Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 199 records · Page 11

Ground facility for large space structures dynamics and control verification

NASA Marshall Space Flight Center has developed a facility in which closed loop control of Large Space Structures (LSS) can be demonstrated and verified. The main objective of the facility is to verify LSS control system techniques so that on-orbit performance can be unsured. The facility consists of an LSS test article or payload which is connected to a 3-axis angular pointing mount assembly that provides control torque commands. The angular pointing mount assembly is attached to a base excitation system which will simulate disturbances most likely to occur for Orbiter and DOD payloads. The control computer contains the calibration software, the reference systems, the alignment procedures, the telemetry software, and the control algorithms. The total system is suspended in such a fashion that the LSS test article has the characteristics common to all LSS.

Waites, Henry↗

Large space structures ground experiment checkout

NASA Marshall Space Flight Center has developed a facility in which closed loop control of Large Space Structures (LSS) can be demonstrated and verified. The main objective of the facility is to verify LSS control system techniques so that on-orbit performance can be ensured. The facility consists of an LSS test article or payload which is connected to a 3-axis angular pointing mount assembly that provides control torque commands. The angular pointing mount assembly is attached to a base excitation system which will simulate disturbances most likely to occur for Orbiter and DOD payloads. The control computer contains the calibration software, the reference systems, the alignment procedures, the telemetry software, and the control algorithms. The total system is suspended in such a fashion that the LSS test article has the characteristics common to all LSS.

Waites, Henry B.↗

Ground facility for Large Space Structures dynamics and control verification

NASA Marshall Space Flight Center has developed a facility in which closed loop control of Large Space Structures (LSS) can be demonstrated and verified. The main objective of the facility is to verify LSS control system techniques so that on-orbit performance can be ensured. The facility consists of an LSS test article or payload which is connected to a 3-axis angular pointing mount assembly that provides control torque commands. The angular pointing mount assembly is attached to a base excitation system which will simulate disturbances most likely to occur for Orbiter and DOD payloads. The control computer contains the calibration software, the reference systems, the alignment procedures, the telemetry software, and the control algorithms. The total system is suspended in such a fashion that the LSS test article has the characteristics common to all LSS.

Waites, Henry↗

Launch and Assembly Reliability Analysis for Mars Human Space Exploration Missions

NASA s long-range goal is focused upon human exploration of Mars. Missions to Mars will require campaigns of multiple launches to assemble Mars Transfer Vehicles in Earth orbit. Launch campaigns are subject to delays, launch vehicles can fail to place their payloads into the required orbit, and spacecraft may fail during the assembly process or while loitering prior to the Trans-Mars Injection (TMI) burn. Additionally, missions to Mars have constrained departure windows lasting approximately sixty days that repeat approximately every two years. Ensuring high reliability of launching and assembling all required elements in time to support the TMI window will be a key enabler to mission success. This paper describes an integrated methodology for analyzing and improving the reliability of the launch and assembly campaign phase. A discrete event simulation involves several pertinent risk factors including, but not limited to: manufacturing completion; transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to TMI. The model accommodates varying numbers of launches, including the potential for spare launches. Having a spare launch capability provides significant improvement to mission success.

Cates, Grant R.↗

MP197HB; First licensed transportation package with canistered high burnup fuel after dry storage - 15580

AREVA TN has recently received the NRC 10 CFR Part 71 transportation license CoC 9302 Revision 7 for the MP197HB transportation package that allows transportation of canistered high burnup fuel assemblies. The Nuclear Horizontal Modular Storage (NUHOMS{sup R}) system canisters containing high burnup PWR and BWR fuel assemblies are now licensed for transportation as a payload in MP197HB after these canisters were in dry storage at the utility ISFSIs. Enhancements have been made to the MP197HB transportation package to improve thermal performance and also provide superior shielding capabilities. Design features of existing AREVA TN transportation packages such as radial fins, thermal shield, neutron resin and optimized gamma and neutron shielding were used to accommodate transportation of high burnup fuel assemblies with heat loads up to 32 kW. The transportation package is designed for exclusive use by rail, truck or marine transport. State-of-the-art analyses methodologies were used to demonstrate compliance with regulatory requirements of 10 CFR 71.55 for the high burnup fuel after dry storage at any ISFSI. Some of the issues addressed in the license application related to the transportation of high burnup fuel included potential degradation of fuel cladding, uncertainty associated with high burnup fuel cladding material properties, and larger radiation and thermal sources due to higher burnups. Bounding conservative assumptions were made where limited test data was available. AREVA TN's licensing approach did not rely on the cladding integrity of high burnup fuel cladding. Instead, the criticality, thermal and shielding analyses were carried out assuming high burnup fuel reconfiguration. With the approval of this transportation package for PWR and BWR canistered high burnup fuel from dry storage at ISFSIs, the utilities can now transport these canisters which are in dry storage at their sites. This is also a major step forward for the canistered fuel that is currently in dry storage at the shutdown plants because they can use this AREVA TN MP197HB transportation package to ship that fuel to any interim storage facility (ISF) or to a repository when they become available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stratosphere Conditions Inactivate Bacterial Endospores from a Mars Spacecraft Assembly Facility

