Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “regenerating”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Chemical-Biological Cyclic Process for Hexavalent Chromium Reduction to Trivalent Chromium in Aqueous Medium - 20224

Conventional treatment of chromium contamination focuses on immobilization of the highly toxic and water-soluble form Cr(VI), by reducing it to the relatively less toxic and less mobile trivalent form, Cr(III), using reducing compounds like ferrous sulfate or ferrous iron, Fe(II). The Cr(VI) also respond to biodegradation and subsequent reduction. During the reduction reaction, Fe(II) is oxidized to ferric, Fe(III), which, being at the highest oxidation state, has no ability to reduce Cr(VI), and therefore remediation process terminates. The good news is that metal-reducing bacteria, S. oneidensis MR-1, can regenerate Fe(II) from Fe(III) with the help of an organic electron donor in an appropriate bacterial media. Thus, in the Cr(VI) chemical remediation process, Fe(II) to Fe(III) conversion is reversed by the biological process, regenerating Fe(II) and the Cr(VI) chemical reduction process continues in a cyclic fashion. This study presents the results of regeneration of Fe(II) from fresh Fe(III) as well as from the reaction products of Cr(VI) and Fe(II). Both fresh Fe(III) and reaction product Fe(III) exhibited the same reduction behavior. Fe(II) production increased with the increase of initial concentration of Fe(III), resulting in 87.5% Fe(II) regeneration. The extent of Fe(III) reduction (Fe(II)t/Fe(III)0.hour) was 21 times higher than the extent of Cr(VI) reduction (Cr(VI)t/Cr(VI)0.hour) by S. oneidensis MR-1. In a cyclic process of sequential Cr(VI) addition, the amount of Fe(II) regeneration decreased with the increase in cycle number, a fixed quantity of starting S. oneidensis MR-1 could regenerate Fe(II) at least five times in a ten-hour period. More importantly, regenerated Fe(II) instantly reduced Cr(VI) to Cr(III). So, Fe(II) regeneration with metal-reducing bacteria has a good potential for application in groundwater and wastewater remediation in reducing Cr(VI) to Cr(III). As a comparison of chemical to biological transformation, chemical transformation of Cr(VI) by Fe(II) was almost 600 times greater than that of biological transformation. Therefore a chemical-biological cyclic process offers potential applications for remediation of groundwater and hexavalent chromium contaminated waste sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benefits and pathologies associated with the inflammatory response

Adult skeletal muscle regenerates completely after a damage, thanks to the satellite cells, or muscle stem cells (MuSCs), that implement the adult myogenic program. This program is sustained by both robust intrinsic mechanisms and extrinsic cues coming from the close neighborhood of MuSCs during muscle regeneration. Among the various cell types present in the regenerating muscle, immune cells, and particularly macrophages, exert numerous functions and provide sequential transient niches to support the myogenic program. The adequate orchestration of the delivery of these cues ensures efficient muscle regeneration and full functional recovery. The situation is very different in muscular dystrophies where asynchronous and permanent microinjuries occur, triggering contradictory regenerating cues at the same time in a specific area, that lead to chronic inflammation and fibrogenesis. Here we review the beneficial effects that leukocytes, and particularly macrophages, exert on their neighboring cells during skeletal muscle regeneration after an acute injury. Then, the more complicated (and less beneficial) roles of leukocytes during muscular dystrophies are presented. Finally, we discuss how the inflammatory compartment may be a target to improve muscle regeneration in both acute muscle injury and muscle diseases.

60 APPLIED LIFE SCIENCES↗

A first and second law analysis of a thermoresponsive polymer desiccant dehumidification and cooling cycle

Herein, we present a theoretical description for a new desiccant air conditioning cycle that uses thermoresponsive polymers instead of traditional desiccants. We use a combined first and second law analysis to demonstrate that this new cycle has three major advantages relative to the traditional case: (i) it can regenerate at lower temperatures, (ii) it can harvest liquid water and (iii) it has significantly higher coefficients of performance (COPs). For example, this new cycle can achieve a COP of 5.1 when regenerated at 95 degrees C, whereas the traditional desiccant cycle is limited to a COP of ~ 1. The fundamental origins of these advantages can be traced to the method of regeneration. The traditional desiccant cycle regenerates by flowing hot air over the desiccant, which provides a medium for gaseous water desorption. However, this also generates entropy and places a minimum temperature constraint on the hot air. In contrast, the thermoresponsive polymer cycle regenerates through a polymer phase transition. The polymer absorbs water vapor in humid air, and then it expels liquid water when raised above its transition temperature. This regeneration method generates liquid water that can be harvested and relaxes constraints on entropy generation and minimum temperature. The minimum regeneration temperature of the thermoresponsive cycle is only limited by the transition temperature of the polymer, which can be tuned through materials science. Due to its liquid water harvesting capability, the new cycle potentially eliminates water consumption when used with evaporative cooling, or it can be directly used for atmospheric water harvesting.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reformulated Red mud: a robust catalyst for in situ catalytic pyrolysis of biomass

