Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Transformation reborn: A new generation expert system for planning HST operations

The Transformation expert system (TRANS) converts proposals for astronomical observations with the Hubble Space Telescope (HST) into detailed observing plans. It encodes expert knowledge to solve problems faced in planning and commanding HST observations to enable their processing by the Science Operations Ground System (SOGS). Among these problems are determining an acceptable order of executing observations, grouping of observations to enhance efficiency and schedulability, inserting extra observations when necessary, and providing parameters for commanding HST instruments. TRANS is currently an operational system and plays a critical role in the HST ground system. It was originally designed using forward-chaining provided by the OPS5 expert system language, but has been reimplemented using a procedural knowledge base. This reimplementation was forced by the explosion in the amount of OPS5 code required to specify the increasingly complicated situations requiring expert-level intervention by the TRANS knowledge base. This problem was compounded by the difficulty of avoiding unintended interaction between rules. To support the TRANS knowledge base, XCL, a small but powerful extension to Commom Lisp was implemented. XCL allows a compact syntax for specifying assignments and references to object attributes. XCL also allows the capability to iterate over objects and perform keyed lookup. The reimplementation of TRANS has greatly diminished the effort needed to maintain and enhance it. As a result of this, its functions have been expanded to include warnings about observations that are difficult or impossible to schedule or command, providing data to aid SPIKE, an intelligent planning system used for HST long-term scheduling, and providing information to the Guide Star Selection System (GSSS) to aid in determination of the long range availability of guide stars.

Gerb, Andrew↗

Operations Coordination Plan Status

This presentation will introduce topics of note for the Earth Science Constellation (ESC) Mission Operations Working Group (MOWG) meeting being held in Toulouse, France from June 5-7, 2019.

Case, Warren F.↗

Program definition and assessment overview

The implementation of a program level assessment of thermal energy storage technology thrusts for the near and far term to assure overall coherent energy storage program is considered. The identification and definition of potential thermal energy storage applications, definition of technology requirements, and appropriate market sectors are discussed along with the necessary coordination, planning, and preparation associated with program reviews, workshops, multi-year plans and annual operating plans for the major laboratory tasks.

Gordon, L. H.↗

Status of tethered satellite system (TSS) development

The Tethered Satellite System (TSS) is a cooperative space system and science development activity being carried out by the U.S. and Italy. The TSS will involve an instrument-laden satellite that can be deployed from the cargo bay of the Shuttle Orbiter using a long tether to altitudes both above and below that of the Orbiter. This paper discusses the predevelopment activities, development approach and management relationships, current hardware and software designs and interfaces, overall science experiment status and plans, and mission operation planning for the first TSS mission.

Laue, Jay H.↗

The Flight Telerobotic Servicer (FTS) NASA's first operational robotic system

NASA has completed the preliminary definition phase of the Flight Telerobotic Servicer (FTS) and is now preparing to begin the detailed design and fabrication phase. The FTS will be designed and built by Martin Marietta Astronautics Group in Denver, CO, for the Goddard Space Flight Center, in support of the Space Station Freedom Program. The design concepts for the FTS are discussed, as well as operational scenarios for the assembly, maintenance, servicing and inspection tasks which are being considered for the FTS. The upcoming Development Test Flight (DTF-1) is the first of two shuttle test flights to test FTS operations in the environment of space and to demonstrate the FTS capabilities in performing tasks for Space Station Freedom. Operational planning for DTF-1 is discussed as well as development plans for the operational support of the FTS on the space station.

Andary, J.↗

AdaNET research project

The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

Digman, R. Michael↗

The Transition from Spacecraft Development Ot Flight Operation: Human Factor Considerations

In the field of aeronautics and astronautics, a paradigm shift has been witnessed by those in academia, research and development, and private industry. Long development life cycles and the budgets to support such programs and projects has given way to aggressive task schedules and leaner resources to draw from all the while challenging assigned individuals to create and produce improved products of processes. however, this "faster, better, cheaper" concept cannot merely be applied to the design, development, and test of complex systems such as earth-orbiting of interplanetary robotic spacecraft. Full advantage is not possible without due consideration and application to mission operations planning and flight operations, Equally as important as the flight system, the mission operations system consisting of qualified personnel, ground hardware and software tools, and verified and validated operational processes, should also be regarded as a complex system requiring personnel to draw upon formal education, training, related experiences, and heuristic reasoning in engineering an effective and efficient system. Unquestionably, qualified personnel are the most important elements of a mission operations system. This paper examines the experiences of the Deep Space I Project, the first in a series of new technology in-flight validation missions sponsored by the United States National Aeronautics and Space Administration (NASA), specifically, in developing a subsystems analysis and technology validation team comprised of former spacecraft development personnel. Human factor considerations are investigated from initial concept/vision formulation; through operational process development; personnel test and training; to initial uplink product development and test support. Emphasis has been placed on challenges and applied or recommended solutions, so as to provide opportunities for future programs and projects to address and disposition potential issues and concerns as early as possible to reap the benefits associated with learning from other's past experiences.

