1994, but for programmatic reasons was deleted from the final payload configuration. The payload was shipped to the White Sands Missile Range on schedule in early April. The launch and successful recovery took place on 25 April, in coordination with the Yohkoh satellite and a supporting ground-based observing campaign.

Bruner, Marilyn E.↗

Management of the Reflection Grating Spectrometer on the Constellation-X Mission

As RGS Integrated Product Team Lead, normal coordination and management efforts in the past year have involved setting and overseeing budgets and schedules, regular status reporting to the Program Manager at Goddard Space Flight Center (GSFC), interacting with Constellation-X groups at GSFC, Smithsonian Astrophysical Observatory (SAO), and RGS team institutions, and supporting the program needs of Constellation-X. In addition to the management aspects described above, there are four significant areas of direct contribution that were accomplished.

Source record↗

Post Flight Reconditioning for US Astronauts Returning from the International Space Station

Prior to spaceflight, each astronaut undergoes medical requirement testing to establish a preflight baseline for physiologic functions. Astronauts returning from the International Space Station can experience deficits in all or some of the following areas: aerobic capacity, muscular strength, power, endurance, stamina, bone, balance, agility, coordination, orthostatic tolerances, proprioception, neurovestibular function and flexibility. These losses occur from living in microgravity and are consistent with deficits seen in terrestrial, de-conditioning individuals. Since 2001, the Astronaut Strength, Conditioning and Rehabilitation (ASCR) specialists have administered a reconditioning program, focusing on all deficits, which improves the physical condition of all returning astronauts. In most cases, astronauts have reached or surpassed their preflight physical condition. Purpose: This presentation will describe and explain the postflight reconditioning program for returning astronauts. Methods: The postflight reconditioning program is designed to stress the body systems that affect the following: aerobic capacity, muscular strength, power, endurance, stamina, bone, balance, agility, coordination, orthostatic tolerances, proprioception, neurovestibular function and flexibility. Postflight reconditioning begins on landing day, is scheduled for two hours per day, 7 days a week for 45 days and is tailored to the specific needs of the astronaut. Initially the program focuses on basic ambulation, cardiovascular endurance, strength, balance, flexibility and proprioception. The program advances through 45 days and specific attention is given to each astronaut s overall condition, testing results, medical status, and assigned duties after their mission. Conclusion: Astronauts will experience noticeable deficits in their physical condition after living in microgravity for an extended length of time. After completing postflight reconditioning, it is shown that astronauts have regained, and in most cases improved upon, their preflight baseline condition.

Nieschwitz, Bruce↗

Summer Final Report

The summer of 2012 has been filled with many memorable events and activities. As an intern, I had responsibilities that had to be fulfilled. My tour of duty was completed as an administrative student trainee in the Information Technology and Communications Services Business Office (IT-A). In accordance with the Business Objectives and Agreement of the Business Office and my performance plan, I was to provide business office support, improve business, project management, and technical work processes. With this being stated, I supported a project called "The Big Move Project" (TBMP), which will take course over the next several years. The Big Move Project is the planning of the Information Technology (IT) Directorate's relocation to various buildings in the course of upcoming years, when designs and the building of Central Campus have been completed. Working directly with my supervisor and the project manager, I was responsible for gathering both administrative and operational area requirements for the Information Technology (IT) Directorate, along with its outsourced support and contractors, such as IMCS, NICS, and ACES. My first action was to create rubrics that will serve as a guideline for the information that should be given by each branch of IT. After receiving that information via a few KAITS actions, I was able to start the consolidation process, and begin working on a presentation. A SharePoint was created shortly after for others to view the progression of the project, which I managed. During the consolidation ofthis information, I would occasionally present to the IT Deputy Director and IT Chiefs. The draft of this presentation was shown to employees of Center Operations (T A) and stakeholders-IT Chief Officers and contractor managers-in the relocation of IT to make them aware of what requirements must be met that will enable IT to be accommodated appropriately in the design of Central Campus Phase 11-the time in which IT and its contractors are scheduled to be relocated. Besides supporting TBMP, I also supported the Section 508 Policy Compliance Coordinator, R. Liang. Section 508 is a policy that requires employers to implement accessibility assurance of information and technology to disabled communities. On Thursday, July 19, 2012, I was able to go to Camp Boggy Creek-a camp for disabled children-for an education outreach, in collaboration with the Education Office. We shared with them information about how astronauts live and work in space, they were able to ride hovercrafts, build paper rockets, and then launch them outside. Although this outreach was quite fun with the kids at the camp, this was a learning opportunity to gain some insight to those with cognitive and physical disabilities, the problems they typically face, and in tum, how to accommodate those with disabilities in the work environment. In the process of implementing accessibility and Section 508 compliance, I attended various teleconferences, did field runs to supply closed-caption call phones to employees with limited hearing, and helped with the development of the charter ofthe Section 508 Compliance Working Group.

