Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scaled testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Fully Distributed Acoustic and Magnetic Field Monitoring Via a Single Fiber Line for Optimized Production of Unconventional Resource Plays

This is the final technical report for the Virginia Tech Center for Photonics Technology (VT-CPT) research project entitled “Fully Distributed Acoustic and Magnetic Field Monitoring Via a Single Fiber Line for Optimized Production of Unconventional Resource Plays”. In the the four-year effort, VT-CPT collaborated with the Departments of Mathmatics at VT and Sentek Instrument, LLC (Sentek) to develop a fiber-optic sensing system capable of real-time simultaneous distributed measurement of multiple subsurface, drilling, and production parameters. The ultra-sensitive fiber optic distributed acoustic sensing technology, picoDAS, developed by Sentek was integrated with a novel multi-material optical sensing fiber fabricated by CPT-VT to obtain distributed acoustic and magnetic field measurements with ultrahigh sensitivity and high spatial resolution. The sensing technology successfully developed and demonstrated under this research program is truly unique has application beyond subsurface imaging to include carbon storage and electrical grid monitoring, as well as healthcare and nuclear fusion. The project, sponsored by the Advanced Technology Program, began in 2019 and had the original goal of developing the next generation of harsh environment sensing systems. Exhaustive theoretical modeling was performed to optimize the multi-material optical fiber design. VT developed the processing techniques employed to successfully fabricate single mode fibers with metal cladding wires. Sensing fibers with nickel and Metglas cladding wires were fully characterized, inscribed with sensors, and fully integrated with the picoDAS system. Laboratory scale testing was performed to demonstrate performance upon exposure to lateral and transverse magnetic fields. Preliminary field trials were performed for prototype magnetic and acoustic sensing systems upon near surface deployment at VT. The distributed acoustic and magnetic field sensing system was advanced from a (Technology Readiness Level) TRL=2 to a TRL=5 via laboratory scale system validation in relevant environments. The truly one-of-its kind distributed magnetic and acoustic sensing system is expected to find immediate applications that require subsurface monitoring, to include carbon storage site monitoring, and has the potential to be a distributive technology in healthcare and electric grid markets. The technologies developed by Virginia Tech’s Center for Photonics Technology will support the mission of the National Energy Technology Laboratory (NETL) to drive innovation and deliver solutions for an environmentally sustainable and prosperous energy future by ensuring affordable, abundant, and reliable energy that drives a robust economy and national security. Technical accomplishments during the program are summarized briefly here and described in detail in the remainder of the report.

02 PETROLEUM↗

Field-Aging Test Bed for Behind-the-Meter PV + Energy Storage

Small DC-coupled battery test systems are deployed at the National Renewable Energy Laboratory to evaluate capacity fade models and report on performance parameters such as round-trip efficiency under indoor and outdoor deployment scenarios. Initial commercial battery products include LG Chem RESU lithium-ion (Li-ion) and Avalon vanadium redox flow batteries. Adapting indoor lab-scale test methods to outdoor systems has challenges, including maintaining constant temperature and fully controlling batteries through standard discharge curves. Initial measurements show the Li-ion battery systems performing within expectations, near 85% round-trip efficiency. Initial lifetime modeling and measurements indicate that battery capacity could degrade by 20%-35% over 10 years at current rates.

14 SOLAR ENERGY↗

Development of Algal Biomass Yield Improvements in an Integrated Process (Final Report)