Basilio, Ralph R.↗

Science Activity Planner for the MER Mission

The Maestro Science Activity Planner is a computer program that assists human users in planning operations of the Mars Explorer Rover (MER) mission and visualizing scientific data returned from the MER rovers. Relative to its predecessors, this program is more powerful and easier to use. This program is built on the Java Eclipse open-source platform around a Web-browser-based user-interface paradigm to provide an intuitive user interface to Mars rovers and landers. This program affords a combination of advanced display and simulation capabilities. For example, a map view of terrain can be generated from images acquired by the High Resolution Imaging Science Explorer instrument aboard the Mars Reconnaissance Orbiter spacecraft and overlaid with images from a navigation camera (more precisely, a stereoscopic pair of cameras) aboard a rover, and an interactive, annotated rover traverse path can be incorporated into the overlay. It is also possible to construct an overhead perspective mosaic image of terrain from navigation-camera images. This program can be adapted to similar use on other outer-space missions and is potentially adaptable to numerous terrestrial applications involving analysis of data, operations of robots, and planning of such operations for acquisition of scientific data.

Norris, Jeffrey S.↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Space Operations↗

Climate-aware decision-making: lessons for electric grid infrastructure planning and operations

Abstract Climate change poses significant risks to large-scale infrastructure systems and brings considerable uncertainties that challenge historical planning approaches. Here we focus on how climate awareness might be better incorporated into planning and decision-making in the electric power sector. To do so, we consider lessons from decision science literature where researchers have specifically focused on how to make better decisions under uncertainty. We perform a three-part review: of decision science literature on best practices for decision-making under uncertainty, of industry practice documents to understand how new uncertainties may affect the types of decisions electric utilities are making today, and of literature on electricity sector planning under climate change to assess how lessons from decision science might fit into sector-specific analyses. We discuss how characterizations of uncertainty from the decision science literature might guide approaches in the electricity sector to appropriately capture climate-related uncertainties. We also distill three key ideas from the decision science literature that can be incorporated into electricity sector planning to manage these new uncertainties: robustness, adaptive planning, and multi-stakeholder engagement. We offer example recommendations for how these key ideas might be incorporated into one essential type of planning activity, capacity expansion.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Flight Dynamics Planning and Operations Support for the JWST Mission

The James Webb Space Telescope (JWST) was launched from Kourou Spaceport on December 25, 2021, at 12:20 UTC on an Ariane 5 launch vehicle. The launch vehicle inserted JWST into a 30-day transfer trajectory to the Sun-Earth-Moon (SEM) Lagrange point L2 region. JWST executed three mid-course correction maneuvers (MCCs) to insert the spacecraft into a quasi-halo orbit about SEM L2; JWST will maintain its trajectory about L2 for at least 5.5 years, with a goal of at least 10.5 years. This paper summarizes the flight dynamics support for JWST, including the prelaunch nominal trajectory design, the launch window analysis, contingency planning for trajectory-related anomalies, mission operations support for the first 6 months, and a comparison of the planned and achieved actual JWST trajectory results. The orbit determination strategy, both planned and executed, will be summarized, and the method of addressing the anomalies as they occurred will be included.

Karen Richon↗

Planning assembly/disassembly operations for space telerobotics

Space telerobotic systems will perform complex tasks of assembly, disassembly, and repair of space-based equipment. Planning such tasks requires reasoning about the functional, physical, and geometrical properties of the equipment, as well as a representation of the characteristics and capabilities of the manipulators and sensors available for the task. The And/Or graph is a useful approach to representation of feasible assembly/disassembly sequences and provides the basis for search among alternative strategies. The paper describes the use of parts entropy measures as evaluation criteria for search in the And/Or graph space. This approach leads to candidate task plans which minimize the complexity of intermediate geometrical states.

Sanderson, Arthur C.↗

An Optimization Approach to Support Science Decision Making for Lunar Surface Exploration