Biomass feedstocks contain inorganic compounds generally classified as ash. The ash consists of compounds of potassium, calcium, magnesium, silicon, phosphorous and other elements. These elements have been reported to influence both the pyrolysis reactions as well as destabilizing the pyrolysis oils during storage. The inorganic elements have also been reported to deposit on catalyst surfaces during in situ catalytic pyrolysis leading to the eventual deactivation of acidic catalysts such as zeolites. The deposition of inorganic elements and their effect on formulated red mud (FRM) catalyst during in situ catalytic pyrolysis of pinyon juniper wood was investigated. The inorganic elements were measured for the fresh, coked, and regenerated catalysts. The BET specific surface area of the FRM catalyst decreased from 76 m2/g for the fresh catalyst to 53 m2/g for the stable regenerated catalyst. After three regenerations, the BET specific surface area stabilized at 53 m2/g and remained constant after all other regenerations. Potassium, calcium, magnesium, and phosphorous were deposited on the catalyst. Potassium deposition was linear with the number of regenerations while magnesium and calcium depositions were initially rapid but leveled off after three regenerations of the catalyst. Phosphorous deposition was almost linear, but the data were more scattered compared to potassium. The potassium deposition was attributed to physical phenomenon whereas calcium and magnesium depositions were more akin to chemical reactions related to the loss of BET surface area of the catalyst. The deposition of these elements on the surface of the catalyst did not deactivate it. After each catalyst regeneration, the oil yield was not significantly affected and the oil oxygen content and viscosity decreased slightly. This clearly showed that formulated red mud is a robust catalyst suitable for in situ catalytic fast pyrolysis of biomass.

Agblevor, Foster↗

Emissions mitigation technology for advanced water-lean solvent-based CO 2 capture processes

