Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Initial Engineering Design of a Post-Combustion CO 2 Capture (PCC) System for Duke Energy’s East Bend Station Using Membrane-Based Technology

The Electric Power Research Institute (EPRI) led a U.S. Department of Energy (DOE) funded study for a membrane-based post-combustion CO 2 capture (PCC) system retrofit to an existing U.S. coal power plant. EPRI teamed with technology suppliers, Membrane Technology and Research (MTR), engineering consultants Nexant, Trimeric Corporation and Bechtel Power Corporation, to develop a first-of-a-kind initial design and cost estimate for a PCC system at Duke Energy’s East Bend Station (EBS) in Kentucky. This project provides a comprehensive overview of the plant design proposed and develops estimated costs to within +/- 30% accuracy for retrofitting the existing EBS coal-fired power plant with the latest MTR’s second-generation Polaris™ membrane technology for CO 2 flue gas removal. The projects primary objective was to develop a design for Duke Energy that will require “minimally invasive surgery” on their existing 600-MWe coal-fired power plant, located on the Ohio River in Boone County, Kentucky. Unlike the current commercially available solvent-based capture systems that require a reliable source of steam to operate, the MTR membrane-based capture system is driven primarily by electric power. This direct, bolt-on approach to retrofitting carbon capture could potentially reduce the impact on the existing power plant, by minimal disruption of the existing facility’s infrastructure and operating procedures. This may also reduce the amount of retrofit downtime before the power plant can resume normal operations. A second objective was to reduce the cost of each ton of captured CO 2 while maintaining the existing 600 MW net output of the East Bend Station. With this aim in mind, various options to provide the necessary auxiliary power for the capture system were evaluated for the site. The full report describes in detail the overall design, layout and components of the entire EBS membrane capture system. The equipment and sizes, the capital cost estimate encompassing both engineering design and construction for the carbon capture process and balance of plant systems is presented. A detailed techno-economic analysis is also undertaken to examine the business case for capture.

01 COAL, LIGNITE, AND PEAT↗

Improving Fission Products at CARIBU: Near Field Detection (Q1/FY21 Quarterly Progress Report)

After receiving funds at the beginning of FY21 we were able to resume work on the project. We continued data analysis of 156 Eu decay. The project has also gone through an Independent Review in November. Following the previously reported steps in the analysis of 156 Eu, specifically removing random coincidences from the gamma ray spectrum, we look not only at the peak of interest (811 keV) but all other gamma rays that are visible. Determining the area of all gamma ray peaks in this random coincidence free spectrum is not only necessary to calculate the gamma ray branching ratios but combined with the peak areas of the gamma ray singles spectrum we are able to determine experimentally the efficiency of the beta detector.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fiscal Year 2021 Filtration of Hanford Tank 241-AP-107 Supernatant Samples Obtained at Prototypic Tank Level and Filtered at 16 °C

Bench-scale filtration testing of 8.5 liters of supernatant from Hanford waste tank 241-AP-107, chilled to 16 °C, was conducted using a backpulse dead-end filter (BDEF) filtration system equipped with a feed vessel and a Mott inline filter Model 6610 (Media Grade 5) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. This was done to assess the impact of a lower sampling location within the tank as well the lowered filtration temperature on supernatant stability and fouling. The as-received samples were transferred to 1.5-liter poly bottles and held at 16 °C for approximately 1 week prior to filtration. The feed was filtered through the BDEF system at a targeted flux of 0.065 gpm/ft 2 to match the prototypic operation of the TSCR system. During the initial period of filtration, the differential pressure required to effect filtration at 0.065 gpm/ft 2 increased until it reached 2 psid [the Tank Side Cesium Removal (TSCR) action limit] at 26 hours. After this, the filter was backpulsed to dislodge accumulated solids and reduce this pressure differential. An additional eight backpulses were conducted during the initial filtration period; each time, the target pressure was reached sooner than during the previous interval. Volume filtered decreased from 0.9 to 0.03 m 3 /m 2 over the course of 14 processing hours. After the ninth backpulse, the backpulse frequency had become unsustainable, and it was decided to perform an extensive filter cleaning. The filter was cleaned by draining the chilled AP-107 feed into chilled holding containers, introducing 0.1 M NaOH into the feed vessel, and recirculating the NaOH through the system for 20 minutes before allowing the system to soak for 2 hours without temperature control. A measurable decrease in filter resistance during this recirculation indicated that the 0.1 M NaOH was likely dissolving some of the solids that had deposited on the filter. Post cleaning, the filter resistance was effectively restored to initial conditions as the initial transmembrane pressure was restored to original levels. However, resumed processing of the AP-107 feed at 16 °C continued to result in an increased rate of filter resistance. An additional five backpulses were conducted (four during feed processing, one during subsequent cleaning) before the conclusion of the test. Solids concentrated from the backpulse solutions displayed sodium oxalate-type phases, Al-oxides and sodium Al-oxides/carbonates, iron oxides, and Ca-bearing phases (calcite). The scanning electron microscopy analyses also revealed a large distribution of particles, with some particles, notably sodium phosphate dodecahydrate, having diameters close to 0.5 mm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding How Organizations Handle Cybersecurity

