Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning under uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Airport Infrastructure Expansion Under Uncertainty

Multistage stochastic optimization can help transportation hubs like airports and seaports plan for future infrastructure expansion while considering risks from emerging technologies and changes in demand.

ADVANCED PROPULSION SYSTEMS,MATHEMATICS AND COMPUT↗

Space shuttle launch vehicle aerodynamic uncertainties: Lessons learned

The chronological development and evolution of an uncertainties model which defines the complex interdependency and interaction of the individual Space Shuttle element and component uncertainties for the launch vehicle are presented. Emphasis is placed on user requirements which dictated certain concessions, simplifications, and assumptions in the analytical model. The use of the uncertainty model in the vehicle design process and flight planning support is discussed. The terminology and justification associated with tolerances as opposed to variations are also presented. Comparisons of and conclusions drawn from flight minus predicted data and uncertainties are given. Lessons learned from the Space Shuttle program concerning aerodynamic uncertainties are examined.

Hamilton, J. T.↗

Mission Operations of the Mars Exploration Rovers

A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.

Bass, Deborah↗

Radiation health for a Mars mission

Uncertainties in risk assessments for exposure of a Mars mission crew to space radiation place limitations on mission design and operation. Large shielding penalties are imposed in order to obtain acceptable safety margins. Galactic cosmic rays (GCR) and solar particle events (SPE) are the major concern. A warning system and 'safe-haven' are needed to protect the crew from large SPE which produce lethal doses. A model developed at NASA Johnson Space Center (JSC) to describe solar modulation of GCR intensities reduces that uncertainty to less than 10 percent. Radiation transport models used to design spacecraft shielding have large uncertainties in nuclear fragmentation cross sections for GCR which interact with spacecraft materials. Planned space measurements of linear energy transfer (LET) spectra behind various shielding thicknesses will reduce uncertainties in dose-versus-shielding thickness relationships to 5-10 percent. The largest remaining uncertainty is in biological effects of space radiation. Data on effects of energetic ions in human are nonexistent. Experimental research on effects in animals and cell is needed to allow extrapolation to the risk of carcinogenesis in humans.

Robbins, Donald E.↗

Amundsen Sea Embayment ice-sheet mass-loss predictions to 2050 calibrated using observations of velocity and elevation change

Mass loss from the Amundsen Sea Embayment of the West Antarctic Ice Sheet is a major contributor to global sea-level rise (SLR) and has been increasing over recent decades. Predictions of future SLR are increasingly modelled using ensembles of simulations within which model parameters and external forcings are varied within credible ranges. Accurately reporting the uncertainty associated with these predictions is crucial in enabling effective planning for, and construction of defences against, rising sea levels. Calibrating model simulations against current observations of ice-sheet behaviour enables the uncertainty to be reduced. Here we calibrate an ensemble of BISICLES ice-sheet model simulations of ice loss from the Amundsen Sea Embayment using remotely sensed observations of surface elevation and ice speed. Each calibration type is shown to be capable of reducing the 90% credibility bounds of predicted contributions to SLR by 34 and 43% respectively.

54 ENVIRONMENTAL SCIENCES↗

Non-stationary precipitation design standards for stormwater infrastructure modernization at USAF installations

The resilience of defense infrastructure systems to a changing climate is critical for national security. Climate induced recurrent flooding is already impacting over 20 U.S. Air Force installations, underscoring the urgency of revisiting precipitation standards and stormwater infrastructure design. Despite growing scientific knowledge and an expanding set of tools for updating outdated precipitation standards based on the assumption of climate stationarity, the adoption of climate informed analyses remain limited in practice. This study utilizes an existing framework to update Intensity (or Depth)-Duration-Frequency (DDF) curves using an ensemble of future climate projections. Change factors in precipitation estimates are derived and applied to six USAF installations across the U.S. The analysis is further extended to evaluate the implications of climate-informed DDFs on stormwater infrastructure performance and flood analysis at Tyndall AFB. Results indicate that the current design precipitation estimates are likely to become obsolete in all six USAF bases by the end of the century. The wide range of change factors across 32 GCM ensembles highlights the need to integrate uncertainty and evolving scientific data into infrastructure planning. The study also finds that the impacts of a changing climate vary spatially and temporally, emphasizing the value of localized analysis for infrastructure decision-making. The work advances ongoing DoD and societal efforts to implement adaptation strategies aimed at enhancing infrastructure resilience.

