Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program ordering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Space Shuttle orbiter modifications to support Space Station Freedom

The Space Shuttle will be the primary vehicle to support the launch, assembly, and maintenance of the Space Station Freedom (SSF). In order to accommodate this function, the Space Shuttle orbiter will require significant modifications. These modifications are currently in development in the Space Shuttle Program. The requirements for the planned modifications to the Space Shuttle orbiter are dependent on the design of the SSF. Therefore, extensive coordination is required with the Space Station Freedom Program (SSFP) in order to identify requirements and resolve integration issues. This paper describes the modifications to the Space Shuttle orbiter required to support SSF assembly and operations.

Segert, Randall↗

Second-Order-Potential Analysis and Optimization

Optimum camber designed for supersonic and hypersonic vehicles. Second Order Potential Analysis and Optimization (SOPA) package set of computer programs used to predict aerodynamic characteristics and design optimum camber for both supersonic and hypersonic vehicles. Analysis program incorporates second-order-potential, small-disturbance theory for analysis of wing/body configurations. Optimization program uses analysis results to generate optimum camber, twist, or flap deflections by minimizing zero suction drag. SOPA written in FORTRAN V for batch execution.

Clever, W. C.↗

Experimental and analytical study of close-coupled ventral nozzles for ASTOVL aircraft

Flow in a generic ventral nozzle system was studied experimentally and analytically with a block version of the PARC3D computational fluid dynamics program (a full Navier-Stokes equation solver) in order to evaluate the program's ability to predict system performance and internal flow patterns. For the experimental work a one-third-size model tailpipe with a single large rectangular ventral nozzle mounted normal to the tailpipe axis was tested with unheated air at steady-state pressure ratios up to 4.0. The end of the tailpipe was closed to simulate a blocked exhaust nozzle. Measurements showed about 5 1/2 percent flow-turning loss, reasonable nozzle performance coefficients, and a significant aftward axial component of thrust due to flow turning loss, reasonable nozzle performance coefficients, and a significant aftward axial component of thrust due to flow turning more than 90 deg. Flow behavior into and through the ventral duct is discussed and illustrated with paint streak flow visualization photographs. For the analytical work the same ventral system configuration was modeled with two computational grids to evaluate the effect of grid density. Both grids gave good results. The finer-grid solution produced more detailed flow patterns and predicted performance parameters, such as thrust and discharge coefficient, within 1 percent of the measured values. PARC3D flow visualization images are shown for comparison with the paint streak photographs. Modeling and computational issues encountered in the analytical work are discussed.

Mcardle, Jack G.↗

Flow studies in close-coupled ventral nozzles for STOVL aircraft

Flow in a generic ventral nozzle system was studied experimentally and analytically with the PARC3D computational fluid dynamics program (a full Navier-Stokes equations solver) in order to evaluate the program's ability to predict system performance and internal flow patterns. A generic model of a tailpipe with a rectangular ventral nozzle, about one-third of full size, was tested with unheated air at steady-state pressure ratios up to 4.0. Measurements showed about 5.5 percent flow-turning loss and reasonable nozzle performance coefficients. The flow turned more than the designed 90 deg, causing an aftward axial component in the total thrust. Flow behavior into and through the ventral duct is discussed and illustrated with paint streak flow visualization photographs. PARC3D graphic images are shown for comparison with the experiment photographs. The program successfully predicted internal flow patterns; it also computed thrust and discharge coefficients within 1 percent of measured values.

Mcardle, Jack G.↗

Experimental and analytical study of close-coupled ventral nozzles for ASTOVL aircraft

Flow in a generic ventral nozzle system was studied experimentally and analytically with a block version of the PARC3D computational fluid dynamics program (a full Navier-Stokes equation solver) in order to evaluate the program's ability to predict system performance and internal flow patterns. Measurements showed about 5.5-percent flow-turning loss, reasonable nozzle performance coefficients, and a significant aftward axial component of thrust due to flow turning more than 90 deg. Flow behavior into and through the ventral duct is discussed and illustrated with paint streak flow visualization photographs. PARC3D flow visualization images are shown for comparison with the paint streak photographs. Modeling and computational issues encountered in the analytical work are discussed.

