NASA NTRS2006
Following the loss of the first X-43 during launch, the mishap investigation board indicated the Fin Actuator System (FAS) needed to have a larger torque margin. To supply this added torque, a second actuator was added. The consequences of what seemed to be a simple modification would trouble the X-43 program. Because of the second actuator, a new computer board was required. This proved to be subject to electronic noise. This resulted in the actuator latch up in ground tests of the FAS for the second launch. Such a latch up would cause the Pegasus booster to fail, as the FAS was a single string system. The problem was corrected and the second flight was successful. The same modifications were added to the FAS for flight three. When the FAS underwent ground tests, it also latched up. The failure indicated that each computer board had a different tolerance to electronic noise. The problem with the FAS was corrected. Subsequently, another failure occurred, raising questions about the design, and the probability of failure for the X-43 Mach 10 flight. This was not simply a technical issue, but illuminated the difficulties facing both managers and engineers in assessing risk, design requirements, and probabilities in cutting edge aerospace projects.