Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pra”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Extension of the ADAPT Framework for Multiple Simulators

Probabilistic Risk Assessment (PRA) uses fault tree/event tree analysis to evaluate the environmental impacts of nuclear power plants due to internal or external initiating events. In a fault tree, basic failure events are assembled using primarily And/Or logic to determine the combinations of failures that lead to failure of the system as a whole. An event tree is forward-facing, and begins with a single initiating event. From there the analysis considers what event may occur next, and branches out among the possible configurations of occurrence and non-occurrence of that event. This branching continues until end states are reached. End states may include a safe and stable configuration of the plant, or any number of differing failure states. Both fault and event trees require basic event probabilities as inputs to provide insight on the likelihood of different outcomes. PRA has been applied to nuclear power plants as an analysis tool since the 1975 Reactor Safety Study. In a traditional PRA, the order of events is prescribed by the analyst and each event is typically a binary aleatory uncertainty: occurrence or non-occurrence. Discrete dynamic event tree (DDET) analysis eliminates this subjectivity in ordering of events by using the output of a dynamic system model (simulator) to inform the branching. Branching conditions are triggered by the existence of a relevant plant state in the code, and therefore only occur as physically appropriate. The DDET approach also allows consideration of both epistemic and aleatory uncertainties on a phenomenologically and stochastically consistent platform. One limitation of the DDET driver codes developed to date (namely ADAPT, ADS, and MCDET ) is that the tree is driven by a single simulator. The goal of this work is a general multi-simulator driver. This limits the parameter space that may be explored in a single DDET to that which may be covered by a single simulator. In this work, the Analysis of Dynamic Accident Progression Trees (ADAPT) code is extended to support multiple arbitrary simulators. This capability will increase the depth and breadth of phenomena that may be analyzed in a single DDET. For example, a large-scale system code may pass the analysis to a more detailed code if certain conditions are met, in order to capture relevant phenomena that would be lost if only the system code were to be used. In addition, the time required to cover a given uncertainty space may be reduced by dynamically identifying and running only the situations that are appropriate given the plant conditions in each simulator. The use of multiple simulators is expected to further reduce subjectivity in PRA by enabling high fidelity modeling of reality. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Determination of a Generic Human Error Probability Distribution, Part 1: A Dynamic Formulation of SPAR-H

In almost all major nuclear power plants (NPP) events include a significant human error component. As an example, in Fukushima Daiichi (2011) nuclear meltdown, the human actions related to the high-pressure injection cooling strongly affected accident evolution. Furthermore, in the Three Mile Island accident (1979) (which was initiated by a stuck open valve and thus was triggered a loss of coolant accident) the unit operators made decisions based upon false assumptions that contributed negatively to the accident. Given these premises, the ability to accurately model human interactions with plant evolution and, in particular, dynamically calculate human error probability (HEP) plays a major role in a probabilistic risk analysis (PRA). Human reliability analysis (HRA) identifies and models the causes of human errors, and quantifies HEP by applying different methodologies. HRA methods identify errors and reflect on the understanding of error-prone people and systems. There are a number of HRA methods available that assist in identifying the vulnerabilities in the system and provide guidance in determining the HEP. HEP is the probability of a human failure event (HFE), and quantification of HEPs under various situations is utilized in PRA of large complex systems. One of the more prominent HRA methods is the Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) method that was developed to estimate HEPs for the use in the Standardized Plant Analysis Risk (SPAR) PRA models employed in U.S. NPPs. SPAR-H is implemented in U.S. NPPs by regulators at the U.S. Nuclear Regulatory Commission (NRC) to determine the HEP based on expert estimation through the use of calculation worksheets. In SPAR-H, the nominal HEPs (NHEPs) are multiplied by performance shaping factors (PSF) multiplier values to obtain the overall error probability. PSFs encompass the human components, individual characteristics, their environment, and aspects of the task. With PSFs, the goal is to capture all factors that can affect human performance. In SPAR-H there are eight PSFs used, each having respective levels corresponding to multipliers: Available Time, Stress/Stressors, Complexity, Experience/Training, Procedures, Ergonomics/Human Machine Interface, Fitness for Duty, and Work Processes. The PSF multipliers indicate enhanced, nominal, or degraded human performance. The SPAR-H method estimates the HEP through multiplying a NHEP with PSFs. Hence, SPAR-H is a traditional HRA method that assesses human performance at a fixed, or static, point in time. In a dynamic HRA framework, human performance is assessed on a continuous time basis. SPAR-H can be used within a dynamic PRA framework through the use of simulation and stochastic models. The goal of dynamic HRA is to build a more realistic model of the human-system interaction to enhance calculation of reliability, risk and safety analysis. The progression of events in dynamic SPAR-H considers that some PSFs may experience gradual change, while other change can be sudden due to individualistic differences or rapid plant status changes. The PSF changes are caused by contextual changes in the scenario. For example, as more time passes, the realization that a task should be completed sooner may cause the operator more stress. In another example, a sudden relay of information about sickness of a family member may alter the operator's general stress level and fitness for duty. Each PSF has a different dynamic nature; PSFs like stress and complexity change more quickly over the course of a task than experience and training. While the experience of an operator changes over the course of attaining the objective, the amount that this added experience changes the HEP is very minimal. In contrast, the stress, complexity, and procedures PSFs may change quite a bit over the course of task completion.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk-Informed Safety Margin Characterization Methods Development Work