If there is anything we can learn from the media, it is the frequency and severity of cyber-attacks is increasing and there are not enough qualified people to combat the risk organizations are facing. Current estimates say there are 3.5 million available cybersecurity related jobs globally and there has been a 350% growth in cybersecurity jobs since 2013 (Group, 2020). The Idaho Cyber Research Project (ICRP) is focused on finding an implementing solution to the problems in the workforce development pipeline. Our team consists of Cohort 2 of the ICRP, we are tasked with solving issues faced by organizations hiring new cyber personnel. To provide solutions to these issues we focused our research on four components of workforce availability and competency: resume and transcript analysis, apprenticeships, cyber incident response plan development, and adversarial mindset training. From this research we have produced the following focus areas and subsequent steps for each component of workforce capability: transcript and knowledge skills abilities (KSA) focused analysis, cybersecurity apprenticeships programs, the value of an adversarial mindset, and a guide to setting up cyber incident response plans for underprepared organizations. These solutions can be further developed and implemented to reduce the gap in workforce demand and talent.

97 MATHEMATICS AND COMPUTING↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2021)

This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2021. The METL facility had a very successful third year of operations having logged about 944 days of operations with molten sodium either in a flowing or static condition. Operations were paused in April 20, 2021 to accommodate the refurbishing of building 308’s alkali metal passivation booth and scrubber (AMPB&S). METL is being prepared to support a second larger experiment, the Thermal Hydraulic Experimental Test Article (THETA) and expects to resume the Gear Test Assembly (GTA) testing. The technology development team is also developing two additional experiments, a gripper test article and a flow sensor test article that are expected to go into METL in late FY22 or early FY23.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Smart Ventilation Controls for Occupancy and Auxiliary Fan Use Across U.S. Climates

Smart Ventilation has been developed as a way to reduce the energy associated with ventilation by changing when ventilation happens and how much ventilation occurs at any given time. In high performance buildings with low envelope and appliance related loads, ventilation is becoming a bigger part of the total building energy use and needs to be addressed if performance targets are to be met. This work explores the development and performance of smart ventilation controls based on occupancy and auxiliary fan operation that provide annual dwelling unit ventilation equivalence to ASHRAE Standard 62.2-2016. A prototype high performance home compliant with U.S. DOE Building America Zero Energy Ready program requirements was simulated using the REGCAP tool with and without smart controls across 15 U.S. DOE climate zones. Balanced and unbalanced IAQ fans were independently simulated, and all smart controlled fans had airflows double the reference 62.2-2016 airflow. Three idealized occupancy patterns were examined: 1st shift (a typical daily work/school absence), an extended 1st shift with more time spent out of the home evenings and weekends and 3rd shift (night work). The Occupancy controller turns the IAQ fan off during unoccupied periods, and it resumes ventilation upon their return. While unoccupied, contaminants are allowed to accumulate in the space, because occupants are not exposed to these contaminants. When occupants return home, they are exposed to these higher contaminant concentrations, and the controller increases the ventilation rate sufficiently to ensure equivalence with a continuous IAQ fan. Accounting for pollutant emissions that occur during unoccupied periods (as required by ASHRAE 62.2-2016), sharply distinguishes our occupancy controls from past Demand Controlled Ventilation systems. This new accounting method results in equivalent contaminant exposure, as well as lower reductions in average ventilation rates and lower energy savings. Smart controls were demonstrated that saved HVAC energy (i.e., avoided heating/cooling load, as well as fan energy)—averaging between 6 and 46% of ventilation-related energy use depending on the control strategy and occupancy pattern assumptions. The greatest savings were in the combined Auxiliary Fan + Occupancy control. Energy savings increased with climate heating demand and longer unoccupied time periods. The 3rd shift occupancy pattern had better performance, due to the thermal benefit of reducing the ventilation rate during the cold nighttime hours. This same effect provided a cooling energy benefit in hotter locations for the 1st shift. Overall, savings from occupancy-based smart controls were low, because of the recovery period required after occupants return home, during which the airflow is double the 62.2 reference. This recovery is required to maintain equivalence with the ASHRAE standard. Occupancy-based control performance was improved when combined with sensing auxiliary fans and when providing a pre-occupancy flush out of one- or two-hours. Performance was similarly improved if the ASHRAE Standard were to recognize that pollutant emissions are lower during unoccupied periods, iii allowing a lower target ventilation rate during unoccupied periods (not currently in the standard) (see Full vs. Half AEQ in this report). Finally, over-sized unbalanced fans that are cycled on-and-off by a smart controller (or timer) were found to substantially increase annual average air exchange and energy use relative to a continuous unbalanced fan due to the effects of superposition with natural infiltration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