Introduction: Scientific exploration is one of the three pillars of NASA’s Moon2Mars architecture, with crew surface extra vehicular activities (EVA) serving a critical enabling function. Development of surface EVA operational planning and execution, specifically integrating science and flight control teams (FCT), is currently being explored through analog scenarios. This integration, exercised, for example, through the Joint EVA and Hu-man Surface Mobility Test Team (JETT), allows for science input on EVA activities in near real-time through a Science Evaluation Room (SER), or Arte-mis science backroom, which integrates with the broader FCT through the Science Officer. The SER works within the FCT to support dynamic EVA planning in response to changes in operational constraints as well as science opportunities and re-prioritization, increasing the mission science return and accelerating the accomplishment of the Moon2Mars science objectives. The SER works within the FCT to provide recommendations to traverse execution in near real-time. One challenge is the requirement to deliver SER inputs to the FCT on operationally relevant timelines. Failure to do so may result in suboptimal execution of science exploration EVAs or even loss of key science objectives. To close this gap, we present a network optimization tool to allow the SER to provide rapid input to the FCT in response to changes in operational constraints or science opportunities. Inputs are predicated on approved science objectives, and clear rationale must be provided to the FCT for any requested change. Accordingly, this tool incorporates the Science Traceability Matrix (STM), SER prioritization scheme, and station characterization and action planning with operational constraints such as duration, traverse speed, and distance to maximize science objectives based on SER priorities, consistent with FCT operational requirements. Method: As a proof of concept, we used an existing linear programing software package used to simulate optimal routes through cellular metabolism. We built a Demonstrative Model with three STM objectives and four stations on a region of the Moon. The objectives were given an arbitrary prioritization and mapped to the stations through four possible crew actions. (Figs. 1 and 2). This station to STM mapping is consistent with the method used by the JETT5 Science Team to develop analog surface EVA science planning. We used a grid system with the landing site at the origin and the four stations placed across the positive x,y quadrant. Actions were assigned to each station and the accomplishment of those actions resulted in a numerical “reward” based on the ability of that action to achieve science objectives. The aggregate reward from each individual STM objective contributes to a global score (Science Yield), weighted by its priority. Operational constraints included a requirement to start and end at the landing site, 5 minutes each for initial station characterization and “clean up,” and variable total EVA time, traverse rate (fixed to 0.5 meters per second in our example), and time to perform each action (10, 5, 7, and 15 min for actions 1, 2, 3, and 4, respectively). Additional constraints and variables will be added in the future (e.g., sample mass, number of stations, traverse route constraints, illumination). Optimization. We converted the connections (arcs) between these stations (nodes) into a mixed integer linear programming optimization problem (arcs = constraints, nodes = variables) with the objective to maximize Science Yield. For any action, the Science Yield is equal to the relevance of that action to an STM objective [3, 2, and 1 point(s) for High, Med., and Low relevance, respectively], multiplied by the STM Objective Priority [3, 2, and 1 point(s) for High, Med., and Low priority, respectively]. This resulted in a model that computes the optimal station and action combination to maximize the Science Yield. These weightings can be adjusted by the SER as desired. Results: We explored three test cases for the Demonstrative Model. First, we set the maximum EVA duration to 120 minutes and computed the optimal route (Fig. 3A). The model suggested per-forming Actions 1 and 2 at Station P01, followed by Actions 1 and 2 at Station P02, and finally Actions 1 and 3 at Station P04 before returning to the Landing Site. Second, we adjusted the STM Objective Priori-ty order and computed the new optimal route (Fig. 3B). Under this situation, the model suggested per-forming all Actions at Station P02 followed by all Actions at Station P03. The previous test cases were relevant to SER planning activities. Next, we explored providing mid-EVA replanning input to the FCT. Scenario: While executing the Route in Fig. 3A the crew finishes at Station P01 and FCT decides that the EVA needs to finish in 45 minutes back at the Landing Site. FCT asks SER to recommend changes to the plan to accommodate this operation-al change. Using the model and incorporating these new constraints (start at Station P01, max. time of 45 min), the model suggested performing Actions 2 and 4 at Station P03 (Fig. 4), requiring 41 minutes to complete and return to the Landing Site. Interestingly, Station 3 was not part of the original route. Using the model, we determined the EVA would need 66 minutes, instead of 45, in order for the original Station P04 to yield a larger Science Yield than Station P03. The parametrization and simulation was per-formed in less than a minute, demonstrating the operational relevance of the approach. Future Efforts: The results from the Demonstrative Model suggest this tool can accelerate SER decision making on operationally relevant timelines. Use in analog activities, such as JETT5 or follow-ons, which have over a dozen stations for a crew to explore and over a dozen actions per station, will provide needed validation of the utility of this tool for planning EVAs, replanning mid-EVA, or planning follow-on EVAs based on previous results. Further integration with FCT execution monitoring tools may provide additional efficiency gains, al-lowing rapid and iterative exploration of operation-al and science decision space by the FCT and SER.