This report summarizes the research activity developed during the Fiscal year 2014 within the Risk Informed Safety Margin and Characterization (RISMC) pathway within the Light Water Reactor Sustainability (LWRS) campaign. This research activity is complementary to the one presented in the INL/EXT-??? report which shows advances Probabilistic Risk Assessment Analysis using RAVEN and RELAP-7 in conjunction to novel flooding simulation tools. Here we present several analyses that prove the values of the RISMC approach in order to assess risk associated to nuclear power plants (NPPs). We focus on simulation based PRA which, in contrast to classical PRA, heavily employs system simulator codes. Firstly we compare, these two types of analyses, classical and RISMC, for a Boiling water reactor (BWR) station black out (SBO) initiating event. Secondly we present an extended BWR SBO analysis using RAVEN and RELAP-5 which address the comments and suggestions received about he original analysis presented in INL/EXT-???. This time we focus more on the stochastic analysis such probability of core damage and on the determination of the most risk-relevant factors. We also show some preliminary results regarding the comparison between RELAP5-3D and the new code RELAP-7 for a simplified Pressurized Water Reactors system. Lastly we present some conceptual ideas regarding the possibility to extended the RISMC capabilities from an off-line tool (i.e., as PRA analysis tool) to an online-tool. In this new configuration, RISMC capabilities can be used to assist and inform reactor operator during real accident scenarios.

97 MATHEMATICS AND COMPUTING↗

Dynamic event tree analysis with the SAS4A/SASSYS-1 safety analysis code

The consequences of a transient in an advanced sodium-cooled fast reactor are difficult to capture with the traditional approach to probabilistic risk assessment (PRA). Numerous safety-relevant systems are passive and may have operational states that cannot be represented by binary success or failure. In addition, the specific order and timing of events may be crucial which necessitates the use of dynamic PRA tools such as ADAPT. The modifications to the SAS4A/SASSYS-1 sodium-cooled fast reactor safety analysis code for linking it to ADAPT to perform a dynamic PRA are described. A test case is used to demonstrate the linking process and to illustrate the type of insights that may be gained with this process. Finally, newly-developed dynamic importance measures are used to assess the significance of reactor parameters/constituents on calculated consequences of initiating events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Expectation vs. Reality: The Sunrise Problem Applied to Probabilistic Risk Assessment

The Sunrise Problem is succinctly stated as a question: “what is the probability that the sun will rise tomorrow?” Attempts to answer this seemingly simple question reveal unexpected incongruities between statistical/probabilistic estimates and “real-world” expectations. Rather than being a purely philosophical problem, similar incongruities can be found in reliability and probabilistic risk assessment (PRA) analyses. These differences between statistical predictions and demonstrated reliability can result in analysis shortcomings that should be addressed and resolved. This presentation will begin by discussing the nature of the Sunrise Problem and how it applies to PRA and reliability. Examples of the Sunrise Problem in a PRA estimate will also be included, along with tips to identify and resolve the shortcomings that result from these anomalous situations.