This project built on the success of Global Algae Innovations Algae Biomass Yield Phase 1 project to accelerate the commercialization of algal biofuels through development of an integrated, economical, photosynthetic, open raceway system to produce algal oil. Two parallel pathways to a biofuel were investigated. In the algal crude oil pathway, highlighted in blue, the dewatered algal biomass slurry is used as a feed to hydrothermal liquefaction to produce an algae crude oil and recycle aqueous stream. In the algal lipid oil pathway, highlighted in green, the algal biomass slurry is dried, and the oil is extracted to produce an algal lipid oil biofuel intermediate and a high protein algae meal co-product. Upgrading to drop-in fuels has been demonstrated for the biofuel intermediates in both pathways. Since the algal lipid oil pathway requires lipid accumulation, the productivity is generally lower than the algal crude oil pathway, but the required productivity for economical algal biofuel production is also lower because the coproduct value is greater. The outdoor cultivation was performed at the Kauai Algae Farm. The project team has expertise across the full breadth strain development, advanced algal cultivation, open raceway contamination control, CO 2 supply, harvesting, dewatering, extraction, hydrothermal liquefaction, technoeconomic analysis and life cycle analysis: Hildebrand laboratory at Scripps Institution of Oceanography – diatom strain development. Mayfield laboratory at UCSD - green algae strain development. TSD Management Associates- CO 2 supply, algal harvesting and dewatering, and algal drying and extraction. Qualitas - large-scale test site for algal harvesting technology. Texas A&M University - algal drying and extraction technology. Pacific Northwest National Laboratory - hydrothermal liquefaction technology. GE Water and Power - membrane technology. National Renewable Energy Laboratory - algal techno-economic analysis. Phase 1 of the project resulted in tremendous productivity and pre-processing improvements in an integrated, large-scale, low-cost cultivation and pre-processing process that moved algal technology closer to economic viability for biofuels than ever before. Phase 2 accomplishments further facilitate development of a commercial algal biofuel industry by adding: several top performing strains and strain development tools including breeding; open-pond cultivation innovations that achieved a 30% improvement in overall productivity, an 83% reduction in cost, and a 95% reduction in energy use relative to conventional technology; further improvements in harvesting that led to the Zobi harvester ® as a universal, economical, low energy, commercially available microalgae harvesting solution; breakthroughs in drying and extraction including a new low energy drying process and several new low energy extraction unit operations that together with the Zobi harvester ® achieve a 90% reduction in cost and 97% reduction in energy use relative to conventional technology. These improvements are sufficient to enable economical production of algae biofuel and protein meal co-product if the process were scaled up to a commercial-scale 5,000-acre algae farm.

09 BIOMASS FUELS↗

Organic Rankine Cycle Integration and Optimization for High Efficiency CHP Genset Systems (Final Technical Report)

This project successfully advanced the integration of Organic Rankine Cycle (ORC) technology with reciprocating engine–based combined heat and power (CHP) systems to improve electrical efficiency, total CHP efficiency, and grid-responsive operation. Over three budget periods, the work progressed from high-temperature ORC component development and thermodynamic model validation to next-generation system design, working fluid transition, and techno-economic analysis. Key technical accomplishments include development and validation of a thermodynamic model capable of accurately predicting ORC performance across an expanded temperature and pressure envelope; successful identification and validation of low-global-warming-potential (GWP) working fluids—most notably R1233zd(E)—as viable replacements for R245fa; and demonstration of scalable ORC architectures suitable for integration with 1–20 MW class reciprocating engines. These advances enable flexible CHP configurations that can increase electrical output while maintaining high overall utilization of available thermal energy. The project also produced a clean-sheet design for a next-generation ORC system targeting substantially higher power output per unit, supported by detailed component selection, heat exchanger evaluation, and system-level modeling. Techno-economic analyses indicate that ORC-enabled flexible CHP systems can meet or exceed Department of Energy (DOE) efficiency targets while providing value to both facility operators and the electric grid.. Late-stage testing of the largest next-generation ORC prototype identified limitations related to pump net positive suction head (NPSH) requirements and condenser flooding under certain operating conditions. Although these issues constrained full validation of that configuration within the project timeframe, they provided clear and actionable design guidance for future system refinements. Importantly, validated modeling, smaller-scale testing, and working fluid evaluations confirmed the technical viability of the overall approach. In aggregate, this project met its core objectives by establishing validated design tools, de-risking key ORC technologies for CHP applications, and defining a credible pathway toward commercialization of flexible, high-efficiency CHP systems. The results form a strong foundation for continued development and deployment beyond the conclusion of the DOE-funded effort.