Intensity-duration-frequency curves↗

Monte Carlo Perturbation Analysis of Fuel Temperature Variations in the MCNP Model of the Annular Core Research Reactor

The Annular Core Research Reactor (ACRR) Monte Carlo N-Particle (MCNP) model is used by ACRR reactor operators and experiment designers at Sandia National Laboratories for a variety of computational calculations ranging from reactor kinetics parameter estimates and safety analyses to experimental planning. To understand the dominant source of uncertainty within the MCNP model, perturbations in temperature were applied to individual ACRR MCNP fuel rods. Fuel rod temperatures were randomly sampled from a uniform distribution from operational temperatures to quantify temperature-related uncertainty effects. Stochastic mixing was used to blend the cross sections of the desired temperatures using the MCNP continuous and Thermal Neutron Scattering Treatment [S(α,β)] libraries in ENDF/B-VII.1. Furthermore, this uncertainty analysis produced a 640 row × 640 column correlation and covariance matrix of the neutron energy spectra. Positive covariance was produced around the 1-MeV region and the 0.2-eV region. Correlation was found in the thermal and fast energy regions, but no correlation was observed in the slowing-down energy region because interactions in this region are not dominated by fuel.

ACRR↗

Navigation Prediction Performance During OSIRIS-REx Proximity Operations at (101955) Bennu

The OSIRIS-REx (Origins, Spectral Interpretation, Resource Identification and Security–Regolith Explorer) Orbit Determination team performed covariance analyses prior to the commencement of proximity operations (ProxOps) at (101955) Bennu to determine the expected predicted trajectory performance in order to meet trajectory knowledge requirements throughout each phase of the mission. One of the primary requirements placed on the predicted trajectory performance was based on the performance during orbital phases leading up to the maneuver to initiate the Touch-and-Go (TAG) trajectory descent. Throughout ProxOps the nominal force models being used to predict the spacecraft trajectory were updated in an effort to improve the prediction performance. The most significant models that contributed to prediction performance were of solar radiation pressure, thermal reradiation of the spacecraft, predicted attitude errors, and desaturation maneuvers. Efforts were made throughout all of ProxOps to monitor, trend, predict, and update spacecraft modeling to improve the prediction performance. These efforts were vital to reduce the spacecraft knowledge errors necessary to achieve a TAG target smaller than pre-launch analysis allowed due to the rough terrain of Bennu. Increased precision in predicted trajectory errors allowed for refined uncertainties to be used for future phase planning throughout the mission. The navigation team successfully predicted the spacecraft trajectory throughout all of ProxOps achieving predicted trajectories errors less than originally analyzed.

Jason M. Leonard↗

Demand Capacity Balancing at Vertiports for Initial Strategic Conflict Management of Urban Air Mobility Operations

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

Demand Capacity Balancing at Vertiports for Urban Air Mobility

Demand Capacity Balancing (DCB) can be applied in strategic conflict management for safe Urban Air Mobility (UAM) operations. Even when the operational tempo is low, traffic demand can locally exceed the capacity at airspace resources like vertiports. This paper proposes a DCB algorithm to manage the UAM traffic demand strategically, given the capacity at vertiports. The DCB algorithm is evaluated with traffic scenarios at Dallas/Fort Worth urban area in terms of various metrics such as demand distribution changes, pre-departure delay, and the number of simultaneous operations in the air. With the same experiment setup, more extended studies are also conducted to investigate how the UAM flight scheduling based on the DCB algorithm is affected by various conditions that can occur in a practical UAM environment, including vertiport capacity changes, a slot size parameter in capacity constraint, differences in operational policy between operators like lead time for flight plan submission and cruise flight speed, and uncertainties in actual departure and arrival times.

Urban Air Mobility↗

Derivation of mission fluences from flux models: Propagation of uncertainties

The calculation of fluences from the flux models for spacecraft designers, and the propagation of uncertainties in the flux models to larger uncertainties in the final answer are discussed. Ionization and displacement damage in silicon, fluence, and a fluence of an equivalent energy are considered. Data in graph form are presented on stopping power and range curves for electrons and protons in silicon, relative electron and proton damage in silicon, and electron fluences expressed as 3 MeV equivalent and proton fluences expressed as 20 MeV equivalent for flybys in Jupiter's magnetic equatorial plane. It is concluded that the problem includes the uncertainty in peak flux, which has an immediate linear effect; uncertainty in the spatial distribution of the flux which gives great divergency between the upper-limit model and the nominal model and in the case of protons, may preclude any mission planning in order to make the situation better; and the uncertainty in the energy spectrum both in shape and energy location of the peak, if any, and which has little importance for mission planning if the spectrum is fairly constant.