Sunrise Problem↗

WHEN MODEL MEETS REALITY – A REVIEW OF SPAR LEVEL 2 MODEL AGAINST FUKUSHIMA ACCIDENT

The Standardized Plant Analysis Risk (SPAR) models are a set of probabilistic risk assessment (PRA) models used by the Nuclear Regulatory Commission (NRC) to evaluate the risk of operations at U.S. nuclear power plants and provide inputs to risk informed regulatory process. A small number of SPAR Level 2 models have been developed mostly for feasibility study purpose. They extend the Level 1 models to include containment systems, group plant damage states, and model containment phenomenology and accident progression in containment event trees. A severe earthquake and tsunami hit the eastern coast of Japan in March 2011 and caused significant damages on the reactors in Fukushima Daiichi site. Station blackout (SBO), core damage, containment damage, hydrogen explosion, and intensive radioactivity release, which have been previous analyzed and assumed as postulated accident progression in PRA models, now occurred with various degrees in the multi-units Fukushima Daiichi site. This paper reviews and compares a typical BWR SPAR Level 2 model with the “real” accident progressions and sequences occurred in Fukushima Daiichi Units 1, 2, and 3. It shows that the SPAR Level 2 model is a robust PRA model that could very reasonably describe the accident progression for a real and complicated nuclear accident in the world. On the other hand, the comparison shows that the SPAR model could be enhanced by incorporating some accident characteristics for better representation of severe accident progression.

42 ENGINEERING↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High-Temperature Electrolysis Hydrogen Production Plant

This paper presents recent updates on the Level 1 Probabilistic Risk Assessment (PRA) of Light Water Reactors (LWRs) coupled with a hydrogen production plant. It provides the overview of past results on the PRA for Pressurized Water Reactors (PWRs) and Boiling Water Reactors (BWRs) coupled to a 1150 MW High Temperature Electrolysis Facility (HTEF), as well as the latest research results for a smaller 100 MW HTEF facility. Differences between the two HTEF designs are listed. Key differences include the amount and quality of diverted LWR steam, complexity of the Heat Extraction System (HES), and the electrical power source for the HTEF plant. A Failure Mode and Effect Analysis (FMEA) was conducted for the new HTEF design, and the LWR PRA models were modified in the SAPHIRE risk assessment tool to account for the newly identified risk contributors. These include the steam loss event at the HES system, the electrical overcurrent event at the HTEF facility and at the transmission line from the LWR plant, and the hydrogen detonation event at the HTEF facility. The coupling of LWRs with a 100 MW HTEF increases the frequency of several initiating events. For the reference PWR, the largest frequency increase is for the steam line break event at 5.5%. While for the reference BWR, the largest frequency increase is for the switchyard-related Loss of Offsite Power (LOOP) event at 0.11%. The overall plant risk increases by 6.56% and 0.03% for PWR and BWR reference plants respectively. It is found that these risk metrics satisfy the safety criteria of both 10 CFR 50.59 and Regulatory Guide 1.174 licensing pathways.

08 HYDROGEN↗

Dose Consequence and Probabilistic Risk Assessment Integration into Digital Documented Safety Analysis

This is an intern poster presentation. The current reactor authorization process is complex and error prone. The development of a digital Documented Safety Analysis has been proposed to provide an automated and integrated solution to enhance the design and authorization process. The digital DSA will consist of interlinked models, analyses, and reports, all of which will be updated using automated workflows when design changes are made. This poster examines the integration of the probabilistic risk assessment (PRA) with the transient and dose consequence analyses. A PRA for a generic high temperature gas-cooled reactor (HTGR) has been constructed which will drive the input parameters for a transient analysis model currently being constructed. Dose consequence will be determined using the results of the transient analysis and the Radiation Safety Analysis Computer (RSAC) code. Dose consequence data will then be input back into the PRA to drive design parameters.

42 ENGINEERING↗

Validating a Dynamic PWR Safety and Security Model?