20 FOSSIL-FUELED POWER PLANTS↗

High Solids Performance Testing in a Scaled TSCR System

The Tank Side Cesium Removal (TSCR) project is a technology demonstration that will pretreat Hanford tank waste supernatant in support of the Direct Feed Low-Activity Waste (DFLAW) mission. The TSCR system employs two key separation technologies: dead-end filtration (DEF) and ion exchange (IX) using crystalline silicotitanate (CST) media. DEF will be used to remove undissolved solids from tank waste to protect the functionality of the IX columns and the IX system will remove Cs-137 from tank waste. The separation technologies (DEF and IX) used in TSCR are technically mature and have also been successfully deployed at the Savannah River site in a similar facility known as the Tank Closure Cesium Removal (TCCR) system. While testing with simulants and real waste has been successfully performed under conditions expected during the initial operation of TSCR, test data is absent for assessing off normal high solids loading that may be in the TSCR waste feed. Normal TSCR treatment operations are expected to handle wastes with solids content on the order of 200 ppm, and off normal solids loading could be much larger than the nominal level. The testing program described in this report was conducted to understand the consequence of operating the TSCR system at elevated solids loadings up to the high-solids limit of 15,000 ppm [i.e., 1.5-wt%] identified in the TSCR design basis. Although the system is not required to make throughput above the nominal solids loading, the testing was intended to provide important information related to potential off normal operations. At off normal levels near the high-solids limit, there are potential implications for TSCR performance in the areas of throughput, DEF pressure drop, filter backflush frequency, and IX column pressure drop. In addition, intrusion of solids into the IX column was postulated to impact the Cs-137 loading behavior by promoting channeling or flow maldistribution in the column; since the magnitude of the postulated effect was unknown, assessing it was also of interest. The testing was performed using representative waste simulants and a prototypic, integrated TSCR system designed and assembled specifically to conduct the high solids performance assessment. Overall, the scaled TSCR testing demonstrated that full-scale unit operations can succeed in fulfilling their processing objectives in the presence of solids up to 3,000 ppm, but there are potential performance challenges to filtration operations at solids loadings as low as ~500 ppm. The severity of the challenge is likely to be dependent on the type and size distribution of solids, of which the current testing only examined a single type and size distribution. To provide some flexibility for future full-scale operations, the results of the testing suggest two possible risk reduction strategies that can be implemented without any changes in TSCR design or configuration. One option would be to enact an administrative limit on the solids loading to protect TSCR from feeds that are likely to require a high DEF swap frequency. Another option is to permit operation of the DEFs at differential pressures greater than 2 psid before swapping filters. The selection of a higher differential pressure target is not anticipated to adversely impact DEF backflushing efficacy and would reduce both swap frequency and the amount of waste sent to AP-108.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prediction of Long-Term Geochemical Change in Bentonite Based on the Interpretative THMC Model of the FEBEX In Situ Test

Since nuclear energy is crucial in the decarbonization of the energy supply, one hurdle to remove is the handling of high-level radioactive waste (HLW). Disposal of HLW in a deep geological repository has long been deemed a viable permanent option. In the design of a deep geological repository, compacted bentonite is the most commonly proposed buffer material. Predicting the long-term chemical evolution in bentonite, which is important for the safety assessment of a repository, has been challenging because of the complex coupled processes. Models for large-scale tests and predictions based on such models have been some of the best practices for such purposes. An 18-year-long in situ test with two dismantling events provided a unique set of chemical data that allowed for studying chemical changes in bentonite. In this paper, we first developed coupled thermal, hydrological, mechanical, and chemical (THMC) models to interpret the geochemical data collected in the in situ test and then extended the THMC model to 200 years to make long-term prediction of the geochemical evolution of bentonite. The interpretive coupled THMC model shows that the geochemical profiles were strongly affected by THM processes such as evaporation/condensation, porosity change caused by swelling, permeability change, and the shape of concentration profiles for major cations were largely controlled by transport processes, but concentration levels were regulated by chemical reactions, and the profiles of some species such as pH, bicarbonate, and sulfate were dominated by these reactions. The long-term THMC model showed that heating prolongs the time that bentonite becomes fully saturated in the area close to the heater/canister; however, once the bentonite becomes fully saturated, high concentrations of ions in bentonite near the heater, which was observed in the field test, will disappear; illitization continues for 50 years but will not proceed further.

Zheng, Liange↗

Evolution of dislocation substructures in metals via high-strain-rate nanoindentation

Deformation at high strain rates often results in high stresses on many engineering materials, potentially leading to catastrophic failure without proper design. High-strain-rate mechanical testing is thus needed to improve the design of future structural materials for a wide range of applications. Although several high-strain-rate mechanical testing techniques have been developed to provide a fundamental understanding of material responses and microstructural evolution under high-strain-rate deformation conditions, these tests are often very time consuming and costly. In this work, we utilize a high-strain-rate nanoindentation testing technique and system in combination with transmission electron microscopy to reveal the deformation mechanisms and dislocation substructures that evolve in pure metals from low (10 –2 s –1 ) to very high indentation strain rates (10 4 s –1 ), using face-centered cubic aluminum and body-centered cubic molybdenum as model materials. The results help to establish the conditions under which micro- and macro-scale tests can be compared with validity and also provide a promising pathway that could lead to accelerated high-strain-rate testing at substantially reduced costs.

36 MATERIALS SCIENCE↗

Electrochemical Hydrogen Compression Cell Design (CRADA Final Report)

Electrochemical compression and purification is a high potential technology that is likely to outcompete mechanical compression for hydrogen end use applications. However, testing and understanding what is occurring within the cell is difficult as it is not readily accessible through experimentation. Thus, the main target is to increase performance and reduce cost of electrochemical hydrogen compression (EHC) and purification (EHP) cells and stacks using multiscale mathematical modeling informed by experiment. The models can provide physical insight into limiting processes and develop mitigation methods, which can be proven out through rapid sub-scale testing of the devices.