This technical final report submitted to DOE/NETL presents all the research activities performed during the entirety of DE-FE0031660 project-Emissions Mitigation Technology for Advanced Water-Lean Solvent-Based CO 2 Capture Processes which spans from October 2018 through March 2022. RTI International has been conducting studies from fundamental and operational aspects to reduce the overall amine emissions from the advanced Water-Lean Solvent (WLS) systems, specifically RTI’s Non-Aqueous Solvent (NAS). This technical final report will highlight the key findings from project which align closely to the project objectives which are: Identify the contribution of vapor loss, entrainment, and aerosols to the overall emissions of water-lean systems; Determine the significance of CO 2 capture system operating parameters to the amine emissions; Develop an emissions model based on critical operating parameters; Evaluate the effectiveness of emissions mitigation devices to reduce the amine emissions to <1 ppm under flue coal-fired flue gas; and, Determine the contribution of the ECTs to the overall CO 2 capture cost. The following are the key findings based on numerous tests using both lab-scale setups and parametric testing performed at RTI’s Bench-scale Gas Absorption System (BsGAS). During the BP1, the aerosol generation system and monitoring equipment were installed at BsGAS to produce and determine the aerosol characteristics during the NAS CO 2 capture process. The aerosol produced by this setup produced aerosols with the peak diameter and concentration of 50 micron and 1.2E10 7 cm -3 , respectively. These particle sizes and concentrations are matched to those observed in the actual coal-fired power plant flue gases and expected to be found at the absorber inlet of the CO 2 capture system. Over 1,300 hours of parametric testing have been conducted to evaluate the impact of the aerosols and operating conditions during the CO 2 capture with NAS on the overall amine emissions in the treated flue gas. At the worse condition tested, the presence of the aerosols in the flue gas could increase the overall emissions by 10X compared to the baseline emissions from NAS’s vapor pressure. CO 2 capture rate was found to be a main factor impacting the overall emissions as well as aerosol size and concentrations in the absorber off-gas. The higher CO 2 capture rate, the higher amine emissions in the treated gas. The temperature difference between the temperature bulge seen in the absorber and the water wash temperature also impacts the particle growth where the larger the temperature difference, the more amine emissions from aerosols in the treated gas. The majority of the aerosols did not grow substantially in the system, and the particle concentrations remained nearly constant between the absorber inlet and wash outlet. Only a small portion of the particles were found to grow significantly. The high efficiency demister with mesh size of 5-10 micron can be installed to remove a portion of the aerosols from the gas stream leaving the water wash. Overall, these results from parametric testing have established the emission baseline and validate our assumption on the need of emission control technologies (ECT) in order to minimize the emissions from the baseline NAS CO 2 capture process. Over 2,000 of BsGAS operating hours was used to investigate a handful of process improvements which led to a selection of the vital few changes that effectively control the amine emissions. These process improvements are lime-coated-filters for absorber gas inlet, advanced demister at the top of the absorber, a second water wash with amine recovery unit were designed, installed, and tested at BsGAS at the end of BP1. The result showed that the NAS CO 2 capture process with these additional emission control devices could lower the amine emission in the treated gas to about 1 ppm using a simulated coal-fire flue gas stream. The main contributor in lowering the amine emission came from the second water wash with amine recovery unit where the amine concentration in the scrubbing water was kept below 2 wt% through a continuous amine removal via an adsorbent bed, resulting in a low amine vapor pressure. The adsorbent bed was regenerated via a direct steam regeneration and the recover amine was returned to the absorber to minimize wastewater and makeup amine. A flue gas generation system was designed and installed during the first half of BP2 to support the emission testing using a real coal-derived flue gas. The system is capable of generating both coal- and natural gas- derived flue gases with the composition of the gaseous species highly resemble to that of the power plant flue gases. The particulates detected in the coal-derived flue gas showed the mean diameter of 1 micron. The CO 2 capture operating was then proceed using the real coal-derived flue gas where the amine emission was controlled to be about 0-3 ppm for the total run time of about 200 hours. Similar testing was conducted with natural gas-derived flue gas and the result showed a highly amine emission of 30 ppm under the total run time of 200 hours. The Principal Component Analysis (PCA) and the Partial Least Squares Projection to Latent Structures (PLS) techniques were applied to the parametric testing data to derive a multivariate statistical model. The model was validated and trained with half of the data collected, and the predictive ability of the model was evaluated using the remaining half of the data. The resulting empirical model was capable of predicting the overall emissions from the NAS process without the ECTs with ±15% accuracy (average absolute deviation, AAD) in BP1. As more emission data were obtained under the real coal-flue gas in the BP2, the model incorporated these new set of data to reflect the final process configuration, operating parameters, and amine emission. This results in the updated empirical model predicting the amine emission from the NAS CO 2 capture process with 84% goodness-of-fit (R 2 ), 85% predictability (Q 2 ), and 15% AAD. The study evaluates the use of RTI’s Non-Aqueous Solvent technology for 90% CO 2 capture from a net 650 MWe pulverized coal power plant, downstream of the flue-gas desulfurization unit. The captured CO 2 has a purity of > 95% CO 2 , and is dried, compressed to 15.3 MPa (2,215 psia), ready for sequestration. The analysis uses Case B12B from the DOE Baseline study on Bituminous Coal, Revision 4 where the Cansolv CO 2 capture plant is replaced by the RTI CO 2 Capture plant. The CO 2 capture plant has been sized to capture >90% CO 2 from flue gas derived from a net 650 MWe supercritical pulverized coal power plant. The CO 2 capture plant is equipped with emission control technologies that limits the amine emissions to < 1 ppm. Two different cases were evaluated for the technoeconomic study. The key difference between the two cases is the regenerator pressure. In Case 1, the regenerator operates at 0.195 MPa (28.3 psia), whereas in Case 2, the regenerator pressure is 0.44 MPa (64 psia) thus removing the need for the first stage of compression of the eight-stage compression train. Results from the TEA are compared against the DOE reference cases for SCPC plant with and without CO 2 Capture (Case B12A and Case B12B of the DOE Baseline study, respectively). Case 2 with CO 2 regeneration at higher pressure results in the lower cost of CO 2 capture. The total capital cost of the capture process has been estimated using 2018 dollars in Aspen Process Economic Analyzer and was estimated to be $579 MM. The capture plant operation leads to a total parasitic power loss rate of 96 MWe, resulting in a decrease in pulverized coal power plant efficiency of 7.8% points. The resulting cost of electric power increases from 64.4 mills/kWh, for no capture, to 97.5 mills/kWh, with 90% capture, an increase of 51% in the COE. The cost of capturing 90% CO 2 was estimated to be $38.2/tonne-CO 2 , and meets the DOE target of $40/t-CO 2 . Emission control technologies (ECT) investigated in this project includes a second water wash with use of activated carbon beds for removal of amine from the wash water prior to recirculation in the water wash. These ECT allow operation of the CO 2 capture plant with < 1 ppm amine emissions with the treated flue gas and contributes to $2.4/t-CO 2 captured. Amine emissions derived from thermal and oxidative degradations were investigated under this project along with the emissions derived from aerosols for the NAS system. The thermally degraded of the lean NAS showed less than 4% decreased of the original total amine content in the NAS at 150 °C while the result obtained at 120 °C showed no drop in total amine content, suggesting that thermal degradation of the NAS is minimal. These results also suggested that the thermally degraded species are not likely formed and contributed to the emissions due to the low regeneration temperature of the NAS at 90-105 °C. The oxidative degradation, on the other hand, could become problematic as some of these oxidative degraded species were observed during the NAS-5 testing at National Carbon Capture Center (NCCC) and SINTEF in our previous project. The rapid screening of selected inhibitors suggested that oxidative degradation of NAS can be suppressed using thiol containing compounds in amounts of at least 1 mol%. The detailed mechanistic degradation pathway was conceived for a specific amine used in NAS formulation during BP2. he reduction of the nitrosamines caused by the NO x present in the flue gas was also examined. The study suggested that the thermo-chemical treatment of the NAS solvent would be a more effective and economically viable compared to removing NO x at the DCC.