Mcardle, Jack G.↗

Introduction to the Abrupt Wing Stall (AWS) Program

The Abrupt Wing Stall (AWS) Program has addressed the problem of uncommanded, transonic lateral motions, such as wing drop, with experimental, computational, and simulation tools. Background to the establishment of the AWS program is given as well as program objectives. In order to understand the fundamental flow mechanisms that caused the undesirable motions for a pre-production version of the F/A-18E, steady and unsteady flow field details were gathered from dedicated transonic wind-tunnel testing and computational studies. The AWS program has also adapted a free-to-roll (FTR) wind-tunnel testing technique traditionally used for low-speed studies of lateral dynamic stability to the transonic flow regime. This FTR capability was demonstrated first in a proof-of -concept study and then applied to an assessment of four different aircraft configurations. Figures of merit for static testing and for FTR testing have been evaluated for two configurations that demonstrated wing drop susceptibility during full-scale flight conditions (the pre-production F/A-18E and the AV-8B at the extremes of its flight envelope) and two configurations that do not exhibit wing drop (the F/A-18C and the F-16C). Design insights have been obtained from aerodynamic computational studies of the four aircraft configurations and from computations quantifying the impact of the various geometric wing differences between the F/A-18C and the F/A-18E wings. Finally, the AWS program provides guidance for assessing, in the simulator, the impact of experimentally determined lateral activity on flight characteristics before going to flight.

Hall, Robert M.↗

Introduction to the Abrupt Wing Stall (AWS) Program

The Abrupt Wing Stall (AWS) Program has addressed the problem of uncommanded, transonic lateral motions, such as wing drop, with experimental, computational, and simulation tools. Background to the establishment of the AWS program is given as well as program objectives. In order to understand the fundamental flow mechanisms that caused the undesirable motions for a pre-production version of the F/A-18E, steady and unsteady flow field details were gathered from dedicated transonic wind-tunnel testing and computational studies. The AWS program has also adapted a free-to- roll (FTR) wind-tunnel testing technique traditionally used for low-speed studies of lateral dynamic stability to the transonic flow regime. This FTR capability was demonstrated first in a proof-of-concept study and then applied to an assessment of four different aircraft configurations. Figures of merit for static testing and for FTR testing have been evaluated for two configurations that demonstrated wing drop susceptibility during full-scale flight conditions (the pre-production F/A-l8E and the AV-8B at the extremes of its flight envelope) and two configurations that do not exhibit wing drop (the F/A-l8C and the F-l6C). Design insights have been obtained from aerodynamic computational studies of the four aircraft configurations and from computations quantifying the impact of the various geometric wing differences between the F/A-18C and the F/A-l8E wings. Finally, the AWS program provides guidance for assessing, in the simulator, the impact of experimentally determined lateral activity on flight characteristics before going to flight.

Hall, Robert M.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Development of a CRAY 1 version of the SINDA program

The SINDA thermal analyzer program was transferred from the UNIVAC 1110 computer to a CYBER And then to a CRAY 1. Significant changes to the code of the program were required in order to execute efficiently on the CYBER and CRAY. The program was tested on the CRAY using a thermal math model of the shuttle which was too large to run on either the UNIVAC or CYBER. An effort was then begun to further modify the code of SINDA in order to make effective use of the vector capabilities of the CRAY.

