Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “progress report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

FY2020 Energy Efficient Mobility Systems Annual Progress Report

EEMS Program activities during FY 2020 focused on analytical research and large-scale modeling and simulation to understand the impacts that new mobility technologies and services will have at the vehicle-, traveler-, and overall transportation system-level. This research included the development of a multi-fidelity, end-to-end transportation system models and tools to evaluate the complex interactions among the various actors within the mobility landscape, analysis of empirical data to characterize which solutions may provide the largest benefits, and development of new control systems and algorithms that use vehicle connectivity and automation to improve the performance and efficiency of individual vehicles as well as the overall traffic system. This document presents a brief overview of the EEMS Program and documents progress and results from projects within each of the EEMS activity areas. The Computational Modeling and Simulation key activity area summarizes work within the sub-areas of (1) the SMART (Systems and Modeling for Accelerated Research in Transportation) Mobility Lab Consortium, (2) Artificial Intelligence, High-Performance Computing, and Data Analytics, and (3) Core Simulation and Evaluation Tools. Additionally, the program’s advanced R&D projects are summarized within (4) the Connectivity and Automation Technology key activity area. Each of the individual progress reports provide a project overview and highlights of the technical results.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Progress Report on Disassembly and Post-Irradiation Experiments for UCSB ATR-2 Experiment

The reactor pressure vessel (RPV) in a light-water reactor (LWR) represents the first line of defense against a release of radiation in case of an accident. Thus, regulations that govern the operation of commercial nuclear power plants require conservative margins of fracture toughness, both during normal operation and under accident scenarios. In the unirradiated condition, the RPV has sufficient fracture toughness such that failure is implausible under any postulated condition, including pressurized thermal shock (PTS) in pressurized water reactors (PWR). In the irradiated condition, however, the fracture toughness of the RPV may be severely degraded, with the degree of toughness loss dependent on the radiation sensitivity of the materials. As stated in previous progress reports, the available embrittlement predictive models, e.g. [1], and our present understanding of radiation damage are not fully quantitative, and do not treat all potentially significant variables and issues, particularly considering extension of operation to 80y.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.

54 ENVIRONMENTAL SCIENCES↗

Pulsed Thermal Tomography Nondestructive Examination of Additively Manufactured Reactor Materials and Components. Third Annual Progress Report

Additive manufacturing (AM) of high-strength corrosion resistance alloys for nuclear energy applications, such as stainless steel and Inconel, is currently based on laser powder bed fusion (LPBF) process. Some of the challenges with using LPBF method for nuclear manufacturing include the possibility of introducing pores into metallic structures. Probability of crack initiation at the pore depends on size, shape, and orientation of the defect. Pulsed Infrared Thermography Imaging (PIT) provides a capability for non-destructive evaluation (NDE) of sub-surface defects in arbitrary size structures. The PIT method is based on recording material surface temperature transients with infrared (IR) camera following thermal pulse delivered on material surface with flash light. The PIT method has advantages for NDE of actual AM structures because the method involves one-sided non-contact measurements and fast processing of large sample areas captured in one image. Following initial qualification of an AM component for deployment in a nuclear reactor, a PIT system can also be used for in-service nondestructive evaluation (NDE) applications. In this report, we describe recent progress in enhancing PIT capabilities in detecting microscopic subsurface defects in metals, and classifying shapes and orientation of pores in thermal images. For detection of microscopic defects in PIT imaging data, we have developed Spatial Temporal Denoised Thermal Source Separation (STDTSS) unsupervised machine learning (ML) image processing algorithm. We show that flat bottom hole (FBH) defects as small as 200µm in SS316 and IN718 specimens, can be detected with STDTSS algorithm. To the best of our knowledge, these are the smallest detected defects which are reported in literature. For classification of defects shapes, we have previously developed thermal tomography (TT) algorithm to obtain depth reconstructions of material defects from data cube of sequentially recorded surface temperatures. However, interpretation of TT images is non-trivial because of blurring with increasing depth. To address this challenge, we have developed a deep learning convolutional neural network (CNN) to classify size and orientation subsurface defects in simulated TT images.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress Report on Model Development for the Transport of Aerosol through Microchannels

This report summarizes the current progress in the development of a phenomenological model of aerosol transport, deposition, and plugging through microchannels. The purpose is to introduce a generic, reliable numerical model for the prediction of aerosol transport, deposition, and plugging in leak paths while accounting for potential plugging formation, to a user community involving researchers, regulators, and industry. In that regard, a Graphical User Interface (GUI) was generated by integrating the individual MATLAB scripts that make up the model and adding additional features to aid the general understanding of the problem to a user. This report focuses on the model development and features included. Further, predictions from the GUI are compared with experimental data for validation. The strength of the GUI is the ability of a user to plug in basic parameters such as the initial pressure conditions and canister model specifications in order to obtain a first principal approximation of vital information such as the blowdown pressure differential, aerosol penetration, and deposition as a function of time. The user can obtain this without the know-how of the underlying MATLAB scripts and thus enables the model to be readily applied by regulators, industry, and shareholders to reduce the uncertainty in the off-site radiological consequences. The report also lists future tasks under this work scope. This includes ongoing efforts to include additional crack geometries (divergent and divergent-convergent slots) to the model; GUI development and improvement based on feedback from users, and integration of aerosol source term data from Sibling Pin tests into the model as we approach realistic canister stress corrosion cracking–induced aerosol release scenarios.