01 COAL, LIGNITE, AND PEAT↗

Enhanced Depolarized Electro-Membrane System (EDEMS) for Direct Capture of Carbon Dioxide from Ambient Air (Final Report)

The goal of this final project report is to summarize the work conducted on project DE-FE0031962. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed an intensified process to capture CO2 from ambient conditions (400 ppm CO2). The process combines low-temperature solvent-aided membrane capture with electrochemically-mediated solvent regeneration to simultaneously capture ambient CO2 while regenerating the solvent. The technology employs only two primary units (regenerator and absorber/contactor) while generating high purity hydrogen as a co-product that can be sold, used for energy storage, or cost-saving depolarization of the direct air capture (DAC) system during the grid peak demand, allowing for flexible operation. When depolarization is employed, the operating voltage is reduced by more than 1 V. Since the technology is powered directly by DC electricity, it can seamlessly tie in with power sources like solar cells without the need for AC/DC converters, therefore allowing for a remote operation to further mitigate greenhouse gas generation toward deploying a negative carbon emissions technology that is completely decoupled from the carbon emissions from the power source for the DAC unit. The project results verified that UK CAER’s integrated approach addressed the complexities of incumbent DAC systems by demonstrating at ambient conditions, including (1) low gas-side pressure-drop facile CO2 capture via a membrane contactor with in-situ generated hydroxide as capture solvent, (2) multi-functional electrochemical regenerator for hydroxide regeneration, CO2 concentration and hydrogen production, and (3) depolarization using cathode-produced hydrogen to reduce energy requirement. The EH&S Assessment of the process did not identify any obvious concern for the bench-scale operation and no apparent barriers to implementing UK CAER’s carbon capture and solvent regeneration system at a larger scale.

20 FOSSIL-FUELED POWER PLANTS↗

Methane liquefaction with an active magnetic regenerative refrigerator

This manuscript reports liquefaction of methane using an active magnetic regenerative refrigerator (AMRR). The AMRR used to cool from 285 K to 135 K has two identical regenerators fabricated with adjacent layers of four ferromagnetic refrigerants, each with sequentially lower Curie temperatures and lesser masses from hot to cold temperatures. The dual multilayer regenerators were assembled in opposition with a single cold region between them. For this set of experiments equal mass of helium gas was pumped through all layers of the regenerators during the two flow steps of the four-step AMR cycle. After successfully reaching 135 K, a compact condensing coil-fin tube heat exchanger (HEX) with a small storage vessel was mounted in the cold region of the dual regenerator assembly to be cooled during the hot-to-cold helium flow from alternatively demagnetized regenerators. The cold HEX was used to cool and liquefy a process stream of methane gas supplied at 295 K and different pressures in different runs. Further, by measuring time to liquefy a known volume of methane at three different pressures, cooling powers of the AMRR as a function of temperature were determined. The resultant data were compared to those predicted by the AMRR performance model. Conclusions from these experiments and suggestions for future work are presented.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hybrid Absorption–Crystallization Strategies for the Direct Air Capture of CO2 Using Phase-Changing Guanidium Bases: Insights from in Operando X-ray Scattering and Infrared Spectroscopy Measurements

Efforts to limit rising concentrations of CO 2 have motivated the development of negative emission technologies. Direct air capture (DAC) of CO 2 is one of the negative emissions technologies that has been proposed for the direct removal of CO 2 from the atmosphere. Phase-changing bis(iminonoguanidine) (BIG) sorbents have been developed for the direct air capture of CO 2 . These phase changing sorbents, specifically glyoxal-bis(iminoguanidine) (GBIG), involve (1) CO 2 absorption with aqueous amino acid salts, such as K- or Na-glycinate to yield bicarbonate-rich solutions, (2) crystallization of the bicarbonate anions with a BIG solid, which regenerates the amino acid, and (3) solid-state CO 2 release from the carbonate crystals and BIG regeneration. Despite the promising potential of these materials, their structural evolution during the thermal regeneration of the BIG solids, chemical regeneration of the sodium or potassium glycinate solvents, and the crystallization behavior of CO 2 -loaded BIG bicarbonate remain to be evaluated and understood in detail. The aim of this study is to probe these knowledge gaps. In situ wide-angle X-ray Scattering (WAXS) results show that CO 2 and water molecules in GBIG bicarbonate are simultaneously released in a single step during the thermal regeneration of the sorbent at 97 – 134 °C. In situ ATR-FTIR measurements showed that sodium glycinate and GBIG bicarbonate are simultaneously generated when GBIG, glycine, and sodium bicarbonate are reacted. The crystallization of GBIG bicarbonate from GBIG and CO 2 -loaded monoethanolamine (MEA) occurs rapidly in the first 10 min of the reaction, as determined using in situ GI-SAXS measurements. Overall, the insights from these studies are essential for the scalable implementation of CO 2 capture technologies using these phase-changing sorbents.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Nanoarray-Based Monolithic Adsorbers for SO 2 Removal