Juba, S. M.↗

Multi-Dimensional Spectral Difference Method for Unstructured Grids

A new, high-order, conservative, and efficient method for conservation laws on unstructured grids is developed. It combines the best features of structured and unstructured grid methods to attain computational efficiency and geometric flexibility; it utilizes the concept of discontinuous and high-order local representations to achieve conservation and high accuracy; and it is based on the finite-difference formulation for simplicity. Universal reconstructions are obtained by distributing unknowns in a geometrically similar manner for all unstructured cells. Placements of the unknown and flux points with various order of accuracy are given for the line, triangular and tetrahedral elements. The data structure of the new method permits an optimum use of cache memory, resulting in further computational efficiency on modern computers. A new pointer system is developed that reduces memory requirements and simplifies programming for any order of accuracy. Numerical solutions are presented and compared with the exact solutions for wave propagation problems in both two and three dimensions to demonstrate the capability of the method. Excellent agreement has been found. The method is simpler and more efficient than previous discontinuous Galerkin and spectral volume methods for unstructured grids.

Liu, Yen↗

Large-scale V/STOL testing

Several facets of large-scale testing of V/STOL aircraft configurations are discussed with particular emphasis on test experience in the Ames 40- by 80-foot wind tunnel. Examples of powered-lift test programs are presented in order to illustrate tradeoffs confronting the planner of V/STOL test programs. It is indicated that large-scale V/STOL wind-tunnel testing can sometimes compete with small-scale testing in the effort required (overall test time) and program costs because of the possibility of conducting a number of different tests with a single large-scale model where several small-scale models would be required. The benefits of both high- and full-scale Reynolds numbers, more detailed configuration simulation, and number and type of onboard measurements increase rapidly with scale. Planning must be more detailed at large scale in order to balance the trade-offs between the increased costs, as number of measurements and model configuration variables increase and the benefits of larger amounts of information coming out of one test.

Koenig, D. G.↗

Mars Exploration 2003 to 2013 - An Integrated Perspective: Time Sequencing the Missions

The science goals for the Mars exploration program, together with the HEDS precursor environmental and technology needs, serve as a solid starting point for re-planning the program in an orderly way. Most recently, the community has recognized the significance of subsurface sampling as a key component in "following the water". Accessing samples from hundreds and even thousands of meters beneath the surface is a challenge that will call for technology development and for one or more demonstration missions. Recent mission failures and concerns about the complexity of the previously planned MSR missions indicate that, before we are ready to undertake sample return and deep sampling, the Mars exploration program needs to include: 1) technology development missions; and 2) basic landing site assessment missions. These precursor missions should demonstrate the capability for reliable & accurate soft landing and in situ propellant production. The precursor missions will need to carry out close-up site observations, ground-penetrating radar mapping from orbit and conduct seismic surveys. Clearly the programs should be planned as a single, continuous exploration effort. A prudent minimum list of missions, including surface rovers with ranges of more than 10 km, can be derived from the numerous goals and requirements; they can be sequenced in an orderly way to ensure that time is available to feed forward the results of the precursor missions. One such sequence of missions is proposed for the decade beginning in 2003.

Briggs, G.↗

Large-scale V/STOL testing

Several facets of large-scale testing of V/STOL aircraft configurations are discussed with particular emphasis on test experience in the Ames 40- by 80-Foot Wind Tunnel. Examples of powered-lift test programs are presented in order to illustrate tradeoffs confronting the planner of V/STOL test programs. Large-scale V/STOL wind-tunnel testing can sometimes compete with small-scale testing in the effort required (overall test time) and program costs because of the possibility of conducting a number of different tests with a single large-scale model where several small-scale models would be required. The benefits of both high- or full-scale Reynolds numbers, more detailed configuration simulation, and number and type of onboard measurements are studied.