08 HYDROGEN↗

Deep Neural Network Assisted Distributed Strain and Temperature Fiber Sensor System for Natural Gas Pipeline Monitoring

Natural gas pipeline integrity monitoring is crucial to detect potential leaks, find structural issues, and prevent environmental damage. This article presents a system of natural gas pipeline monitoring that uses a specialized double Brillouin peak sensing fiber along with the Brillouin optical time domain analysis (BOTDAs) technique. The calibrated sensing fiber coefficients for strain and temperature are 41.8 kHz/ με and 0.9 MHz/°C for peak 1; and 47.2 kHz/ με , and 1.11 MHz/°C for peak 2, respectively. Initially, lab tests were performed by installing a short section of double Brillouin peak fiber (DBPF) on a 1-in steel pipe under pressure up to 1000 per square inch (psi) at elevated temperatures. Simultaneous distributed measurements of temperature and pressure-induced hoop strain were successfully measured. Considering the long processing speed to extract Brillouin frequency shift (BFS), we employ a novel probabilistic deep neural network (PDNN) framework for rapid BFS prediction. Additionally, using the Finite Element Method, the effects of the pipeline pressure on hoop strain were modeled and compared to the experimental hoop strain under the same set of pipeline conditions. Finally, an actual 4-in outer diameter steel natural gas pipeline was used for pilot-scale tests, where hoop strain was measured at various pressure levels. Leaks were simulated to demonstrate accurate pipeline integrity monitoring. At an internal pipe pressure of 1000 psi, hoop strain of approximately 300 με was observed, and the sensitivity was calculated as 0.28 με /psi. The results of this pilot-scale study demonstrated that the system is capable of performing distributed monitoring sufficient to detect pipeline pressure and the presence of leaks to ensure the safe operation of gas pipelines in the field.

03 NATURAL GAS↗

Effect of Anoxic Iron Corrosion on WIPP Brine Geochemistry FY23 Final Report (U)

A 280-day study was completed to evaluate the effect of zero-valent iron (Fe 0 ) on the Waste Isolation Pilot Plant (WIPP) brine geochemistry under anticipated reducing conditions. Hydrogen (H 2 ) gas is expected to be present in the repository after closure due to the anoxic corrosion of a vast quantity of iron contained in the waste forms disposed at WIPP; therefore, a background argon atmosphere containing H 2 was chosen for this study. WIPP groundwater brine pH and E h will impact the mobility and fate of plutonium within the repository. Modeling and laboratory results for Castile WIPP brine indicate that equilibrium fa values relative to the standard hydrogen electrode (SHE) are 40 mV more reducing (i.e., more negative) than those for Salado WIPP brine (-480 mV vs. -440 mV, respectively) because of the higher pH of the Castile brine (pH 9 .3 for Castile vs. pH 8.8 for Salado). The E h and pH data were corrected for the effects of high ionic strength. The experimental results for both brines are consistent with thermodynamic predictions using OLI Systems' Mixed Solvent Electrolyte chemical equilibrium model. The measured and corrected pH and E h data from this study are provided in Table ES-I and Table ES-2, respectively. The experimental study, with four test conditions in triplicate, was performed in a dual glovebox with a nominally 3 vol.% H 2 in argon atmosphere (target H 2 range: 3 ± I vol.%). Simulants containing MgO only ( experimental control) and MgO+Fe 0 (WIPP base case) were prepared for both the Salado and Castile brines. MgO was included in all simulants to account for the use of bulk magnesium oxide in the WIPP repository. Fe 0 was included in some simulants to incorporate the effects of the anoxic corrosion of iron and in-situ hydrogen generation in the study. The brine compositions were developed by Sandia National Laboratory (SNL; Xiong, 2008) and have been used in previous WIPP evaluations. The test method (agitation, etc.) is partially based on ASTM D3987-12. Twelve rounds of periodic measurements of pH and E h were performed over the course of the study. Chemical analysis results for liquids and solids (ICP-MS, ICP-ES, IC Anion, TIC, SEM-EDX) are consistent with the pH, E h , and thermodynamic modeling results. This study included the following conditions that deviate from anticipated post-closure conditions following brine intrusion, but were selected to facilitate bench-scale testing to validate modeling of pH and E h for the post-closure WIP P repository: an anoxic glove box atmosphere containing ≤ 4 vol. % H 2 vs. substantially higher H 2 gas concentrations assumed in the WIPP Performance Assessment (PA); a significantly higher liquid-to-solid test ratio compared to the much lower phase ratio anticipated in the WIP P repository; agitation of the simulant bottles to maximize mass transfer; and finally the use of Fe 0 reagents having a much greater surface area than expected in the WIP P repository. Non-representative conditions were chosen for various reasons such as: to provide bounding conservative results, to provide a margin of safety for testing, or to facilitate simulant sub-sampling and analysis. In a parallel effort, aqueous electrolyte thermodynamic models were developed for the synthetic Salado and Castile brines to inform the experimental design, facilitate laboratory data interpretation, and allow extension of evaluations beyond the parameters tested. Thermodynamic modeling simulations including the MgO and Fe 0 additives that are directly relevant to the experimental measurements (e.g., pH calibration curve, ORP corrections) are included in this report. The measured fa of the simulants was close to the OLI model predictions for both brines and was largely controlled by the background H 2 partial pressure in the vapor phase as well as H 2 generated in situ in the aqueous phase by the Fe 0 corrosion. The H 2 gas-phase concentration tested and thermodynamically evaluated was much lower than is assumed in the WIPP PA; however, H 2 (g) concentrations significantly below this level are still predicted to result in very reducing conditions. In conclusion: • The experimental results are consistent with thermodynamic model predictions for fa, pH, and the effects of high ionic strength. • Evidence to date suggests that the H2 concentration in the glovebox atmosphere ultimately determined the final E h values of the simulants and resulted in highly reducing conditions. As a result, little difference was observed between the control simulants containing only MgO and the WIPP base-case simulants that contained MgO and Fe 0 . • This test methodology is recommended for future studies evaluating WIPP repository conditions. The methodology includes: (1) background H 2 in argon with agitation ( or could alternatively include in-situ-generated H 2 in sealed bottles); (2) carefully measured and corrected ORP data ( with much effort focused on allowing the probes to fully stabilize); and (3) ionic-strength-corrected pH data. Other best practices, such as simulant sparging/handling, ORP probe replacement, etc., should also be considered. • The coupling of experimental studies and thermodynamic modeling is also highly recommended because these methods inform and direct one another leading to greater confidence in and understanding of the results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Degradation Mechanisms for Solid Secondary Waste Grout Waste Forms