Nanoarray-based monolithic catalysts have been developed for various applications, including CO oxidation, hydrocarbon combustion, lean NO x trapping, and low-pressure CO 2 hydrogenation. In this work, SO 2 adsorption properties have been explored and evaluated on the cordierite honeycomb monoliths grown with zinc oxide nanoarray (ZnO), zinc oxide nanoarray washcoated by BaCO 3 nanoparticles (ZnO/BaCO 3 ), and manganese oxide nanowire array with cryptomelane structure (MnO x ) at a temperature range from 50 to 425 °C. All samples show temperature-dependent SO 2 adsorption behaviors. The adsorption results reveal the performance order: MnO x > ZnO/BaCO 3 > ZnO, with ~ 90% SO 2 adsorbed in MnO x at 425 °C. Washcoated BaCO 3 contributes to the improvement of SO 2 adsorption in ZnO nanoarray, and the best performance displayed in MnO x may be attributed to their high specific surface area. After regeneration, nanoarrays all exhibit good thermal stability during test-regeneration cycles. No additional phase is formed in regenerated ZnO nanoarrays (ZnO-R), while BaCO 3 is converted to BaSO 4 in the regenerated ZnO/BaCO 3 nanoarrays (ZnO/BaCO 3 -R), and the sulfur species (possibly MnSO 4 ) and Mn 2 O 3 are found in regenerated MnO x nanoarrays (MnO x -R). It is noted that a small amount of sulfur species (possibly MnSO 4 ) may promote the SO 2 adsorption of MnO x -R at a lower temperature, while the formed Mn 2 O 3 contributes to the deactivation of MnO x -R.

36 MATERIALS SCIENCE↗

Review of liquid desiccant air dehumidification systems coupled with heat pump: System configurations, component design, and performance

Vapor Compression Systems (VCS) are the most common air conditioning technology. VCS cool the air to its dew point temperature (overcooling) to remove water vapor in the air through condensation and then reheats the air back to the comfort temperature for direct use. The VCS process is inefficient due to overcooling and reheating. Liquid Desiccant Dehumidification (LDD) is a potentially energy-efficient air conditioning. LDD removes water vapor in the process air using liquid desiccant’s high-water affinity. It hybrids with sensible cooling to control temperature and humidity separately. The LD in the LDD becomes weak after dehumidification. The LDD needs additional heating to regenerate the weak Liquid Desiccant (LD) to a high concentration for dehumidification. Earlier versions of the LDD systems use highly concentrated liquid desiccant (large water removal capability) to dehumidify the air by only dealing with latent load. It leads to highly elevated temperatures above 60 °C of heat sources (combustion or electric resistance-based heating) for regeneration. The energy needed for the elevated temperature heat resource significantly reduces or demolishes the benefit of LDD systems. In the recent two decades, researchers have investigated a new configured LDD system that couples an LDD with a heat pump at both dehumidification and regeneration sides for better efficiency. The heat pump provides cooling (from the evaporator) for both dehumidification and sensible cooling and simultaneous heating from the condenser for regeneration. The highly integrated system (HP-LDD) with improved efficiency enables the LDD to operate at lower concentrations and temperatures in dehumidification and regeneration. This paper depicts the working principle behind HP-LDD and its heating and cooling requirements. It reviews the comparison between the HP-LDD systems and the conventional LDD systems regarding system configurations, component design, energy efficiency, and dehumidification performance characteristics. The main findings from the review include the preferred use of packed bed over membrane-based dehumidifiers, the use of internally cooled dehumidifiers enabled by the HP cooling capacity, the high dispersion of HP operation conditions, and the dependence of dehumidification performance on various dehumidifiers. Finally, an outlook for future research on HP-LDD strategies is presented based on the reviewed works and their limitations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Restoration of a Tritium-Aged LaNi 4.25 Al 0.75 Sample