Every spacecraft sent to Mars is allowed to land viable microbial bioburden, including hardy endospore-forming bacteria resistant to environmental extremes. Earth's stratosphere is severely cold, dry, irradiated, and oligotrophic; it can be used as a stand-in location for predicting how stowaway microbes might respond to the Martian surface. We launched E-MIST, a high-altitude NASA balloon payload on 10 October 2015 carrying known quantities of viable Bacillus pumilus SAFR-032 (4.07?×?10(7) spores per sample), a radiation-tolerant strain collected from a spacecraft assembly facility. The payload spent 8?h at ~31?km above sea level, exposing bacterial spores to the stratosphere. We found that within 120 and 240?min, spore viability was significantly reduced by 2 and 4 orders of magnitude, respectively. By 480?min, <0.001% of spores carried to the stratosphere remained viable. Our balloon flight results predict that most terrestrial bacteria would be inactivated within the first sol on Mars if contaminated spacecraft surfaces receive direct sunlight. Unfortunately, an instrument malfunction prevented the acquisition of UV light measurements during our balloon mission. To make up for the absence of radiometer data, we calculated a stratosphere UV model and conducted ground tests with a 271.1?nm UVC light source (0.5 W/m(2)), observing a similarly rapid inactivation rate when using a lower number of contaminants (640 spores per sample). The starting concentration of spores and microconfiguration on hardware surfaces appeared to influence survivability outcomes in both experiments. With the relatively few spores that survived the stratosphere, we performed a resequencing analysis and identified three single nucleotide polymorphisms compared to unexposed controls. It is therefore plausible that bacteria enduring radiation-rich environments (e.g., Earth's upper atmosphere, interplanetary space, or the surface of Mars) may be pushed in evolutionarily consequential directions.

Planetary protection↗

Advanced Manufacturing of the SLS Block 1B Payload Adapter: Engineering Development Unit

The Payload Adapter (PLA) for the Space Launch System Block 1B configuration (SLS B1B) is a structural frustum that interfaces with the Exploration Upper Stage (EUS) and the Universal Stage Adapter (USA) or the cargo fairing at the aft end and interfaces with the primary or co-manifested payload at the forward end. The primary structure is composed of a single piece aluminum forward ring, a segmented aluminum aft ring, eight carbon composite sandwich panels, and composite bonded longitudinal joints. The PLA is designed and fabricated in-house at MSFC. Development and flight article builds are joint efforts between the Materials & Processes Laboratory (EM), the Spacecraft & Vehicle Systems Department (EV), the Space Systems Department (ES), and the Test Laboratory (ET). The large-scale manufacturing efforts associated with this task include the fabrication of pathfinder panels; the fabrication and assembly of a full-scale Manufacturing Demonstration Article (MDA); the fabrication, assembly, and test of an Engineering Demonstration Unit (EDU); the fabrication, assembly, and test of a qualification Article; and the fabrication, assembly, and proof test of subsequent flight articles. The PLA team recently completed assembly of the EDU. The final assembly included the instillation of the co-manifested secondary payload, NEST, and the instillation and tensioning of the Payload Separation System (PSS). This poster will detail the assembly process which includes: (1) composite panel to ring assembly, (2) adhesive bonding for the longitudinal joints, and (3) instillation of the NEST and PSS. The PLA EDU is prepared to undergo modal and static load testing.