The overall objective of this work is to provide defensibility for the long-term performance of grouted Hanford SSW streams when disposed in a near surface disposal facility, IDF, on the Hanford Site. Providing defensibly for the long-term performance of the grouted waste forms is consistent with the research and development activities identified in the Performance Assessment Maintenance Plan, (Westcott et al. 2019), that are necessary to address the assumptions made in the PA. Specifically, this work addresses two areas identified for further research and development activities in the plan: (1) “Evaluate ongoing research on transport characteristics of cementitious materials using accelerated tests to approximate the effects of aging/alteration/weathering”; and (2) “Evaluate ongoing research on microbial effects on transport processes in cementitious materials.” The assembled subject matter expert team evaluated a list of degradation mechanisms and supporting processes and provided rankings of areas where further research and development (R&D) are needed. From this assessment, high priority R&D areas include: (1) the effects of carbonation, Ca leaching, and SSW dimensional change in grout waste forms; (2) updated model representations of grouted waste forms; and (3) scaled testing demonstrations. Moderate priority items including a paper study on possible microbial influence, reoxidation rates, radionuclide/contaminant dissolution from SSW in the grout and freeze thaw behavior. Other processes evaluated were either deemed unlikely to occur, to have little impact on the SSW waste forms, or to occur at time frames beyond those considered (>10,000 years). The assessments and proposed R&D approaches are expected to support an update to the WRPS SSW roadmap.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Economic Extraction and Recovery of REEs and Production of Clean Value-Added Products from Low-Rank Coal Fly Ash

The University of North Dakota (UND) Energy & Environmental Research Center (EERC) teamed with Pacific Northwest National Laboratory (PNNL) , the North Dakota Industrial Commission Lignite Research Program, and commercial partners Basin Electric Power Cooperative, Great River Energy, and Southern Company to execute a Cooperative Agreement funded by the U.S. Department of Energy’s (DOE’s) National Energy Technology Laboratory (NETL) focused on identifying unique pathways and pretreatments to extract rare-earth elements (REEs) from low-rank coal (LRC) ash in a more economical and environmentally benign manner than current methods. The EERC drew upon the unique and deep knowledge of the team regarding LRC geochemistry, ash transformation mechanisms during combustion, and fly ash chemistry in the approach to understand the portioning of REEs in LRC ash. A comprehensive characterization effort was undertaken to fully establish the form, associations, and partitioning of the REEs and other elements/minerals of interest in fly ash, as well as the ash chemistry, mineralogy, and morphology. Using this information, the team tested methods of REE extraction to take advantage of the unique and advantageous properties of LRC ash. Multiple complementary approaches were evaluated that combined both novel and proven methods to develop an extractive process for REEs and other high-value metals from LRC ash that provide technological and economic progress on the current state of the art. Methodologies were also evaluated for the potential to synergistically remove toxic metals while extracting other high-value metals from the ash, generating a clean, safe ash material as a value-added product. This would eliminate waste and offer significant additional revenue potential. Based on laboratory-scale testing, an initial high-level technical and economic analysis to estimate operating expenses and product revenues to guide future phases of technology development was implemented. By focusing on minimizing process steps and consumptive use of extraction solutions, a tunable, economically viable process for REE extraction from LRC ash was developed. The tunable process has the ability to be adjusted to adapt to the differing ash chemical and physical properties that are characteristic of LRC ash. This is key to deployment as a commercial process. In demonstrating the process, the EERC was able to illustrate mixed REE concentration greater than the goal of 2 wt%. High-level economic analysis of the process with LRC ash of moderate REE levels demonstrated the potential of the process, but recovery of just the REEs was insufficient to cover operational costs. With the additional extraction of other high-value metals found in LRC ash, the process economics approach would break even, and it is anticipated that with process optimization, the developed process could potentially be economically sound. The same economic analysis performed utilizing LRC ash with high levels of REEs showed the recovery of the REEs alone would make the process economically viable even without further optimization.