Hydride beds containing LaNi 4.25 Al 0.75 (LANA.75) are used to store significant quantities of tritium. These hydride beds have a limited service life due to radiolytic decay of tritium to 3He within the metal matrix. The crystal structure of the hydride is altered by trapped 3 He, which has a very low solubility in the metal. The altered structure induces the formation of a heel of trapped hydrogen isotopes and diminishes the reversible capacity of the hydride. With sufficient tritium exposure, the bed loses the ability to deliver 3He-free tritium, and replacement is needed. Demonstration of a means to regenerate tritium-aged LANA.75 in situ would delay or even eliminate the need to replace lanthanum nickel aluminum (LANA) hydride beds. This paper presents test results obtained during regeneration testing. The efficacy of regeneration testing was evaluated by comparing tritium desorption isotherms collected on the hydride before and after exposure to regeneration conditions. Testing was performed on a bench-scale tritium-aged LANA.75 sample that was previously isotopically exchanged (from tritium to deuterium), passivated, and recovered. Once transferred to a high-temperature test cell, the deuterium heel of the sample was isotopically exchanged with tritium, and a baseline desorption isotherm was collected for comparison purposes. The sample was then heated under vacuum, and comparative isotherms were gathered between regeneration evolutions. Shifts in isotherms show progressive improvements with higher-temperature exposure over the tritium-aged baseline. The heel was significantly reduced, and the reversible capacity of the hydride was essentially restored to near virgin values. For all tested conditions, the plateau pressure remained higher than virgin LANA.75.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Understanding the Mechanism of Light and Elevated Temperature Induced Degradation of p-type Silicon Solar Cells (Final Report)

Light- and elevated-temperature-induced degradation (LeTID) was first discovered in multicrystalline Si (mc-Si) solar cells and was initially attributed to metal impurities. Later, LeTID was reported in Czochralski (Cz) and float-zone (FZ) Si, and is considered as an important efficiency loss mechanism in p-type passivated emitter rear contact (p-PERC) Cz Si solar cells. LeTID causes ~10% relative and permeant efficiency losses in these cells in warmer climate regions where the module temperature is > 50 °C. Unlike light-induced degradation (LID), which is also observed in p-PERC cells, LeTID is slower and takes weeks to months in the field to saturate. Another difference compared to LID is that regeneration in LeTID proceeds very slowly, and field regeneration could take > 25 years — essentially the life of the module. Unlike B-O defects that are responsible for LID, neither B nor O impurities are directly involved in LeTID. LeTID appears to be unique to p-type Si, and is also observed in Ga-doped Si. Currently, most experimental evidence relates LeTID to the injection of hydrogen present in the dielectric surface passivation layers, such as SiN x and Al 2 O 3 , into the monocrystalline Si (c-Si) bulk during the fast-firing step. The involvement of hydrogen is further strengthened by controlled studies that show that increasing the amount of hydrogen in the dielectric during fast-firing increases the degree of LeTID. Similar to LID, a regeneration process has been discovered for LeTID. Regeneration of LeTID defects occurs when samples are exposed to 2–4 Suns illumination at elevated temperatures of 140–220 °C for 2–15 hr. Given the slower kinetics of LeTID and sample regeneration compared to LID, this poses a challenge for the manufacturing and field reliability of p-PERC cells, which will be the leading photovoltaic technologies over the next decade. Therefore, there is a need to understand LeTID and develop strategies to mitigate this effect. The defect responsible for LeTID has been extensively studied with over 100 publications, but direct spectroscopic evidence of this defect’s structure is lacking. Without an atomistic understanding of the LeTID defect, it is difficult to assess the long-term efficacy of the current industrial mitigation strategies. This, in turn, has implications on energy production for tens of gigawatts of these cells that will be deployed yearly worldwide. Using electron paramagnetic resonance, we identified a defect associated with LeTID with a g-value of 2.006, which we attribute to an Si dangling bond in an extended defect such as a vacancy agglomerate with H possibly within or in close vicinity. These vacancy agglomerates are likely created during the firing process, during which time H atoms are also injected into the bulk from the hydrogenated SiN x dielectric layer. Our atomistic-level insight shows that the LeTID defect can be mitigated by targeted intrinsic defect engineering of the c-Si material through a slower pull rate of the Cz ingot or 1000 °C oxygen ambient processing of the Si wafer to reduce the vacancy concentration. This project was a collaborative effort between the Colorado School of Mines and the National Renewable Energy Laboratory.

14 SOLAR ENERGY↗

Optimizing Process Conditions during Catalytic Fast Pyrolysis of Pine with Pt/TiO 2 —Improving the Viability of a Multiple-Fixed-Bed Configuration