Monique Wallace↗

Human Space Flight and Future Major Space Astrophysics Missions: Servicing and Assembly

Some concepts for candidate future "flagship" space observatories approach the payload limits of the largest launch vehicles planned for the next few decades, specifically in the available volume in the vehicle fairing. This indicates that an alternative to autonomous self-deployment similar to that of the James Webb Space Telescope will eventually be required. Moreover, even before this size limit is reached, there will be significant motivation to service, repair, and upgrade in-space missions of all sizes, whether to extend the life of expensive facilities or to replace outworn or obsolete onboard systems as was demonstrated so effectively by the Hubble Space Telescope program. In parallel with these challenges to future major space astronomy missions, the capabilities of in-space robotic systems and the goals for human space flight in the 2020s and 2030s offer opportunities for achieving the most exciting science goals of the early 21st Century. In this paper, we summarize the history of concepts for human operations beyond the immediate vicinity of the Earth, the importance of very large apertures for scientific discovery, and current capabilities and future developments in robot- and astronaut-enabled servicing and assembly.

Hubble Space Telescope↗

A Robotically Assembled and Serviced Science Station for Earth Observations

In this paper we present the overall architecture of a ”Science Station”, a robotically assembled and serviced persistent platform that can host multiple payloads for Earth observations. Recent decadal survey findings motivate the need to have spatial and temporal concurrency in measurements from multiple instruments. We have architected the science station to simultaneously host up to twelve Earth Venture class instruments at a time. These instruments can be replaced by newer instruments periodically to take advantage of evolving science needs and technology capabilities. The Science Station can also concurrently host science, commercial, defense and other national interest payloads. The Science Station may provide a cost-effective paradigm by mitigating some of the risks and costs associated with multiple free-flyers that may otherwise be needed for the various instruments. It leverages emergent and existent technologies in robotic assembly and servicing, lower cost commercial launch vehicles, secondary launch vehicles, and rendezvous and proximity operations. In this paper, we report the findings of a survey we conducted on the desired performance of the Science Station from various instrument hosting perspectives. We report the various trade studies that we conducted to developed a feasible architecture that meets the goals of the Science Station while also meeting the constraints of a space system. We also report the various considerations in the configuration, thermal system, pointing system, overall concept of operations, and the robotic system of the Science Station architecture. The paper then describes a testbed activity we are undertaking to evaluate the supervised autonomy robotics needed for the Science Station as well as to conduct a riskreduction demonstration of the end-to-end robotics behaviors.

Mukherjee, Rudranarayan↗

Targeted self-assembly of functionalized carbon nanotubes on tumors

Provided herein are methods for delivering a molecule in situ to a cell and for treating a cancer via the in situ delivery. The methods comprise contacting or administering to the cell, as two separate components, a morpholino oligonucleotide comprising a targeting moiety followed by a single wall nanotube construct comprising second morpholino oligonucleotides complementary to the first morpholino oligonucleotides and one or both of a therapeutic or diagnostic payload molecule linked to the single wall nanotube construct. Upon self-assembly of a single wall nanotube complex via hybridization of the first morpholino and second complementary morpholino oligonucleotides at the cell, the payload molecule is delivered. Also provided is the two component self-assembly single wall nanotube system and the single wall nanotube construct comprising the second component.

59 BASIC BIOLOGICAL SCIENCES↗

Development of a magnetic acquisition and attitude control system for spinning rocket payloads

An attitude control system capable of pointing the roll principle axis of a spinning payload to within one degree of the magnetic field vector was flown successfully in 1981-82 aboard three Black Brant X payloads and one Terrier Malemute payload, and additional flights with the system have been requested. Using a filtered linear combination of signals provided by a single-axis rate gyro and a two-axis magnetometer, and control actuation from two cold-gas thrusters, the system can be assembled from standard rocket components and fitted to any payload size.

Olney, D. J.↗

Basic space payload fastener

A new basic space fastener has been developed and tested by the GSFC. The purposes of this fastener are to permit assembly and servicing in space by astronauts and/or robots and to facilitate qualification of payloads on Earth prior to launch by saving time and money during the systems integration and component testing and qualification processes. The space fastener is a rework of the basic machine screw such that crossthreading is impossible; it is self-locking and will not work its way out during launch (vibration proof); it will not wear out despite repeated use; it occupies a small foot print which is comparable to its machine screw equivalent, and it provides force and exhibits strength comparable to its machine screw equivalent. Construction is ultra-simple and cost effective and the principle is applicable across the full range of screw sizes ranging from a #10 screw to 2.5 cm (1 in) or more. In this paper, the fastener principles of operation will be discussed along with test results and construction details. The new fastener also has considerable potential in the commercial sector. A few promising applications will be presented.