01 COAL, LIGNITE, AND PEAT↗

Vulcan Test Platform: Demonstrating the Data Center as a Flexible Grid Asset

Explosive data center demand is outpacing grid infrastructure development. AI workloads and hyperscale cloud growth are creating unprecedented power requirements, while traditional grid expansion faces multi-year development timelines, regulatory hurdles, and decarbonization challenges. Sidewalk Infrastructure Partners recognized this impending crisis years ago and founded Verrus to develop an innovative solution: data centers that function as grid assets rather than passive loads. The Verrus approach integrates proprietary grid-aware controls with battery energy storage systems (BESS) in a medium-voltage architecture that delivers three critical capabilities: Fast-responding demand flexibility that can service requests from the utility within 10 seconds, Uninterrupted transition to islanded operation during grid disturbances, Continuous uptime assurance while maintaining all customer service level commitments Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), we validated these capabilities on Vulcan, a 70 MW utility-scale test platform powered by NREL's ARIES Virtual Emulation Environment. This deployment-ready technology has successfully demonstrated that Verrus data centers can deliver meaningful grid services while maintaining mission-critical reliability. This technical report outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can play a pivotal role in enhancing grid flexibility and reliability, without sacrificing service level guarantees.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Discretization limits of lattice‐Boltzmann methods for studying immiscible two‐phase flow in porous media

Summary Digital images of porous media often include features approaching the image resolution length scale. The behavior of numerical methods at low resolution is therefore important even for well‐resolved systems. We study the behavior of the Shan‐Chen (SC) and Rothman‐Keller (RK) multicomponent lattice‐Boltzmann models in situations where the fluid‐fluid interfacial radius of curvature and/or the feature size of the medium approaches the discrete unit size of the computational grid. Various simple, small‐scale test geometries are considered, and a drainage test is also performed in a Bentheimer sandstone sample. We find that both RK and SC models show very high ultimate limits: in ideal conditions the models can simulate static fluid configuration with acceptable accuracy in tubes as small as three lattice units across for RK model (six lattice units for SC model) and with an interfacial radius of curvature of two lattice units for RK and SC models. However, the stability of the models is affected when operating in these extreme discrete limits: in certain circumstances the models exhibit behaviors ranging from loss of accuracy to numerical instability. We discuss the circumstances where these behaviors occur and the ramifications for larger‐scale fluid displacement simulations in porous media, along with strategies to mitigate the most severe effects. Overall we find that the RK model, with modern enhancements, exhibits fewer instabilities and is more suitable for systems of low fluid‐fluid miscibility. The shortcomings of the SC model seem to arise predominantly from the high, strongly pressure‐dependent miscibility of the two fluid components.

Li, Zhe↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Organic Iodide Sorption from Dilute Gas Streams