Barengoltz, J.↗

A hybrid data-driven and model-based approach for computationally efficient stochastic unit commitment and economic dispatch under wind and solar uncertainty

Stochastic unit commitment (UC) and economic dispatch (ED) are imperative in dealing with uncertainty in renewable forecast for power system operation and planning such that the overall expected production cost is minimized over the planning horizon. However, accurate calculation of the expected production cost requires assessment of a very large number of different scenarios of uncertain renewable resources, such as solar and wind, which is practically infeasible to simulate in real time. This article proposes a hybrid datadriven and physics-based model-predictive paradigm to efficiently solve for stochastic unit commitment and economic dispatch considering uncertainty in wind and solar power forecasts. Here, the novelty of the approach lies in decoupling the production cost estimation from the unit commitment and economic dispatch optimization problems under uncertainty without compromising on the fidelity of the solutions. A data-driven machine learning model is first developed to predict the mean optimal production cost. A physics-based inverse problem is then solved to get the stochastic UC and ED profiles from the expected cost. The presented approach considers, for the first time, solar uncertainty in UC/ED determination and enables efficient and accurate propagation of wind and solar uncertainty to estimate the statistics of the production cost. The effectiveness of the developed approach is demonstrated systematically on a stylized RTS-GMLC single-node system. The overall framework predicts the expected cost 62.5% more accurately than the existing state-of-the-art, on unforeseen days during the entire year, and yields, for the first time, the associated physically consistent UC and ED profiles. The solutions are also shown to be flexible in providing adequate daily reserves to address any statistical deviations from probabilistic power forecasts. The computational time associated with the presented method is only about 10 s compared to over 24 h needed for a conventional stochastic UC/ED determination under uncertainty on an Intel Core i9 processor with 32 GB of RAM.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Probabilistic Motion Planning of Balloons in Strong, Uncertain Wind Fields

This paper introduces a new algorithm for probabilistic motion planning in arbitrary, uncertain vector fields, with emphasis on high-level planning for Montgolfiere balloons in the atmosphere of Titan. The goal of the algorithm is to determine what altitude--and what horizontal actuation, if any is available on the vehicle--to use to reach a goal location in the fastest expected time. The winds can vary greatly at different altitudes and are strong relative to any feasible horizontal actuation, so the incorporation of the winds is critical for guidance plans. This paper focuses on how to integrate the uncertainty of the wind field into the wind model and how to reach a goal location through the uncertain wind field, using a Markov decision process (MDP). The resulting probabilistic solutions enable more robust guidance plans and more thorough analysis of potential paths than existing methods.

Wolf, Michael T.↗

Estimating Future Surface Water Availability Through an Integrated Climate‐Hydrology‐Management Modeling Framework at a Basin Scale Under CMIP6 Scenarios

Abstract Climate change and increasing water demand due to population growth pose serious threats to surface water availability. The biggest challenge in addressing these threats is the gap between climate science and water management practices. Local water planning often lacks the integration of climate change information, especially with regard to its impacts on surface water storage and evaporation as well as the associated uncertainties. Using Texas as an example, state and regional water planning relies on the use of reservoir “Firm Yield” (FY)—an important metric that quantifies surface water availability. However, this existing planning methodology does not account for the impacts of climate change on future inflows and on reservoir evaporation. To bridge this knowledge gap, an integrated climate‐hydrology‐management (CHM) modeling framework was developed, which is generally applicable to river basins with geographical, hydrological, and water right settings similar to those in Texas. The framework leverages the advantages of two modeling approaches—the Distributed Hydrology Soil Vegetation Model (DHSVM) and Water Availability Modeling (WAM). Additionally, the Double Bias Correction Constructed Analogues method is utilized to downscale and incorporate Coupled Model Intercomparison Project Phase 6 GCMs. Finally, the DHSVM simulated naturalized streamflow and reservoir evaporation rate are input to WAM to simulate reservoir FY. A new term—“Ratio of Firm Yield” (RFY)—is created to compare how much FY changes under different climate scenarios. The results indicate that climate change has a significant impact on surface water availability by increasing reservoir evaporation, altering the seasonal pattern of naturalized streamflow, and reducing FY.

54 ENVIRONMENTAL SCIENCES↗

Disentangling climate and policy uncertainties for the Colorado River post-2026 operations

Abstract Lakes Mead and Powell in the Colorado River Basin underpin water and hydropower supply for the western United States. While the policies currently regulating the basin will expire by 2026, planning remains challenging due to intertwined climate variability and policy uncertainties. Based on streamflow projections from 10 dynamically downscaled CMIP6 global climate models and unique methods that add and remove internal variability, we evaluate future conditions at Powell and Mead under existing and alternative policies. Due to projected streamflow declines, under existing policy, both reservoirs will face substantial risks (>80% likelihood) of reaching dead pool before 2060. Adopting recently proposed alternative policies reduces but doesn’t eliminate such risks. All policies also exhibit tipping points where reservoir levels can change rapidly with a slight change in streamflow. A sustainable policy may require larger reductions to further reduce the reservoirs’ dead pool risks and provide better buffers from sudden changes.