Catalytic fast pyrolysis (CFP) has been identified as a promising pathway for the production of renewable fuels and co-products. However, continued technology development is needed to increase process efficiency and reduce process costs. This report builds upon previous research in which a bifunctional metal–acid Pt/TiO 2 catalyst was utilized in a fixed-bed reactor operated with co-fed H 2 to improve product yield and reduce coke generation compared to conventional CFP methods. Here, we report further process optimization, in which we achieved similar CFP oil carbon efficiency (>35%) and CFP oil oxygen content (<20 wt %) to our previous report while reducing catalyst and equipment costs by increasing time-on-stream between regenerations by 40–95% and decreasing required regeneration time by more than a factor of 2. These process improvements were achieved by conducting parameter sweeps to determine optimum conditions for CFP and regeneration with key variables including pyrolysis temperature, catalytic upgrading temperature, hydrogen partial pressure, and regeneration oxygen concentration. Coupled with comprehensive oil analyses, these data provide foundational insight into the deoxygenation and coking chemistries for CFP under realistic process conditions while also advancing the technology through applied engineering.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Optimal management of electric hotel loads in mild hybrid heavy duty truck

Here, the problem of engine idling for heavy-duty trucks has been under study for decades with Auxiliary Power Units (APUs) and Truck Stop Electrification (TSE) as the most compelling solutions. With the electrification of trucks approaching feasibility in terms of cost-effective technology, hybridization offers another “degree of freedom” to tackle the problem. Here, this work aims at exploiting a battery pack of a 48 V mild-hybrid heavy-duty truck to store sufficient onboard energy for powering the auxiliary loads during the hoteling. This problem is not trivial, as the battery packs typically cannot recover the entire energy required through regeneration alone; hence an optimal energy management strategy needs to be employed to charge the battery through the engine during drive operation. This strategy optimizes powertrain performances among the four modes: (i) Engine of Coasting (EOC), (ii) Regeneration by braking, (iii) Regeneration by engine, and (iv) engine idling. This paper presents the development of a Dynamic Programming (DP) framework that employs a multi-objective cost function to minimize the fuel consumption and maximize the regeneration using the above-mentioned four modes. A typical heavy-duty truck drive cycle is used to represent the drive phase, with mandatory hoteling stops as per regulations. A comprehensive powertrain model is developed using validated components’ model. The DP employs two state variables: battery State-of-Charge (SOC) and engine mode, and three control inputs: (i) the engine ON–OFF state, (ii) clutch engagement state, and (iii) power request at the Electric Machine (EM) for calculating optimal SOC trajectory. The framework also tackles rapid engine ON–OFF scenarios to avoid the challenges associated with DP and the compromises in fuel cost with those approaches. Finally, the effectiveness of the proposed framework is tested for potential fuel savings on two different battery packs by performing the full cycle simulations. The results show 6.47% of fuel consumption reduction as compared to traditional APU-based heavy-duty truck.

33 ADVANCED PROPULSION SYSTEMS↗

Cyclic moisture reactivation of calcium sorbents for long duration thermochemical energy storage

The transition to a flexible and reliable energy infrastructure, using electro-thermal energy generation technologies such as geothermal, concentrated solar power, and nuclear, usually demands simultaneous advancement of thermal energy storage (TES) to support on-demand electricity generation and industrial applications while mitigating the inherent intermittency of renewable energy sources and power outages from direct energy generation. Among TES technologies, thermochemical energy storage (TCES) based on calcium looping emerges as a compelling high-power energy storage candidate due to its high reaction enthalpy, compatibility with elevated operating temperatures, and abundance of low-cost materials. However, the long-term durability of calcium-based sorbents for TCES is hindered by surface sintering and particle aggregation, leading to performance degradation over repeated thermal cycles. This study explores a moisture hydration-based strategy to regenerate a degraded calcium sorbent and mitigate performance degradation for long duration TCES. The addition of moisture transforms calcium oxide into calcium hydroxide and produces intercalation water layers, associated with a regenerated surface area and reduced calcium oxide crystallite size. Both these effects are beneficial in restoring the sorbents' reactivity for carbonization. Additionally, an optimized hydration-assisted reactivation protocol balances the recovered energy storage capacity with heating penalty required for moisture removal from hydrated samples, resulting in an enhanced energy storage capacity up to 176% compared to benchmark sorbents that undergo cycling without reactivation after 60 cycles. In conclusion, these results highlight the potential of hydration-assisted reactivation to enhance the long-term performance of TCES, providing an effective pathway to advancing electro-thermal storage technologies.

36 MATERIALS SCIENCE↗

Economic viability of using thermal energy storage for flexible carbon capture on natural gas power plants

