Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power systems planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Intelligent Partitioning based Fully Parallel AC Security-Constrained Optimal Power Flow

Today’s power grid is becoming more diverse and integrated with high-level distributed energy resources and smart control technologies that is creating a new set of grid management challenges in terms of large-scale, nonlinear, and non-convex problem modeling, complex and time-consuming computation, as well as difficult uncertainty handling. This project focused on solving a challenging multi-period security-constrained generation scheduling problem, which is of great importance for maximizing the social welfare of real-time dispatch, day-ahead market, as well as weekly planning of power systems. Our developed software explored parallel optimization algorithms for complex and realistic power system models, and develop fast, efficient, and robust grid optimization solutions on the high-performance computing platform that will enable increased grid economics, flexibility, resilience, as well as energy security in the United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space power system design and development from an economic point of view

The concept of a satellite solar power system offers a feasible, but unproven, long-range energy alternative. While the basic physics of these systems is understood, many developments are necessary in order to reduce the system cost to the point of being cost-competitive with alternative energy sources. Thus, a substantial technology advancement and verification program, plus test and demonstration satellite programs are necessary before a full-scale satellite can be designed and built. It is important to properly identify those elements of the technology that should be subject to development efforts, the goals of the corresponding development programs and the appropriate funding levels and schedules. Systems studies and designs play a major role in rationally formulating a development program. This paper uses an economic approach to place these studies into a framework for formulating a viable satellite solar power system development plan.

Hazelrigg, G. A., Jr.↗

Satellite power system (SPS) concept definition study. Volume 3: Experimental verification definition

An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.

Hanley, G. M.↗

Definition of an arcjet propulsion sub-system

An engineering flight demonstration of a 100 kW3 Space Reactor Power System is planned for the mid to late 1990s. An arcjet based propulsion subsystem will be included on the flight demonstraction as a secondary experiment. Two studies, sponsored by the Kay Technologies Directorate of the SDI Organization and managed by the Jet Propulsion Laboratory are currently under way to define that propulsion subsystem. The principal tasks of those contracts and the plans for two later phases, an experimental verification of the concept and a flight qualification/delivery of a flight unit, are described.

Price, Theodore W.↗

A Generic Advanced Computing Framework for Executing Windows-based Dynamic Contingency Analysis Tool in Parallel on Cluster Machines

Dynamic contingency analysis tool (DCAT) has been developed to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. By including more customized protection models and corrective actions into the Windows-based commercial tools, DCAT can help operators understand the cascading behavior and find mitigation approaches to reduce the risk of cascading outages in a more realistic manner. In order to further enhance the capability of DCAT, this paper presents a design of an advanced computing framework that enables DCAT to run on a cluster machine to improve its computational performance. This framework is generic and can be applied to other Windows-based simulation tools to fill the technical gap of applying advanced computing technology to vendors' Windows-based tools. The preliminary tests using medium to large power systems have shown the effectiveness of this framework and its potential for accelerating the adoption of advanced computing in utilities.

Advanced computing, dynamic contingency analysis, ↗

Solar power satellite system definition study

A synopsis of the study plan for the solar power satellite system is presented. Descriptions of early task progress is reported for the following areas: (1) laser annealing, (2) solid state power amplifiers, (3) rectenna option, (4) construction of an independent electric orbit transfer vehicle, and (5) construction of a 2.5 GW solar power satellite.

Source record↗

New Resource Adequacy Criteria for the Energy Transition: Modernizing Reliability Requirements

The transition toward a cleaner and more weather-dependent power system brings with it unprecedented challenges and opportunities for maintaining resource adequacy—namely, a future that includes rapid load growth, plant retirements, and a shift toward variable and energy-limited resources. Resource adequacy analyses, capacity accreditation, and the resource adequacy planning criteria are becoming increasingly important for power system planning and investment decisions. While previous ESIG reports evaluated the changing resource adequacy risks and planning practices created by the energy transition, none specifically examined potential changes to the resource adequacy criterion used for planning. The resource adequacy criterion sets the level of supply- and demand-side resources that are required for a given power system to meet reliability objectives. It is a pivotal standard that influences billions of dollars of investment decisions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Quantifying Solar PV Variability at Multiple Timescales for Power Systems Studies: Preprint

Increasing penetration of solar photovoltaics (PV) has concerned power system operators about their ability to balance load and generation over multiple timescales and maintain acceptable frequency profile because of the variability and uncertainty associated with solar PV. This paper focuses on developing metrics to quantify solar PV variability at multiple temporal scales ranging from seconds to an hour to help power system operators and planners better understand and account for solar PV variability under high solar PV penetration. Fourier coefficients of solar irradiation spectrum and average size of solar irradiation ramps over a day are the two metrics that are used to quantity the variability. It is shown that by using the two metrics the days with highest and lowest solar irradiation variability can be identified, which is useful information for operations planning or long-term power system planning studies. The key findings of the paper are (i) single sensor-based variability quantification can significantly exaggerate the variability of a solar PV plant, particularly at seconds to 1-min temporal resolution, (ii) at 1-minute or lower temporal resolutions, single sensor-based variability quantification of an entire plant can be fairly accurate, with the accuracy increasing as the temporal resolution reduces from 1-minute to 1-hour, (iii) at each 1-minute and lower temporal resolutions, maximum solar irradiation ramps appear to be independent of the geographical location of the sensor, and (iv) significant reduction in solar PV plant variability over a region with multiple plants is possible at all temporal scales, but more high quality, high temporal resolution data is needed to quantify the reduction with high confidence.