Reprocessing used nuclear fuel releases volatile radionuclides, including 129 iodine (I), into the off-gas of a processing plant. Volatile radioiodine could be present in several forms, depending on the chemistry of the process used and the off-gas stream. Inorganic I 2 is expected to be the predominant I species in the dissolver off-gas (DOG), with minor organic iodides present. The bulk of the I is expected to volatilize into the DOG in parts-per-million-level (ppm) concentrations. In contrast, in the vessel off-gas (VOG), most of the volatile I is expected to be found as organic iodides, such as CH 3 I, C 4 H 9 I, and C 12 H 25 I. These species are expected to be present in parts-per-billion-level (ppb) concentrations but require abatement, even at low expected concentrations, to meet regulatory emissions limits in the United States. Historically, studies of I abatement by Ag-functionalized sorbents have focused on inorganic I in the DOG, but in the last few years, more research attention has been given to organic iodides, especially longer chain species, such as C 4 H 9 I, and C 12 H 25 I. This report has three main goals: (1) to present new data generated at Oak Ridge National Laboratory (ORNL) in FY21 on the sorption behavior of organic iodides on AgZ, (2) to summarize and synthesize organic iodide data produced by ORNL and Idaho National Laboratory (INL) over the last 4 years to answer questions on organic iodides behavior outlined in the 2018 joint test plan (Jubin et al. 2018), and (3) to propose a VOG abatement system design that can provide the capture efficiencies required to meet I emission limits. The 2021 ORNL experimental campaign tested the effects of organic iodide speciation and concentration in the off-gas, superficial velocity of the off-gas, and effects of aging on AgZ sorbent capacity. These studies found that the sorption rate of organic iodides by AgZ depends on the hydrocarbon chain length and the concentration in the off-gas. Higher molecular weight organic iodides adsorb to AgZ more slowly than I. At a concentration of 50 ppm concentration in the off-gas, CH 3 I loads 8% slower, C 4 H 9 I loads 20% slower, and C 12 H 25 I loads 40% slower than I. The lowest concentration loading rates calculated were in 5 ppm organic iodide gas streams in which AgZ gained on average 0.14 mg I/g sorbent/hour in the bench scale test system. Thus, longer sorbent beds might be needed to accommodate slower loading rates onto AgZ in lower concentration gas streams. Although sorption rate varies as a function of hydrocarbon chain length, the saturation concentration of the sorbent for these I-bearing species does not vary. Aging AgZ in a humid air stream for 9 months drops the overall sorbent capacity by ~35% for CH 3 I, ~50% for C 4 H 9 I, and ~40% for C 12 H 25 I. This results in a saturation capacity between 35 and 70 mg I/g sorbent for the aged AgZ. In conjunction with recent data produced by INL, these data are used to estimate the mass transfer zone (MTZ) and decontamination factor (DF) for sorbent beds of AgZ. Sorption tests performed with iodide gas concentrations of about 1 ppm and higher at a superficial gas velocity of 10 m/min, indicate that MTZ depths for these conditions tend to range between about 8-20 cm. Tests performed at lower concentrations between 50-90 ppb and at gas superficial velocities of 1, 10, and 20 m/min indicate that the MTZ depth increases with increasing superficial gas velocity. The 20 m/min test indicates that the MTZ for those conditions was at least 22 cm, and doubling the superficial gas velocity from 10 to 20 m/min could roughly double or triple the MTZ depth. Doubling and tripling the bounding MTZ depth of 20 cm for the body of MTZ estimates made at with 10 m/min superficial velocity would extend the MTZ for a superficial velocity of 20 m/min to 40-60 cm. This bounding limit applies to all of the organic iodides that have been tested. These results also indicate that the sorption rate-limiting step is not sensitive to the superficial gas velocity; otherwise the MTZ depth would not have increased approximately in proportion to the increase in the gas superficial velocity. This further suggests that the rate limiting step is not associated with mass transfer of the sorbate to the sorbent surface, or mass transfer of the reaction byproducts from the sorbent surface, but is associated with sorption or chemical reactions on the sorbent surface or in sorbent pores. Deep bed testing at INL has established DFs of >2,000 for I, CH 3 I, and C 4 H 9 I under a range of conditions (Soelberg et al. 2021, Bruffey et al. 2019). DF does not seem to be affected by the concentration of the organic iodide in the gas stream over the range of 1 to 50 ppm. Thus, if the MTZ is accommodated in sorbent bed design for the DOG and VOG, then regulatory DFs will be met. To meet the third objective outlined in this report, these experimental data were used to update an engineering evaluation of the VOG first completed in 2016. The updated VOG design can be found in an accompanying document (Welty et al., 2021; INL- LTD-21-64587). This report finds that the VOG will decrease in both size and complexity, relative to previous designs, and will still meet regulatory requirements for all iodine forms.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

BWR Spent Nuclear Fuel Acquisition and Testing to Support DOE-NE High Burnup Spent Fuel Data Project