Makidi, Nitou↗

Getting NuSTAR on Target: Predicting Mast Motion

The Nuclear Spectroscopic Telescope Array (NuSTAR) is the first focusing high energy (3-79 keV) X-ray observatory operating for four years from low Earth orbit. The X-ray detector arrays are located on the spacecraft bus with the optics modules mounted on a flexible mast of 10.14m length. The motion of the telescope optical axis on the detectors during each observation is measured by a laser metrology system and matches the pre-launch predictions of the thermal flexing of the mast as the spacecraft enters and exits the Earths shadow each orbit. However, an additional motion of the telescope field of view was discovered during observatory commissioning that is associated with the spacecraft attitude control system and an additional flexing of the mast correlated with the Solar aspect angle for the observation. We present the methodology developed to predict where any particular target coordinate will fall on the NuSTAR detectors based on the Solar aspect angle at the scheduled time of an observation. This may be applicable to future observatories that employ optics deployed on extendable masts. The automation of the prediction system has greatly improved observatory operations efficiency and the reliability of observation planning.

NASA small explorer↗

Using the cFS Command and Data Dictionary (CCDD) to Automate Software Development on Habulous

Final paper is attached. The NASA developed Core Flight System (cFS) is a reusable software architecture that has been used on multiple spaceflight missions. By using this framework, missions are able to reuse code from other missions, as well as leverage deployment onto similar computer architectures (i.e. not "reinvent the wheel" on each new mission). The success in the cFS concept can be seen in the large number of projects using cFS at FSW-2018. The Habulous project is an Earth-based testbed, used for hardware and software that may one day be used on a future space habitat unit, with many participating groups from various NASA centers and aerospace organizations around the country. The distributed nature of the various teams mean that defining (and following) an interface definition is critical on the project. Additionally, since various groups use various types of computer hardware (32/64-bit, big/little endian, Linux/VxWorks/Windows) many additional complications exist in interfacing all the various components into a final integrated system. cFS is used on the majority the flight software (FSW) in running in Habulous. But some subsystems have elected to not use cFS, and use a software bridge (called SBN_lib) to interact with the other cFS nodes in Habulous. In order to most efficiently develop the FSW, a central database is used to define and store each message sent by cFS. A Command and Data Dictionary (CDD) is something nearly universal on spacecraft, but as a team we worked to develop the CDD before the SW development was complete, and not treat it like "as built" documentation. To manage the CDD, the cFS Command and Data Dictionary (CCDD) tool was chosen (available from NASA as open source software). The CCDD tool has successfully been used to automate/autocode a large amount of software used on Habulous, as we are hoping to use it to define even more items in the future (time-triggered Ethernet (TTE) network maps, CPU scheduling). Additionally, Habulous has been exploring the use of cFS on wildly heterogeneous CPUs, and how to coordinate all those various machines using/extending the software bus – network (SBN) application in cFS, as well as TTE to coordinate message passing between various synchronized machines. The major topics to be covered in the presentation are: (1) Updating to the CCSDS_v2 extended headers (and using CPU# as subsystem ID). (2) Managing all the message identification numbers for each cFS message sent/received on any of the various CPUs. (3) Using the CCDD information to automatically generate the C-header files that define the structure for all software bus (SB) commands/telemetry messages. (4) Using the CCDD to automatically generate XML Telemetry and Command Exchange (XTCE) files, which streams display production/integration/testing in a web based display architecture (5) Extending/customizing SBN to pass messages among computers on multiple networks. (6) Using "Protobetter" inside SBN to manage different endian-ness/architectures. (7) Using SBN_lib to allow non-cFS node to communicate with cFS nodes. (8) Developing TTE network and schedule tables for all the various CPUs to use.

