Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “remote”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Remote Fiber Laser Cutting System for Dismantling Glass Melter - 13071

Since 2008, the equipment for dismantling the used glass melter has been developed in High-level Liquid Waste (HLW) Vitrification Facility in the Japanese Rokkasho Reprocessing Plant (RRP). Due to the high radioactivity of the glass melter, the equipment requires a fully-remote operation in the vitrification cell. The remote fiber laser cutting system was adopted as one of the major pieces of equipment. An output power of fiber laser is typically higher than other types of laser and so can provide high-cutting performance. The fiber laser can cut thick stainless steel and Inconel, which are parts of the glass melter such as casings, electrodes and nozzles. As a result, it can make the whole of the dismantling work efficiently done for a shorter period. Various conditions of the cutting test have been evaluated in the process of developing the remote fiber cutting system. In addition, the expected remote operations of the power manipulator with the laser torch have been fully verified and optimized using 3D simulations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Robust Power Remote Manipulator for Use in Waste Sorting, Processing, and Packaging - 12158

Disposition of radioactive waste is one of the Department of Energy's (DOE's) highest priorities. A critical component of the waste disposition strategy is shipment of Transuranic (TRU) waste from DOE's Oak Ridge Reservation to the Waste Isolation Plant Project (WIPP) in Carlsbad, New Mexico. This is the mission of the DOE TRU Waste Processing Center (TWPC). The remote-handled TRU waste at the Oak Ridge Reservation is currently in a mixed waste form that must be repackaged in to meet WIPP Waste Acceptance Criteria (WAC). Because this remote-handled legacy waste is very diverse, sorting, size reducing, and packaging will require equipment flexibility and strength that is not possible with standard master-slave manipulators. To perform the wide range of tasks necessary with such diverse, highly contaminated material, TWPC worked with S.A. Technology (SAT) to modify SAT's Power Remote Manipulator (PRM) technology to provide the processing center with an added degree of dexterity and high load handling capability inside its shielded cells. TWPC and SAT incorporated innovative technologies into the PRM design to better suit the operations required at TWPC, and to increase the overall capability of the PRM system. Improving on an already proven PRM system will ensure that TWPC gains the capabilities necessary to efficiently complete its TRU waste disposition mission. The collaborative effort between TWPC and S.A. Technology has yielded an extremely capable and robust solution to perform the wide range of tasks necessary to repackage TRU waste containers at TWPC. Incorporating innovative technologies into a proven manipulator system, these PRMs are expected to be an important addition to the capabilities available to shielded cell operators. The PRMs provide operators with the ability to reach anywhere in the cell, lift heavy objects, perform size reduction associated with the disposition of noncompliant waste. Factory acceptance testing of the TWPC Powered Remote Manipulators has completed at SAT's Colorado facility, and on-site training at TWPC is scheduled to start in early 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remotely-Controlled Shear for Dismantling Highly Radioactive Tools In Rokkasho Vitrification Facility - 12204

A high-level liquid waste vitrification facility in the Japanese Rokkasho Reprocessing Plant (RRP) is right in the middle of hot commissioning tests toward starting operation in fall of 2012. In these tests, various tools were applied to address issues occurring in the vitrification cell. Because of these tools' unplanned placement in the cell it has been necessary to dismantle and dispose of them promptly. One of the tools requiring removal is a rod used in the glass melter to improve glass pouring. It is composed of a long rod made of Inconel 601 or 625 and has been highly contaminated. In order to dismantle these tools and to remotely put them in a designated waste basket, a custom electric shear machine was developed. It was installed in a dismantling area of the vitrification cell by remote cranes and manipulators and has been successfully operated. It can be remotely dismantled and placed in a waste basket for interim storage. This is a very good example of a successful deployment of a specialty remote tool in a hot cell environment. This paper also highlights how commissioning and operations are done in the Japanese Rokkasho Reprocessing Plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience in Remote Demolition of the Activated Biological Shielding of the Multi Purpose Research Reactor (MZFR) on the German Karlsruhe Site - 12208