54 ENVIRONMENTAL SCIENCES↗

Progress Report on SAM Reduced-Order Model Development for Thermal Stratification and Mixing during Reactor Transients

This report documents the initial progress on the reduced-order flow model developments in SAM for thermal stratification and mixing modeling. Two different modeling approaches are pursued. The first one is based on one-dimensional fluid equations with additional terms accounting for the thermal mixing from both flow circulations and turbulent mixing. The second approach is based on three-dimensional coarse-grid CFD approach, in which the full three-dimensional fluid conservation equations are modeled with closure models to account for the effects of turbulence.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dual-Purpose Canister Filling Demonstration Project Progress Report, Rev. 1

This report discusses the initial progress made at the Oak Ridge National Laboratory to support direct disposal of dual-purpose canisters (DPCs)using filler materials to demonstrate that the probability of criticality in DPCs during disposal to be below the probability for inclusion in a repository performance assessment. In the initial phase of a multi-phase effort that will result in a full-scale demonstration, a computational fluid dynamics (CFD) model was developed to gauge the filling process and to uncover any unforeseen issues. The initial filling simulations of the lower region (mouse holes) of a prototypic DPC show successful removal of the inner space voids and smooth,even progression of the liquid level. In the initial phase, flow through a pipe that is similar to the drain pipe in a DPC will be investigated separately to gain valuable insight of flow regime inside a pipe. The initial experimental setups for validating the computational filling model have been designed,and the various assembly parts are being procured. The experience gained from the initial experiments will be applied to the next steps toward a full-scale demonstration and to the validation of multiphysics filling simulation models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dual-Purpose Canister Filling Demonstration Project Progress Report

This report discusses the initial progress made at the Oak Ridge National Laboratory to support direct disposal of dual-purpose canisters (DPCs) using filler materials to demonstrate that the probability of criticality in DPCs during disposal to be below the probability for inclusion in a repository performance assessment. In the initial phase of a multi-phase effort that will result in a full-scale demonstration, a computational fluid dynamics (CFD) model was developed to gauge the filling process and to uncover any unforeseen issues. The initial filling simulations of the lower region (mouse holes) of a prototypic DPC show successful removal of the inner space voids and smooth, even progression of the liquid level. In the initial phase, flow through a pipe that is similar to the drain pipe in a DPC will be investigated separately to gain valuable insight of flow regime inside a pipe. The initial experimental setups for validating the computational filling model have been designed, and the various assembly parts are being procured. The experience gained from the initial experiments will be applied to the next steps toward a full-scale demonstration and to the validation of multiphysics filling simulation models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dual-Purpose Canister Filling Demonstration Project Progress Report

This report discusses the initial progress made at the Oak Ridge National Laboratory to support direct disposal of dual-purpose canisters (DPCs) using filler materials to demonstrate that the probability of criticality in DPCs during disposal to be below the probability for inclusion in a repository performance assessment. In the initial phase of a multi-phase effort that will result in a full-scale demonstration, a computational fluid dynamics (CFD) model was developed to gauge the filling process and to uncover any unforeseen issues. The initial filling simulations of the lower region (mouse holes) of a prototypic DPC show successful removal of the inner space voids and smooth, even progression of the liquid level. In the initial phase, flow through a pipe that is similar to the drain pipe in a DPC will be investigated separately to gain valuable insight of flow regime inside a pipe. The initial experimental setups for validating the computational filling model have been designed, and the various assembly parts are being procured. The experience gained from the initial experiments will be applied to the next steps toward a full-scale demonstration and to the validation of multiphysics filling simulation models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FY21 progress report for Advanced Re-fabrication/Re-instrumentation Capability Development

This report will focus on progress and development in establishment of refabrication/instrumentation capability at Idaho National Laboratory (INL). Refabrication/instrumentation is considered an enabling capability that allows access to fuel materials at any point in their life cycle. It is also critical in supporting deployment and qualification of ATF materials as many candidate materials are already undergoing irradiation as lead test rods (LTR) in commercial nuclear power plans (NPP) and irradiation in ATR alone can not produce the quantities of materials necessary to support qualification.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jul. 2018 through Dec. 2018

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2018. This report extends the data analysis through the end of 2018. The data period focus of this report is July 2018-December 2018. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2019 through Jun. 2019 [Slides]

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2018. This report extends the data analysis through June 2019. The data period focus of this report is January 2019-June 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Battery Electric Bus Progress Report (Jul-Dec 2019)

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through June 2019. This report extends the data analysis through December 2019. The data period focus of this report is July 2019–December 2019. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report. Data Period Focus: Jan. 2020 through June 2020

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2019. This report extends the data analysis through June 2020. The data period focus of this report is January 2020-June 2020. NREL plans to publish progress reports on the Foothill Transit fleet every 6 months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Foothill Transit Agency Battery Electric Bus Progress Report, Data Period Focus: Jan. 2017 through Dec. 2017

This report summarizes results of a battery electric bus (BEB) evaluation at Foothill Transit, located in the San Gabriel Valley area of Los Angeles. Foothill Transit is collaborating with the California Air Resources Board and the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The focus of this evaluation is to compare the performance and the operating costs of the BEBs to that of conventional technology buses and to track progress over time. Previous reports documented results from April 2014 through December 2016. This report extends the data analysis through December 2017. NREL plans to publish progress reports on the Foothill Transit fleet every six months through 2020.

33 ADVANCED PROPULSION SYSTEMS↗

Environmental ISR (Quarterly Progress Report Q3 FY19 April-June 2019)

Progress have been good on both projects. On the subsurface radionuclide project, graduate student, Emily Tran, submitted our first joint manuscript resulting from this collaboration to Water Resources. The manuscript covers batch and flow through experiments using radionuclides with and without bentonite colloids through a naturally fractured chalk rock. Solutions used were collected from a field site in Israel with high ionic strength and filtered prior to using in the experiment. Results show that the bentonite colloids are unstable under these high ionic strengths in carbonate rock in Israel. The U is not significantly eluted with or without bentonite colloids and cerium precipitates as a mobile colloid in the absence of colloids.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