Fiscal Year 2010 Well Plugging and Abandonment Reconfiguration Program Description for WIPP Wells 25 and H-4b
This work plan describes an addendum to the program for plugging and abandonment (P&A) or reconfiguration of groundwater monitoring wells at the Waste Isolation Pilot Plant (WIPP) for fiscal year 2009. The addendum adds work scope to the previously developed program plan (DOE/WIPP-08-3376, Fiscal Year 2008 Well Plugging and Abandonment and Reconfiguration Program). Over the years, a number of wells have been installed to monitor temporal and spatial changes in groundwater elevation and chemistry. Many of the wells used for this purpose were cased with carbon steel pipe that has deteriorated to varying degrees. For some wells, the integrity has failed and they must be either reconfigured or completely plugged, according to regulatory requirements, to prevent possible commingling of water from different water bearing formations. Others are nearing the end of their useful life and/or are no longer needed for monitoring. This work plan presents the field activities and objectives, requisite documentation, project organization, and project team roles and responsibilities. Work described in this plan will be performed by a New Mexico licensed drilling contractor. The term "Contractor" refers to the driller, who will be supervised by the Site Technical Representative (STR) or designee. This Contractor will arrange lower-tier subcontracts, to include geophysics, tool rental, and waste containers.