In 2009, WAK Decommissioning and Waste Management GmbH (WAK) became owner and operator of the waste treatment facilities of Karlsruhe Institute of Technology (KIT) as well as of the prototype reactors, the Compact Sodium-Cooled Fast Reactor (KNK) and Multi-Purpose Reactor (MZFR), both being in an advanced stage of dismantling. Together with the dismantling and decontamination activities of the former WAK reprocessing facility since 1990, the envisaged demolishing of the R and D reactor FR2 and a hot cell facility, all governmentally funded nuclear decommissioning projects on the Karlsruhe site are concentrated under the WAK management. The small space typical of prototype research reactors represented a challenge also during the last phase of activated dismantling, dismantling of the activated biological shield of the MZFR. Successful demolition of the biological shield required detailed planning and extensive testing in the years before. In view of the limited space and the ambient dose rate that was too high for manual work, it was required to find a tool carrier system to take up and control various demolition and dismantling tools in a remote manner. The strategy formulated in the concept of dismantling the biological shield by means of a modified electro-hydraulic demolition excavator in an adaptable working scaffolding turned out to be feasible. The following boundary conditions were essential: - Remote exchange of the dismantling and removal tools in smallest space. - Positioning of various supply facilities on the working platform. - Avoiding of interfering edges. - Optimization of mass flow (removal of the dismantled mass from the working area). - Maintenance in the surroundings of the dismantling area (in the controlled area). - Testing and qualification of the facilities and training of the staff. Both the dismantling technique chosen and the proceeding selected proved to be successful. Using various designs of universal cutters developed on the basis of wall saws, both the activated steel liner and the inner reinforcing layer were cut remotely in one process. This allowed for the efficient execution of the following remote concrete removal steps using mining techniques. The electro-hydraulic demolition excavator that was purchased and then modified turned out to be an ideal tool carrier system with rapid-exchange coupling. Due to the high availability, no major delays occurred. This also was a result of the consistently implemented maintenance and repair concept. With the excavator installed in a modifiable scaffolding suspended from a rotating carrier ring, all dismantling areas could be reached and treated in spite of the small space. Thanks to an optimum organization of work-flows, routine change of dismantling work, and maintenance or repair, the iterative radiological measurement campaigns could be integrated in the whole activity without the dismantling work being disturbed significantly. The ventilation system with pressure grading and pre-filtration units ensured a low contamination level in the dismantling area. It was also possible to manage the dust formed by the milling of concrete surfaces. As it was possible to further cut metal parts and crushed concrete later on, residue flows were optimized. The planned overall period for testing, dismantling the bio-shield and removing the equipment was 36 months. The final duration was 39 months. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Retrieval, Disruption and Processing of Legacy Nuclear Waste - 16179