Koenig, D. G.↗

Mars Exploration 2003 to 2013: An Integrated Perspective

The science goals for the Mars exploration program, together with the HEDS precursor environmental and technology needs, have been carefully laid out over the last several years and serve as a solid starting point for re-planning the program in an orderly way. Most recently, the science and HEDS communities have recognized the significance of subsurface sampling as a key component in "following the water": 1) to achieve science goals related to the search for evidence of life and 2) to gain access to the most valuable resource -- water. Accessing samples from hundreds and even thousands of meters beneath the surface is a challenge that will call for technology development and for one or more demonstration missions. Recent mission failures and concerns about the complexity of the previously planned MSR missions indicate that, before we are ready to undertake sample return and deep sampling, the Mars exploration program needs to include 1) technology development missions and 2) basic landing site assessment missions. These precursor missions should demonstrate the capability for reliable & accurate soft landing and in situ propellant production. The precursor missions will need to carry out close-up site observations, ground-penetrating radar mapping from orbit and conduct seismic surveys. The needs of the science and HEDS program requirements have much in common and clearly the programs should be planned as a single, continuous exploration effort. (We note that, although we are not yet ready to carry out sample return missions, we already have the capability to make impressive gains in in situ exploration by deploying full-scale rovers with mobility upward of ten kilometers.) A prudent minimum list of missions can be derived from the numerous goals and requirements; they can be sequenced in an orderly way to ensure that time is available to feed forward the results of the precursor missions.

Briggs, G.↗

The Evolution of the NASA Commercial Crew Program Mission Assurance Process

In 2010, the National Aeronautics and Space Administration (NASA) established the Commercial Crew Program (CCP) in order to provide human access to the International Space Station and low Earth orbit via the commercial (non-governmental) sector. A particular challenge to NASA has been how to determine that the Commercial Provider's transportation system complies with programmatic safety requirements. The process used in this determination is the Safety Technical Review Board which reviews and approves provider submitted hazard reports. One significant product of the review is a set of hazard control verifications. In past NASA programs, 100% of these safety critical verifications were typically confirmed by NASA. The traditional Safety and Mission Assurance (S&MA) model does not support the nature of the CCP. To that end, NASA S&MA is implementing a Risk Based Assurance process to determine which hazard control verifications require NASA authentication. Additionally, a Shared Assurance Model is also being developed to efficiently use the available resources to execute the verifications.

Mission Assurance↗

MUADEE: Mars Upper Atmosphere Dynamics, Energetics, and Evolution discovery mission. Executive summary volume

This document is the final report of the MAUDEE (Mars Upper Atmosphere Dynamics, Energetics, and Evolution) consortium. It describes a low cost Discovery mission to investigate the upper atmosphere of Mars and to understand the manner in which Mars has evolved over geologic time. In keeping with the innovative philosophy permeating the Discovery Program and in order to minimize the burden of reading an extensive prose exposition, a new presentation format has been adopted. The format involves a series of view graphs with facing text. The view graphs form the basis of a complete oral presentation of the MAUDEE mission and the facing text provides more detailed, but still brief, explanatory descriptions. Readers can scan the view graphs and/or read the facing text at their discretion. The oral presentation of this study was given to code SL personnel at NASA Headquarters on February 23, 1994. MAUDEE is an essential component of the Mars Exploration Program. It provides the information required to understand the evolution of the planet via the escape of volatiles. It provides the key measurements needed to understand the upper atmosphere of the last of the three terrestrial planets to be so studied. It connects and supplements investigations based on other Mars missions: Mars Surveyor, Planet-B and Mars-96. The MAUDEE mission plan involves a combination of remote and in-situ sensors, housed in three instrument packages. The sensors make measurements of the atmospheric regions between 60-200 km. These instruments are based on extensive heritage from Earth explorers and Pioneer Venus. The mission scenario has several phases and employs aerobraking maneuvers to lower initial apoapsis, thereby reducing fuel requirements. The spacecraft has body-mounted solar cells, enabling deep diving into the Martian atmosphere. The orbital inclination allows for pole-to-pole latitudinal sweeps in an initial elliptical phase, followed by a circular phase affording detailed diurnal measurements. The nominal mission duration at Mars is one Mars year.

Killeen, Timothy L.↗