Hirsh, Robert L.↗

Identifying Functional Requirements for Flexible Airspace Management Concept Using Human-In-The-Loop Simulations

Flexible Airspace Management (FAM) is a mid- term Next Generation Air Transportation System (NextGen) concept that allows dynamic changes to airspace configurations to meet the changes in the traffic demand. A series of human-in-the-loop (HITL) studies have identified procedures and decision support requirements needed to implement FAM. This paper outlines a suggested FAM procedure and associated decision support functionality based on these HITL studies. A description of both the tools used to support the HITLs and the planned NextGen technologies available in the mid-term are presented and compared. The mid-term implementation of several NextGen capabilities, specifically, upgrades to the Traffic Management Unit (TMU), the initial release of an en route automation system, the deployment of a digital data communication system, a more flexible voice communications network, and the introduction of a tool envisioned to manage and coordinate networked ground systems can support the implementation of the FAM concept. Because of the variability in the overall deployment schedule of the mid-term NextGen capabilities, the dependency of the individual NextGen capabilities are examined to determine their impact on a mid-term implementation of FAM. A cursory review of the different technologies suggests that new functionality slated for the new en route automation system is a critical enabling technology for FAM, as well as the functionality to manage and coordinate networked ground systems. Upgrades to the TMU are less critical but important nonetheless for FAM to be fully realized. Flexible voice communications network and digital data communication system could allow more flexible FAM operations but they are not as essential.

dynamic airspace configuration↗

Preliminary design study of a lateral-directional control system using thrust vectoring

A preliminary design of a lateral-directional control system for a fighter airplane capable of controlled operation at extreme angles of attack is developed. The subject airplane is representative of a modern twin-engine high-performance jet fighter, is equipped with ailerons, rudder, and independent horizontal-tail surfaces. Idealized bidirectional thrust-vectoring engine nozzles are appended to the mathematic model of the airplane to provide additional control moments. Optimal schedules for lateral and directional pseudo control variables are calculated. Use of pseudo controls results in coordinated operation of the aerodynamic and thrust-vectoring controls with minimum coupling between the lateral and directional airplane dynamics. Linear quadratic regulator designs are used to specify a preliminary flight control system to improve the stability and response characteristics of the airplane. Simulated responses to step pilot control inputs are stable and well behaved. For lateral stick deflections, peak stability axis roll rates are between 1.25 and 1.60 rad/sec over an angle-of-attack range of 10 deg to 70 deg. For rudder pedal deflections, the roll rates accompanying the sideslip responses can be arrested by small lateral stick motions.

Lallman, F. J.↗

Reconditioning of Batteries on the International Space Station

Primary source of electric power for the International Space Station (ISS) is the photovoltaic module (PVM). At assembly complete stage, the ISS will be served by 4 PVMs. Each PVM contains two independent power channels such that one failure will result in loss of only one power channel. During early stages of assembly, the ISS is served by only one PVM designated as P6. Solar arrays are used to convert solar flux into electrical power. Nickel hydrogen batteries are used to store electrical power for use during periods when the solar input is not adequate to support channel loads. Batteries are operated per established procedures that ensure that they are maintained within specified temperature limits, charge current is controlled to conform to a specified charge profile, and battery voltages are maintained within specified limits. Both power channels on the PVM P6 have been operating flawlessly since December 2000 with 100 percent power availability. All components, including batteries, are monitored regularly to ensure that they are operating within specified limits and to trend their wear out and age effects. The paper briefly describes the battery trend data. Batteries have started to show some effects of aging and a battery reconditioning procedure is being evaluated at this time. Reconditioning is expected to reduce cell voltage divergence and provide data that can be used to update the state of charge (SOC) computation in the software to account for battery age. During reconditioning, each battery, one at a time, will be discharged per a specified procedure and then returned to a full state of charge. The paper describes the reconditioning procedure and the expected benefits. The reconditioning procedures have been thoroughly coordinated by all affected technical teams and approved by all required boards. The reconditioning is tentatively scheduled for September 2004.

Hajela, Gyan↗

Automated Derivation of Complex System Constraints from User Requirements

International Space Station (ISS) payload developers submit their payload science requirements for the development of on-board execution timelines. The ISS systems required to execute the payload science operations must be represented as constraints for the execution timeline. Payload developers use a software application, User Requirements Collection (URC), to submit their requirements by selecting a simplified representation of ISS system constraints. To fully represent the complex ISS systems, the constraints require a level of detail that is beyond the insight of the payload developer. To provide the complex representation of the ISS system constraints, HOSC operations personnel, specifically the Payload Activity Requirements Coordinators (PARC), manually translate the payload developers simplified constraints into detailed ISS system constraints used for scheduling the payload activities in the Consolidated Planning System (CPS). This paper describes the implementation for a software application, User Requirements Integration (URI), developed to automate the manual ISS constraint translation process.