HJET performance in RHIC Run 22

In Run 22, the polarized proton beams were resumed at RHIC after four years of heavy ion beam operation. Here we compare HJET performance in the 255 GeV proton Runs 17 and 22. It was found that analyzing power calibration obtained in Run 17 can be used in Run 22 absolute proton beam polarization measurements. Results for average absolute proton beam polarization in the RHIC Run 22 stores are presented.

43 PARTICLE ACCELERATORS↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The 1958 Nuclear Test Moratorium

Against the backdrop of international concern about radioactive fallout, the United States, the Soviet Union, and Great Britain agreed to a moratorium on nuclear testing. Neither monitored nor enforceable, the moratorium was not much more than a gentleman’s agreement. Nonetheless, it proved remarkedly durable, beginning on October 31, 1958, and lasting until September 1961. After France began nuclear testing in 1960, followed by the shooting down of an American U-2 spy plane over Soviet air space, and a failed summit meeting of international leaders, the Soviet Union resumed testing. The United States followed shortly thereafter.

99 GENERAL AND MISCELLANEOUS↗

Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (Final Report)

This document presents final technical findings for the project Using Natural Gas Liquids to Recover Unconventional Oil and Gas Resources (FE0031782). The project is part of the U.S. Department of Energy Oil and Gas Program to develop and advance technologies that can significantly improve the recovery efficiencies of unconventional oil and gas resources. The overall objective of this project is to improve the ultimate recovery from unconventional oil and gas (UOG) resources in the United States by developing a method for using unrefined natural gas liquids (NGLs) as treatment fluids to improve hydrocarbon production. Horizontal extended-lateral drilling coupled with high volume hydraulic fracturing has significantly increased production from UOG resources in the U.S. However, the recovery efficiency is low compared to the estimated oil and gas in place. Recent data indicate that less than 10% of the oil in the liquid-rich UOG reservoirs is produced. Alternative completion methods using NGLs could increase production (Battelle, 2016; Wan et al., 2013; Wan, 2013; Downey et al, 2021); however, field validation tests are needed to develop an approach that is economical, efficient, and compatible in the UOG setting to advance towards commercial deployment. This project aims to develop and field test a method to improve recovery of oil resources in UOG shale plays by using Y-Grade NGLs, or a similar combination of NGLs, as treatment fluids. Refined NGLs have been used as a hydraulic treatment fluid in UOG plays for decades and are shown to be particularly effective because their miscibility with oil allows oil to flow more freely; however, the use of Y-Grade (unrefined) NGLs has not been studied. The use of Y-Grade NGLs would be advantageous over refined NGLs because Y-Grade NGLs do not require infrastructure or investment in refining and are already being produced from many UOG reservoirs. The concept was tested and monitored in the field at a commercial well site owned by project partner Hopco, Ltd. The project team, which consists of multiple oil and gas operators, Linde Gas North America LLC (Linde) and the Ohio Division of Geological Survey (ODGS), has extensive experience with oil and gas production in the Appalachian basin and the ability to work together quickly to solve technical issues and research needs. A key part of the proposed work was the use of existing wells for field testing and monitoring. A total of four wells (three vertical and one horizontal) were available for this project. One of the vertical wells was utilized as the test well for the NGL treatment test. A nearby vertical well was used for microseismic monitoring. The remaining vertical well and the horizontal well provided a baseline for typical UOG production in the oil window of the Utica/Point Pleasant (UPP). Major technical tasks of the project include characterization of the geotechnical properties of the UPP with an emphasis on the field site; design and planning for the NGLs testing; field testing and monitoring; analysis and integration of field data; and economic and resource/reserve assessment. The Shoman monitoring well and Doughty NGL treatment well were successfully plugged back during September-October 2020 in preparation for treatment and monitoring. A nitrogen diagnostic fracture injection test (DFIT) was completed on the Doughty well on July 22, 2021, consisting of 133,000 scf (91 Bbl.) of nitrogen. A nitrogen foam frac was completed in the Utica-Point Pleasant interval on August 17, 2021 with funding from outside sources. A microseismic monitoring array was installed in the Shoman well and monitored microseismic activity during the Doughty well frac job. Y-Grade NGL injection commenced on August 26, 2021. A total of 215 Bbl. was injected but the job was shut down due to a small leak on the suction hose on the pump truck. The Y-Grade treatment resumed on August 27, 2021 and an additional 726 Bbl. of Y-Grade NGL was injected at a well head pressure of 3850 psi. Total volume of injected Y-Grade over the two days of injection was 941 Bbl. The well was shut-in for 17 days following injection to allow the Y-Grade NGLs to soak on the formation. Y-Grade treatment flow back commenced on 9/13/2021 on a weekly basis. Production data, including surface pressures, oil, nitrogen, natural gas, and flow times was measured and recorded. Periodic gas samples were collected and analyzed to determine composition of flowback gas. As of July 2022, the treatment well had produced 726 Bbl of oil and 2,888 mcf gas. In August 2022, tubing and packer in the well were removed and a pump was installed to enhance oil recovery. Currently, the operator is producing the well about 2 days a week for a few hours. The performance of the NGL treatment test was evaluated based on reservoir simulations of the treatment process, processing of well testing data, analysis of micro seismic monitoring data, and production data analysis. This analysis suggested that oil production in the small test would continue through 2025. Upscaling the treatment to a horizontal Utica Point-Pleasant well would allow more oil recovery, but the process would involve more investment, services, and operational support. An economic analysis was conducted for scenarios aimed at upscaling the NGL treatment process for more typical horizontal UPP wells in the Appalachian Basin.