The UK National Nuclear Laboratory (NNL) is currently undertaking, in conjunction with Sellafield Ltd, a series of high profile trials of robotic equipment on a full scale test facility at their Workington Laboratory in England. These trials are designed to underpin and substantiate the processes proposed for the remote retrieval, disruption and processing of legacy Miscellaneous Beta Gamma Waste (MBGW) from a number of different donor plants on the Sellafield site, including some of the older fuel storage ponds and storage silos. These processes will be conducted inside the new Box Encapsulation Plant (BEP) which is due to be commissioned at Sellafield by 2020. These processes will subsequently enable Sellafield Ltd to safely recover legacy Intermediate Level Waste (ILW) from the older storage facilities on site and process it into a safer form which is more suitable for long term storage and then ultimately final disposal in a Geological Disposal Facility. As part of this legacy waste processing within the BEP plant, MBGW waste items will have to be remotely removed from a variety of different types of import skips. This waste will then be transferred, using robots, into the export container, which is a 3 m{sup 3} box liner, where the processed waste will be flood grouted to produce an encapsulated waste package. As part of this processing, any MBGW items consisting of sealed containers will have to be remotely disrupted before being grout encapsulated. This disruption is in order to (a) release any trapped liquors or gases from the containers and (b) ensure full grout infiltration of the container contents, thus minimising the amount of free liquors and voids within the final waste product. The NNL are conducting this technical work to confirm the viability of the proposed concept, processes and equipment. The developed solution consists of a linear layout of processing equipment with a pair of heavy duty, standard industrial, 'commercially off the shelf' (COTS) robots positioned around a Waste Handling Table. These robots have a 500 kg payload capacity and are operated remotely to handle all of the various types of MBGW waste, including the heavy and bulky items. The robots can be operated in manual tele-operation mode as well as pre-programmed automatic mode and have a range of primary and secondary tooling in order to perform the waste processing and disruption tasks as well as undertake general house-keeping and cleaning duties within the cell. The main tools include two types of hydraulic grab for the main waste recovery and handling tasks and a hydraulic shear for the waste disruption activities, but a number of other tools have also been designed and built for ancillary activities, such as a set of general purpose gripper jaws, drilling tool, bolt removal tool, pump tool, spray tool and a number of different housekeeping tools etc. The robot trials were started in November 2014, and have attracted a significant degree of high level stakeholder interest, including the UK Nuclear Decommissioning Authority (NDA), Office for Nuclear Regulation (ONR), Environment Agency (EA) and Radioactive Waste Management Limited (RWML) witnessing a number of the critical demonstration trials. Robots of the type selected are readily available, robust, reliable and easy to use. The trials have been very successful in proving the retrieval, processing and disruption operations, reducing the burden in the legacy waste facilities. Utilising robots to perform these tasks will lower the probability of producing non-compliant waste packages. In addition the robots can increase the consolidation of incoming waste skips into outgoing 3 m{sup 3} box liners, significantly increasing packing efficiencies and reducing the overall number of export containers produced thus lowering the decommissioning and waste storage/disposal costs. The trials have also enabled an assessment of the optimum way to operate the robots, as well as their reliability and maintainability issues. Engineering work associated with recovering failed robots and removing them from a typical Sellafield plant environment and then subsequently replacing them with functioning robots has also been undertaken and further work is now planned. The success of the trials, completed safely to a very challenging timescale, has enabled the use of robots in BEP to be endorsed as a viable option by the key stakeholders. Following a robust decision making process, this was a clear cut decision. The technical development and testing of the robot technology is currently continuing in order to investigate areas such as robot reliability, failure recoveries, human factors, ease of waste identification, optimisation of throughput rates, nuclearisation modifications etc. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macrophysical properties of continental cumulus clouds from active and passive remote sensing

Cloud amount is an essential and extensively used macrophysical parameter of cumulus clouds. It is commonly defined as a cloud fraction (CF) from zenith-pointing ground-based active and passive remote sensing. However, conventional retrievals of CF from the remote sensing data with very narrow field-of-view (FOV) may not be representative of the surrounding area. Here we assess its representativeness using an integrated dataset collected at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) program's Southern Great Plains (SGP) site in Oklahoma, USA. For our assessment with focus on selected days with single-layer cumulus clouds (2005-2016), we include the narrow-FOV ARM Active Remotely Sensed Clouds Locations (ARSCL) and large-FOV Total Sky Imager (TSI) cloud products, the 915-MHz Radar Wind Profiler (RWP) measurements of wind speed and direction, and also high-resolution satellite images from Landsat and the Moderate Resolution Imaging Spectroradiometer (MODIS). We demonstrate that a root-mean-square difference (RMSD) between the 15-min averaged ARSCL cloud fraction (CF) and the 15-min averaged TSI fractional sky cover (FSC) is large (up to 0.3). We also discuss how the horizontal distribution of clouds can modify the obtained large RMSD using a new uniformity metric. The latter utilizes the spatial distribution of the FSC over the 100° FOV TSI images obtained with high temporal resolution (30 sec sampling). We demonstrate that cases with more uniform spatial distribution of FSC show better agreement between the narrow-FOV CF and large-FOV FSC, reducing the RMSD by up to a factor of 2.