Fossil fuel-based power plants generate 80% of the electricity in the United States and provide a reliable generation source for both base and peak power demands. These plants are expected to adapt to changes in environmental policies that will require carbon management with carbon capture and storage (CCS) representing a possible solution. Current solvent-based CCS has a detrimental impact on a power plant's performance due to large heat loads required for carbon capture solvent regeneration. This parasitic load restricts the power plant's output and operation flexibility. Therefore, this study evaluates the feasibility of using thermal storage technologies for natural gas combined cycle (NGCC) power plants coupled with CCS to minimize the impact of solvent regeneration and enable the plant to operate at peak power output. Thermal storage can minimize the impact of CCS on the power plant by providing the heat load required for solvent regeneration during times of peak demand which will allow the plant to operate unrestricted and at full power. In total, fifteen unique thermal storage configurations were evaluated from three thermal storage categories: Brayton cycle heat pump, vapor compression heat pump, and heat recovery steam generator steam extraction for storage. The viability of these systems was determined by evaluating each configuration on thousands of real-world Locational Marginal Pricing (LMP) profiles from the New York Independent System Operator and California Independent System Operator electricity markets using a techno-economic analysis. Afterwards, results were compared to the performance of a base power plant (NGCC with CCS and no thermal storage) to determine the impact of thermal storage on power plant economics. Overall, six of the thermal storage configurations performed better than base CCS enabled power plant on between 11.5% and 38.7% of the LMP signals evaluated. The best performing configuration was a vapor compression heat pump that used flue gas as the working fluid and had both hot and cold thermal storage units. This configuration performed better than the base CCS power plant on 38.7% of the LMP profiles. The results of this study show thermal storage can mitigate the economic impact of carbon capture solvent regeneration on NGCC power plants. Discussion focuses on the impact of electricity pricing on the optimal thermal storage system, the advantages and disadvantages of the systems evaluated, and identifies limitations with the study.

25 ENERGY STORAGE↗

Lab-scaled performance evaluation of novel water-lean solvents for post combustion CO 2 capture

Here, this work focuses on demonstrating the energetic performance and operational reliability in a continuous system of RTI's water-lean solvents for post-combustion CO 2 capture applications. RTI's Non-Aqueous Solvent, NAS-1A was subjected to 100 h of continuous, CO 2 capture and regeneration operation using a Lab-scale Gas Absorption System (LsGAS) while the CO 2 capture efficiency, mass balance, and total energy inputs were monitored. Throughout the test period, NAS-1A demonstrated stable operation with 90% CO 2 capture while requiring about 15% lower total energy input for solvent regeneration compared to 30 wt% monoethanolamine (MEA) solution. The use of a slipstream of CO 2 -rich solvent from the absorber sump reduced the regenerated CO 2 temperature before the gas was further cooled by the overhead condenser at the top of the desorber. The rich-split setup combined with a wash section may be an effective approach to remove water and solvent vapor from the regenerated CO 2 as well as to recover heat at the top of the desorber. NAS-1B was later developed and included a modifier component that lowers the heat of CO 2 absorption and reduces the vapor pressure of the amine component. The total energy inputs for 90% CO 2 capture with NAS-1B was found to be 25% less than that of the MEA. A gas chromatograph was used to monitor the amine concentration in the gas leaving the absorber wash section. It was found that under similar operating conditions, the presence of the modifier in NAS-1B reduces the amine in the absorber off-gas from 143 ppm in NAS-1A to 20 ppm.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Long noncoding RNA MEG3 expressed in human dental pulp regulates LPS-Induced inflammation and odontogenic differentiation in pulpitis

Highlights: • LncRNA MEG3, upregulated in inflamed dental pulp, is involved in the inflammation and regeneration in pulpitis. • The expression of lncRNA MEG3 was semiquantitatively detected in the pulp tissue by the innovative RNAscope® technique. • MEG3 downregulation can inhibit inflammatory cytokines secretion and also promote the odontogenic differentiation of hDPCs. • LncRNA MEG3 can be a potential therapeutic target in the inflammation and regeneration of dentin-pulp complex in pulpitis. Pulpitis refers to inflammation of the inner pulp by invading microbes, and tissue repair occurs due to odontogenic differentiation of human dental pulp cells (hDPCs) with multidifferentiation potential. Long noncoding RNAs (lncRNAs) can modulate numerous pathological and biological processes; however, the role of lncRNAs in the inflammation and regeneration of the dentin-pulp complex in pulpitis is unclear. Here, we performed high-throughput sequencing to identify differentially expressed lncRNAs between human normal and inflamed pulp and concluded that lncMEG3 (lncRNA maternally expressed gene 3, MEG3) was signicantly upregulated in both inflamed pulp and LPS-treated hDPCs. MEG3 expression in the pulp tissue was detected using the RNAscope® technique. RNA pulldown assays identified the MEG3-interacting proteins and the potential mechanisms. With MEG3 knockdown, we investigated the role of MEG3 in the secretion of inflammatory cytokines in LPS-treated hDPCs and odontogenic differentiation of hDPCs. MEG3 downregulation inhibited the secretion of TNF-α, IL-1β and IL-6 in LPS-treated hDPCs, and the p38/MAPK signaling pathway may be related to this effect. MEG3 knockdown promoted odontogenic differentiation of hDPCs by regulating the Wnt/β-catenin signaling pathway. Our study suggested that MEG3 has a negative effect on inflammation and regeneration of the dentin-pulp complex in pulpitis.

60 APPLIED LIFE SCIENCES↗