Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Generic mission planning and scheduling: The AXAF solution

During SpaceOps 92 the idea of generic mission planning concepts for space astronomy missions, that could be applied to future missions in order to simplify software development, was introduced. It was proposed that mission planning systems could be decomposed into functional elements that could be standardized and then organized into optimal functional flows for each individual mission. In addition, it was further suggested that these flows themselves could be reduced to a small set of possibilities by describing them in terms of generic mission type, such as manned, unmanned, high orbit, low orbit, etc. The Advanced X-ray Astrophysics Facility (AXAF), planned for launch in the latter part of '98, represents the first application of this idea on an unmanned mission. This paper examines the AXAF Mission Planning and Scheduling concept in light of the generic system theory. Each functional element is evaluated according to AXAF characteristics and requirements and then compared to its generic counterpart. Functional flow considerations are then derived from the overall AXAF mission planning concept to determine the viability and sensitivity of the generic flow to actual requirements. The results of this analysis are then used to update the generic system concept and to define the level of commonality and core system components that are practical to achieve across multiple missions.

Guffin, O. T.↗

Generic astronomy mission planning and scheduling: The AXAF solution

During SpaceOps 92 the idea of generic mission planning concepts for space astronomy missions, that could be applied to future missions in order to simplify software development, was introduced. It was proposed that mission planning systems could be decomposed into functional elements that could be standardized and then organized into optimal functional flows for each individual mission. In addition, it was further suggested that these flows themselves could be reduced to a small set of possibilities by describing them in terms of generic mission type, such as manned, unmanned, high orbit, low orbit, etc. The Advanced X-ray Astrophysics Facility (AXAF), planned for launch in the latter part of 1998, represents the first application of this idea on an unmanned mission. This paper examines the AXAF Mission Planning and Scheduling concept in light of the generic system theory. Each functional element is evaluated according to AXAF characteristics and requirements and then compared to its generic counterpart. Functional flow considerations are then derived from the overall AXAF mission planning concept to determine the viability and sensitivity of the generic flow to actual requirements. The results of this analysis are then used to update the generic system concept and to define the level of commonality and core system components that are practical to achieve across multiple missions.

Guffin, O. T.↗

MES-based management of manufacturing processes

In optimal management of short-run and one-off production, the goal is simultaneous maximization of the load on the machine tools and the speed of order completion. This entails optimal scheduling of the manufacturing systems.

42 ENGINEERING↗

Coordinated Scheduling for Interdependent Electric Power and Natural Gas Infrastructures

The extensive installation of gas-fired power plants in many parts of the world has led electric systems to depend heavily on reliable gas supplies. The use of gas-fired generators for peak load and reserve provision causes high intraday variability in withdrawals from high-pressure gas transmission systems. Such variability can lead to gas price fluctuations and supply disruptions that affect electric generator dispatch, electricity prices, and threaten the security of power systems and gas pipelines. These infrastructures function on vastly different spatio-temporal scales, which prevents current practices for separate operations and market clearing from being coordinated. Here in this article, we apply new techniques for control of dynamic gas flows on pipeline networks to examine day-ahead scheduling of electric generator dispatch and gas compressor operation for different levels of integration, spanning from separate forecasting, and simulation to combined optimal control. We formulate multiple coordination scenarios and develop tractable physically accurate computational implementations. These scenarios are compared using an integrated model of test networks for power and gas systems with 24 nodes and 24 pipes, respectively, which are coupled through gas-fired generators. The analysis quantifies the economic efficiency and security benefits of gas-electric coordination and dynamic gas system operation.

03 NATURAL GAS↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Economic Risk-Informed Maintenance Planning and Asset Management (Final Report)

The proposed work will provide a holistic framework for cost-minimizing risk-informed maintenance planning, including inspection, in light water reactors (LWRs). Specifically, we develop a two-tier framework that (a) coarsely minimizes the total maintenance cost during the remaining normal operating cycle of the plant prior to the next scheduled outage (long-term), subject to safety requirements, and (b) uses the outputs of the first model to develop a secondary optimization model to finely schedule maintenance activities to maximize the financial impact of these activities in the next week (short-term).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Practical considerations in aeroelastic design

The structural design process for large transport aircraft is described. Critical loads must be determined from a large number of load cases within the flight maneuver envelope. The structural design is also constrained by considerations of producibility, reliability, maintainability, durability, and damage tolerance, as well as impact dynamics and multiple constraints due to flutter and aeroelasticity. Aircraft aeroelastic design considerations in three distinct areas of product development (preliminary design, advanced design, and detailed design) are presented and contrasted. The present state of the art is challenged to solve the practical difficulties associated with design, analysis, and redesign within cost and schedule constraints. The current practice consists of largely independent engineering disciplines operating with unorganized data interfaces. The need is then demonstrated for a well-planned computerized aeroelastic structural design optimization system operating with a common interdisciplinary data base. This system must incorporate automated interfaces between modular programs. In each phase of the design process, a common finite-element model for static and dynamic optimization is required to reduce errors due to modeling discrepancies. As the design proceeds from the simple models in preliminary design to the more complex models in advanced and detailed design, a means of retrieving design data from the previous models must be established.