The Office of Spent Fuel and Waste Disposition (SFWD) within the US Department of Energy (DOE) Office of Nuclear Energy (NE) established the Spent Fuel and Waste Science and Technology (SFWST) campaign to conduct research and development (R&D) activities related to the storage, transportation, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste. The SFWST program was created within SFWD to address issues of extended or long-term SNF storage and transportation. Some near-term objectives of SFWST are to use a science-based, engineering-driven approach to: Support the enhancement of the technical bases to support the continued safe and secure dry storage of SNF for extended periods; Support the enhancement of the technical bases for retrieving SNF after extended dry storage; Support the enhancement of the technical bases for transporting high burnup (HBU) fuel and transporting low burnup fuel and HBU fuel after dry storage DOE-NE, in partnership with the Electric Power Research Institute, developed the High Burnup Spent Fuel Data Project to perform a large-scale demonstration and laboratory-scale testing of HBU pressurized water reactor (PWR) fuels (exceeding 45 gigawatt-days per metric ton of uranium [GWd/MTU]). Under this project, 25 sister rods—which are rods that have the same design, power histories, and other characteristics—were removed from assemblies at the North Anna Nuclear Power Station and sent to Oak Ridge National Laboratory (ORNL) in January 2016. ORNL performed detailed nondestructive examination (NDE) on all 25 rods. The NDE consisted of visual examinations, gamma and neutron scanning, profilometry and rod length measurements, and eddy current examinations. After completing the NDE, 10 of the sister rods were delivered to Pacific Northwest National Laboratory (PNNL) in a NAC International, Inc. legal-weight truck cask in September 2018 for destructive examination (DE). To date, SFWD work has focused on the PWR fuel that is part of the Sister Rod Test program. No boiling water reactor (BWR) fuel has been tested in the program, and the data needs that were identified for the PWR fuel have not been collected for BWR fuel. The goal to obtain six to nine BWR rods and test them at ORNL will support closing this important data gap. BWR fuel comprises approximately 56% of the total fuel assemblies currently in storage at nuclear power plants in the United States. BWR nuclear fuel and cladding designs and manufacturing are significantly different from PWRs. Differences include the following: BWR fuel pellets are larger than PWR pellets; Variations of Zircaloy-2 (including liners) are used instead of the Zircaloy-4 cladding materials used in PWRs; Clad manufacturing and stress-relief processes are different between PWRs and BWRs; The fuel rod dimensions are different because larger rod diameters and thicker cladding are used in BWRs; BWR fuel typically has lower internal rod pressures and sees vastly different operating conditions than PWR fuel (i.e., two-phase flow); BWR assemblies are “canned,” meaning each assembly is surrounded by a metal fuel channel; BWR cladding is often composed of an inner pure Zr liner that has widely different mechanical properties than the Zircaloy-2 alloy and exhibits a stronger affinity for hydrogen; The BWR SNF generally has more total hydrogen in the cladding/liner than typical PWR fuel; The construction of the PWR and BWR assemblies is vastly different; BWR rods are solidly attached to the assembly nozzles and experience a much different vibration and shock load than PWR rods, which are “floating” within a grid system attached to guide tubes, and the rods sit loosely on the bottom end plates. These numerous differences will affect the way the BWR SNF responds under dry storage preparation processes (e.g., vacuum drying) and during transportation. The results collected in the PWR experimental program must be compared with a subset of similar data collected on BWR SNF to establish a technical basis for whether the larger PWR database is sufficient to bound the BWR SNF end-of-life conditions as is currently assumed for several fuel/clad properties. Changes that occur in both fuel types at HBU could exacerbate any mechanical property differences. As the fuel burnup increases, several changes occur that might affect the performance of the fuel, cladding, and assembly hardware in storage and transportation. These changes include increased cladding corrosion layer thickness, increased cladding hydrogen content, increased cladding creep strains, increased fission gas release, and the formation of the HBU structure at the surface of the fuel pellets. The Nuclear Regulatory Commission (NRC) limits the current maximum rod-averaged burnup to 62 GWd/MTU due to these changes and the lack of data at higher burnups.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Magnesium Oxysulfate Formulation for SRPPF Aqueous Recovery Liquid Solidification

The liquid effluent from the Savannah River Plutonium Processing Facility (SRPPF) Aqueous Recovery Processes will be solidified into a stable form that is acceptable by Waste Isolation Pilot Plant (WIPP) for disposal. The current Aqueous Recovery flow sheet proposes to solidify the liquid effluent using a grout formula that was developed and tested for the former Waste Solidification Building process. This Portland cement based mixture results in a high pH (~13) leachate from the solidified waste form which is not acceptable to WIPP in the large quantities expected from production at SRPPF. Various cementitious materials were previously evaluated as alternative grout formulations to Portland cement and a MgO-based mix was identified as a promising alternative. A magnesium oxysulfate (MOS) cement formulation comprised of reactive magnesium oxide (MgO), anhydrous magnesium sulfate (MgSO 4 ), and sand, as a non-reactive heat sink provided good mixability, similar density to the original Portland-cement based mix, and a leachate pH of 9.4, within the assumed WIPP brine pH range. However, the MOS formulation exhibited an appreciable amount of heat generation, which resulted in premature setting of a large-scale test.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