Vranish, J. M.↗

On-orbit Servicing, Assembly and Manufacturing (OSAM) Near-Term in-Space Developmental Test Persistent Platform: ESPA-Star Based Implementation

Roundtable Session on In-Space Developmental Test: Springboard for Rapid Development. Presentation is a brief description of the On-orbit Servicing Assembly & Manufacturing (OSAM) national initiative & using standard EELV Secondary Payload Adapters (ESPAs) as the core building block to construct an ESPA-Star based implementation for an iSDT persistent platform in space.

Persistent Platform↗

Automated installation of large platform utilities

The capabilities of the assembler in installing nonstructural platform systems were assessed. These systems include electrical power distribution, heat transport, command and data signal transmission, and payload data transmission. The effects of including installation of utilities on the assembly process and on the design, operation, and performance of the assembler were evaluated. In addition, any special requirements on the assembler and/or the platform due to the installation of utilities were identified. The procedure followed was to define a set of candidate utility characteristics and installation requirements, define and design installation concepts, and perform an assessment of impacts on the assembler and its operation.

Vernon, R. M.↗

Assembly, Test and Launch Operations for a Nuclear-enabled NASA Mission: Considerations that are Specific to Use of a Nuclear Payload

For more than five decades, Radioisotope Power Systems (RPS) have played a critical role in the exploration of space, enabling missions of scientific discovery to destinations across the solar system by providing electrical power to explore remote, challenging and extreme environments. In particular, RPS enable deep space missions where increased heliocentric distances reduce the ability of solar power to adequately meet spacecraft and instruments power requirements. Some previous notable missions that were enabled by RPS include Nimbus III, the Apollo Surface Experiments, the Pioneers 10 and 11, the Viking Mars Landers, Galileo, Ulysses, Cassini, New Horizons and Curiosity. The current operating set of missions that are enabled by RPS are Voyagers 1 and 2, Cassini, New Horizons, and Curiosity. The Multi-Mission Radioisotope Thermal Generator (MMRTG) is the current RPS used for missions. An enhanced version of this generator outfitted with higher efficiency thermoelectrics is under development for potential use in the future. Other previously deployed power systems include the Multi-hundred Watt Radisotope Thermo-electric Generator (MHW RTG) and the General Purpose Heat Source Radisotope Thermo-electric Generator (GPHS RTG). The common thread for all of these power systems is that they are fueled with Pu-238. The use of this unique isotope involves additional planning activities and requires specific actions when the devices are delivered to Kennedy Space Center (KSC), launch site, and incorporated into the assembly, test and launch operations (ATLO) process to ensure mission success, met safety and security challenges. It has been forecasted that the use of a nuclear reactor system is on the horizon. This system could be used for either specifically powering S/C propulsion system or for surface power use once the mission arrived at its destina-tion. Since a nuclear-fission-based system has never been handled or integrated into a spacecraft at KSC, this nuclear reactor system would potentially require further challenges that must be accounted for in the ATLO process. This paper will explain ATLO considerations for the recent RTG-enabled launches that have occurred and planned in the near future (Mars 2020 NASA mission). It will also describe where further challenges that need to be met for the placement of a nuclear reactor (either for propulsion or transportation for surface power use) onto a space mission. Specifically, the following topics will be addressed: • Approach for nuclear safety planning for nuclear material use and its transportation to launch site • Planning for security posture for nuclear materials at launch site • Preparation for transportation of the nuclear power system from the fueling/testing location to the launch site • Preparation of documentation and procedures for nuclear material use at launch site • Planning for coordination between power system and space mission groups • Planning for appropriate staffing and scheduling of operations

07 ISOTOPE AND RADIATION SOURCES↗

TRUPACT-III Operations Manual (Rev. 0)

This procedure provides instructions for assembling the following contact-handled (CH) packaging payload: Standard Large Box 2 (SLB2).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRUPACT-III Operations Manual (Rev. 1)

This procedure provides instructions for assembling the following contact-handled (CH) packaging payload: Standard Large Box 2 (SLB2).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TRUPACT-III Operations Manual (Rev. 2)

This procedure provides instructions for assembling the following contact-handled (CH) packaging payload: Standard Large Box 2 (SLB2).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