Rommel, B. A.↗

Leverage modern artificial intelligence (AI) enabled systems for waste reduction

Manufacturing industries continue to face challenges in reducing waste, as upstream strategies such as source reduction and product redesign require a deeper understanding of processes compared to conventional recycling methods. Recent advancements in artificial intelligence (AI) and machine learning (ML) have opened new opportunities to integrate modern computational techniques with traditional waste minimization strategies. This paper explores AI-enabled approaches for product redesign, source reduction, and recycling that can significantly reduce waste generation while improving efficiency and sustainability. AI-driven material substitution and lightweighting in product design enable discovery of novel materials with optimized properties, reducing waste without compromising performance. Reinforcement learning models optimize process parameters, raw material specifications, and machine sequencing to minimize production losses, while Industrial Internet of Things (IIoT) systems paired with AI analytics enhance real-time waste tracking, predictive maintenance, and quality inspection. Furthermore, AI-based demand forecasting and production planning reduce overproduction and excess inventory, as demonstrated in industrial applications. In recycling, ML-powered pattern recognition and robotic sorting technologies achieve higher accuracy in waste segregation, directly improving recycling efficiency. Complementary solutions such as smart bins and AI-enabled waste pickup scheduling optimize collection logistics, reducing both costs and emissions. Although implementation requires upfront investment in infrastructure and training, the long-term benefits include higher material efficiency, reduced waste, improved product quality, and stronger sustainability outcomes across the supply chain. By leveraging AI-enabled systems, manufacturers can align waste minimization efforts with circular economy principles, creating scalable solutions for both industry and society.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal planning and design of a renewable energy based supply system for microgrids

This paper presents a technique for optimal planning and design of hybrid renewable energy systems for microgrid applications. The Distributed Energy Resources Customer Adoption Model (DER-CAM) is used to determine the optimal size and type of distributed energy resources (DERs) and their operating schedules for a sample utility distribution system. Using the DER-CAM results, an evaluation is performed to evaluate the electrical performance of the distribution circuit if the DERs selected by the DER-CAM optimization analyses are incorporated. Results of analyses regarding the economic benefits of utilizing the optimal locations identified for the selected DER within the system are also presented. The actual Brookhaven National Laboratory (BNL) campus electrical network is used as an example to show the effectiveness of this approach. The results show that these technical and economic analyses of hybrid renewable energy systems are essential for the efficient utilization of renewable energy resources for microgird applications.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Automatic Substitute Computed Tomography Generation and Contouring for Magnetic Resonance Imaging (MRI)-Alone External Beam Radiation Therapy From Standard MRI Sequences

Purpose: To validate automatic substitute computed tomography CT (sCT) scans generated from standard T2-weighted (T2w) magnetic resonance (MR) pelvic scans for MR-Sim prostate treatment planning. Patients and Methods: A Siemens Skyra 3T MR imaging (MRI) scanner with laser bridge, flat couch, and pelvic coil mounts was used to scan 39 patients scheduled for external beam radiation therapy for localized prostate cancer. For sCT generation a whole-pelvis MRI scan (1.6 mm 3-dimensional isotropic T2w SPACE [Sampling Perfection with Application optimized Contrasts using different flip angle Evolution] sequence) was acquired. Three additional small field of view scans were acquired: T2w, T2*w, and T1w flip angle 80° for gold fiducials. Patients received a routine planning CT scan. Manual contouring of the prostate, rectum, bladder, and bones was performed independently on the CT and MR scans. Three experienced observers contoured each organ on MRI, allowing interobserver quantification. To generate a training database, each patient CT scan was coregistered to their whole-pelvis T2w using symmetric rigid registration and structure-guided deformable registration. A new multi-atlas local weighted voting method was used to generate automatic contours and sCT results. Results: The mean error in Hounsfield units between the sCT and corresponding patient CT (within the body contour) was 0.6 ± 14.7 (mean ± 1 SD), with a mean absolute error of 40.5 ± 8.2 Hounsfield units. Automatic contouring results were very close to the expert interobserver level (Dice similarity coefficient): prostate 0.80 ± 0.08, bladder 0.86 ± 0.12, rectum 0.84 ± 0.06, bones 0.91 ± 0.03, and body 1.00 ± 0.003. The change in monitor units between the sCT-based plans relative to the gold standard CT plan for the same dose prescription was found to be 0.3% ± 0.8%. The 3-dimensional γ pass rate was 1.00 ± 0.00 (2 mm/2%). Conclusions: The MR-Sim setup and automatic sCT generation methods using standard MR sequences generates realistic contours and electron densities for prostate cancer radiation therapy dose planning and digitally reconstructed radiograph generation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Transport spatial model for the definition of green routes for city logistics centers