Nuclear power plants (NPPs) are assessed for safety and security using separate models that cannot capture how an attacker's decisions and a plant's response unfold together in real time, leaving regulators and operators without a complete picture of true plant vulnerability. Traditional probabilistic risk assessment (PRA) methods treat adversarial events as fixed initiators with predetermined outcomes, and are structurally incapable of representing the time-dependent interplay between physical security events, safety system response, and operator mitigative actions. At Idaho National Laboratory (INL), I contributed to the development and validation of Modeling and Analysis for Safety and Security using the Dynamic EMRALD Framework (MASS-DEF). Where static PRA relies on event-tree logic that cannot evolve mid-scenario, MASS-DEF couples a time-dependent dynamic PRA tool EMRALD (Event Modeling Risk Assessment using Linked Diagrams) with attack simulation software, allowing attacker behavior, plant system states, and operator actions to interact across time. My work focused on validating a general Pressurized Water Reactor (PWR) model. I traced model logic against PWR plant to identified errors in logic and confirm accuracy. I then built and tested attack scenarios against a general PWR model to verify that the model produced expected outcomes across all logical pathways. I also contributed a section to a related technical paper applying the same EMRALD platform to radiation dose modeling. Results show that MASS-DEF can quantitatively demonstrate that many plants exceed their regulatory security thresholds. This demonstrated margin provides a technically defensible basis for reducing the number of guards without compromising regulatory compliance. Physical security costs represent roughly 10% of annual operating budgets, making such reductions directly meaningful to INL's mission of sustaining existing commercial NPPs. This internship strengthened my understanding of nuclear systems, probabilistic modeling, and technical writing, and has solidified my pursuit of a career at a national laboratory.

98 - NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL↗

A computational risk assessment approach to the integration of seismic and flooding hazards with internal hazards

Probabilistic risk assessment (PRA) of nuclear power plants historically focuses on internal events at the plant, rather than external hazards. Although the importance of external hazards risk analysis is now well recognized, the methods for assessing the risk associated with low probability external hazards rely heavily on subjective judgment of specialists, often using conservative elements in the analysis, as is the case with the Conservative Deterministic Failure Margin approach commonly used for seismic PRA. The U.S. Department of Energy Light Water Reactor Sustainability program has been investigating the use of first principles analyses to provide a more realistic assessment of the risk of external hazards, in a process called computational risk assessment (CRA). Efforts undertaken are described in the development of CRA methods to integrate the risk associated with seismic and flooding events into traditional PRA. Further, the results of four case studies are presented.

99 GENERAL AND MISCELLANEOUS↗

Identifying human failure events (HFEs) for external hazard probabilistic risk assessment

In recent years, several advancements in nuclear power plant (NPP) probabilistic risk assessment (PRA) have been driven by increased understanding of external hazards, plant response, and uncertainties. However, major sources of uncertainty associated with external hazard PRA remain. One important source is how risk-significant human actions that are carried out to enable plant response and recovery from natural hazards cause the close coupling of physical impacts on plants and overall plant risk during these hazard events. This makes human reliability and human-plant interactions important elements to consider in resolving PRA gaps in external hazards. One of the challenges in considering human response in external hazard probabilistic risk assessment (XHPRA) is that most existing human reliability analysis (HRA) models were not developed for assessing actions outside the control room (termed ex-control room actions) and hazard response. To support this new scope, HRA models will need to be developed or modified to support identification of human activities, causal factors, and uncertainties inherent in external hazard response, thereby providing insights regarding event timing and physical event conditions as they relate to human performance. In this study, there are two main objectives: (1) evaluate the applicability of an existing cognitive-based HRA method, Phoenix, to ex-control room actions, and (2) identify sources of uncertainty to be characterized or reduced in order to make this method suitable for XHPRA. The first step of such work is performed by assessing the suitability of existing HRA methods to support identifying human failure events (HFEs) for human response to flooding hazards. These HFEs are human actions or inactions that are involved in human responses to flooding hazards and could contribute to the loss of a critical function for the plant in the scenario being examined. Here, in this work, decomposition analyses using the cognitive-based Phoenix HRA model are used to identify HFEs. The Phoenix method was found to be suitable for analyzing ex-control room actions as well as identifying specific HFEs and underlying crew failure modes (CFMs). However, the method's suitability for use in ex-control room actions would benefit from expanding the available CFMs to accommodate a larger variety of physical and communication tasks.

42 ENGINEERING↗

Event-modeled Risk Assessment Using Linked Diagrams

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at INL for researching the capabilities of dynamic PRA (Probabilistic Risk Assessment). In order to promote the effective use of dynamic PRA by the general community, EMRALD focuses on the following key aspects: Simplifying the modeling process by providing a structure that corresponds to traditional PRA modeling methods Providing a user interface (UI) that makes it easy for the user to model and visualize complex interactions Allowing the user to couple with other analysis applications such as physics based simulations. This includes one-way communication for most applications and two-way loose coupling for customizable applications Providing the sequence and timing of events that lead to the specified outcomes when calculating results Traditional aspects of components with basic events, fault trees, and event trees are all captured in a dynamic framework of state diagrams, which are displayed.