Muery, Kim↗

Adaptive Responses in Eye-Head-Hand Coordination Following Exposures to a Virtual Environment as a Possible Space Flight Analog

Virtual environments (VE) offer unique training opportunities, particularly for training astronauts and preadapting them to the novel sensory conditions of microgravity. Sensorimotor aftereffects of VEs are often quite similar to adaptive sensorimotor responses observed in astronauts during and/or following space flight. The purpose of this research was to compare disturbances in sensorimotor coordination produced by dome virtual environment display and to examine the effects of exposure duration, and repeated exposures to VR systems. The current study examined disturbances in eye-head-hand (EHH) and eye-head coordination. Preliminary results will be presented. Eleven subjects have participated in the study to date. One training session was completed in order to achieve stable performance on the EHH coordination and VE tasks. Three experimental sessions were performed each separated by one day. Subjects performed a navigation and pick and place task in a dome immersive display VE for 30 or 60 min. The subjects were asked to move objects from one set of 15 pedestals to the other set across a virtual square room through a random pathway as quickly and accurately as possible. EHH coordination was measured before, immediately after, and at 1 hr, 2 hr, 4 hr and 6 hr following exposure to VR. EHH coordination was measured as position errors and reaction time in a pointing task that included multiple horizontal and vertical LED targets. Repeated measures ANOVAs were used to analyze the data. In general, we observed significant increases in position errors for both horizontal and vertical targets. The largest decrements were observed immediately following exposure to VR and showed a fairly rapid recovery across test sessions, but not across days. Subjects generally showed faster RTs across days. Individuals recovered from the detrimental effects of exposure to the VE on position errors within 1-2 hours. The fact that subjects did not significantly improve across days suggests that in order to achieve dual adaptation of EHH coordination may require more than three training sessions. These findings provide some direction for developing training schedules for VE users that facilitate adaptation, support the idea that preflight training of astronauts may serve as useful countermeasure for the sensorimotor effects of space flight, and support the idea that VEs may serve as an analog for sensorimotor effects of spaceflight.

Harm, Deborah L.↗

Streamlining Payload Integration

Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.

Lufkin, Susan N.↗

The Planning and Implementation of Test Facility Improvements

As engineering programs develop, and product testing begins, ideas for process improvement soon become obvious. Engineers envision new holding and handling fixtures. Additional custom-made support equipment may be needed. Perhaps modifications to the building or modifications to facility hardware are the order of the day. This is where a flexible creative test organization is needed. We need not be content with the status quo. All of these desired test innovations can make the difficult easy and improve the work flow. At times, implementing these new ideas demands more time or specialized expertise than test team members have. Through the coordinated use of labor resources, the needed improvements can still be made and in a timely fashion that supports program schedules. This presentation provides practical advice and a method whereby test personnel can creatively develop facility improvements and manage them from start to finish. You can control just how much time you invest and what part of your concepts you will personally design. By wisely defining the requirements and presenting them to the appropriate help sources (vendors, contractors, coworkers, and support departments), you can get the help you need to bring the improvements you have conceived, into fruition. Aspects of this presentation include defining requirements for test facility improvements, choosing labor resources, writing a statement of work, determining cost and benefits, securing department approval, coordinating procurement, managing the project, and training the end users. The process of successfully implementing test facility improvements is thoroughly explained. It has been tried, proven and improved over nearly 25 years of use. Whether considering a $50 improvement or a $50 million dollar improvement, this discussion will provide helpful pointers. Examples of improvements made through this process and their illustration will be included.

Oberlander, Larry↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduling logic for Miles-In-Trail traffic management

This paper presents an algorithm which can be used for scheduling arrival air traffic in an Air Route Traffic Control Center (ARTCC or Center) entering a Terminal Radar Approach Control (TRACON) Facility . The algorithm aids a Traffic Management Coordinator (TMC) in deciding how to restrict traffic while the traffic expected to arrive in the TRACON exceeds the TRACON capacity. The restrictions employed fall under the category of Miles-in-Trail, one of two principal traffic separation techniques used in scheduling arrival traffic . The algorithm calculates aircraft separations for each stream of aircraft destined to the TRACON. The calculations depend upon TRACON characteristics, TMC preferences, and other parameters adapted to the specific needs of scheduling traffic in a Center. Some preliminary results of traffic simulations scheduled by this algorithm are presented, and conclusions are drawn as to the effectiveness of using this algorithm in different traffic scenarios.

Synnestvedt, Robert G.↗