This paper presents a transport spatial decision support model (TSDSM) for carrying out the optimization of green routes for city logistics centers. The TSDSM model is based on the integration of the multi-criteria method of Weighted Linear Combination (WLC) and the modified Dijkstra algorithm within a geographic information system (GIS). The GIS is used for processing spatial data. The proposed model makes it possible to plan routes for green vehicles and maximize the positive effects on the environment, which can be seen in the reduction of harmful gas emissions and an increase in the air quality in highly populated areas. The scheduling of delivery vehicles is given as a problem of optimization in terms of the parameters of: the environment, health, use of space and logistics operating costs. Each of these input parameters was thoroughly examined and broken down in the GIS into criteria which further describe them. The model presented here takes into account the fact that logistics operators have a limited number of environmentally friendly (green) vehicles available. The TSDSM was tested on a network of roads with 127 links for the delivery of goods from the city logistics center to the user. The model supports any number of available environmentally friendly or environmentally unfriendly vehicles consistent with the size of the network and the transportation requirements. - Highlights: • Model for routing light delivery vehicles in urban areas. • Optimization of green routes for city logistics centers. • The proposed model maximizes the positive effects on the environment. • The model was tested on a real network.

54 ENVIRONMENTAL SCIENCES↗

Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC)

GEMINI-XFC will use first-of-a-kind integrated high-fidelity grid and transport modeling to identify effective pathways for widespread electrification, to design and evaluate integrated vehicle-grid control schemes, and to optimize electric vehicle integration at a full regional scale with individual customer resolution. Control variables will include: Charging station design and planning (where and what kind of charging stations); EV route scheduling considering grid "status"; and Dispatch of behind-the-meter energy storage and legacy voltage control actuators (on-load tap changes, voltage regulators, capacitors).

DIRECT ENERGY CONVERSION,POWER TRANSMISSION AND DI↗

Software for Optimizing Quality Assurance of Other Software

Software assurance is the planned and systematic set of activities that ensures that software processes and products conform to requirements, standards, and procedures. Examples of such activities are the following: code inspections, unit tests, design reviews, performance analyses, construction of traceability matrices, etc. In practice, software development projects have only limited resources (e.g., schedule, budget, and availability of personnel) to cover the entire development effort, of which assurance is but a part. Projects must therefore select judiciously from among the possible assurance activities. At its heart, this can be viewed as an optimization problem; namely, to determine the allocation of limited resources (time, money, and personnel) to minimize risk or, alternatively, to minimize the resources needed to reduce risk to an acceptable level. The end result of the work reported here is a means to optimize quality-assurance processes used in developing software.

Feather, Martin↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

An energy-aware multiobjective ant colony algorithm to minimize total completion time and energy cost on a single-machine preemptive scheduling

Energy-aware scheduling in manufacturing operations with time-of-use electricity tariffs is a challenging problem. Sustainable manufacturing is gaining significant momentum: companies are not only improving their product quality, but also optimizing the production processes to improve energy consumption (i.e., minimizing energy cost) in order to manage environmental challenges which contribute to global climate change. The purpose of this paper is to study a preemptive scheduling problem on a single-machine to minimize the total completion time and total energy cost under time-of-use electricity tariffs, which is a mixed-integer multiobjective mathematical programming model. To solve these objectives, we develop several new holistic ant colony optimization algorithms. The proposed model is solved via several methods including weighted sum method (WSM) using CPLEX, and multiobjective ant colony optimization based on a dominance ranking (ACO-DR) or based on a dominance ranking procedure and crowding distance comparison (ACO-DRC) or based on a heuristic approach to obtain an approximate Pareto-front and also provide information on when to start and resume each job for any solution on the Pareto-front. We provide detailed experimental results evaluating the performance of the proposed algorithms. In a case study, we demonstrate how the results of the multiobjective model could be utilized in decision making using the multiobjective optimization on the basis of ratio analysis (MOORA) method. Furthermore, this proposed model and heuristics allows decision makers to operate in challenging-data enabled environments in industrial internet of things ecosystem, and assists in optimizing production planning to improve energy cost.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Air traffic management evaluation tool

Methods for evaluating and implementing air traffic management tools and approaches for managing and avoiding an air traffic incident before the incident occurs. A first system receives parameters for flight plan configurations (e.g., initial fuel carried, flight route, flight route segments followed, flight altitude for a given flight route segment, aircraft velocity for each flight route segment, flight route ascent rate, flight route descent route, flight departure site, flight departure time, flight arrival time, flight destination site and/or alternate flight destination site), flight plan schedule, expected weather along each flight route segment, aircraft specifics, airspace (altitude) bounds for each flight route segment, navigational aids available. The invention provides flight plan routing and direct routing or wind optimal routing, using great circle navigation and spherical Earth geometry. The invention provides for aircraft dynamics effects, such as wind effects at each altitude, altitude changes, airspeed changes and aircraft turns to provide predictions of aircraft trajectory (and, optionally, aircraft fuel use). A second system provides several aviation applications using the first system. Several classes of potential incidents are analyzed and averted, by appropriate change en route of one or more parameters in the flight plan configuration, as provided by a conflict detection and resolution module and/or traffic flow management modules. These applications include conflict detection and resolution, miles-in trail or minutes-in-trail aircraft separation, flight arrival management, flight re-routing, weather prediction and analysis and interpolation of weather variables based upon sparse measurements. The invention combines these features to provide an aircraft monitoring system and an aircraft user system that interact and negotiate changes with each other.

Sridhar, Banavar↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