ARM Active Remotely Sensed Cloud Locations (ARSCL)↗

Remote Sensing and Geology of Glass Buttes, Oregon

This data set includes Light Detection and Ranging (LiDAR) data, a remote sensing processing report, and a geologic map of the Glass Buttes study area for ORMAT. The total area flown for the LiDAR remote sensing was 86,631 acres to fully encompass the area of interest (84,849 acres). The "LiDAR Remote Sensing Report" reflects statistics for the overall LiDAR survey. An airborne hyperspectral scanner imagery survey over an area in Glass Buttes, Oregon. The "HyMap Survey Processing Report" describes the processing that has been applied to the HyMap data to produce a number of image products including overview colour composites, decorrelation colour composites, minimum noise fraction (MNF) colour composites, and unmixed end-member mineral map. To produce these products the data first has various processes applied to it that converts the raw data into reflectance imagery which is then geometrically corrected and radiometrically leveled so that seamless image mosaics are produced. A detailed geologic map with cross sections of the Glass Buttes Volcanic Complex, Oregon is also included.

15 GEOTHERMAL ENERGY↗

Nuclear Remote System Design: Radiation and Electronics

Idaho National Laboratory has unique opportunities to examine fuels, materials, and experiment inside of the available radiological hot cells. Due to the uninhabitable nature of a hot cell environment, everything done inside of the hot cell is operated remotely. Remote operations are optimized by Nuclear Remote System Design (NRSD). NRSD is the designing, altering, or configuring of structures, items, and systems that will be placed into radiological environments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Remote Handling Approach for Whiteshell Laboratories Standpipe and Bunker Legacy Waste Retrieval - 18417

Veolia Nuclear Solutions (VNS) has been contracted by Canadian Nuclear Laboratories (CNL) to design and delivery a system to retrieve and repackage legacy waste on-site. The waste has a variety of forms and conditions and requires a flexible and robust set of remote handling devices to complete the task. The focus of this paper is to highlight the remote handling philosophy being used on the project which can be applicable to other projects. This approach is based on past experience and uses a range of remote handling devices and techniques matched to the variety of tasks in the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 94: Nuclear and Industrial Robotics, Remote Systems and Emerging Technologies

This panel focused on the use and benefits of robotics in different nuclear environments. Examples of robotics deployed in nuclear environments that come from industry, academia, and the government were presented. It is through these varying perspectives that the panel participants will show the breath of nuclear robotics used across the world. Presentations proposed include: 1 - Robotics and Emerging Technologies at Assystem (Fanny Fouin, Assystem Energy and Infrastructure (United Kingdom)); 2 - An Undergraduate Perspective (Michael DiBono, Applied Research Center - FIU (USA)); 3 - US-ROK International Collaboration on Robotics and Remote Systems for D and D of NPPs (Young Soo Park, Argonne National Laboratory (USA)); 4 - EM's Historical Engagement with Robotics and Universities (Genia McKinley, US DOE (USA)); 5 - Robotic Systems for Environmental Remediation Applications (Leonel Lagos, Applied Research Center - FIU (USA)); 6 - Remote and Nuclear Challenges and Solutions at the Savannah River Site - SRS (Jean Plummer, Savannah River National Laboratory (USA)); 7 - Nuclear and Industrial Robotics, Remote Systems and Emerging Technologies Challenges, Opportunities and Prognostications (Kim 'KD' Auclair, KD Auclair and Associates LLC (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spectral Methods of Remote-Sensing Monitoring of Radioactive Substances and Toxic Chemicals

The physical principles of passive and active methods of remote-sensing monitoring of radioactive substances and toxic chemicals in accidental emissions (leaks) at nuclear fuel cycle objects are examined. The analytical possibilities of the most sensitive methods of remote-sensing monitoring, which are based on the advances made in UV and microwave range radiometry, laser IR-absorption spectroscopy, laser-induced fluorescence, and laser spark emission spectrometry, are discussed. The prospects for the development of spectral methods of remote-sensing monitoring in different ranges are analyzed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluating the state-of-the-art in remote volcanic eruption characterization Part I: Raikoke volcano, Kuril Islands