Science & Technology - Other Topics↗

Calibration Plan for the Ocean Color Instrument (OCI) Engineering Test Unit

The Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission will launch no earlier than summer 2022. The primary payload is the Ocean Color Instrument (OCI). OCI is a hyperspectral imaging radiometer that will measure top-of-atmosphere radiances from 340nm to 2260nm at approximately 1km spatial resolution. The spectral resolution will be 5nm from 340nm to 890nm to enable the production of innovative ocean color products on a global scale (OCI will provide global coverage every 2 days). There are 7 different multispectral bands in the shortwave infrared to support atmospheric correction for ocean color and aerosol and cloud studies. Ocean color applications require state of the art radiometric accuracy (approximately 0.5%, excluding the absolute calibration uncertainty). Considerable effort has been invested in the planning of the prelaunch calibration campaign and the on-orbit calibration capabilities. This paper describes the current plans for the prelaunch calibration and characterization campaign of the OCI Engineering Test Unit (ETU), which is scheduled to begin towards the end of 2019, and expected to conclude April 2020. The prelaunch calibration campaign will characterize all sensor characteristics that are expected to influence radiometric sensitivity: absolute calibration (i.e. radiometric gains), signal to noise ratio, nonlinearity, response versus scan angle, dynamic range, straylight, crosstalk, and sensitivities to polarization and temperature. In addition to these characterization tests (which will only be performed once for the ETU), two types of tests have been developed that monitor the evolution of several OCI radiometric characteristics: a Limited Performance Test (LPT, expected duration about 8 hours), and a Comprehensive Performance Test (CPT, expected duration about 2 days).

Meister, Gerhard↗

Evaluation of CFD as a Surrogate for Wind Tunnel Testing - Experimental Uncertainty Quantification

A series of wind tunnel tests is being performed at the Unitary Plan Wind Tunnel at Langley Research Center to assess the validity of using computational fluid dynamics (CFD) as a surrogate for wind tunnel testing. In order to make proper comparisons, uncertainties in CFD results and experimental data must be well understood. The material presented will highlight the methods, assumptions, and elemental inputs used to achieve experimental uncertainty estimates for several variables of interest.The work performed to date has focused on gaining insight into random uncertainty via statistical analysis of repeat data and systematic uncertainty via Monte Carlo propagation analysis. These methods were combined using a second-order Monte Carlo propagation, resulting in a probability box (P-box) for each variable and at all conditions of interest. Figure 1 provides an example of one such P-box, showing the experimental uncertainty in a locally determined dynamic pressure (QC10) for one of many tunnel conditions evaluated during the Flow Survey experiment. This particular condition (Condition 27) has nominal set points of Mach number = 3.85, Reynolds number = 3x10(exp 6) ft(exp -1), total pressure = 5160 psfa, and total temperature = 150°F. The uncertainty in dynamic pressure at this condition is now well defined by this plot. Armed with this experimental data uncertainty, meaningful comparisons can be made with computational results, when their associated uncertainties are also considered.

Heather P Houlden↗

Carbon Dioxide Removal Measurement, Reporting, and Verification Simulation toolkit (CDR MRVSim) v0.1

CDR MRVSim is a statistical software toolkit for techno-economic analysis of measurement, reporting, and verification of multiple carbon dioxide removal technologies. The current version applies Monte Carlo simulation to existing datasets estimate the cost and uncertainty of measuring the soil organic carbon (SOC) content of agricultural land, accounting for multiple sources of uncertainty, using data from field measurements. We are planning to incorporate enhanced rock weathering and other technologies into the software. The current model leverages existing data to characterize underlying variability in soil organic carbon and related parameters, including bulk density, in an agricultural field attempting to increase its SOC. We then simulate baseline and post-intervention "measurement campaigns" in which some number of SOC and bulk density measurements are conducted using a selected technology. This enables estimates of the cost and accuracy of measuring changes in SOC in the simulated field. The primary advantages over similar software are: 1) ability to quantify tradeoffs between cost and uncertainty in MRV across a range of possible MRV approaches 2) focus on guiding development of novel sensors by determining desirable sets of characteristics

Sherwin, Evan [Lawrence Berkeley National Laborato↗