Science Operations↗

Stardust Entry: Landing and Population Hazards in Mission Planning and Operations

The 385 kg Stardust mission was launched on Feb 7, 1999 on a mission to collect samples from the tail of comet Wild 2 and from interplanetary space. Stardust returned to Earth in the early morning of January 15, 2006. The sample return capsule landed in the Utah Test and Training Range (UTTR) southwest of Salt Lake City. Because Stardust was landing on Earth, hazard analysis was required by the National Aeronautics and Space Administration, UTTR, and the Stardust Project to ensure the safe return of the landing capsule along with the safety of people, ground assets, and aircraft. This paper focuses on the requirements affecting safe return of the capsule and safety of people on the ground by investigating parameters such as probability of impacting on UTTR, casualty expectation, and probability of casualty. This paper introduces the methods for the calculation of these requirements and shows how they affected mission planning, site selection, and mission operations. By analyzing these requirements before and during entry it allowed for the selection of a robust landing point that met all of the requirements during the actual landing event.

Desai, P.↗

An RTDS-Based Testbed for Investigating the Impacts of Transmission-Level Disturbances on Solar PV Operation

The increasing penetration of renewable energy resources such as solar and wind via power electronic inverters is challenging grid dynamics, as well as grid planning, operation, and protection. Recently, the North American Electric Reliability Corporation (NERC) has reported a series of similar events of the unintended loss of solar generation in Southern California over a large geographic area following the transmission-level disturbances. These events highlight the importance of understanding the characteristics of the transmission-side disturbances propagating into the distribution systems and their impacts on the operation of inverter-based resources. In this paper, a real-time electromagnetic simulation testbed is constructed for real-time electromagnetic simulations to generate realistic transmission-level disturbances and investigate their impacts on the solar PV operation under different fault types and locations, solar penetration levels, and loading levels. Through the simulation analysis and grid strength assessment, it is found that the grid strength at points of integration (POIs) of solar PVs significantly affects the transient stability of solar generators. Particularly, undesirable transient stability events are more likely to occur at the weak POIs following the transmission-level disturbances. Moreover, undesirable transient stability events become severer when the transmission-level disturbance is closer to the weak POIs or the disturbances become more serious. Additionally, the impact of the transmission-level disturbances on the solar PVs at the weak POIs exacerbate with the increasing solar penetration levels and loading levels. Thus, it is important to study and develop new technologies for grid planning, operation, and protection in weak grid conditions to address the emerging issues of integrating the high penetration of solar PVs and other IBRs.

14 SOLAR ENERGY↗

Optimization Model and Algorithm for Capacity Planning and Operation of Reliable and Carbon-neutral Power Systems with High Penetration of Renewable Generation

In this work, we propose a Generalized Disjunctive Programming (GDP) model that optimizes both long-term capacity planning (such as the number and size of dispatchable/renewable generators, batteries, and transmission lines) and hourly operation (such as on/off schedules of dispatchable generators, power output from each generator, and power flow) to maximize power system reliability while minimizing total cost and CO2 emissions.

Cho, Seolhee↗

Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) for Transportation Hubs (Final Report)

This report summarizes the work performed under the award number EE0008524. The project develops the Multi-modal Energy-optimal Trip Scheduling in Real-time (METS-R) platform as the next-generation transportation solution based on autonomous electric vehicles (AEV) serving passenger trips from and to urban transportation hubs, to substantially reduce transportation energy consumption. Extensive data collection and analyses were first conducted to understand the demand patterns and energy consumption of hub-based on-road trips. Then, a data-driven framework that consists of an analytical module and a simulation module was proposed. For the analytical module, five planning + operation tools were developed to support the planning and energy-efficient operations of urban AEV services: the charging station planning that robotically allocates charging supplies based on the stationary charging demand distribution; the transit planning and demand adaptive scheduling model that efficiently generates\ candidate transit routes from hubs to other places and dynamically adjusts the transit time table to fit the current demand; the online energy-efficient routing that learns the energy-optimal paths from observations of link-level energy consumption in real-time; the hub-based ridesharing that matches trip requests together with account for the uncertainty of future trip demand and vehicle supply; and finally, the integrated demand prediction and anomaly detection pipeline that leverages the flight/train time table and support other planning/operation tools. To demonstrate the performance of these tools, a scalable high-performance agent-based simulator was built. We divided the urban space into multiple service zones where each zone was considered as an agent for passenger generation and vehicle charging. Two types of AEV agents were coded to model two types of mobility services: AEV taxi and AEV transit. For the AEV taxi, the team implemented the functions of pickup/drop-off passengers, energy-efficient routing, ridesharing, fleet rebalancing, and recharging. For the AEV bus, the team implemented the functions of demand-adaptive route scheduling, passenger boarding, and recharging. A high-performance computing framework was introduced to receive various profiling information (such as link energy updates, vehicle speed) from the simulator instances and communicate the operational commands back to the instances. The numerical experiments show that each of the proposed operational algorithms can reduce energy consumption and improve system efficiency. Furthermore, there exists the need to collectively consider multiple planning + operational strategies as multiple strategies can influence each other in terms of performance impacts. Recommendations for future work related to AEV planning and simulation are discussed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