Raikoke, a small, unmonitored volcano in the Kuril Islands, erupted in June 2019. We integrate data from satellites (including Sentinel-2, TROPOMI, MODIS, Himawari-8), the International Monitoring System (IMS) infrasound network, and global lightning detection network (GLD360) with information from local authorities and social media to retrospectively characterize the eruptive sequence and improve understanding of the pre-, syn- and post- eruptive behavior. In this work, we observe six infrasound pulses beginning on 21 June at 17:49:55 UTC as well as the main Plinian phase on 21 June at 22:29 UTC. Each pulse is tracked in space and time using lightning and satellite imagery as the plumes drift eastward. Post-eruption visible satellite imagery shows expansion of the island's surface area, an increase in crater size, and a possibly-linked algal bloom south of the island. We use thermal satellite imagery and plume modeling to estimate plume height at 10–12 km asl and 1.5–2 × 10 6 kg/s mass eruption rate. Remote infrasound data provide insight into syn-eruptive changes in eruption intensity. Our analysis illustrates the value of interdisciplinary analyses of remote data to illuminate eruptive processes. However, our inability to identify deformation, pre-eruptive outgassing, and thermal signals, which may reflect the relatively short duration (~12 h) of the eruption and minimal land area around the volcano and/or the character of closed-system eruptions, highlights current limitations in the application of remote sensing for eruption detection and characterization.

58 GEOSCIENCES↗

Evaluating the state-of-the-art in remote volcanic eruption characterization Part II: Ulawun volcano, Papua New Guinea

Retrospective eruption characterization is valuable for advancing our understanding of volcanic systems and evaluating our observational capabilities, especially with remote technologies (defined here as a space-borne system or non-local, ground-based instrumentation which include regional and remote infrasound sensors). In June 2019, the open-system Ulawun volcano, Papua New Guinea, produced a VEI 4 eruption. We combined data from satellites (including Sentinel-2, TROPOMI, MODIS, Himawari-8), the International Monitoring System infrasound network, and GLD360 globally detected lightning with information from the local authorities and social media to characterize the pre-, syn- and post-eruptive behaviour. The Rabaul Volcano Observatory recorded ~24 h of seismicity and detected SO 2 emissions ~16 h before the visually-documented start of the Plinian phase on 26 June at 04:20 UTC. Infrasound and SO2 detections suggest the eruption started during the night on 24 June 2019 at 10:39 UTC ~38 h before ash detections with a gas-dominated jetting phase. Local reports and infrasound detections show that the second phase of the eruption started on 25 June 19:28 UTC with ~6 h of jetting. The first detected lightning occurred on 26 June 00:14 UTC, and ash emissions were first detected by Himawari-8 at 01:00 UTC. Post-eruptive satellite imagery indicates new flow deposits to the south and north of the edifice and ash fall to the west and southwest. In particular, regional infrasound data provided novel insight into eruption onset and syn-eruptive changes in intensity. We conclude that, while remote observations are sufficient for detection and tracking of syn-eruptive changes, key challenges in data latency, acquisition, and synthesis must be addressed to improve future near-real-time characterization of eruptions at minimally-monitored or unmonitored volcanoes.

58 GEOSCIENCES↗

Performance of Landsat-8 and Sentinel-2 surface reflectance products for river remote sensing retrievals of chlorophyll-a and turbidity

Rivers and other freshwater systems play a crucial role in ecosystems, industry, transportation and agriculture. Despite the > 40 years of inland water observations made possible by optical remote sensing, a standardized reflectance product for inland waters is yet forthcoming. The aim of this work is to compare the standard USGS land surface reflectance product to two Landsat-8 and Sentinel-2 aquatic remote sensing reflectance products over the Amazon, Columbia and Mississippi rivers. Landsat-8 reflectance products from all three routines are then evaluated for their comparative performance in retrieving chlorophyll-a and turbidity in reference to ship- borne, underway in situ validation measurements. The land surface product shows the best agreement (4% Mean Absolute Percent Difference) with field measurements of radiometry collected on the Amazon River and gen- erates 36% higher reflectance values in the visible bands compared to aquatic methods (ACOLITE and SeaDAS) with larger differences between land and aquatic products observed in Sentinel-2 (0.01sr-1) compared to Landsat-8 (0.001 sr-1). Choice of atmospheric correction routine can bias Landsat-8 retrievals of chlorophyll-a and turbidity by as much as 59% and 35% respectively. Using a more restrictive time window for matching in situ and satellite imagery can reduce differences by 5–31% depending on correction technique. This work highlights the challenges of satellite retrievals over rivers and underscores the need for future optical and biogeochemical research aimed at improving our understanding of the absorbing and scattering properties of river water and their relationships to remote sensing reflectance.