photovoltaics↗

From zonal to nodal capacity expansion planning: Spatial aggregation impacts on a realistic test-case

Solving power system capacity expansion planning (CEP) problems at realistic spatial resolutions is computationally challenging. Thus, a common practice is to solve CEP over zonal models with low spatial resolution rather than over full-scale nodal power networks. Due to improvements in solving large-scale stochastic mixed integer programs, these computational limitations are becoming less relevant, and the assumption that zonal models are realistic and useful approximations of nodal CEP is worth revisiting. Here, this work is the first to conduct a systematic computational study on the assumption that spatial aggregation can reasonably be used for ISO-scale CEP. By considering a realistic, large-scale test network based on the state of California with over 8000 buses, we find that well-designed small spatial aggregations can yield good approximations but that coarser zonal models may result in large distortions of investment decisions, e.g., capacity under-investment of up to 41% for the lowest resolution model considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Guide to Understanding Power System Model Results for Long-Term Resource Plans

This guide is for public utility commission staff, state energy office staff, and other stakeholders who review model results for utility integrated resource plans (IRPs). It builds on the "Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans," and delves into more advanced topics that were not included or not fully covered in the beginner's guide. The topics included here are evolving and may or may not be important to the resource plan you are evaluating. Due to limitations in resources, it's also not possible to give the highest level of detail or attention to every topic within a plan. An important part of planning for an uncertain future involves deciding which topics deserve the most focus and resources. It's all about prioritizing efforts where they will have the most impact or be most beneficial despite uncertainties ahead. As with the beginner's guide, we intend for this guide to help improve decision-making in the electricity planning process by strengthening understanding and dialogue between electricity system planners and relevant stakeholders. The following information is designed to allow you to better engage in the planning process by evaluating results, asking questions, and thinking through what is most important. We allocate significant discussion in the guide to electricity demand evolution, demand-side resources, and resource adequacy. These topics have garnered increasing attention, hence their prominence in this guide. Other topics are also presented, but their incorporation into the planning process might vary based on interest and relevance. The absence of certain topics doesn't diminish their importance; rather, it reflects the reality that in planning, trade-offs necessitate prioritizing certain aspects over others.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Overview of the physics basis for the ARC fusion power plant

Commonwealth Fusion Systems plans to build ARC as the first fusion power plant at a site in Chesterfield County, Virginia, USA by the early 2030s. We present an overview of analysis comprising the physics basis of the ARC V3A design, a high-magnetic-field tokamak with 𝐵 0 =11.4 T, 𝐼 𝑝 =12.0 MA, 𝑅 0 =4.62 m, 𝑎 =1.18 m. ARC V3A is designed to produce 𝑃 𝑓⁡𝑢⁢𝑠 ≈1.13 GW DT fusion power and deliver ⩾400 MW net electric power to the grid. This overview includes quantitative analysis of fundamental issues for design of and operational plasma scenarios for a tokamak power plant, and lays out the design targets and strategic choices for ARC, including empirical fusion performance projections, assessment of H-mode access, ion cyclotron resonance heating simulations, alpha particle physics and time-dependent full-pulse simulations. This is complemented by topical papers on fusion performance and transport, disruption physics, boundary physics and magnetohydrodynamic stability. Critically, these studies identify key model uncertainties and physics risks to be retired through SPARC operation. Due to the modular nature of ARC, early results from SPARC can be incorporated into the design of the first ARC as well as subsequent replacements of the ARC vacuum vessel.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

ARIES: Advanced Research on Integrated Energy Systems Research Plan

The Advanced Research on Integrated Energy Systems (ARIES) platform is one of the most powerful research environments anywhere for addressing the speed and scale of change on power systems. This research plan details ARIES capabilities, current and upcoming, and how they relate to objectives for advanced energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Space Station Power System

The strategies, reasoning, and planning guidelines used in the development of the United States Space Station Program are outlined. The power required to support Space Station missions and housekeeping loads is a key driver in overall Space Station design. conversely, Space Station requirements drive the power technology. Various power system technology options are discussed. The mission analysis studies resulting in the required Space Station capabilities are also discussed. An example of Space Station functions and a concept to provide them is presented. The weight, area, payload and altitude requirements on draft and mass requirements are described with a summary and status of key power systems technology requirements and issues.

Baraona, C. R.↗

Impacts of Solar Land Availability on the Evolution of the U.S. Power System

Long-term planning scenarios of the United States electricity system have not identified solar resource availability to be a limiting factor in how much solar capacity might be deployed. However, there are some smaller regions where siting challenges indicate solar deployment could be limited by solar resource availability. In this work, we use geospatial modeling tools to develop a restrictive siting scenario that significantly reduces the amount and location of utility-scale solar resources. We use that restrictive siting regime, along with other previously defined siting scenarios, to examine how solar resource availability impacts the buildout of the electricity system using business-as-usual and decarbonization futures in a national-scale capacity expansion model. The restrictive siting scenario uses observed siting pressures to exclude many types of land on which development is allowed today and results in a greater than 90% reduction in solar resource potential-to approximately 3000 GW. Even with this drastic reduction, utility-scale solar capacity grows by more than 3 times through 2050 in the business-as-usual scenarios and by more than 6 times in the decarbonization scenarios, though less solar is deployed in scenarios with lower available solar resource. We quantify how system costs and generation mixes change as solar resource availability changes.

14 SOLAR ENERGY↗