02 PETROLEUM↗

Resumen del Informe de Progreso del PR100: Resultados Preliminares del Modelo y Conjuntos de Datos Solares y Eólica de Alta Resolución

El estudio de Resiliencia y Transiciones a 100% Energia Renovable de Puerto Rico (PR100) es un estudio de 2 anos de la Oficina de Movilizacion de la Red del Departamento de Energia y seis laboratorios nacionales para analizar exhaustivamente las rutas dirigidas por las personas interesadas hacia un futuro de energia limpia en Puerto Rico. En el Ano 1 del estudio, el equipo PR100, creo y analizo los modelos que alcanzan las metas de energia renovable para Puerto Rico y los objetivos de resiliencia energetica a corto y largo plazo. Este informe, que resume el progreso en el Ano 1, proporciona las consideraciones que pueden informar posibles decisiones de fondos e implementacion potenciales por parte de las agencias federales y locales clave y partes interesadas. El resumen de este informe sigue a la publicacion en julio 2022 de un Informe de Seis Meses de Progreso de PR100. (en ingles y espanol), asi como webinarios publicos en febrero 2022 para lanzar el estudio y julio 2022 para presentar la actualizacion a 6 meses. Un informe final por escrito y visuales por la web seran publicados a finales del 2023. Todas las publicaciones y eventos publicos asociados con el estudio estaran disponibles en ingles y espanol. This report is also available in English https://www.nrel.gov/docs/fy23osti/85018.pdf.

14 SOLAR ENERGY↗

Report of the 2021 U.S. Community Study on the Future of Particle Physics (Snowmass 2021)

In 2019, with the construction of the projects supported by the 2014 P5 process well underway or in an advanced stage of planning, the Division of Particle and Fields (DPF) of the American Physical Society (APS) began to prepare a new community study of U.S. high energy physics (HEP) for the decade of 2025 – 2035, and beyond. This “Snowmass 2021” HEP Community Planning Exercise began formally with a kick-off meeting at the 2020 APS April Meeting and a Community-wide Planning Meeting in October of 2020. The exercise was to conclude in July of 2021 with a workshop in Seattle hosted by the University of Washington. The COVID-19 pandemic severely disrupted these plans. Work was paused from January to September of 2021 to lighten the burden on our younger scientists. We resumed work by September of 2021 and, despite the continuing challenges of COVID-19, our community was well prepared for the Seattle meeting, which had been rescheduled for July 17–26, 2022.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Improving Fission Products at CARIBU: Near Field Detection (Q4/FY23 Quarterly Progress Report)