Amazon↗

Remote sensing of planetary boundary layer from ground and space: Structure, thermodynamics, and boundary layer clouds

The planetary boundary layer (PBL) is a critical interface between Earth's surface and atmosphere, influencing atmospheric convection, weather patterns, and air quality. Recognized by the 2017 National Academies of Sciences, Engineering, and Medicine Earth Science Decadal Survey as an Incubation Targeted Observable, high-quality and effective observation of the PBL has become a priority. This paper reviews surface-based and satellite remote sensing techniques for characterizing PBL features, including PBL height (PBLH), boundary layer thermodynamics, turbulence, and boundary layer clouds (BLCs). These elements are treated as interconnected aspects of the PBL system, while recognizing that different instruments retrieve different physical manifestations of the PBL. The review summarizes recent advances and limitations in Micro-Pulse Lidar (MPL), Doppler lidar, Raman lidar, Differential Absorption Lidar (DIAL), ceilometers, wind profilers, GNSS Radio Occultation, radar, and hyperspectral sounders. These observations help trace dynamic processes within the PBL and link PBL structure to broader weather and climate processes. The review also highlights persistent observational gaps over oceans, remote land, and polar regions, where continuous surface-based profiling is sparse. By comparing instrument capabilities, practical limitations, and interpretation issues, this review emphasizes the need for integrated remote sensing approaches and careful definition of the retrieved PBL quantities.

Boundary layer clouds↗

Energy and cost analysis of a solar-hydrogen combined heat and power system for remote power supply using a computer simulation

A simulation program, based on Visual Pascal, for sizing and techno-economic analysis of the performance of solar-hydrogen combined heat and power systems for remote applications is described. The accuracy of the submodels is checked by comparing the real performances of the system's components obtained from experimental measurements with model outputs. The use of the heat generated by the PEM fuel cell, and any unused excess hydrogen, is investigated for hot water production or space heating while the solar-hydrogen system is supplying electricity. A 5 kWh daily demand profile and the solar radiation profile of Melbourne have been used in a case study to investigate the typical techno-economic characteristics of the system to supply a remote household. The simulation shows that by harnessing both thermal load and excess hydrogen it is possible to increase the average yearly energy efficiency of the fuel cell in the solar-hydrogen system from just below 40% up to about 80% in both heat and power generation (based on the high heating value of hydrogen). The fuel cell in the system is conventionally sized to meet the peak of the demand profile. However, an economic optimisation analysis illustrates that installing a larger fuel cell could lead to up to a 15% reduction in the unit cost of the electricity to an average of just below 90 c/kWh over the assessment period of 30 years. Further, for an economically optimal size of the fuel cell, nearly a half the yearly energy demand for hot water of the remote household could be supplied by heat recovery from the fuel cell and utilising unused hydrogen in the exit stream. Such a system could then complement a conventional solar water heating system by providing the boosting energy (usually in the order of 40% of the total) normally obtained from gas or electricity. (author)

14 SOLAR ENERGY↗

Fabrication of a Microcavity Prepared by Remote Epitaxy over Monolayer Molybdenum Disulfide

We report advances in epitaxy have enabled the preparation of high-quality material architectures consisting of incommensurate components. Remote epitaxy based on lattice transparency of atomically thin graphene has been intensively studied for cost-effective advanced device manufacturing and heterostructure formation. However, remote epitaxy on nongraphene two-dimensional (2D) materials has rarely been studied even though it has a broad and immediate impact on various disciplines, such as many-body physics and the design of advanced devices. Herein, we report remote epitaxy of ZnO on monolayer MoS 2 and the realization of a whispering-gallery-mode (WGM) cavity composed of a single crystalline ZnO nanorod and monolayer MoS 2 . Cross-sectional transmission electron microscopy and first-principles calculations revealed that the nongraphene 2D material interacted with overgrown and substrate layers and also exhibited lattice transparency. The WGM cavity embedding monolayer MoS 2 showed enhanced luminescence of MoS 2 and multimodal emission.

36 MATERIALS SCIENCE↗