Prescott, SteveR↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗

A Research Roadmap for Computation-Based Human Reliability Analysis

The United States (U.S.) Department of Energy (DOE) is sponsoring research through the Light Water Reactor Sustainability (LWRS) program to extend the life of the currently operating fleet of commercial nuclear power plants. The Risk Informed Safety Margin Characterization (RISMC) research pathway within LWRS looks at ways to maintain and improve the safety margins of these plants. The RISMC pathway includes significant developments in the area of thermalhydraulics code modeling and the development of tools to facilitate dynamic probabilistic risk assessment (PRA). PRA is primarily concerned with the risk of hardware systems at the plant; yet, hardware reliability is often secondary in overall risk significance to human errors that can trigger or compound undesirable events at the plant. This report highlights ongoing efforts to develop a computation-based approach to human reliability analysis (HRA). This computation-based approach differs from existing static and dynamic HRA approaches in that it: (i) interfaces with a dynamic computation engine that includes a full scope plant model, and (ii) interfaces with a PRA software toolset. The computation-based HRA approach presented in this report is called the Human Unimodels for Nuclear Technology to Enhance Reliability (HUNTER) and incorporates in a hybrid fashion elements of existing HRA methods to interface with new computational tools developed under the RISMC pathway. The goal of this research effort is to model human performance more accurately than existing approaches, thereby minimizing modeling uncertainty found in current plant risk models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human reliability analysis for NMSS P-406

The PRA Technology Training Program was established in 1982 to formulate a curriculum for training NRC staff members in the use of Probabilistic Risk Assessment (PRA) techniques. Use of these techniques enables the employee to evaluate risks associated with various safety issues, and to apply the results in the process of regulating and inspecting nuclear systems. The training materials are periodically reviewed and revised to incorporate the latest information available, and as needs change, new courses and workshops are added to the curriculum. Course instructors are PRA experts employed in private industry and at the national laboratories.

99 GENERAL AND MISCELLANEOUS↗

Experimental Breeder Reactor II (EBR-II) Level 1 Probabilistic Risk Assessment

The National Academy of Sciences Study of the USDOE Category A Reactors recommended that a Probabilistic Risk Assessment (PRA) should be performed on the EBR-11 Reactor. In January 1989, a Level 1 PRA was initiated. This report documents work performed in completing the Level 1 PRA except for seismic analysis; it describes the methodology used, assumptions made, the analysis performed, and the final results. The seismic risk assessment is in progress. It will be separately documented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of an Integrated Mechanistic Source Term Assessment Capability for Lead- and Sodium-Cooled Fast Reactors

The scope of this project entails development of mechanistic source term assessment capabilities to inform and guide plant design activities and to support license applications. The main objective of this project is to couple NL’s SAS4A safety analysis code with the FAI’s FATE facility modeling code for mechanistic source term assessments in liquid-metal-cooled fast reactors. The end product is a coupled SAS4A-FATE code system for integrated mechanistic source term assessments and Level-2 PRA as the precursor for off-site dispersion analyses (Level-3 PRA). The SAS4A code is used to model system transients with fuel failures and its results are linked to the FATE code to predict radionuclide transport through the reactor vessel cover gas and containment system. The integrated code package offers a state-of-the-art radionuclide tracking capability for a spectrum of accident scenarios consistent with the plant dynamic response including the reactivity feedback to support Probabilistic Risk Assessments (PRA).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methods for the Enhancement of Security Probabilistic Risk Assessments

The US Department of Energy is exploring the methods associated with probabilistic risk assessment (PRA) and how they could be used to enhance physical security evaluations for nuclear facilities. A brief review of both international and US Nuclear Regulatory Commission physical security assessment methods is presented. From this review, and with an understanding of the technical elements associated with a traditional nuclear safety PRA, several observations are made pertaining to where physical security analysis methods could be enhanced. These observations principally support and enhance the answers within a physical security context to the risk triplet: (1) What can go wrong? (2) What is the likelihood? and (3) What are the consequences? Finally, benefits and technical challenges toward the development of a full security PRA are presented.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