We have addressed another round of referees’ comments and resubmitted our mass measurement of the isomer and ground state of 128 Sb to Phys. Rev. Letters. One of the referees recommended publication so we anticipate this will be the last round with the referees. This paper focuses on the astrophysical implications of our measurement, as we can directly measure the excitation energy of the isomer along with other observables like the isomer to ground state ratio produced in the fission of 252 Cf. With our summer student Asha, we were able to determine that there was an error in our Gas Counter simulations, which has been corrected and is now implemented in our 111 Ag simulations. This report describes the progress on this effort from July until August 2023. We have paused the work on this project in the last 7 Weeks while the PI was on leave. We are resuming the work on this effort in early October.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fundamental aspects of Spacetime and Quantum Fields

The proposal contained two goals: firstly, placing fundamental bound on thermalization in Quantum Field Theories (QFTs) and, secondly, developing our understanding of emergent spacetime from matrices through concrete models. Since the previous reporting period, in collaboration with Sean Hartnoll we have continued our study of entanglement edge modes in matrix quantum mechanics (MQM). This has resulted in two papers. The first applies our construction for the Matrix Quantum Hall system first to fuzzy sphere states known to correspond to stringy M2-branes in MQM. Entanglement in these states using machine learning methods have also been studied by Sean Hartnoll and Xizhi Han in previous work done under this grant. Our construction builds on this work, and further demonstrates how area laws on fuzzy geometries emerge from strongly coupled systems. The second paper generalizes this construction to all noncommutative geometries with curvature much larger than the noncommutativity parameter. We demonstrate that despite UV/IR mixing effects, the structure of entanglement edge mode irreducible representations is determined by the boundary area of subsystems. On manifolds without global symmetries, we have demonstrated that nonlocal effects inherent to noncommutative geometries resum into a change of frame of the metric structure, similar to the change from string frame to Einstein frame for entanglement entropies calculated in string theory. These advancements lay the groundwork for future progress in the understanding of emergent geometry from large-N theories. Using these techniques, we are currently working on applying our methods to noncom mutative geometries whose construction is not so well understood, such as the fuzzy 5-sphere. Despite their opacity these objects are quite important, as string physics in the bulk of holographic systems bears many features of noncommutative geometry. We have also laid the groundwork of applying our methods to tensor networks, one of the most powerful models for understanding how geometry emerges from entanglement.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

IER-479/547: Low-Temperature TEX Final Design and Surrogate Measurements [Slides]

This presentation covers the final design, and measurements of the Low-Temperature TEX. Visual Diagrams of the apparatus and detailed part explanations are included. Neutronic calculations for Low-Temperature TEX was performed. Six configurations were proposed. Thermal analysis for the boundary cases was performed. Thermal testing with surrogate materials has been underway and testing will resume shortly.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

IER-479/547: Low-Temperature TEX Surrogate Testing and Reflector Design [Slides]

This lecture includes a look into progress in surrogate testing. This includes a new chiller that has been fabricated and testing that has resumed. Additional tests are being conducted, including: using formed aluminum gaskets, extended testing with natural uranium, testing with pseudo-spindle, testing with no vacuum. This lecture includes a look into the Reflector Design. Results for detailed model are consistent with results presented in CED-2. Calculations provide flexibility in the physical design of the reflectors (e.g. reflector segment widths and heights). Provided initial CAD models of reflector components.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Flavor Fragmentation Function Factorization

A definition of partonic jet flavor that is both theoretically well-defined and experimentally robust would have profound implications for measurements and predictions especially for heavy flavor applications. Recently, a definition of jet flavor was introduced as the net flavor flowing along the direction of the Winner-Take-All axis of a jet which is soft safe to all orders, but not collinear safe. Here, we exploit the lack of collinear safety and propose a factorization theorem of perturbative flavor fragmentation functions that resum collinear divergences and describe the evolution of flavor from the short distance of jet production to the long distance at which hadronization occurs. Collinear flavor evolution is governed by a small modification of the DGLAP equations. We present a detailed all-orders analysis and identify exact relations that must hold amongst the various anomalous dimensions by probability conservation and the existence of fixed points of the renormalization group flow. We explicitly validate the factorization theorem at one-loop order, and demonstrate its consistency at two loops in particular flavor channels. Starting at two-loops, constraints on phase space imposed by flavor measurements potentially allow for non-trivial soft contributions, but we demonstrate that they are scaleless and so explicitly vanish, ensuring that soft particles are summed inclusively and all divergences are exclusively collinear in nature. This factorization theorem opens the door to precision calculations with identified flavor in the infrared.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